Water_Quality_Monitoring_PWS_1.pdf
PDF 375 KB Posted
- Solicitation number
- 140R2025Q0066
About this file
This Performance Work Statement (PWS) details a comprehensive ecological monitoring and research project for the Bureau of Reclamation in the Sacramento-San Joaquin Delta and Suisun Bay. The project aims to document and understand the effects of the Central Valley Project (CVP) operations on the region's hydrological, biogeochemical, sediment, and ecological characteristics through extensive data collection.
Key monitoring activities include collecting high-frequency data on hydrodynamics, water quality, phytoplankton species composition, and suspended sediment at multiple stations. The contractor will be responsible for obtaining necessary permits, providing equipment and staffing, conducting biological sample collection and processing, performing data quality control, and leading data analysis and reporting. The contract is for one year, running from October 1, 2025, through September 30, 2026, with a firm-fixed price structure. Deliverables include real-time and discrete data, quarterly data summaries, progress reports, metadata reports, and Tableau data visualizations. The project will utilize various scientific instruments such as acoustic Doppler velocity meters, YSI EXO2 multiparameter sondes, and multi-channel fluorometers to gather comprehensive environmental data.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Continuous Flow and Water Quality Monitoring Network in the Sacramento-San Joaquin Delta and Suisun Bay
1.0 Background
Reclamation operates and maintains the Central Valley Project (CVP) for the purposes of navigation and flood control; fish and wildlife mitigation, protection, restoration, and enhancement; agricultural and municipal and industrial water supply; power generation; and recreation. Reclamation’s mission is to perform these functions in an environmentally and economically responsible manner. To carry out this mission, Reclamation requires accurate and reliable data and information on the hydrodynamic, water quality and biogeochemical properties of the Sacramento-San Joaquin Delta (Delta) and Suisun Bay. Observational environmental data are used for: (i) real-time operation of CVP facilities, (ii) documenting long term status and trend measures of Delta ecosystem responses to hydrologic conditions, CVP operations and habitat restoration actions, and (iii) calibrating and validating hydrodynamic, sediment transport, biogeochemical, and ecological models.
The proposed tasks include high-frequency monitoring for flow, water quality (including chlorophyll, nutrients, and phytoplankton species composition), sediment, as well as biological responses at key locations in the Delta. The physical properties monitored by the fixed-station network are the primary drivers of the habitat conditions and biological responses that management actions are designed for.
For example, nutrient and phytoplankton dynamics are explicitly measured at select stations to improve our understanding of how physical dynamics, water quality, and landscape features shape the base of Delta food webs. These data will provide information about drivers linked to food quantity and quality as well as potential toxin production by harmful algae. Suspended-sediment monitoring provides an understanding of the sediment inputs and internal exchanges between Delta regions, locations of sources and sinks, and provides insight into the underlying cause of turbidity variability in the Delta. Suspended-sediment measurements also gage the availability of suspended sediment for existing tidal wetlands and for proposed large-scale marsh restoration efforts in the Delta.
Combined, these data establish the spatially and temporally rich data set needed for real-time operation of CVP facilities, understanding Delta ecosystem responses to hydrological conditions altered by the CVP, and evaluating restoration actions.
2.0 Purpose and Scope of Work
The scope of this project includes ecological monitoring and research in Sacramento-San Joaquin Delta to better document and understand the effect of CVP operations on hydrological, biogeochemical, sediment, and ecological characteristics of the system. Data collected will include:
• Hydrodynamic data: continuous water level, velocity, and flow (including both discharge and direction) that provides information about transport, mixing processes and water residence times. Hydrodynamic processes directly affect water supply, fish habitat, fish migration, and wetland inundation. The equipment used to collect hydrodynamic data include acoustic Doppler velocity meters and pressure sensors.
• Water-quality data: continuous temperature, specific conductance, and turbidity, all of which drive biological and ecosystem processes. YSI EXO2 multiparameter water quality sondes are used to collect these data. In addition to basic water quality parameters (temperature, specific conductance and turbidity), some stations measure continuous dissolved oxygen, pH, chlorophyll, dissolved organic carbon, and nutrients that impact aquatic biogeochemical processes (e.g. transformation rates, aquatic productivity, zooplankton growth) and are also in turn altered by many of these processes (e.g., photosynthesis, respiration, uptake). Together with hydrodynamic data, these parameters allow us to understand conditions that favor different phytoplankton species, which can determine the health of the food web, and whether conditions create suitable habitat for critical species. These data are collected by adding additional probes to the YSI EXO2 multiparameter sondes with the exception of the nitrate data which are collected using a SUNA V2. Discrete samples for nutrients are chlorophyll concentration also collected for sensor validation and to analyze additional parameters.
• Phytoplankton species composition data include: the collection of discrete samples analyzed for phytoplankton enumeration, in addition to deployment of in situ multiparameter fluorometers that measure phytoplankton species composition at critical locations across the network to evaluate phytoplankton community dynamics that can inform the science and management of both beneficial and harmful algal blooms. Time-series data are collected using a multi-channel fluorometer (bbe Fluoroprobe).
• Sediment data are critical to assess and quantify suspended sediment distribution across the region and availability to existing and planned marsh habitats. Sediment concentration data are needed to transform turbidity data (a measure of water clarity) into suspended sediment concentration, a transportable quantity that can be used to compute suspended sediment fluxes and can be used in numerical models (turbidity cannot be used for either of these purposes).
Suspended-sediment concentration data are typically measured with the D96 sampler, but collection methods determined by field conditions.
For continuous monitoring stations, data are collected at high temporal resolution (every 15 minutes) across a network of stations in the Sacramento-San Joaquin Bay-Delta region. The recipient will provide various modes of data delivery including curated data summaries; interactive dashboards of flow, water quality, biogeochemical conditions and constituent fluxes; real-time posting of in situ field data and timely posting of discrete data to a public repository [e.g., Environmental Data Initiative (EDI), California Data Exchange Center (CDEC)]. These products provide information for evaluation and understanding of ecosystem responses to management actions in the Bay-Delta.
Additionally, the recipient will: obtain the required permitting for monitoring and research activities;
provide the necessary equipment, materials, supplies, and staffing to complete all tasks; conduct biological sample collection and processing (e.g., identification, enumeration); conduct data quality control and assurance, management and open access publishing; and serve as lead or co-lead on data analysis and reporting of results. These activities will be completed in collaboration with Reclamation biologists and natural resource specialists.
3.0 Type of Contract: The Government anticipates award of a Firm-Fixed Priced contract.
4.0 Period of Performance: The anticipated period of performance of the contract will be for one-year, October 1, 2025, through September 30, 2026.
No Option years are included in this contract.
5.0 Administrative Information
5.1 Recognized Holidays:
The Government-recognized holidays are as follows:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veterans Day Memorial Day Thanksgiving Day Juneteenth National Independence Day Christmas Day Independence Day
5.2 Place of Performance:
The work to be performed under this contract shall be performed at the Recipient’s facility and other places appropriate for accomplishing tasks (e.g., meetings, field and laboratory work).
Access to private property may be necessary to complete this PWS. Reclamation will work with private landowners to facilitate access. Under no circumstances should the Recipient access private property without prior approval from the landowner. Additionally, under no circumstances shall the Recipient release the results of the field surveys except to the respective landowner without prior authorization by Reclamation.
All field surveys shall be conducted by qualified professionals. Specific qualifications for professionals conducting these surveys shall be developed in coordination with Reclamation and may include prior professional experience, professional registrations, professional licenses, and permits or certifications issued by the National Marine Fisheries Service (NMFS), the United States Fish and Wildlife Service (USFWS), and/or the California Department of Fish and Wildlife (CDFW).
5.3 Security:
The Recipient shall be responsible for safeguarding all government equipment, information and property provided for Recipient use.
The Recipient shall be responsible for obtaining any rights-of entry and/or permission from Reclamation, State or Local entities and/or private landowners regarding assess to any properties that may be subject to any field visits.
5.4 Contract Key Personnel:
Recipient shall name a project manager and identify other key personnel prior to the commencement of work.
5.5 Contract Travel:
Any travel performed by the Recipient shall be in accordance with the Federal Travel Regulation, 41 CFR 300-304 and Clause WBR 1452.231-80, Contract Reimbursable Travel Costs – Bureau of Reclamation. The Clause can be found under the information of this requirement.
6.0 Deliverables:
The Recipient shall develop an initial project and deliverables schedule no later than one (1) month after contract award that includes monitoring activities and deliverables as described below and in Table C1.
• All deliverables (other than invoices) shall be delivered to the Contracting Officer’s Representative (COR) at Reclamation’s Bay-Delta Office on the specified due dates listed below.
• All electronic deliverables to be posted externally shall be compliant with Section 508 Amendment to the Rehabilitation Act of 1973 (https://section508.gov/content/learn/laws-and-policies).
• All electronic deliverables to be posted and all materials made available to the general public shall meet Reclamation’s Visual Identity Standards (https://www.usbr.gov/vip/IV-p-reports.html).
• All data shall be delivered in a format that is discoverable and useable by end users inside and outside the government, and consistent with Memorandum M-13-13 Open Data Policy – Managing Information as an Asset (https://project-open-data.cio.gov/policy-memo/).
• All draft electronic deliverables shall be developed and submitted using Microsoft (MS) Office programs as applicable (e.g., Word, Excel, PowerPoint, Project, etc.) and all spatial data will be submitted using Environmental Systems Research Institute (ESRI) ArcGIS (Geographic Information System).
• All data management, summaries, and statistical analyses will be developed and submitted using program R (https://www.r-project.org/) and/or Tableau (https://www.tableau.com/tableau-login-hub).
7.0 Government Furnished Property:
Government-Furnished Property will be provided for this contract. Government will furnish certain property, services, utilities, etc.
Title to all property acquired with funds provided under this agreement shall be vested in Reclamation and is subject to the condition that the property shall be used for authorized purposes of the project.
Should the recipient wish to take unrestricted title to any property acquired or to change the use of the facilities or real property so acquired, such transactions shall be governed by Federal Property Management Regulations.
All procurements of property using agreement funds shall be approved in writing by Reclamation prior to the transaction being initiated. The recipient shall not make disposition of any property except as directed in writing by Reclamation.
https://www.r-project.org/ https://www.tableau.com/tableau-login-hub
8.0 Objectives:
Reclamation requires accurate and reliable data and information on the hydrodynamic, water quality, and biogeochemical properties of the Sacramento-San Joaquin Delta (Delta) and Suisun Bay to enable the fulfillment of their mission in an environmentally and economically responsible manner. Specific objectives for this contract are to:
• Collect high-frequency, real time data for hydrodynamics, biogeochemistry, phytoplankton, and suspended sediment at established stations across the Sacramento-San Joaquin Delta.
• Collect discrete data for nitrate, nitrite, ammonium, phosphate, total dissolved nitrogen, chlorophyll a, phaeophytin, phytoplankton enumeration, and suspended sediment.
• Develop and maintain station-specific turbidity – suspended sediment rating curves for selected stations.
• Create data summaries of flow, water quality, and biogeochemical conditions, constituent fluxes, and highlight events of ecological and management interest in quarterly reports, Tableau dashboards, and as requested by Reclamation.
9.0 Tasks:
Field and laboratory work includes the collection and processing of abiotic (i.e., physical environmental conditions) and biological samples. Processing is specific to the type of sample and must meet national and/or state standards or protocols. The Recipient will provide for up to two boats, with boat operators and field staff. The Recipient will provide all equipment and supplies required to measure physical characteristics and collect and process water and biological samples, including but not limited to ADCPs, multiparameter sondes, fluoroprobes, nets for collecting phytoplankton, preservatives, containers, and microscopes.
The Recipient shall perform the following tasks in each year.
Task 1. Fixed Station Network Operation and Maintenance-Tidal flow and Water Quality -- Hydrodynamics Task 1 continues and refines the long-term monitoring network in the Delta. The flow and water quality data supported through this task will be further integrated with data collected by other groups or agencies. The Recipient will collect continuous hydrodynamic and water quality data at the locations specified in Figure A1 and Table B1.
• Hydrodynamic properties to be measured will include gage height, mean velocity, discharge, and tidally filtered discharge (Figure A1; see methods in Turnipseed and Sauer, 2010 and Levesque and Oberg, 2012). Several stations are noted as “vel” in Table B1 to indicate that only sensor velocity and gage height will be reported.
o Pending landowner permissions and final 408/USACE permits, stations may be installed at: Old River near Byron (OH4), Steamboat Slough near Walnut Grove (SSS), Sutter Slough at Courtland (SUT), Shag Slough at Liberty Island near Courtland (SGG), Toe Drain North at Mallard Road near Courtland (TOEn), San Joaquin River below Garwood Bridge at Stockton (SJG), Channel Marker 66/Sacramento Deep Water Ship Channel near Clarksburg (CM66). If permits, or landowner permission are unsuccessful, we may need to continue operations with our existing configurations, delay data collection activities, or consider eliminating some data collection.
• Water-quality properties to be measured will include the following: water temperature, specific conductance, and turbidity.
o 11455338 (CM51) and 11455136 (CM66) – both stations have expanded water quality data collection underway to include water temperature, specific conductance, turbidity, dissolved oxygen concentration, pH, chlorophyll fluorescence (see Figure A2).
Deliverables:
• Real-time 15-minute-inteval data and relevant metadata posted to a publicly available website, complete all data annually by September 30.
• Discrete data posted online to a publicly available website, complete annually by September 30.
Task 2. Fixed Station Network Operation and Maintenance-Biogeochemistry The Recipient will collect continuous water quality and biogeochemical data at the locations specified in Table B1 and all locations identified in Figure A2 except as noted below.
• Water-quality properties will be measured using YSI EXO multiparameter sondes and will include: water temperature, specific conductance, turbidity, pH, dissolved oxygen (DO), chlorophyll fluorescence (fCHL), and fluorescence of dissolved organic matter (fDOM). Continuous nitrate data will be collected using a Seabird SUNA.
• Continuous data related to phytoplankton community composition will be collected using a multichannel fluorometer (e.g., bbe Fluoroprobe) at five stations [Old River at Bacon Island (OBI), Middle River at Middle River (MDM), San Joaquin River at Jersey Point (SJJ), Sacramento River at Toland Landing near Rio Vista (TOL), Suisun Bay at Van Sickle Island near Pittsburg (CONFL); Table B1 and Figure A2]. These measurements provide a means to assess the presence and development of harmful algal blooms (HABs) by providing direct measurements of cyanobacterial biomass as well as beneficial algal blooms such as diatoms.
• In addition to in situ measurements, discrete water samples will be collected every 4-8 weeks at each station to validate and calibrate the instruments, as well as to measure additional parameters. Analyses will include nitrate, nitrite, ammonium, phosphate, total dissolved nitrogen, chlorophyll a, phaeophytin, and phytoplankton enumeration (methods examples in USGS, 2023 and Bouma-Gregson et al., 2023). Discrete water quality validation data and phytoplankton enumeration data will be published online on a publicly available site (e.g., https://www.sciencebase.gov/catalog/item/6254b009d34e21f8276f4339).
Deliverables:
• Real-time 15-minute-inteval data and relevant metadata posted to a publicly available website, complete all data annually by September 30.
• Discrete data posted online to a publicly available website, complete annually by September 30.
https://www.sciencebase.gov/catalog/item/6254b009d34e21f8276f4339
• Up-to-date Tableau data visualization tools, as needed (within 30 days of request by COTR) and annually by September 30.
Task 3. Fixed Station Network Operation and Maintenance-Delta Suspended Sediment At a subset of continuous flow and water quality stations specified in Table B1 and Figure A3, the Recipient will collect concurrent measurements of turbidity and cross-section representative suspended sediment concentration (methods example in Morgan-King et al. link above) and maintain station-specific turbidity – suspended sediment rating curves. These rating curves will be presented in Model Archive Summary reports for each station using standard protocols and methods developed by the US Geological Survey (example: Haught, 2023; USGS ScienceBase data- see Table C2).
website, complete all data annually by September 30.
• Discrete data posted online to a publicly available website, complete annually by September 30.
• List of Sediment Model Archive Summary (MAS) publication links and summary of model updates for all stations provided annually by September 30.
Task 4. Fixed Station Network Operation and Maintenance-Bay Suspended Sediment
At two monitoring stations, Mallard Island and Benicia, (the upstream and downstream ends of Suisun Bay, respectively) specified in Table B1 and Figure A3, the Recipient will collect concurrent measurements of turbidity and suspended sediment concentration (methods example in Morgan-King et al. link above) to develop station-specific turbidity–suspended sediment rating curves. These rating curves will be presented in Model Archive Summary reports for each station using standard protocols and methods developed by the US Geological Survey (example: Haught, 2023; USGS ScienceBase data- see Table C2).
website, complete all data annually by September 30.
• Discrete data posted online to a publicly available website, complete annually by September 30.
• List of Sediment Model Archive Summary (MAS) publication links and summary of model updates for all stations provided annually by September 30.
Task 5. Project Management and Reporting The Recipient will manage this project by providing project oversight and coordination with Reclamation, progress reporting, budget tracking, scheduling, report writing, report review and edits, annual presentations, and review of deliverables for quality. Project management includes preparation and completion of deliverables and planning and coordination of project activities. The project manager will prepare the agenda and chair quarterly coordination meetings with Reclamation and other agency staff.
Within three months of the Period of Performance start date, the Recipient will enter this project’s initial information for each monitoring task into the Delta Science Tracker with input from the Reclamation technical representative. The Recipient will enter pertinent updates annually. The Delta Science Tracker is an online platform to inventory and summarize science activities in the Delta with the intent of improving communication among the Delta science community, promoting opportunities for collaboration, and tracking funding opportunities and expenditures. The Tracker serves as a mechanism for sharing information about scientific activities, highlights opportunities for collaboration, and provides access to related publications and outputs.
• Quarterly Coordination Meetings, Progress Reports, and Financial Reports (provided by October 30; January 31; April 30; and July 31 over the course of the agreement)
• Quarterly curated data summaries of flow, water quality, and biogeochemical conditions, constituent fluxes, and highlighting events of ecological and management interest (provided by October 30; January 31; April 30; and July 31 over the course of the agreement)
• Annual meta data reports for each station (meta data reports include information such as data availability statements, QA/QC reports, summary statistics, etc.) provided by September 30.
• Annually updated Delta Science Tracker entries (by September 30 each year).
Task 6. Tableau databases and visualizations To support Reclamation’s use and analysis of these datasets, the Recipient will coordinate with Reclamation staff to find a means to access combined Tableau datasets (including monitoring data collected under Tasks 1-4 as it becomes publicly available) so that collaborative visualizations may be developed with Reclamation. The Recipient will meet and collaborate with the Reclamation technical representative and other Reclamation staff to develop Tableau visualizations that address Reclamation management and science interests, including, but not limited to, understanding food web dynamics, sediment movement, and responses to management actions.
• Work with Reclamation to develop access to Tableau database resources and maintain access or updates for Reclamation Tableau users.
• Support, as needed, Tableau-focused database updates, training, work time, and discussions on cooperative projects.
See Appendix C, Table C2 for reference list.
10.0 Performance Assessment
The Quality Assurance Surveillance Plan is one evaluation method the government uses to surveillance to determine whether the Recipient meets the standards of performance as defined in the Performance Work Statement.
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)/
PERFORMANCE REQUIREMENTS SUMMARY (PRS)
Performance Requirements Summary
Performance Standard/ Acceptable Quality Level* Method of Surveillance
SOPs and Data Collection Written protocols for fieldwork, laboratory work, and data QA/QC and management
Vessels are maintained for safe and effective use; equipment is maintained and calibrated to meet standards; samples are collected and preserved properly; data are recorded electronically and QA/QCd;
organisms are identified, enumerated, and measured per agreed upon protocols and taxonomic lists
No more than 5% of samples missing or not processed. No more than 5% of organisms misidentified or not identified to the specified taxonomic resolution. All phytoplankton and sediment samples processed with one year of collection.
Send via email to Reclamation COR and project PIs at least one month before start of field and laboratory work; provide any updated SOPs within one month of finalized revisions.
Monitor regular data updates, discuss study plans and issues at regular meetings
Documents and Data Reporting Address all relevant components that are included within Task descriptions.
Includes up to date information that is the best available current science.
Meet requirements of applicable laws, statutes, regulations, standards, and principles and guidelines.
Review of the materials submitted
Schedule and participate in meetings
Meetings, as needed, are scheduled, attended and facilitated
Adequate technical material and facilitation is provided to support the intended purpose of each meeting
Observation at meetings
Observation at meetings, input from attendees
Maintain Tableau data servers, assist Reclamation with analyses, graphics, and interpretation of data using Tableau and other programs (e.g., R)
Reclamation access to current data from monitoring, updated Tableau dashboards within 30 days of request
Provide annotated R scripts used in data management and analysis
Review data, metadata, R scripts, and Tableau dashboards
R-based functions, statistical tests, data figure generation can be re-run demonstrating the reproduction of monitoring results
*Note - Timeliness is required for all tasks within their required timeframes 100% of the time
Appendix A. Station Maps
Figure A1. Flow stations included in Task 1: Hydrodynamics. Stations either measure flow and velocity (vel; pink points) or only velocity (teal points). Station abbreviations can be found in Appendix B, Table B1.
Figure A2. Water quality stations included in Tasks 1-3. Stations measure temperature (temp), specific conductivity (SpC), and turbidity (turb; purple points); all water quality (WQ) consituents (temperature, specific conductivity, turbidity, pH, dissolved oxygen, chlorophyll a, and fluorescent dissolved organic matter; pink points); all water quality and nutrients (Nutr; SUNA nitrate measurements and nutrient sample collection; green points); or all water quality consituents, nutrients, and fluoroprobe measurements (teal points). Station abbreviations can be found in Appendix B, Table B1.
Figure A3. Sedmiment measurement and discrete sample collection stations for Tasks 3-4 in the Bay (pink points) and the Delta (teal points). Station abbreviations can be found in Appendix B, Table B1.
Appendix B. Station locations and description
Table B1. Details of monitoring stations included in this contract. Information includes the full station name, the station abbreviation (Abbr.), the coordinates [Latitude (Lat) and Longitude (Lon), and the data types for hydrology [flow and velocity (vel)], water quality (WQ), and sediment (Sed.). For water quality data, categories indicate whether stations measure temperature (temp), specific conductivity (SpC), and turbidity (turb); all water quality consituents (temperature, specific conductivity, turbidity, pH, dissolved oxygen, chlorophyll a, and fluorescent dissolved organic matter); all water quality and nutrients (Nutr; SUNA nitrate measurements and nutrient sample collection); or all water quality consituents, nutrients, and fluoroprobe measurements. Italicized stations are no longer active, see CM49A in liu of LIB.
Station Name Station Abbr.
Lat Lon Flow data type
WQ data type
Sed.
data type
OLD R A FRANKS TRACT NR
TERMINOUS CA
OSJ 38.07111 -121.579 Flow + vel Delta
SAN JOAQUIN R A
PRISONERS PT NR
TERMINOUS CA
PRI 38.05944 -121.557 Flow + vel Delta
DELTA CROSS CHANNEL NR
WALNUT GROVE
DLC 38.24472 -121.505 Flow + vel All WQ
S MOKELUMNE R A NEW
HOPE BR NR WALNUT
GROVE CA
SMR 38.22556 -121.491 Flow + vel Temp + SpC + Turb
Delta
N MOKELUMNE NR WALNUT
GROVE CA
NMR 38.22333 -121.507 Flow + vel Temp + SpC + Turb
Delta
LITTLE POTATO SLOUGH A
TERMINOUS CA
LPS 38.09639 -121.496 Flow + vel All WQ + Nutr
MOKELUMNE R A ANDRUS
ISLAND NR TERMINOUS CA
MOK 38.10611 -121.571 Flow + vel Delta
THREEMILE SLOUGH NR RIO
VISTA CA
TSL 38.10333 -121.686 Delta
SAN JOAQUIN R BL
GARWOOD BRIDGE A
STOCKTON CA
SJG 37.93556 -121.329 Flow + vel Temp + SpC + Turb
Delta
SAN JOAQUIN R A JERSEY
POINT CA
SJJ 38.05222 -121.688 All WQ + Nutr + Flouroprobe
Delta
SUTTER SLOUGH A
COURTLAND CA
SUT 38.32917 -121.579 Flow + vel
STEAMBOAT SLOUGH NR
WALNUT GROVE CA
SSS 38.28472 -121.587 Flow + vel
SACRAMENTO R AB DELTA
CROSS CHANNEL CA
SDC 38.25778 -121.517 All WQ +
GEORGIANA SLOUGH NR
SACRAMENTO R
GSS 38.23722 -121.518 Flow + vel Temp + SpC + Turb
Delta
SACRAMENTO R BL
GEORGIANA SLOUGH CA
GES 38.23889 -121.522 Temp + SpC + Turb
Lat Lon Flow data type
WQ data type
Sed.
data type
SACRAMENTO R DEEP
WATER SHIP CHANNEL NR
FREEPORT
CM 72 38.47687 -121.584 Flow + vel Temp + SpC
SACRAMENTO R DEEP
WATER SHIP CHANNEL NR
CLARKSBURG
CM 66 38.40444 -121.615 Vel All WQ
TURNER CUT NR HOLT CA TRN 37.9925 -121.454 Flow + vel Delta
TOE DRAIN A MALLARD RD
NR COURTLAND CA
ToeN / ToeS
38.36514 -121.638 Flow + vel All WQ + Nutr
Delta
SACRAMENTO R DEEP
WATER SHIP CHANNEL NR
COURTLAND
CM 62 38.34167 -121.644 Vel All WQ +
SHAG SLOUGH A LIBERTY
ISLAND NR COURTLAND CA
SGG 38.31833 -121.693 Flow + vel All WQ + Nutr
Delta
VICTORIA CANAL NR BYRON
CA
VCU 37.87083 -121.53 Flow + vel Delta
YOLO BYPASS NR
WOODLAND CA
YOLO 38.67778 -121.643 Delta in lieu of LIB -- at point entering Cache Slough Complex
CM
49A
38.23333 -121.675 Flow + vel All WQ + Nutr
Delta
MIDDLE R AT MIDDLE RIVER
CA
MDM 37.94278 -121.533 All WQ + Nutr + Flouroprobe
CACHE SLOUGH A S LIBERTY
ISLAND NR RIO VISTA CA
LIB 38.24222 -121.686 Flow + vel All WQ + Nutr
Delta
SACRAMENTO R DEEP
WATER SHIP CHANNEL
MARKER 51 CA (CM51)
CM 51 38.23739 -121.674 Flow + vel All WQ Delta
MIDDLE R NR HOLT CA HLT 38.00306 -121.511 Flow + vel Delta
CACHE SLOUGH AB RYER
ISLAND FERRY NR RIO VISTA
CA
RYF 38.19396 -121.658 Flow + vel All WQ + Nutr
Delta
OLD R NR DELTA MENDOTA
CANAL CA
ODM 37.81056 -121.541 Delta
GRANT LINE CN NR TRACY
CA
GLC 37.82 -121.545 Delta
OLD RIVER NEAR BYRON CA OH4 37.89111 -121.569 Temp + SpC + Turb
Delta
SACRAMENTO R A RIO VISTA
CA
SRV 38.14904 -121.689 Delta
SACRAMENTO R BL TOLAND
LANDING NR RIO VISTA CA
(CM13)
TOL 38.07781 -121.767 Vel All WQ +
OLD R A BACON ISLAND CA OBI 37.97 -121.571 All WQ +
Lat Lon Flow data type
WQ data type
Sed.
data type
SUISUN BAY A VAN SICKLE
ISLAND NR PITTSBURG CA
CONFL 38.04953 -121.888 All WQ +
HOLLAND CUT NR BETHEL
ISLAND CA
HOL 38.01639 -121.582 Flow + vel Delta
SUISUN BAY A BENICIA
BRIDGE NR BENICIA CA
BEN 38.045 -122.126 Temp + SpC + Turb
Bay
DUTCH SLOUGH BL JERSEY
ISLAND RD A JERSEY ISLAND
DSJ 38.01361 -121.667 Temp + SpC
OLD R A QUIMBY ISLAND NR
BETHEL ISLAND CA
ORQ 38.02722 -121.564 Flow + vel Delta
SUISUN BAY A MALLARD IS
CA
MLD 38.04278 -121.919 Temp + SpC + Turb
Bay
SUISUN BAY A CHANNEL
MARKER 16 NR PORT
CHICAGO CA
M16 38.06553 -122.044
GRIZZLY BAY A SUISUN
SLOUGH NR AVON CA
GRIZ 38.10853 -122.056 All WQ +
FALSE R NR OAKLEY CA FAL 38.05583 -121.667 Flow + vel Delta
MINER SLOUGH NEAR
SACRAMENTO RIVER AND
PROSPECT ISLAND
MIR 38.23556 -121.666 Delta
Appendix C. Additional Information
Table C1. Detailed descriptions of deliverables and deadlines for this agreement.
Deliverable Description Due Date
Time Series Data (Tasks 1-4) Real-time access, complete annually by September 30
Discrete Data (Tasks 1-4) Ongoing, complete annually by September
Quarterly Data Summaries October 30; January 31; April 30; and July 31 over the course of the agreement
Quarterly Progress Reports, Coordination Meetings, Financial Reports
October 30; January 31; April 30; and July 31 over the course of the agreement
Meta Data Reports Annually by September 30 over the course of the agreement
Delta Science Tracker entries Annually by September 30 over the course of the agreement
Data management, summaries, visualizations, and statistical analyses developed using R and/or Tableau
Annually by September 30, or as needed over the course of the agreement
Table C2. Applicable publications and references describing methods used in each task.
Relevant Task Number
Title and Edition
Date
Source
Task 1 Turnipseed, D.P., and Sauer, V.B., 2010, Discharge measurements at gaging stations: U.S. Geological Survey Techniques and Methods book 3, chap. A8, 87 p. (Also available at https://pubs.usgs.gov/tm/tm3-a8/.)
2010 Discharge measurements at gaging stations
Task 1 Levesque, V.A., and Oberg, K.A., 2012, Computing discharge using the index velocity method: U.S.
Geological Survey Techniques and Methods 3–A23, 148 p.
(Also available at https://pubs.usgs.gov/tm/3a23/.)
2012 Techniques and Methods 3– A23: Computing Discharge Using the Index Velocity Method
Task 2 Phytoplankton Species Composition and Abundance in the Sacramento-San Joaquin River Delta: Microscopic Enumeration of USGS Samples, beginning in 2016 (ver. 1.1, December 2023): U.S.
Geological Survey data release, https://doi.org/10.5066/P97ZBP
LH.
2023 Phytoplankton Species Composition and Abundance in the Sacramento-San Joaquin River Delta:
Microscopic Enumeration of USGS Samples, beginning in 2016 (ver. 1.1, December 2023) - ScienceBase-Catalog
Task 2 Example Delta Water Quality Methods for discrete sampling:
Bouma-Gregson, K., O’Donnell, K., Uebner, M.Q., Sturgeon, C.L., Cone, K.M., Jaegge, A.C., Brinkman, J.D., Bergamaschi, B.A., Kraus, T.E.C., 2023, Water quality, nutrient, and phytoplankton data from Franks Tract, Mildred Island, and neighboring channels in the California Sacramento-San Joaquin Delta: 2022 and 2023 High-resolution mapping
2023 Water quality, nutrient, and phytoplankton data from Franks Tract, Mildred Island, and neighboring channels in the California Sacramento- San Joaquin Delta: 2022 and 2023 High-resolution mapping surveys - ScienceBase-Catalog https://pubs.usgs.gov/publication/tm3A8 https://pubs.usgs.gov/publication/tm3A8 https://pubs.usgs.gov/tm/3a23/ https://pubs.usgs.gov/tm/3a23/ https://pubs.usgs.gov/tm/3a23/ https://pubs.usgs.gov/tm/3a23/ https://www.sciencebase.gov/catalog/item/6254b009d34e21f8276f4339 https://www.sciencebase.gov/catalog/item/6254b009d34e21f8276f4339 https://www.sciencebase.gov/catalog/item/6254b009d34e21f8276f4339 https://www.sciencebase.gov/catalog/item/6254b009d34e21f8276f4339 https://www.sciencebase.gov/catalog/item/6254b009d34e21f8276f4339 https://www.sciencebase.gov/catalog/item/6254b009d34e21f8276f4339 https://www.sciencebase.gov/catalog/item/6254b009d34e21f8276f4339 https://www.sciencebase.gov/catalog/item/6254b009d34e21f8276f4339 https://www.sciencebase.gov/catalog/item/64ee7f82d34e4b6d8ab71438 https://www.sciencebase.gov/catalog/item/64ee7f82d34e4b6d8ab71438 https://www.sciencebase.gov/catalog/item/64ee7f82d34e4b6d8ab71438 https://www.sciencebase.gov/catalog/item/64ee7f82d34e4b6d8ab71438 https://www.sciencebase.gov/catalog/item/64ee7f82d34e4b6d8ab71438 https://www.sciencebase.gov/catalog/item/64ee7f82d34e4b6d8ab71438 https://www.sciencebase.gov/catalog/item/64ee7f82d34e4b6d8ab71438 https://www.sciencebase.gov/catalog/item/64ee7f82d34e4b6d8ab71438 https://www.sciencebase.gov/catalog/item/64ee7f82d34e4b6d8ab71438 surveys: U.S. Geological Survey data release, https://doi.org/10.5066/P9TDM
WDH.
Task 3-4 Continuous 15-minute Time-series Suspended-Sediment Concentration Data and Model Summaries at Select Sites in the Sacramento-San Joaquin Delta, California
Continuous 15-minute Time-series Suspended-Sediment Concentration Data and Model Summaries at Select Sites in the Sacramento-San Joaquin Delta, California - ScienceBase-Catalog
Task 3-4 Haught, D.R.W., 2023, Model Archive Summary for Suspended-Sediment Concentration at Station 11185185 – Upper Sensor;
Suisun Bay at Mallard Island, California – Water Years 2018- 2020: U.S. Geological Survey data release, https://doi.org/10.5066/P9LPD3
CN.
2023 Model Archive Summary for Suspended-Sediment Concentration at Station 11185185 – Upper Sensor;
Suisun Bay at Mallard Island, California – Water Years 2018-2020 - ScienceBase- Catalog https://www.sciencebase.gov/catalog/item/5eeca1bb82ce3bd58d8a27a7 https://www.sciencebase.gov/catalog/item/5eeca1bb82ce3bd58d8a27a7 https://www.sciencebase.gov/catalog/item/5eeca1bb82ce3bd58d8a27a7 https://www.sciencebase.gov/catalog/item/5eeca1bb82ce3bd58d8a27a7 https://www.sciencebase.gov/catalog/item/5eeca1bb82ce3bd58d8a27a7 https://www.sciencebase.gov/catalog/item/5eeca1bb82ce3bd58d8a27a7 https://www.sciencebase.gov/catalog/item/5eeca1bb82ce3bd58d8a27a7 https://doi.org/10.5066/P9LPD3CN https://doi.org/10.5066/P9LPD3CN https://www.sciencebase.gov/catalog/item/62e9b436d34e749ac04cc20b https://www.sciencebase.gov/catalog/item/62e9b436d34e749ac04cc20b https://www.sciencebase.gov/catalog/item/62e9b436d34e749ac04cc20b https://www.sciencebase.gov/catalog/item/62e9b436d34e749ac04cc20b https://www.sciencebase.gov/catalog/item/62e9b436d34e749ac04cc20b https://www.sciencebase.gov/catalog/item/62e9b436d34e749ac04cc20b https://www.sciencebase.gov/catalog/item/62e9b436d34e749ac04cc20b https://www.sciencebase.gov/catalog/item/62e9b436d34e749ac04cc20b
File details come from the government source that posted it. Updated .