Water 24in Potable Main Crossing Highway Crossing.pdf

PDF 78 KB Posted

Attached to
Water 24in Potable Main Crossing Highway Crossing
Solicitation number
UD26-04-0-2026/TR
Issued by
San Luis Obispo County, California

About this file

This Request for Proposals (RFP) is issued by the City of El Paso De Robles, located in San Luis Obispo County, California, soliciting qualified engineering design firms to develop complete, bid-ready construction plans and technical specifications for a trenchless installation project. The project involves installing approximately 230 linear feet of 24-inch potable water transmission main within a casing pipe crossing Highway 46. The scope of work encompasses associated surveying, right-of-way research, utility investigations, geotechnical investigations, and other engineering services necessary to support design and construction advertisement of the proposed highway crossing. The proposal due date and time is November 30, 2026, at 3:00 PM Pacific Time. Interested parties should download the RFP package from DemandStar Corporation via the City's website at https://www.demandstar.com. Questions or additional information can be directed to Tonia Roeder, Utilities Department Administrative Assistant, at 805-237-3864.

The RFP identification number is UD26-04-0-2026/TR. The City encourages Minority-Owned Business Enterprises (M/WBEs) to participate in the bid process. No pricing terms, contract duration, renewal options, or specific funding sources are detailed in the available documentation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of El Paso De Robles 1000 Spring Street

San Luis Obispo County,Paso Robles, CA, 93446 RFP - Request For Proposals

WATER 24in POTALBE MAIN CROSSING HIGHWAY CROSSING

RFP -UD26-04-0-2026/TR

Scope of Work: The City is soliciting proposals from qualified engineering design firms to prepare complete, bid-ready construction plans and technical specifications for the trenchless installation of approximately 230 linear feet of 24-inch potable water transmission main within a casing pipe crossing Highway 46. The scope includes associated surveying, right-of-way research, utility investigations, geotechnical investigations, and other engineering services necessary to support the design and construction advertisement of the proposed highway crossing.

Ordering Instructions: This package can be downloaded from DemandStar Corporation on our website at https://www.demandstar.com.

Due Date/Time: 11/30/2026 3:00:00 PM Pacific City of El Paso De Robles

M/WBE's are encouraged to participate in the bid process.

Contact: Tonia Roeder Utilities Department Administrative Assistant

Phone: 8052373864

DemandStar Corporation

File details come from the government source that posted it. Updated .