Waubonsie Plan Set_09-04-36-03 water distribution for cabins 2009.html

HTML file 33 KB Posted

Attached to
DOM Vulnerability Assessment and Penetration Testing MSOW
Solicitation number
DOMPQB-185-1827-2025
Issued by
Floyd County, Iowa

About this file

This file is a vendor registration login page for the State of Iowa's procurement system, IMPACS (Iowa Manage Procurement and Contract Services), operated through the JAGGAER platform. However, the associated contract opportunity is issued by the Iowa Department of Natural Resources (DNR) for the Waubonsie Water Supply Improvement Project at Waubonsie State Park in Fremont County. The project seeks a qualified engineering consulting firm to design comprehensive improvements to the water distribution system, including replacement of waterlines, pressure reducing valves, and plumbing infrastructure. Key deliverables include facility plans, final designs, drawings, specifications, cost estimates, permit acquisition, and construction administration support. The proposal submission deadline is May 20, 2025, at 4:00 PM Central Time, with no mandatory site visit required. The contract term is 11 months commencing on the date of contract execution. Proposals will be evaluated using a 100-point scoring system: 20 points for cost, 40 points for professional experience and project team qualifications, and 40 points for the work plan and RFP compliance. Respondents scoring below 25 total points will be deemed ineligible for award. Proposals must include three letters of reference from previous clients and be submitted as separate technical and cost proposal files.

The DNR has established a construction budget range of $115,000 to $145,000, with a detailed breakdown including $65,000 for general construction, $10,000 for valve pit work, $25,000 for connections and incidentals, $15,000 for well building plumbing, and $30,000 contingency. The project specifications include a 15SQE10-220 Grundfos Submersible Pump and requires replacement of all plumbing inside the existing well building. The DNR reserves the right to award to the respondent providing the best value and may apply preferences for Iowa-based businesses. The state is open to increasing the construction budget if the evaluation identifies higher costs for recommended improvements. Proposal terms remain firm for 120 days following the submission deadline.

Text of this file

This serves as an invitation to register to become a vendor for the State of Iowa. If you have registered, please login.

Enter your email to Login/Create Account

English English

Looks like you don't have an account yet. Click 'Create Account' to register.

Email

Next

Password

Back

Login

Trouble logging in?

If you have not previously registered, please create an account. Otherwise, login as normal.

Create Account

Please contact IMPACS Support at impacs@iowa.gov or +1 515-823-9083 for assistance.

Please wait while your page is loaded.

Powered by JAGGAER | JAGGAER Service Privacy Policy

Requesting help from server...

Unable to retrieve help from server show entire help text

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .