Summary

This Invitation for Bids (IFB) document issued by the Town of Lincoln Water Department in Lincoln, Massachusetts solicits sealed bids from qualified contractors for renovation work at four separate municipal facility locations. The scope encompasses labor and materials for general structural repairs, exterior envelope maintenance, and door/window replacements across the facilities located at 77 Sandy Pond Road, 80 Sandy Pond Road, Birchwood Lane, and 65 Tower Road. Specific work includes brick room beam repair and reinforcement, roofing replacements, siding and trim repairs, door and window installations, and structural/flooring repairs. A pre-bid walk-through is scheduled for Wednesday, September 16, 2026, at 9:00 AM, beginning at 77 Sandy Pond Road and expected to last approximately two hours. Written questions must be submitted to Richard Nolli, Water Superintendent, by Thursday, September 17, 2026, at 3:00 PM, with responses provided by September 24, 2026. Sealed bid responses are due by Thursday, October 1, 2026, at 12:00 PM, with public opening and reading of bids occurring the same day at the Water Department Office. The contract term extends from the signing date through December 31, 2026, unless extended by mutual written agreement. The Town reserves the right to award some, all, or none of the bid items and to accept or reject any or all bids.

Bidders must submit a five percent bid deposit in the form of a bid bond, cash, or certified check payable to the Town of Lincoln. If selected, contractors must provide a payment bond equal to fifty percent of the contract price within ten days of notification, with premiums included in the contract price. Contractors must demonstrate a minimum of seven years' experience in municipal building renovations, provide at least three references for municipal renovation work within the past five years, possess appropriate licensing, and secure all necessary permits prior to work commencement. Insurance requirements include Workers' Compensation coverage, Employer's Liability with a minimum of $100,000 per accident, and Comprehensive General Liability and Automotive Liability with combined single limits of $1,000,000 per person and per occurrence, with the Town named as an additional insured. Prevailing Wage Rates apply to the project as established by the Massachusetts Department of Labor Standards, effective through December 31, 2026. MBE/WBE firms are strongly encouraged to apply. All work must pass inspection and receive final sign-off from the Building Inspector prior to final payment, and a one-year installation warranty is required.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Town of Lincoln INVITATION FOR BIDS Lincoln Water Department Property Renovations 2026

The Town of Lincoln Water Department is soliciting sealed bids from qualified contractors for renovation work at (4) separate building locations. Contractors shall provide labor and materials for general structural repairs, exterior envelope maintenance, and door/window replacements across four municipal facilities located in Lincoln, MA. Project specifications are listed below. Prevailing Wage Rates apply and are included in the bid specifications. Copies of bid specifications may be picked up at the Lincoln Water Department Office, 77 Sandy Pond Road, Lincoln, MA 01773 Monday through Friday, 7:00 a.m. to 3:00 p.m. They are available for download at the Town’s website:

www.lincolntown.org. They can also be downloaded directly at: https://www.lincolntown.org/Bids.aspx?BidID=156

A pre-bid walk-through of the site will be held on Wednesday, September 16, 2026, at 9:00AM, starting at 77 Sandy Pond Road, Lincoln, MA 01773 and proceeding to the different properties. We expect the walk through to last 2 hours.

Attendance at this walk-through is strongly encouraged to ensure you understand the scope of the work.

Questions about this bid may be submitted via email to Richard Nolli, Water Superintendent, at nollir@lincolnma.gov no later than Thursday, September 17 at 3:00PM. Responses will be made via email no later than Thursday, September 24, 2026.

Sealed Bid responses are due by Thursday, October 1, 2026, at 12:00 pm. Responses can be mailed to: Lincoln Water Department c/o Lincoln Town Offices, 16 Lincoln Road, Lincoln, MA 01773. Bids can also be hand delivered to the Lincoln Water Department, 77 Sandy Pond Road, Lincoln, MA 01773 between 7:00AM and 3PM.

On Thursday, October 1, 2026, at 12:00 pm., bids received will be publicly opened and read at the Water Department Office, 77 Sandy Pond Road, Lincoln, MA 01773.

The Town reserves the right to accept or reject any or all bids if deemed in the Town’s best interest to do so, or to waive any informalities. MBE/WBE firms strongly encouraged to apply. EEO.

- Lincoln Water Dept.

https://www.lincolntown.org/Bids.aspx?BidID=156

Town of Lincoln BID INSTRUCTIONS Lincoln Water Department Property HVAC Improvements 2026

The Town of Lincoln Water Department is soliciting sealed bids from qualified contractors for renovation work at (4) separate building locations. Contractors shall provide labor and materials for general structural repairs, exterior envelope maintenance, and door/window replacements across four municipal facilities located in Lincoln, MA. Project specifications are listed below. Prevailing Wage Rates apply and are included in the bid specifications. Copies of bid specifications may be picked up at the Lincoln Water Department Office, 77 Sandy Pond Road, Lincoln, MA 01773 Monday through Friday, 7:00 a.m. to 3:00 p.m. They are available for download at the Town’s website:

www.lincolntown.org. They can also be downloaded directly at: https://www.lincolntown.org/Bids.aspx?BidID=156

The full Bid specifications are comprised of:

1) Invitation to Bid

2) Bid Instructions

3) Bid Specifications

4) Bid Response Sheet

5) Attachment A - Authorizations

6) Attachment B - Certifications

7) Attachment C – Sample Town of Lincoln Contract

8) Attachment D – Prevailing Wage Rates

A pre-bid walk-through of the site will be held on Wednesday, September 16, 2026, at 9:00AM, starting at 77 Sandy Pond Road, Lincoln, MA 01773 and proceeding to the different properties. We expect the walk through to last 2 hours.

Attendance at this walk-through is strongly encouraged to ensure you understand the scope of the work.

Questions about this bid may be submitted via email to Richard Nolli, Water Superintendent, at nollir@lincolnma.gov no later than Thursday, September 17 at 3:00PM. Responses will be made via email no later than Thursday, September 24, 2026.

Sealed Bid responses are due by Thursday, October 1, 2026 at 12:00 pm. Responses can be mailed to: Lincoln Water Department c/o Lincoln Town Offices, 16 Lincoln Road, Lincoln, MA 01773. Bids can also be hand delivered to the Lincoln Water Department, 77 Sandy Pond Road, Lincoln, MA 01773 between 7:00AM and 3PM.

On Thursday, October 1, 2026 at 12:00 pm., bids received will be publicly opened and read at the Water Department Office, 77 Sandy Pond Road, Lincoln, MA 01773.

The Town will make an award to the lowest responsible and responsive bidder within seven (7) business days of the acceptance of the bids. The lowest bidder will be determined by the total contract price as reported on the Bid Response Sheet.

The Town reserves the right to reject any or all bids if it were in the Town's interest to do so. The Town also reserves the right to waive any informalities.

https://www.lincolntown.org/Bids.aspx?BidID=156

All bids must comply with the following conditions:

1. All bids shall be submitted on the Bid Response Sheet provided in this specification in a sealed envelope clearly marked "Bid – Lincoln Water Department Property Renovations 2026”

2. Bid Deposit - all bids shall be accompanied by a bid deposit in the form of a bid bond, or cash, or a certified check on, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Town of Lincoln. The amount of such bid deposit shall be five percent (5%) of the total value of the bid.

3. Payment Bond – If selected as contractor, the vendor will, within ten days (Saturdays, Sundays and legal holidays excluded), following notification of selection, provide a payment bond, from a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the awarding authority, in the sum of fifty percent of the contract price, the premiums for which are to be paid by the contractor and are included in the contract price.

4. Bid Response Sheet - The bidder shall complete the attached Bid Response Sheet to indicate the price for the Lincoln Water Department Property HVAC Improvements.

5. Contractors must possess all appropriate licensing necessary to obtain required permits as required by 781 CMR.

6. Contractors must be able to provide at least three references for municipal renovation work within the past 5 years.

7. Contractors must be able to enter into a contract with the Town of Lincoln, as detailed in Attachment C –

SAMPLE TOWN OF LINCOLN CONTRACT.

8. Contractors must apply for and receive any necessary permits prior to starting work with the Town of Lincoln.

9. All work must pass inspection and receive final sign off from the Building Inspector prior to final payment.

10. Contractors must have a minimum of seven years' experience in the renovation of municipal buildings as specified in the IFB.

11. Insurance - coverage as specified below shall be taken out in a company or companies authorized to do such business in the Commonwealth of Massachusetts and shall be written for not less than any limits of liability as specified herein below, or required by law, whichever is greater.

a. Worker's Compensation and other benefits as required under Chapter 152 of the General Laws, as amended, and Section 34A of Chapter 149 of the General Laws. Employer's Liability with a limit of at least $100,000 each accident.

b. Comprehensive General Liability and Automotive Liability: General Liability shall include Contractor's Liability, Completed Operations and Products Liability; all on the occurrence basis with Personal Injury Coverage and Broad Form Property Damage. Automotive Liability shall include coverage for owner, non-owned and hired automobiles, where applicable. Combined single limit for Comprehensive General Liability and Automotive Liability: Each Person $1,000,000, Each Occurrence $1,000,000

c. The Town of Lincoln will be named as an additional insured on all policies.

d. Certificates of Insurance shall be submitted to the Town simultaneously with the execution of the

Contract. Certificates shall indicate that Contractual Liability coverage is in force. These Certificates shall contain a provision that the insurance company will notify the Town by registered mail at least thirty days in advance of any cancellation, change or expiration of the policies.

12. The Town will make an award to the lowest responsible and responsive bidder. The responsive bidder will be the one who meets all bid requirements and submits all required information to the Town. The responsible bidder will also be subject to reference checks.

13. All work will be performed in accordance with the relevant section(s) of the Bid Specifications below.

14. This contract shall be in effect from the date of signing and must be completed not later than December 31, 2026, unless otherwise agreed upon by the Town.

15. The Town reserves the right to reassign the contract to another firm should the vendor awarded the contract fail to carry out the contract at any time during the contracting period.

16. Questions regarding this bid may be submitted to Richard Nolli, Water Superintendent, in writing via email (nollir@lincolnma.gov)

17. The Terms and Conditions of the contract are spelled out in this Invitation for Bids, in the Bid Specifications, and in the Bid Response Sheet, all of which will be part of the contract document. The successful bidder will be acknowledged with a letter of award, which will be signed by both parties. This letter will also become part of the contract document.

mailto:nollir@lincolnma.gov

BID SPECIFICATIONS

The winning bidder will provide labor and materials for the renovations at the address listed below as indicated:

Office - 77 Sandy Pond Road

1. Brick Room - Beam Repair & Reinforcement: Sister damaged wood beam in beam pocket using two (2) LVL beams, installed directly from underneath within the storage room.

2. Large Bump-Out: Remove damaged/existing rake boards and install new PVC trim boards along the roofline.

Perform selective siding repairs strictly where visibly damaged or necessary to complete the rake board installation. Construct and install one (1) new exterior access hatch providing entry into the attic space.

3. Small Bump-Out: Remove existing roofing materials as necessary and install new three-tab asphalt roof shingles across the designated roof area. Replace existing boards and install new PVC fascia and PVC rake boards along all roof edges. Remove existing trims and install all-new exterior PVC trim components around the bump-out section. Supply and install new 5" K-style aluminum gutters along with matching downspouts to ensure proper water shedding.

4. Doors and Windows & Masonry: Harvey Windows or equivalent. Style and model window TBD. Included: (1) window in Administrative Assistants Office and (2) windows in Superintendents Office. Complete tear-out and removal of existing window units and related materials as required for installation. Perform rough framing adjustments and opening modifications necessary to fit the new window assembly. Supply and install new windows, including proper pan flashing, weather-resistive barrier integration, and perimeter waterproofing tape. Install new weather-resistant PVC exterior trim surrounding the window opening. Install new interior oak windowsills and primed finger-jointed (PFJ) interior trim casing. Paint all newly installed interior trim, oak sills, and directly adjacent wall repair areas within the immediate work area.

5. Exterior and Interior Doors. Manufacturer, model and style doors TBD. To include (1) Exterior front door, (1) Exterior storm door (1) Interior Door. Labor includes Complete selective demolition of existing door/opening assemblies and perform all structural framing rework required to adjust the rough opening, install new door unit, complete with all interior and exterior trim casing, Patch, repair, or replace damaged existing concrete surfaces immediately surrounding the doorway and construct a sloped concrete or asphalt transition ramp up to the door threshold to ensure smooth entry.

Water Treatment Plant - 80 Sandy Pond Road

1. Siding & Trim: Localized exterior trim and siding replacement with like-kind materials and touch-up stain.

2. Door Hardware: Installation of a new commercial door plunger and removal/reinstallation of the metal sill plate on the chlorine room door.

Birchwood Lane Storage Garage

1. Roofing: Complete tear-off and re-roofing featuring architectural grade shingles, drip edge, and ice/water shield installation. NOTE: Shingles required to match existing buildings within the development.

2. Structural/Flooring: Removal of damaged floor assembly plywood, replacement of the first sill and floor ledger.

3. Localized siding/trim repairs. Includes replacing localized trim to like and painting work area. Includes removal of exterior protrusions and disposal.

4. Side Door Replacement: Manufacturer, model and style door TBD. Labor includes Complete selective demolition of existing door/opening assemblies and perform all structural framing rework required to adjust the rough opening, install new door unit, complete with all interior and exterior trim casing

65 Tower Road

1. Steel Door Replacement: Manufacturer, model and style door TBD. Labor includes Complete selective demolition of existing door/opening assemblies and perform all structural framing rework required to adjust the rough opening, install new door unit, complete with all interior and exterior trim casing

All debris removal to be included in total cost.

All work should include one (1) year installation warranty.

BID RESPONSE SHEET

THIS FORM MUST BE FULLY COMPLETED AND SUBMITTED WITH THE BID FORM FOR GENERAL BID

From: ____________________________________________________________________________________________

(Name of General Bidder)

To: The Town of Lincoln (the Awarding Authority) The Undersigned proposes to furnish all labor and materials required for the project referred to as the Water Department Property Property Renovations 2026 in accordance with the accompanying plans and specifications for the contract price specified below, subject to additions and deductions according to the terms of the specifications.

Cost for supplying materials and installation labor:

1) 77 Sandy Pond Rd Lincoln MA 01773: _____________________________________________________________

2) 80 Sandy Pond Road Lincoln Ma 01773: ____________________________________________________________

3) Birchwood Lane Lincoln Ma 01773: _______________________________________________________________

4) 65 Tower Road Lincoln Ma 01773: _________________________________________________________________

Based on an addition of the above COSTS, the proposed total contract price is: $___________________________ Dollars

The awarding authority reserves the right to award some, all, or none of the bid items, whatever best serves their interests. If contract value is over$50,000, it should be accompanied by a bid deposit with a value of five percent.

If the contact value is over $25,000, the undersigned agrees that, if they is selected as contractor, they will within ten days, Saturdays, Sundays and legal holidays excluded, following notification of selection, provide a payment bond, from a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the awarding authority, in the sum of 50% of the contract price, the premiums for which are to be paid by the contractor and are included in the contract price.

By signing and submitting this Form for General Bid, each bidder represents that in regard to the conditions affecting the work to be done and the labor and materials needed, his general bid is based on his own investigations and his familiarization with the site in conjunction with the plans and specifications and not on any oral or other representations of any employee, officer, agent or consultant of the Awarding Authority.

Date:___________ (Print Name of General Bidder): __________________________________________________

(Signature of General Bidder): ________________________________________________________________________

(Print Name of Person Signing Bid and Title): _____________________________________________________________

(Business Address): _________________________________________________________________________________

Telephone: ( ) _____________________ SSI or Federal Identification Number: ___________________________

ATTACHMENT A - AUTHORIZATIONS

AUTHORIZATION OF SIGNATURE

COMPANY: ________________________________________________________________________________________

ADDRESS: _________________________________________________________________________________________

TELEPHONE NO: ( ) _____________________

AUTHORIZED PARTY FOR PROPOSER MUST SIGN THE FOLLOWING IN INK:

BY: _______________________________________________________________________________________________

(Signature)

PLEASE PRINT NAME AND TITLE OF SIGNER BELOW:

NAME: ____________________________________________________________________________________________

TITLE: _____________________________________________________________________________________________

NAME, SIGNATURE AND COMPANY MUST BE THE SAME ON THE PROPOSAL AND DSB 2005 AS THEY APPEAR ABOVE.

INDICATE WHICH TYPE OF ORGANIZATION BELOW:

INDIVIDUAL: ________ PARTNERSHIP: ________ CORPORATION: __________ OTHER: __________

ATTACHMENT B - CERTIFICATIONS

TAX COMPLIANCE CERTIFICATION

Pursuant to M.G.L. c49A, I certify under penalties of perjury that, to the best of my knowledge and belief, I am in compliance with all laws of the Commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting child support.

NAME: ___________________________________________________________________________________________

TITLE: ____________________________________________________________________________________________

NAME OF BUSINESS: ________________________________________________________________________________

CERTIFICATE OF NON-COLLUSION

The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any person. As used in this certification, the word "person" shall mean any neutral person, business, partnership, corporation, union, committee, club, or other organization, entity, or group of individuals

NAME: ____________________________________________________________________________________________

NAME OF BUSINESS: _________________________________________________________________________________

OSHA TRAINING CERTIFICATION

Pursuant to M.G.L. c30, §39S, I certify under penalties of perjury that, to the best of my knowledge and belief, all employees I will employ on the worksite, or in work subject to this bid, have successfully completed at least ten hours of OSHA-approved training.

NAME: ____________________________________________________________________________________________

LABOR HARMONY CERTIFICATION

Pursuant to M.G.L. c30, §39S, I certify under penalties of perjury that, to the best of my knowledge and belief, all employees I will furnish labor in harmony with all other elements of labor employed in the work under this bid.

NAME: ____________________________________________________________________________________________

TITLE: ____________________________________________________________________________________________

ATTACHMENT C – SAMPLE TOWN CONTRACT

TOWN OF LINCOLN, MASSACHUSETTS AGREEMENT

THIS AGREEMENT made this __________by and between the Town of Lincoln, a municipal corporation duly organized under the laws of Massachusetts and having a usual place of business at 16 Lincoln Road, Lincoln, Massachusetts, hereinafter referred to as the “TOWN”, and ________________________ hereinafter referred to as the “CONTRACTOR”.

WITNESSETH:

WHEREAS, the TOWN invited the submission of proposals for the Water Department Property Renovations, hereinafter “the Project”; and

WHEREAS, the CONTRACTOR submitted a Proposal to perform the work required to complete the Project, and the TOWN has decided to award the contract therefore to the CONTRACTOR.

NOW, THEREFORE, the TOWN and the CONTRACTOR agree as follows:

1. CONTRACT DOCUMENTS. The Contract Documents consist of this Agreement, the Invitation for Bid, and the CONTRACTOR’s bid submission. The Contract Documents constitute the entire Agreement between the parties concerning the work, and all are as fully a part of this Agreement as if attached hereto.

2. THE WORK. The Work consists of delivering the Water Department Property Renovations, as outlined within the Town of Lincoln Invitation to Bid and as further defined in the contractor proposal.

3. TERM OF CONTRACT. This Agreement shall be in effect from date of signing and shall expire on December

31, 2026, unless extended by written agreement of both parties, or unless terminated earlier pursuant to the terms hereof.

4. COMPENSATION. The TOWN shall pay, as full compensation for items and/or services furnished and delivered in carrying out this Agreement. Bid Price is _________________.

5. PAYMENT OF COMPENSATION. The TOWN shall make payments within thirty (30) days after its receipt of

Invoice. Invoices shall be submitted at the end of each key deliverables phase as follows: Invoices will be submitted upon completion of the project.

6. LIABILITY OF THE TOWN. The TOWN’s liability hereunder shall be to make all payments when they shall become due, and the TOWN shall be under no further obligation or liability. Nothing in this Agreement shall be construed to render the TOWN or any elected or appointed official or employee of the TOWN, or their successors in office, personally liable for any obligation under this Agreement.

7. INDEPENDENT CONTRACTOR. The CONTRACTOR acknowledges and agrees that it is acting as an independent CONTRACTOR for all work and services rendered pursuant to this Agreement and shall not be considered an employee or agent of the TOWN for any purpose.

8. INDEMNIFICATION. The CONTRACTOR shall indemnify, defend, and hold the TOWN harmless from and against any and all claims, demands, liabilities, actions, causes of actions, costs and expenses, including attorney’s fees, arising out of the CONTRACTOR's breach of this Agreement or the negligence or misconduct of the CONTRACTOR, or the CONTRACTOR's agents or employees.

9. INSURANCE.

a. The CONTRACTOR shall obtain and maintain during the term of this Agreement the insurance coverage in companies licensed to do business in the Commonwealth of Massachusetts, and acceptable to the TOWN, as outlined in the Specification for Goods and Services.

b. All policies shall identify the TOWN as an additional insured (except Workers' Compensation) and shall provide that the TOWN shall receive written notification at least 30 days prior to the effective date of any amendment or cancellation. Certificates evidencing all such coverages shall be provided to the TOWN upon the execution of this Agreement. Each such certificate shall specifically refer to this Agreement and shall state that such insurance is as required by this Agreement. Failure to provide or to continue in force such insurance shall be deemed a material breach of this Agreement and shall be grounds for immediate termination.

10. ASSIGNMENT. The CONTRACTOR shall not assign, sublet, or otherwise transfer this Agreement, in whole or in part, without the prior written consent of the TOWN, and shall not assign any of the moneys payable under this Agreement, except by and with the written consent of the TOWN.

11. TERMINATION.

a. Termination for Cause. If at any time during the term of this Agreement the TOWN determines that the CONTRACTOR has breached the terms of this Agreement by negligently or incompetently performing the work, or any part thereof, or by failing to perform the work in a timely fashion, or by failing to perform the work to the satisfaction of the TOWN, or by not complying with the direction of the TOWN or its agents, or by otherwise failing to perform this Agreement in accordance with all of its terms and provisions, the TOWN shall notify the CONTRACTOR in writing stating therein the nature of the alleged breach and directing the CONTRACTOR to cure such breach within ten (10) days. The CONTRACTOR specifically agrees that it shall indemnify and hold the TOWN harmless from any loss, damage, cost, charge, expense or claim arising out of our resulting from such breach regardless of its knowledge or authorization of the actions resulting in the breach. If the CONTRACTOR fails to cure said breach within ten (10) days, the TOWN may, at its election at any time after the expiration of said ten (10) days, terminate this Agreement by giving written notice thereof to the CONTRACTOR specifying the effective date of the termination. Upon receipt of said notice, the CONTRACTOR shall cease to incur additional expenses in connection with this Agreement. Upon the date specified in said notice, this Agreement shall terminate. Such termination shall not prejudice or waive any rights or action which the TOWN may have against the CONTRACTOR up to the date of such termination, and the CONTRACTOR shall be liable to the TOWN for any amount which it may be required to pay in excess of the compensation provided herein in order to complete the work specified herein in a timely manner. Upon such termination, the CONTRACTOR shall be entitled to compensation for all satisfactory work completed prior to the termination date, as determined by the TOWN.

b. Termination for Convenience. The TOWN may terminate this Agreement at any time for convenience by providing the CONTRACTOR written notice specifying therein the termination date which shall not be sooner than ten days from the issuance of said notice. Upon receipt of said notice, the CONTRACTOR shall cease to incur additional expenses in connection with this Agreement. Upon such termination, the CONTRACTOR shall be entitled to compensation for all satisfactory work completed prior to the termination date, as determined by the TOWN, such payment not to exceed the fair value of the services provided hereunder.

12. INSPECTION AND REPORTS. The TOWN shall have the right at any time to inspect the work of the CONTRACTOR, including the right to enter upon any property owned or occupied by CONTRACTOR, whether situated within or beyond the limits of the TOWN. Whenever requested, CONTRACTOR shall immediately furnish to the TOWN full and complete written reports of his operation under this Contract in such detail and with such information as the TOWN may request.

13. SUCCESSOR AND ASSIGNS. This Agreement is binding upon the parties hereto, their successors, assigns and legal representatives. Neither the TOWN nor the CONTRACTOR shall assign or transfer any interest in the Agreement without the written consent of the other.

14. COMPLIANCE WITH LAWS. The CONTRACTOR shall comply with all Federal, State, and local laws, rules, regulations and orders applicable to the work provided pursuant to this Agreement, such provisions being incorporated herein by reference, and shall be responsible for obtaining all necessary licenses, permits, and approvals required for the performance of such work.

15. NOTICE. Any and all notices, or other communications required or permitted under this Agreement, shall be in writing and delivered by hand or mailed postage prepaid, return receipt requested, by registered or certified mail or by other reputable delivery service, to the parties at the addresses set forth on Page 1 or furnished from time to time in writing hereafter by one party to the other party. Any such notice or correspondence shall be deemed given when so delivered by hand, if so mailed, when deposited with the U.S. Postal Service or, if sent by private overnight or other delivery service, when deposited with such delivery service.

16. SEVERABILITY. If any term or condition of this Agreement or any application thereof shall to any extent be held invalid, illegal, or unenforceable by the court of competent jurisdiction, the validity, legality, and enforceability of the remaining terms and conditions of this Agreement shall not be deemed affected thereby unless one or both parties would be substantially or materially prejudiced.

17. GOVERNING LAW. This Agreement shall be governed by, construed, and enforced in accordance with the laws of the Commonwealth of Massachusetts and the CONTRACTOR submits to the jurisdiction of any of its appropriate courts for the adjudication of disputes arising out of this Agreement.

18. ENTIRE AGREEMENT. This Agreement, including all documents incorporated herein by reference, constitutes the entire integrated agreement between the parties with respect to the matters described. This Agreement supersedes all prior agreements, negotiations, and representations, either written or oral, and it shall not be modified or amended except by a written document executed by the parties hereto.

IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and year first above written.

I certify that an appropriation TOWN OF LINCOLN, MA is available in the amount of this Contract.

Town Accountant Asst. Town Administrator

CONTRACTOR:

(Signature)

(Name and Title)

ATTACHMENT D – PREVAILING WAGE RATES

THE COMMONWEALTH OF MASSACHUSETTS

EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT

DEPARTMENT OF LABOR STANDARDS

Prevailing Wage Rates

MAURA HEALEY

Governor

KIM DRISCOLL

Lt. Governor

As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H

LAUREN JONES

Secretary

MICHAEL FLANAGAN

Director

Awarding Authority: Lincoln - Water Department City/Town: LINCOLN

Wage Request No: 20260824160038 Job Location: 77 Sandy Pond Road, Lincoln, MA 01773

Description of Work: Labor and materials for general structural repairs, exterior envelope service and door/window replacements across 4 municipal facilities.

Contract Number: 20260902-1

§§ 26-27D Construction Project

This Prevailing Wage Schedule establishes the minimum wage rates that employees on this public works construction project must be paid. The project’s Wage Request Number is listed above and on all pages of this Schedule. This schedule applies only to this specific project.

Awarding Authority Responsibilities Contractor Responsibilities

You must include this Prevailing Wage Schedule (PWS) or an appropriate reference to it in all advertisements and calls for bids.

The PWS must be incorporated in its entirety into all contracts for this project (G.L. c. 149, § 27).

The wage rates on this PWS will remain in effect for the duration of the project. Exception: You must request an updated schedule for any multi-year construction project no later than 2 weeks before the project’s yearly anniversary date.

For CM AT RISK projects, the anniversary date is the earlier of the signing date of: (a) the GMP Amendment; or (b) the first amendment to permit procurement of construction services.

For all other construction projects, the anniversary date is the date the contract was signed by the Awarding Authority and the General

Contractor.

You must also request an updated PWS if you have not opened bids or selected a contractor within 90 days of the date of issuance on this PWS.

For CM AT RISK projects, the earlier of (a) the signing date of the

GMP Amendment; or (b) the bid for the first construction scope of work must be within 90 days of the date of issuance on this Schedule.

You must provide any updated PWS to all contractors working on the project, including general and sub-contractors.

You must keep the contractors’ weekly certified payroll records and

Statements of Compliance on file for 3 years.

Awarding authorities have other prevailing wage responsibilities not listed above. Learn more at: [Prevailing wage: for awarding authorities |

Mass.gov] and G.L. c. 149, §§ 26-27D.

You must pay all employees who perform construction work on this project at least the wage rate listed on this PWS. Warning! If you do not follow this requirement, you can face civil fines, criminal charges, or private lawsuits.

You must post this PWS at the worksite where it can be easily seen. (G.L.

c. 149, § 27)

You must file weekly payroll reports and a Statement of Compliance with the awarding authority (not DLS). You can file payroll reports by mail or email and must keep them on file for 3 years. Each weekly payroll report must include each employees’ name, address, occupational classification(s), hours worked, and wages paid. Find a sample report at:

mass.gov/dols/pw.

You cannot pay any employees at the apprentice rates listed on this PWS unless they are registered with the Massachusetts Division of Apprentice

Standards (DAS). Qualifying apprentices must be paid at the applicable step rate and must carry their apprentice ID card during all work hours on the project. Apprentices not registered with DAS must be paid at the listed journeyworker’s rate, even if they are registered with a different federal/state public agency or private entity. For every week in which apprentice rates are paid, a copy of each apprentice's apprentice ID card issued by DAS shall be attached to the certified payroll records.

If you don’t know what classification or rate applies to the work being performed, you must ask DLS; paying the wrong rate subjects you to enforcement.

Please contact DLS if you have any questions about the Prevailing Wage

Schedule: (617) 626-6953 or DLS.Feedback@mass.gov

Employees who are not paid the wage listed on the Prevailing Wage Schedule (PWS) may file a complaint with the Attorney General’s Fair Labor Division: www.mass.gov/ago/fld; (617) 727-3465.

Page 1 of 31Wage Request Number: 20260824160038Issue Date: 08/24/2026 https://www.mass.gov/info-details/prevailing-wage-for-awarding-authorities https://www.mass.gov/info-details/prevailing-wage-for-awarding-authorities mailto:DLS.Feedback@mass.gov https://www.mass.gov/ago/fld

Construction

Classification Effective Date Base Wage Health Pension Annuity Supplemental

Unemployment Total Rate

6/1/2026 $41.95 $16.17 $21.78 $0.00 $0.00 $79.90

12/1/2026 $41.95 $16.17 $23.52 $0.00 $0.00 $81.64

(2 AXLE) DRIVER - EQUIPMENT

TEAMSTERS JOINT COUNCIL NO. 10

TEAMSTERS JOINT COUNCIL NO. 10 ZONE B

1/1/2027 $41.95 $16.77 $23.52 $0.00 $0.00 $82.24

6/1/2026 $42.02 $16.17 $21.78 $0.00 $0.00 $79.97

12/1/2026 $42.02 $16.17 $23.52 $0.00 $0.00 $81.71

(3 AXLE) DRIVER - EQUIPMENT

TEAMSTERS JOINT COUNCIL NO. 10

TEAMSTERS JOINT COUNCIL NO. 10 ZONE B

1/1/2027 $42.02 $16.77 $23.52 $0.00 $0.00 $82.31

6/1/2026 $42.14 $16.17 $21.78 $0.00 $0.00 $80.09

12/1/2026 $42.14 $16.17 $23.52 $0.00 $0.00 $81.83

(4 & 5 AXLE) DRIVER - EQUIPMENT

TEAMSTERS JOINT COUNCIL NO. 10

TEAMSTERS JOINT COUNCIL NO. 10 ZONE B

1/1/2027 $42.14 $16.77 $23.52 $0.00 $0.00 $82.43

ADS/SUBMERSIBLE PILOT

PILE DRIVER LOCAL 56

PILE DRIVER LOCAL 56 (ZONE 1)

1/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53

For apprentice rates see "Apprentice- PILE DRIVER"

6/1/2026 $42.41 $10.90 $9.75 $9.11 $0.00 $72.17

12/1/2026 $43.85 $10.90 $9.75 $9.11 $0.00 $73.61

6/1/2027 $45.30 $10.90 $9.75 $9.11 $0.00 $75.06

12/1/2027 $46.75 $10.90 $9.75 $9.11 $0.00 $76.51

6/1/2028 $48.25 $10.90 $9.75 $9.11 $0.00 $78.01

AIR TRACK OPERATOR

LABORERS

LABORERS - ZONE 2

12/1/2028 $49.75 $10.90 $9.75 $9.11 $0.00 $79.51

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $42.41 $10.90 $9.75 $9.21 $0.00 $72.27AIR TRACK OPERATOR (HEAVY & HIGHWAY)

LABORERS

LABORERS - ZONE 2 (HEAVY & HIGHWAY)

12/1/2026 $43.85 $10.90 $9.75 $9.21 $0.00 $73.71

For apprentice rates see "Apprentice- LABORER (Heavy and Highway)

ASBESTOS REMOVER - PIPE / MECH. EQUIPT.

HEAT & FROST INSULATORS LOCAL 6

HEAT & FROST INSULATORS LOCAL 6 (BOSTON)

12/1/2025 $44.80 $14.50 $4.30 $6.75 $0.00 $70.35

6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67

12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11

6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56

12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01

6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51

ASPHALT RAKER

LABORERS

LABORERS - ZONE 2

12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $41.91 $10.90 $9.75 $9.21 $0.00 $71.77ASPHALT RAKER (HEAVY & HIGHWAY)

LABORERS

LABORERS - ZONE 2 (HEAVY & HIGHWAY)

12/1/2026 $43.35 $10.90 $9.75 $9.21 $0.00 $73.21

For apprentice rates see "Apprentice- LABORER (Heavy and Highway)

6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE

OPERATING ENGINEERS LOCAL 4

OPERATING ENGINEERS LOCAL 4

12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48

For apprentice rates see "Apprentice- OPERATING ENGINEERS"

Page 2 of 31Wage Request Number: 20260824160038Issue Date: 08/24/2026

Supplemental

Unemployment Total Rate

6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03BACKHOE/FRONT-END LOADER

OPERATING ENGINEERS LOCAL 4

OPERATING ENGINEERS LOCAL 4

12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48

For apprentice rates see "Apprentice- OPERATING ENGINEERS"

6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67

12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11

6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56

12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01

6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51

BARCO-TYPE JUMPING TAMPER

LABORERS

LABORERS - ZONE 2

12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $42.41 $10.90 $9.75 $9.11 $0.00 $72.17

12/1/2026 $43.85 $10.90 $9.75 $9.11 $0.00 $73.61

6/1/2027 $45.30 $10.90 $9.75 $9.11 $0.00 $75.06

12/1/2027 $46.75 $10.90 $9.75 $9.11 $0.00 $76.51

6/1/2028 $48.25 $10.90 $9.75 $9.11 $0.00 $78.01

BLOCK PAVER, RAMMER / CURB SETTER

LABORERS

LABORERS - ZONE 2

12/1/2028 $49.75 $10.90 $9.75 $9.11 $0.00 $79.51

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $42.41 $10.90 $9.75 $9.21 $0.00 $72.27BLOCK PAVER, RAMMER / CURB SETTER (HEAVY &

HIGHWAY)

LABORERS

LABORERS - ZONE 2 (HEAVY & HIGHWAY)

12/1/2026 $43.85 $10.90 $9.75 $9.21 $0.00 $73.71

For apprentice rates see "Apprentice- LABORER (Heavy and Highway)

BOILER MAKER

BOILERMAKERS LOCAL 29

BOILERMAKERS LOCAL 29

1/1/2024 $48.12 $7.07 $14.60 $6.00 $0.00 $75.79

8/1/2026 $70.15 $12.84 $15.57 $8.02 $0.00 $106.58BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY

WATERPROOFING)

BRICKLAYERS LOCAL 3

BRICKLAYERS LOCAL 3 (WALTHAM)

2/1/2027 $71.55 $12.84 $15.57 $8.02 $0.00 $107.98

Apprentice: BOILER MAKER

Effective Date: 1/1/2024

Step Percent Apprentice Base Wage Health Pension Annuity

Supplemental Unemployment

Total Rate

1 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57

2 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57

3 70.00 $33.68 $7.07 $10.03 $4.20 $0.00 $54.98

4 75.00 $36.09 $7.07 $10.74 $4.50 $0.00 $58.40

5 80.00 $38.50 $7.07 $11.45 $4.80 $0.00 $61.82

6 85.00 $40.90 $7.07 $12.18 $5.10 $0.00 $65.25

7 90.00 $43.31 $7.07 $12.88 $5.40 $0.00 $68.66

8 95.00 $45.71 $7.07 $13.62 $5.70 $0.00 $72.10

Apprentice to Journeyworker Ratio: 1:4

Page 3 of 31Wage Request Number: 20260824160038Issue Date: 08/24/2026

Supplemental

Unemployment Total Rate

6/1/2026 $58.70 $17.05 $13.35 $3.25 $0.00 $92.35BULLDOZER/GRADER/SCRAPER

OPERATING ENGINEERS LOCAL 4

OPERATING ENGINEERS LOCAL 4

12/1/2026 $60.14 $17.05 $13.35 $3.25 $0.00 $93.79

For apprentice rates see "Apprentice- OPERATING ENGINEERS"

6/1/2026 $50.40 $10.90 $9.75 $9.80 $0.00 $80.85CAISSON & UNDERPINNING BOTTOM MAN

LABORERS

LABORERS - FOUNDATION AND MARINE

12/1/2026 $51.90 $10.90 $9.75 $9.80 $0.00 $82.35

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $49.25 $10.90 $9.75 $9.80 $0.00 $79.70CAISSON & UNDERPINNING LABORER

LABORERS

LABORERS - FOUNDATION AND MARINE

12/1/2026 $50.75 $10.90 $9.75 $9.80 $0.00 $81.20

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $49.58 $10.90 $9.75 $9.80 $0.00 $80.03CAISSON & UNDERPINNING TOP MAN

LABORERS

LABORERS - FOUNDATION AND MARINE

12/1/2026 $51.08 $10.90 $9.75 $9.80 $0.00 $81.53

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67

12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11

6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56

12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01

6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51

CARBIDE CORE DRILL OPERATOR

LABORERS

LABORERS - ZONE 2

12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01

For apprentice rates see "Apprentice- LABORER"

Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)

Effective Date: 8/1/2026

Step Percent Apprentice Base Wage Health Pension Annuity

Supplemental Unemployment

Total Rate

1 50.00 $35.08 $12.84 $15.57 $8.02 $0.00 $71.51

2 60.00 $42.09 $12.84 $15.57 $8.02 $0.00 $78.52

3 70.00 $49.11 $12.84 $15.57 $8.02 $0.00 $85.54

4 80.00 $56.12 $12.84 $15.57 $8.02 $0.00 $92.55

5 90.00 $63.14 $12.84 $15.57 $8.02 $0.00 $99.57

Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)

Effective Date: 2/1/2027

Step Percent Apprentice Base Wage Health Pension Annuity

Supplemental Unemployment

Total Rate

1 50.00 $35.78 $12.84 $15.57 $8.02 $0.00 $72.21

2 60.00 $42.93 $12.84 $15.57 $8.02 $0.00 $79.36

3 70.00 $50.09 $12.84 $15.57 $8.02 $0.00 $86.52

4 80.00 $57.24 $12.84 $15.57 $8.02 $0.00 $93.67

5 90.00 $64.40 $12.84 $15.57 $8.02 $0.00 $100.83

Apprentice to Journeyworker Ratio: 1:5

Page 4 of 31Wage Request Number: 20260824160038Issue Date: 08/24/2026

Supplemental

Unemployment Total Rate

3/1/2026 $50.85 $11.08 $11.47 $8.50 $0.00 $81.90

9/1/2026 $52.10 $11.08 $11.47 $8.50 $0.00 $83.15

CARPENTER

CARPENTERS

CARPENTERS -ZONE 2 (Eastern Massachusetts) 3/1/2027 $53.35 $11.08 $11.47 $8.50 $0.00 $84.40

10/1/2025 $27.37 $7.38 $4.47 $1.00 $0.00 $40.22CARPENTER WOOD FRAME

CARPENTERS

CARPENTERS-ZONE 3 (Wood Frame) 10/1/2026 $28.47 $7.38 $4.47 $1.00 $0.00 $41.32

All Aspects of New Wood Frame Work

Apprentice: CARPENTER

Effective Date: 3/1/2026

Step Percent Apprentice Base Wage Health Pension Annuity

Supplemental Unemployment

Total Rate

1 45.00 $22.88 $11.08 $0.00 $1.73 $0.00 $35.69

2 45.00 $22.88 $11.08 $0.00 $1.73 $0.00 $35.69

3 55.00 $27.97 $11.08 $0.00 $3.40 $0.00 $42.45

4 55.00 $27.97 $11.08 $0.00 $3.40 $0.00 $42.45

5 70.00 $35.60 $11.08 $11.41 $5.10 $0.00 $63.19

6 70.00 $35.60 $11.08 $11.41 $5.10 $0.00 $63.19

7 80.00 $40.68 $11.08 $11.44 $6.80 $0.00 $70.00

8 80.00 $40.68 $11.08 $11.44 $6.80 $0.00 $70.00

Apprentice: CARPENTER

Effective Date: 9/1/2026

Step Percent Apprentice Base Wage Health Pension Annuity

Supplemental Unemployment

Total Rate

1 45.00 $23.45 $11.08 $0.00 $1.73 $0.00 $36.26

2 45.00 $23.45 $11.08 $0.00 $1.73 $0.00 $36.26

3 55.00 $28.66 $11.08 $0.00 $3.40 $0.00 $43.14

4 55.00 $28.66 $11.08 $0.00 $3.40 $0.00 $43.14

5 70.00 $36.47 $11.08 $11.41 $5.10 $0.00 $64.06

6 70.00 $36.47 $11.08 $11.41 $5.10 $0.00 $64.06

7 80.00 $41.68 $11.08 $11.44 $6.80 $0.00 $71.00

8 80.00 $41.68 $11.08 $11.44 $6.80 $0.00 $71.00

Apprentice to Journeyworker Ratio: 1:5

Apprentice: CARPENTER WOOD FRAME

Effective Date: 10/1/2025

Step Percent Apprentice Base Wage Health Pension Annuity

Supplemental Unemployment

Total Rate

1 60.00 $16.42 $7.38 $0.00 $0.00 $0.00 $23.80

2 60.00 $16.42 $7.38 $0.00 $0.00 $0.00 $23.80

3 65.00 $17.79 $7.38 $0.00 $1.00 $0.00 $26.17

4 70.00 $19.16 $7.38 $0.00 $1.00 $0.00 $27.54

5 75.00 $20.53 $7.38 $3.80 $1.00 $0.00 $32.71

6 80.00 $21.90 $7.38 $3.80 $1.00 $0.00 $34.08

Page 5 of 31Wage Request Number: 20260824160038Issue Date: 08/24/2026

Supplemental

Unemployment Total Rate

7/1/2026 $54.49 $13.35 $16.43 $7.78 $1.80 $93.85

1/1/2027 $55.94 $13.35 $16.43 $7.78 $1.80 $95.30

7/1/2027 $57.29 $13.35 $16.43 $7.78 $1.80 $96.65

CEMENT MASONRY/PLASTERING

PLASTERERS AND CEMENT MASONS LOCAL 534

Plasterers and Cement Masons - Zone 1

1/1/2028 $58.64 $13.35 $16.43 $7.78 $1.80 $98.00

Apprentice: CARPENTER WOOD FRAME

Effective Date: 10/1/2025

Step Percent Apprentice Base Wage Health Pension Annuity

Supplemental Unemployment

Total Rate

7 85.00 $23.26 $7.38 $3.80 $1.00 $0.00 $35.44

8 90.00 $24.63 $7.38 $3.80 $1.00 $0.00 $36.81

Apprentice: CARPENTER WOOD FRAME

Effective Date: 10/1/2026

Step Percent Apprentice Base Wage Health Pension Annuity

Supplemental Unemployment

Total Rate

1 60.00 $17.08 $7.38 $0.00 $0.00 $0.00 $24.46

2 60.00 $17.08 $7.38 $0.00 $0.00 $0.00 $24.46

3 65.00 $18.51 $7.38 $0.00 $1.00 $0.00 $26.89

4 70.00 $19.93 $7.38 $0.00 $1.00 $0.00 $28.31

5 75.00 $21.35 $7.38 $3.80 $1.00 $0.00 $33.53

6 80.00 $22.78 $7.38 $3.80 $1.00 $0.00 $34.96

7 85.00 $24.20 $7.38 $3.80 $1.00 $0.00 $36.38

8 90.00 $25.62 $7.38 $3.80 $1.00 $0.00 $37.80

Apprentice to Journeyworker Ratio: 1:5

Apprentice: CEMENT MASONRY/PLASTERING

Effective Date: 7/1/2026

Step Percent Apprentice Base Wage Health Pension Annuity

Supplemental Unemployment

Total Rate

1 50.00 $27.25 $13.35 $16.43 $0.00 $0.00 $57.03

2 60.00 $32.69 $13.35 $16.43 $7.78 $1.80 $72.05

3 65.00 $35.42 $13.35 $16.43 $7.78 $1.80 $74.78

4 70.00 $38.14 $13.35 $16.43 $7.78 $1.80 $77.50

5 75.00 $40.87 $13.35 $16.43 $7.78 $1.80 $80.23

6 80.00 $43.59 $13.35 $16.43 $7.78 $1.80 $82.95

7 90.00 $49.04 $13.35 $0.00 $7.78 $0.00 $70.17

Apprentice: CEMENT MASONRY/PLASTERING

Effective Date: 1/1/2027

Step Percent Apprentice Base Wage Health Pension Annuity

Supplemental Unemployment

Total Rate

1 50.00 $27.97 $13.35 $16.43 $0.00 $0.00 $57.75

2 60.00 $33.56 $13.35 $16.43 $7.78 $1.80 $72.92

Page 6 of 31Wage Request Number: 20260824160038Issue Date: 08/24/2026

Supplemental

Unemployment Total Rate

6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67

12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11

6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56

12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01

6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51

CHAIN SAW OPERATOR

LABORERS

LABORERS - ZONE 2

12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $60.61 $17.05 $13.35 $3.25 $0.00 $94.26CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES

OPERATING ENGINEERS LOCAL 4

OPERATING ENGINEERS LOCAL 4

12/1/2026 $62.09 $17.05 $13.35 $3.25 $0.00 $95.74

For apprentice rates see "Apprentice- OPERATING ENGINEERS"

6/1/2026 $37.63 $17.05 $13.35 $3.25 $0.00 $71.28COMPRESSOR OPERATOR

OPERATING ENGINEERS LOCAL 4

OPERATING ENGINEERS LOCAL 4

12/1/2026 $38.58 $17.05 $13.35 $3.25 $0.00 $72.23

For apprentice rates see "Apprentice- OPERATING ENGINEERS"

DELEADER (BRIDGE)

PAINTERS LOCAL 35

PAINTERS LOCAL 35 - ZONE 2

1/1/2026 $59.56 $10.35 $12.00 $12.60 $0.00 $94.51

6/1/2026 $49.30 $10.90 $9.75 $9.65 $0.00 $79.60DEMO: ADZEMAN

Apprentice: CEMENT MASONRY/PLASTERING

Effective Date: 1/1/2027

Step Percent Apprentice Base Wage Health Pension Annuity

Supplemental Unemployment

Total Rate

3 65.00 $36.36 $13.35 $16.43 $7.78 $1.80 $75.72

4 70.00 $39.16 $13.35 $16.43 $7.78 $1.80 $78.52

5 75.00 $41.96 $13.35 $16.43 $7.78 $1.80 $81.32

6 80.00 $44.75 $13.35 $16.43 $7.78 $1.80 $84.11

7 90.00 $50.35 $0.00 $16.43 $0.00 $0.00 $66.78

Apprentice to Journeyworker Ratio: 1:5

Apprentice: DELEADER (BRIDGE)

Effective Date: 1/1/2026

Step Percent Apprentice Base Wage Health Pension Annuity

Supplemental Unemployment

Total Rate

1 50.00 $29.78 $10.35 $0.00 $0.00 $0.00 $40.13

2 55.00 $32.76 $10.35 $0.00 $6.93 $0.00 $50.04

3 60.00 $35.74 $10.35 $0.00 $7.56 $0.00 $53.65

4 65.00 $38.71 $10.35 $0.00 $8.19 $0.00 $57.25

5 70.00 $41.69 $10.35 $12.00 $8.82 $0.00 $72.86

6 75.00 $44.67 $10.35 $12.00 $9.45 $0.00 $76.47

7 80.00 $47.65 $10.35 $12.00 $10.08 $0.00 $80.08

8 90.00 $53.60 $10.35 $12.00 $11.34 $0.00 $87.29

Apprentice to Journeyworker Ratio: 1:1

Page 7 of 31Wage Request Number: 20260824160038Issue Date: 08/24/2026

Supplemental

Unemployment Total Rate

12/7/2026 $50.80 $10.90 $9.75 $9.65 $0.00 $81.10

6/7/2027 $52.40 $10.90 $9.75 $9.65 $0.00 $82.70

12/6/2027 $54.00 $10.90 $9.75 $9.65 $0.00 $84.30

6/5/2028 $55.68 $10.90 $9.75 $9.65 $0.00 $85.98

LABORERS

LABORERS - ZONE 2

12/4/2028 $57.35 $10.90 $9.75 $9.65 $0.00 $87.65

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $50.30 $10.90 $9.75 $9.65 $0.00 $80.60

12/7/2026 $51.80 $10.90 $9.75 $9.65 $0.00 $82.10

6/7/2027 $53.40 $10.90 $9.75 $9.65 $0.00 $83.70

12/6/2027 $55.00 $10.90 $9.75 $9.65 $0.00 $85.30

6/5/2028 $56.68 $10.90 $9.75 $9.65 $0.00 $86.98

DEMO: BACKHOE/LOADER/HAMMER OPERATOR

LABORERS

LABORERS - ZONE 2

12/4/2028 $58.35 $10.90 $9.75 $9.65 $0.00 $88.65

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $50.05 $10.90 $9.75 $9.65 $0.00 $80.35

12/7/2026 $51.55 $10.90 $9.75 $9.65 $0.00 $81.85

6/7/2027 $53.15 $10.90 $9.75 $9.65 $0.00 $83.45

12/6/2027 $54.75 $10.90 $9.75 $9.65 $0.00 $85.05

6/5/2028 $56.43 $10.90 $9.75 $9.65 $0.00 $86.73

DEMO: BURNERS

LABORERS

LABORERS - ZONE 2

12/4/2028 $58.10 $10.90 $9.75 $9.65 $0.00 $88.40

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $50.30 $10.90 $9.75 $9.65 $0.00 $80.60

12/7/2026 $51.80 $10.90 $9.75 $9.65 $0.00 $82.10

6/7/2027 $53.40 $10.90 $9.75 $9.65 $0.00 $83.70

12/6/2027 $55.00 $10.90 $9.75 $9.65 $0.00 $85.30

6/5/2028 $56.68 $10.90 $9.75 $9.65 $0.00 $86.98

DEMO: CONCRETE CUTTER/SAWYER

LABORERS

LABORERS - ZONE 2

12/4/2028 $58.35 $10.90 $9.75 $9.65 $0.00 $88.65

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $50.05 $10.90 $9.75 $9.65 $0.00 $80.35

12/7/2026 $51.55 $10.90 $9.75 $9.65 $0.00 $81.85

6/7/2027 $53.15 $10.90 $9.75 $9.65 $0.00 $83.45

12/6/2027 $54.75 $10.90 $9.75 $9.65 $0.00 $85.05

6/5/2028 $56.43 $10.90 $9.75 $9.65 $0.00 $86.73

DEMO: JACKHAMMER OPERATOR

LABORERS

LABORERS - ZONE 2

12/4/2028 $58.10 $10.90 $9.75 $9.65 $0.00 $88.40

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $49.30 $10.90 $9.75 $9.65 $0.00 $79.60

12/7/2026 $50.80 $10.90 $9.75 $9.65 $0.00 $81.10

6/7/2027 $52.40 $10.90 $9.75 $9.65 $0.00 $82.70

12/6/2027 $54.00 $10.90 $9.75 $9.65 $0.00 $84.30

6/5/2028 $55.68 $10.90 $9.75 $9.65 $0.00 $85.98

DEMO: WRECKING LABORER

LABORERS

LABORERS - ZONE 2

12/4/2028 $57.35 $10.90 $9.75 $9.65 $0.00 $87.65

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $58.70 $17.05 $13.35 $3.25 $0.00 $92.35DIRECTIONAL DRILL MACHINE OPERATOR

OPERATING ENGINEERS LOCAL 4

OPERATING ENGINEERS LOCAL 4

12/1/2026 $60.14 $17.05 $13.35 $3.25 $0.00 $93.79

For apprentice rates see "Apprentice- OPERATING ENGINEERS"

Page 8 of 31Wage Request Number: 20260824160038Issue Date: 08/24/2026

Supplemental

Unemployment Total Rate

DIVER

PILE DRIVER LOCAL 56

PILE DRIVER LOCAL 56 (ZONE 1)

8/1/2024 $78.11 $10.08 $11.62 $10.04 $0.00 $109.85 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Diver wage 70/80/90 2A $69.83, 3A $91.79,4A $102.14 Total Rate

DIVER TENDER

PILE DRIVER LOCAL 56

PILE DRIVER LOCAL 56 (ZONE 1)

8/1/2024 $55.79 $10.08 $11.62 $12.67 $0.00 $90.16 as of 8-1-24, Apprentices with diving licenses begin at second year.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .