Wastewater Treatment Facility Blower Improvements - Specs.pdf
PDF 6 MB Posted
- Attached to
- RFP WWTF Blower Improvements
- Solicitation number
- 26408.02
- Issued by
- Snohomish County, Washington
About this file
This is a specifications document for a Wastewater Treatment Facility Blower Improvements project issued by a Washington state or local jurisdiction. The scope of work encompasses the demolition of four existing process blowers and the procurement and installation of four new process blowers, along with heating and ventilating improvements and all associated piping and electrical system improvements. The project represents a comprehensive upgrade to the facility's blower infrastructure, addressing both equipment replacement and ancillary system enhancements necessary to support the new equipment.
The document serves as the technical specifications component of the RFP WWTF Blower Improvements solicitation. Additional details regarding pricing terms, set-asides, contract duration, response deadlines, site visit requirements, and other bidding parameters would be contained in supplementary RFP documents and should be reviewed in conjunction with these specifications to fully understand the project requirements and submission procedures.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKE STEVENS
SEWER DISTRICT
SNOHOMISH COUNTY WASHINGTON
CONTRACT PROVISIONS
for
WASTEWATER TREATMENT FACILITY
BLOWER IMPROVEMENTS
G&O #26408.02
NOVEMBER 2026
LAKE STEVENS
SEWER DISTRICT
SNOHOMISH COUNTY WASHINGTON
for
11/18/2026
G&O #26408.02
NOVEMBER 2026
CB-1
CALL FOR BIDS
LAKE STEVENS SEWER DISTRICT
ENGINEER’S ESTIMATE $1,500,000 TO $1,700,000
Electronic/digital Proposals will be received by the undersigned via the Project
Document Portal which is located at the link provided below, up to 2:00 p.m.; local time on Wednesday, December 16, 2026, for furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to construct the Wastewater Treatment Facility
Blower Improvements.
The scope of work for this project includes demolition of four existing process blowers, procurement and installation of four new process blowers, heating and ventilating improvements, and all associated piping and electrical system improvements.
The Work shall be substantially complete within 280 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the District
Manager in Lake Stevens, Washington.
The Proposals will be publicly opened and read aloud shortly after the time and date stated above. Proposals are to be submitted only on the form provided with the Bid
Documents. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the “Lake Stevens Sewer District” and in an amount of not less than five percent (5%) of the total Proposal amount. Bidders may attend the virtual bid opening using the following link:
https://teams.microsoft.com/meet/2813454213037045?p=IGtNBhlLf7jStc3L3L.
Bid Documents for this project are available free-of-charge via the following websites:
https://www.lkstevenssewer.org/district_info/district_projects and https://mrscrosters.bonfirehub.com/portal/?tab=openOpportunities. Bidders are encouraged to register in order to receive automatic email notification of future addenda and to be placed on the Bidders List. For assistance, please call (206) 284-0860.
Contract questions shall be directed only to the office of the Project Engineer.
https://teams.microsoft.com/meet/2813454213037045?p=IGtNBhlLf7jStc3L3L https://www.lkstevenssewer.org/district_info/district_projects https://mrscrosters.bonfirehub.com/portal/?tab=openOpportunities
CB-2
A Prebid Conference is scheduled for Tuesday, December 1, 2026. The conference will begin at the Lake Stevens Sewer District Wastewater Treatment Facility located at 7110
9th Street SE, Lake Stevens, Washington at 10:00 a.m. (local time). No other site visits are allowed for this project.
Financing of the Project has been provided by the Lake Stevens Sewer District, Washington. The Lake Stevens Sewer District expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal.
(Signed) MARIAH LOW
GENERAL MANAGER
TC-1
TABLE OF CONTENTS
WASTEWATER TREATMENT FACILITY BLOWER IMPROVEMENTS
PAGE NO.
CALL FOR BIDS
PART 1. BID DOCUMENTS
BIDDER’S CHECKLIST ........................................................................... BC-1 PROPOSAL ......................................................................................... P-1 – P-6 PROPOSAL BOND .................................................................................... PB-1
APPRENTICESHIP UTILIZATION PLAN FORM ............................... AUP-1
PART 2. AGREEMENT AND BONDS (FOR INFORMATION ONLY)
AGREEMENT .................................................................................... A-1 – A-3 PERFORMANCE BOND .............................................................................. B-1 PUBLIC WORKS PAYMENT BOND ......................................................... B-2
PART 3. SUPPLEMENTART GENERAL CONDITIONS AND
GENERAL CONDITIONS
PART 4. TECHNICAL SPECIFICATIONS
PART 5. WAGE RATES
PART 6. APPENDIX
Appendix A – Supplemental Bidder Responsibility Criteria
PART 1
BID DOCUMENTS
BC-1
BIDDER’S CHECKLIST
1. REQUIRED FORMS
The Bidder shall submit the following forms, which must be executed in full and submitted with the Proposal via the online project bidding portal.
a. Proposal (including Statement of Bidder’s Qualifications) (Pages P-1 – P-6)
b. Bid Deposit or Proposal Bond (Page PB-1)
c. Apprenticeship Utilization Plan Form (Pages AUP-1 – AUP-9)
Form (a.) shall be submitted as a pdf file via the online project bidding portal listed in the
Contract Documents. This form will be used to determine the lowest responsible, responsive bidder. The “Untitled Pricing Sheet (BT-31VJ)” available in the online project bidding portal does not need to be submitted.
Form (b.) may also be submitted via the online project bidding portal listed in the
Contract Documents. If a Contractor elects to provide a check or Bid Deposit, the document must be received by the Contracting Agency prior to the date and time of the
Bid Opening.
Form (c.) may also be submitted via the online project bidding portal listed in the
Contract Documents.
2. SUPPLMENTAL BIDDER CRITERIA
The Apparent two lowest bidders shall submit to the Contracting Agency the completed
Supplemental Bidder Criteria forms in Appendix A by noon of the second business day following the bid submittal deadline.
These files shall be submitted electronically, via email to the Contracting Agency as well as the Engineer of Record.
3. AGREEMENT FORMS
The following forms (a., b., and c.) are to be executed and the Certificates of Insurance (d.
and e.) are to be provided after the Contract is awarded and prior to Contract execution.
a. Agreement (Pages A-1 – A-3)
b. Performance Bond (Page B-1)
c. Public Works Payment Bond (Page B-2)
d. Certificate of Insurance
e. Certificate of Builders Risk Insurance
BC-2
Hard copies of forms (a., b., and c.) shall be submitted to the Engineer of Record after the
Contract is awarded by the Contracting Agency.
Forms (d. and e.) may be submitted electronically, via email, to the Engineer of Record after the Contract is awarded by the Contracting Agency.
P-1
PROPOSAL
Lake Stevens Sewer District
1106 Vernon Road, Suite A
Lake Stevens, Washington 98258
The undersigned has examined the Work site(s), local conditions, the Contract, and all applicable laws and regulations covering the Work. The following unit and lump sum prices are tendered as an offer to perform the Work in accordance with all of the requirements set forth in the Contract and all applicable laws and regulations.
As required by the Contract, a postal money order, certified check, cashier’s check or Proposal bond made payable to the Owner is attached hereto. If this Proposal is accepted and the undersigned fail(s) or refuse(s) to enter into a contract and furnish the required performance bond, labor and material payment bond, special guarantee bonds (if required), required insurance and all other required documentation, the undersigned will forfeit to the Owner an amount equal to five percent of the Proposal amount.
After the date and hour set for submitting the Proposals, no bidder may withdraw its Proposal, unless the Award of the contract is delayed for a period exceeding 60 consecutive calendar days.
The undersigned agrees that in the event it is Awarded the contract for the Work, it shall employ only Contractors and Subcontractors that are duly licensed by the State of Washington and remain so at all times they are in any way involved with the Work.
The undersigned agrees that the Owner reserves the right to reject any or all Proposals and to waive any minor irregularities and informalities in any Proposal.
The undersigned agrees that the Owner will Award the Contract to the lowest responsible, responsive bidder whose Proposal is in the best interest of the Owner.
PROPOSAL - Continued
P-2
NO. ITEM QUANTITY UNIT PRICE AMOUNT
1. Wastewater Treatment Facility
Blower Improvements
LS
2. Mobilization and Demobilization 1 LS $____________ $___________
3. Minor Change 1 EST $20,000.00 $20,000.00
4. Apprenticeship Incentive/Penalty 1 CALC $2,000.00 $2,000.00
Subtotal: .................................................................................................$_____________________
Washington State Sales Tax (9.3%): .....................................................$_____________________
TOTAL CONSTRUCTION COST: ......................................................$_____________________
Note: A bid must be received on all items.
P-3
STATEMENT OF BIDDER'S QUALIFICATIONS
Name of Firm:
Address:
Telephone No. Fax No.
Contact Person for this Project:
E-mail:
Number of years the Contractor has been engaged in the construction business under the present firm name, as indicated above:
WORK TO BE COMPLETED BY BIDDER
List the Work and the dollar amount thereof that the Bidder will complete with its forces, if awarded the contract.
Work to be Performed Dollar Amount
P-4
PROPOSED SUBCONTRACTORS (Per RCW 39.30.060 as amended)
Failure to list subcontractors with whom the bidder, if awarded the contract, will directly subcontract for performance of the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform the same work will result in your bid being non-responsive and therefore void.
These subcontractors must be listed below along with the work to be performed. This information must be provided with the Proposal for the work of heating, ventilation, air conditioning, plumbing and electrical. This information must be provided with the Proposal or within 48 hours after the published bid submittal time for the work of structural steel and rebar installation.
If RCW 39.30.060 requires a proof of license, the license number of that Subcontractor is required. To the extent the Project includes one or more categories of work referenced in RCW 39.30.060, and no subcontractor is listed below to perform such work, the bidder certifies that the work will either (i) be performed by the bidder itself, or (ii) be performed by a lower tier subcontractor who will not contract directly with the bidder.
Subcontractor Name Work to be Performed License Number (if required)
Bidder’s are notified that it is the opinion of the enforcement agency that PVC or metal conduit, junction boxes, etc., are considered electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical current is connected during the project.
P-5
ADDENDA RECEIVED
Addendum No. Date Received Name of Recipient
NOTE: Bidder shall acknowledge receipt of all addenda. Bidder is responsible for verifying the actual number of addenda issued prior to submitting a Proposal.
Subject to any extensions of the Contract Time granted under the Contract, the undersigned agrees to substantially complete the Work required under this Contract within 280 working days
(the Substantial Completion Date) and to physically complete the Work required under this contract within 310 working days (the Physical Completion Date) from when Contract Time begins.
The undersigned has reviewed and fully understands the provisions in the Contract regarding liquidated damages and agrees that liquidated damages shall be $1,000.00 per day for each and every working day beyond the Contract Time allowed for substantial completion until the
Substantial Completion Date is achieved and $500.00 for each and every working day required beyond the Contract Time for physical completion until the Physical Completion Date is achieved.
The undersigned is, and will remain in, full compliance with all Washington State administrative agency requirements including, but not limited to registration requirements of Washington State
Department of Labor & Industries for contractors, including but not limited to requirements for bond, proof of insurance and annual registration fee. The undersigned's Washington State:
Dept. of Labor and Industries Workman's Compensation Account No. is ___________________;
Dept. of Licensing Contractor's Registration No. is ______________________________;
Unified Business Identifier Number is ________________________________;
Excise Tax Registration Number is ______________________________; and
Employment Security Account Number is _____________________________.
The undersigned has reviewed all insurance requirements contained in the Contract and has verified the availability of and the undersigned’s eligibility for all required insurance. The undersigned verifies that the cost for all required insurance, has been included in this Proposal.
In relation to claims related in whole or in part to workplace injuries to employees, the undersigned waives any immunity granted under the State Industrial Insurance Law, RCW Title
51. This waiver has been specially negotiated by the parties, which is acknowledged by the undersigned in signing this Proposal.
P-6
By signing the proposal, the undersigned declares, under penalty of perjury under the laws of the
United States and the State of Washington, that the following statements are true and correct:
1. That the undersigned person(s) or entity(ies) has(have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this Proposal is submitted.
2. Certification of Compliance with Wage Payment Statutes: The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date November 19, 2026, that the bidder is not a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52
RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction.
The undersigned agrees that the Owner is authorized to obtain information from all references included herein.
Sincerely, Sign Name Date
By:
Print Name, Title Location Executed (City, State or County)
Print Company Name
Amount of Proposal deposit: $ Check No. , or Proposal bond in the amount of $
, issued through
Name of Bank/Bonding Company located at
Mailing Address
Telephone Number of Bank/Bonding Company
PB-1
PROPOSAL BOND
KNOW ALL MEN BY THESE PRESENTS, That we of as principal, and the a corporation duly organized under the laws of the state of , and authorized to do business in the State of
Washington, as surety, are held and firmly bound unto the LAKE STEVENS SEWER
DISTRICT in the full and penal sum of five percent of the total amount of the bid proposal of said principal for the work hereinafter described, for the payment of which, well and truly to be made, we bind our heirs, executors, administrators and assigns, and successors and assigns, firmly by these presents.
The condition of this bond is such, that whereas the principal herein is herewith submitting their sealed proposal for the following construction project, to wit:
said bid and proposal, by reference thereto, being made a part hereof.
NOW, THEREFORE, If the said proposal bid by said principal be accepted, and the contract be awarded to said principal, and if said principal shall duly make and enter into and execute said Contract and shall furnish bond as required by the LAKE STEVENS SEWER
DISTRICT within a period of 10 days from and after said award, exclusive of the day of such award, then this obligation shall be null and void, otherwise it shall remain and be in full force and effect.
IN TESTIMONY WHEREOF, The principal and surety have caused these presents to be signed and sealed this day of , __________.
(Principal)
(Surety)
(Attorney-in-fact)
LKSSD Apprentice Utilization Plan 1 of 7
APPRENTICE UTILIZATION PLAN INSTRUCTIONS
REQUIREMENTS FOR PROJECT APPRENTICESHIP UTILIZATION PLAN
• An initial apprentice utilization plan must be submitted with the bid on the Lake Stevens Sewer District
Apprentice Utilization Plan form.
• The initial Apprentice Utilization Plan provides an estimate of all labor hours anticipated to be performed and plan for utilization of state-registered apprentices by the prime contractor and an/all subcontractors performing trade scopes on the project; and as known at the time of bid.
• Estimated subcontractors, scopes, hours, and listed percentages need to be reasonable within the scope and duration of project.
• The plan demonstrates that you, and the subcontractors, intend to meet the requirement or use good faith efforts to comply.
• The plan shall be revised as more information becomes available or changes are experienced in such things as scopes, subcontracting, apprentice availability, or the project schedule.
• Non-signatory contractors/subcontractors are subject to the requirement.
INSTRUCTIONS
• Include a listing of all subcontractors and their trades, regardless of if they will be using apprentices.
• Include an estimate from each subcontractor of how many hours they will perform on the project and how many of those hours will be performed by apprentices, as anticipated.
• List all state approved programs under which apprentices are enrolled or are going to enroll.
• Update the plan as the schedule changes, change orders are issued and/or new subcontractors are subcontracted, to verify that you can still meet the requirement through utilization.
• Upload certified payroll for every contractor, subcontractor, and hourly employee weekly into L&I’s prevailing wage intents and affidavits portal.
• If, or as discovered, the prime or any subcontractor believes they cannot meet the apprenticeship utilization requirement a good faith efforts approval process must be started (see form attached)
QUESTIONS? Please contact:
Management@lkssd.org or 425-334-8588
AUP-1
mailto:Management@lkssd.org
LKSSD Apprentice Utilization Plan 2 of 7
PROJECT APPRENTICE UTILIZATION PLAN FORM
Project Name and No. AUR 15% Prime Contractor Name
Initial Date Submitted Revision No.
Submitted By Revision Date
* Include labor hours and count for all trades, including those performed by Subcontractors. Mark all revisions in RED.
Part A
Prime
Program/Trade No. Name Estimated Journey Level Hours
Estimated Apprentice Hours
Total Estimated Hours Part A
Part B
Subcontractor business name
Estimated Start Date
Program/Trade Name No. Estimated Journey Level
Hours
Estimated Apprentice
Hours
Total Estimated Hours Part B
Total Estimated Hours Part A (from above)
Total apprentice utilization percentage based on planned values
Reviewed by: Date:
Good faith efforts needed*? � yes � no
*If the estimated total apprentice utilization percentage is under 15%, good faith efforts must be made.
Use separate form to document. A revised Apprentice Utilization Plan is to be attached to every good faith effort AUR adjustment request.
• The owner reserves the right to request additional documentation or information to verify subcontractors, scope, trade, and/or hours of work.
• Those projects that do not meet the apprentice utilization goal (approved goal adjustments meet the goal) shall be assessed a penalty per the contract documents.
AUP-2
LKSSD Apprentice Utilization Plan 3 of 7
Apprentice Utilization Good Faith Efforts Documentation
Project: Date:
Prime:
Prepared By (print name and title):
Requested apprentice utilization percentage (goal adjustment):
Contractor Statement
An adjustment to the apprentice utilization requirements for the above-named project is hereby requested. All contractors and subcontractors on the project understand the requirements, have performed the following documented good faith efforts, and have confirmed that the required apprentice utilization hours will not be able to be achieved for the following rationale. (initial)
Check all that apply.
� Demonstrated lack of availability of apprentices (regionally or by trade). [list trades] � Disproportionately high ratio of material/product/equipment cost to labor.
� Not enough hours available on the job to accommodate the ratio, supervision, or work process required.
� State approved apprentice programs unavailable for the specific work type.
� Warranty or specialty work requirements unable to accommodate apprentices.
� Funding requires federal, native American, or other employee training program that conflicts with Washington
State apprentice utilization requirements.
� Other: (fill in)
Documentation must be attached to substantiate the request. Check all that apply and attach.
� Emails, letters, or similar communication with appropriate state apprenticeship program confirming the assessment or denying apprentices or similar. Include, dates, time, responses, names, titles, and similar information.
� Manufacturer letter or email statement of equipment, material, or product that substantiates the cost and/or the specialty nature or the item and the requirement for certified/specific installers or similar.
� Specification section, funding requirement, or similar precluding or hindering state apprentice utilization requirements.
� Other: (fill in)
� Attach a revised Apprentice Utilization Plan showing where adjustments are requested.
AUP-3
LKSSD Apprentice Utilization Plan 4 of 7
APPRENTICESHIP UTILIZATION GOOD FAITH EFFORT (GFE) & GOAL ADJUSTMENT REQUEST:
DOCUMENTATION AND PROCESSING GUIDANCE
Must be submitted with an updated Apprentice Utilization Plan.
The Contractor, and trade subcontractors, must demonstrate that they have exercised “best efforts” to recruit apprentices and were still unable to meet the goal. One or more of the following rationales apply and are evidenced in this request.
GFE documentation must be submitted to the Lake Stevens Sewer District as soon as it is known that the apprenticeship requirement cannot be met. Waiting until completion or near completion of the project to submit information is not acceptable;
time is of the essence.
The Lake Stevens Sewer District will review the contractor’s good faith documentation to determine that:
1. The situation/s documented by the contractor represent a legitimate Good Faith Efforts, and
2. The shortfall in apprentice participation is attributable to the situation/s documented by the contractor in the
GFE.
ACCEPTABLE GOOD FAITH EFFORTS
� NO APPRENTICES AVAILABLE: The contractor will document their prior participation or contact with State-approved apprenticeship training program/s (such as a letter from the program/s or a copy of their current agreement with the program/s); their contacts with the apprenticeship program/s (such as copies of e-mails or letters requesting apprentices and the response from the program/s stating by letter or e-mail that no apprentices are available). On longer duration jobs it is expected the contractor document continued contact with the program/s as the project progresses.
� NO APPRENTICESHIP PROGRAM: In situations where a large portion of work on a project is in an occupation without a State-approved apprenticeship program, the contractor must document the fact that there is no State-approved apprenticeship program, (such as a letter from L&I or the Washington State Apprentice Training Council, a printout of the programs on L&I’s website or documentation from approved training programs that apprentice training for that specific occupation is not available).
� CONFLICTING FEDERAL TRAINING REQUIREMENT: Federal training requirements take precedence over the State apprenticeship requirement. The contractor must submit documentation demonstrating that Federal requirements are solely responsible for the relief being sought.
� APPRENTICE TO JOURNEYMEN RATIOS AND LACK OF AVAILABLE HOURS: A contractor can document the ratio of journey level to apprentice worker limitations, hours in the job, and total crew size on the project makes it impossible to meet apprenticeship requirements. The contractor must submit documentation of their workforce by each occupation that can be apprenticed, total crew size, supervision level required and the number of apprentices that could be utilized on the project in order to demonstrate that the requirement cannot be met.
� APPRENTICE/S GRADUATE DURING PROJECT: If an apprentice graduates during a project, a Contractor can submit documentation from the apprentice program and evidence of change in worker status. Estimated hours on the project would not change overall only the apprentice utilization percentage.
� WORK TOO TECHNICAL OR PERSCRIPTIVE WARRANTY WORK: Work performed used on the project is too critical or technical to be performed by apprentices, even when working under the supervision of a journey level worker. In these circumstances, the contractor must document the critical or technical aspect of the work or equipment by demonstrating how rare/uncommon it is, how few employees are sufficiently skilled to perform or operate the work/equipment, any special training needed to do so, and why it would not be reasonable to provide an apprentice the required training. The contractor must also document the portion of the total project hours involved performing this work or operating equipment. Any further documentation of concurrence from an approved apprenticeship program could supplement a waiver request. Further, if work by an apprentice will compromise or void the warranty provided by a manufacturer or surety, a contractor should provide a letter or communication from the 3rd party responsible for warranty or underwriting.
� ADDED OR DELETED APPRENTICE WORK: If the Owner has made a significant change to the contract that alters the contractor’s plan for achieving the apprenticeship requirement, the contractor is encouraged to make reasonable attempts to meet the requirement a different way. The contractor should document the change in total labor hours based on the
AUP-4
LKSSD Apprentice Utilization Plan 5 of 7 change to the contract by occupation and demonstrate the effect on apprentice hiring needs as compared to the original utilization plan and efforts made to acquire the additional apprentices.
� APPRENTICE WORK CONDITION ISSUES: If for any reason the contractor has a difficult time finding apprentices that will work on their project due to specific issues (night work, short shifts, irregular work) or an apprentice quits (drops out of program completely or finds a different opportunity) a time lag in getting a new apprentice on site may be a legitimate GFE reason. The contractor will document the date the apprentice began work, the duration of their work, when they quit, when the contractor called the apprentice program or began hiring a new apprentice and when the replacement apprentice arrived at the job site.
� SMALL OR ESTABLISHED WORKFORCE: It is not the intent of apprentice utilization requirements for contractor(s) to have to lay off journeymen or recently graduated apprentices to hire apprentices. In a small or established workforce with little turnover, apprentice opportunities may not exist. This can be a legitimate GFE reason if the contractor can demonstrate that when hiring opportunities do occur, they hire apprentices in State- approved training programs. The contractor must submit evidence showing the individuals on the crew for the project, their duration of employment, if they were hired as apprentices, and whether or not they graduated from a State-approved program. The contractor should also submit a list of recent hires companywide and whether or not they are/were apprentices in a State-approved apprenticeship program.
� CLASSROOM TRAINING: Apprentices must complete a certain amount of classroom training each year. Depending on the program, training could last up to two months. The training could be one continuous period or spread out. If an apprentice must leave the project to attend classroom training, the Owner may consider a reduction in apprentice utilization hours. The contractor must document the number of hours missed by the apprentice due to classroom training. (This is not the number of classroom training hours, but the number of hours they would have been on the job had they not been in classroom training.) Documentation by the instructor or program administrator and its classroom duration/timing is also required.
� WORK TOO DANGEROUS: Generally, no work should be too dangerous for apprentices. If a contractor can demonstrate that work occurs in an area where an apprentice could not be supervised, it may qualify as a GFE. The situation must be documented appropriately with communication from the Apprentice Program, pictures, and other safety considerations.
NOT A GOOD FAITH EFFORT:
� CONTRACTOR CANNOT GET THEIR OWN APPRENTICESHIP PROGRAM APPROVED: A contractor cannot get their own apprenticeship program approved by the State in time to meet the contract requirements.
AUP-5
LKSSD Apprentice Utilization Plan 6 of 7
APPRENTICE UTILIZATION REQUIREMENTS
Intent: As a material part of this Contract, this exhibit includes the requirements, process, and procedures associated with the utilization of apprentices on this Contract. These requirements are in addition to the requirements that may be found elsewhere in the Contract.
1. APPRENTICE UTILIZATION REQUIREMENT
The Contractor must ensure that 15 percent of the total Contract Labor Hours used on the project are performed by apprentices registered in a state-approved training program. This requirement must be included in any subcontract at any tier on the Project.
Total Contract labor hours include additional hours worked because of Change Orders, and exclude hours worked by foremen, superintendents, supervisors, owners, and workers who are not subject to prevailing wage requirements.
However, it may be determined that they are subject to prevailing wage requirements under the following criteria of WAC 296-127-015: supervisors (e.g. foreman, general foreman, superintendents) are entitled to receive at least the journey level prevailing rate of wage for performing manual or physical labor:
1. For each hour spent in the performance of manual or physical labor if it is for more than 20 percent but less than 50 percent of their hours worked on a public works project during any given week.
2. For all hours worked in any given week if they perform manual or physical labor for 50 percent or more of their hours worked on a public works project during such week. The Contractor must include the apprentice utilization requirements of this Section in all subcontracts executed for the Project and ensure that all Subcontractors working on the project are notified of the apprentice utilization requirements. The Contractor is responsible for meeting the apprentice utilization requirements of the Contract, including overall compliance on all Contract labor hours worked by Subcontractors.
2. APPRENTICE UTILIZATION PLAN
The Contractor must submit a comprehensive plan listing the subcontractors and apprentices/ programs to be used on the Project and how the apprentice utilization requirements will be met on the total Contract labor hours.
The plan must be submitted with the contractors proposal.
An approved Plan is required prior to the Notice to Proceed is issued. An updated Plan is required when any new subcontractor is approved to the project and when any Change Order Proposal is submitted.
3. GOOD FAITH EFFORTS AND ADJUSTMENTS TO THE APPRENTICE UTILIZATION REQUIREMENT
If the Contractor determines that the Project will be unable to achieve the apprentice utilization percentage, the Contractor may make a written request to Lake Stevens Sewer District to adjust the required apprentice utilization percentage as allowed under RCW 39.04.320(2).
The request must include documentation of the Contractor’s and subcontractor’s good faith efforts to hire registered apprentices.
Acceptable good faith efforts must include one, or more of the following:
1. Not enough registered apprentices in the geographic/county area as verified by WSATC;
2. An inadequate number of apprentices are available to comply with the required apprentice utilization percentage as verified by appropriate state programs;
3. There are not enough hours on the project to afford the appropriate ratio of journey level to apprentice oversight as verified by the appropriate state programs and documented through the Project schedule;
4. There is a disproportionately high ratio of material costs to labor hours, which does not make the required minimum levels of apprentice participation possible for this Contract as verified by the schedule of values/bid item breakdown and/or backup invoicing from suppliers or similar;
AUP-6
LKSSD Apprentice Utilization Plan 7 of 7
5. Apprentice utilization and involvement in Work of the Project would void warranty as verified by an original equipment manufacturer and/or surety;
6. Other documented and verifiable impracticality that could not have been foreseen or avoided.
The District will evaluate the request and, if appropriate, prepare a Change Order reducing the required utilization percentage. If the Owner determines that a reduction in the required utilization percentage is not justified, the District will communicate the decision in writing to the Contractor and a monetary disincentive may be assessed.
4. PREVAILING WAGES FOR APPRENTICES
An apprentice is defined as a laborer, worker, or mechanic employed to perform the Work for whom an apprentice agreement is established through a Training Program that is registered and approved by the Washington State Apprenticeship and Training Council (WSATC).
Per RCW 39.12.021 and RCW 49.04, apprentices must be paid the applicable prevailing hourly rate for an apprentice of that trade. An apprentice wage schedule has been added to the Journey Level rates.
Intents, Affidavits, and certified payrolls must contain the relevant apprentice information and be recorded in L&I’s Prevailing Wage Intents and Affidavits system.
5. APPRENTICE UTILIZATION REPORTING
The Contractor and every Subcontractor must report all apprentices and the wages paid as required by L&I.
The Contractor must submit other information as requested by the Owner to verify compliance with the apprentice utilization requirements of the Contract. The Owner may add, delete, or change the information required by the Contractor, as necessary.
6. MONITORING APPRENTICE UTILIZATION
The Owner will monitor the Contractor’s and subcontractor’s progress in apprentice utilization by reviewing and approving Apprentice Utilization Plan(s), Intents and Affidavits filed and Certified Payroll as part of the monthly Progress Payment reviews. The Owner reserves the right to withhold payment until appropriate documentation is loaded into
PWIA.
7. MEETING APPRENTICE UTILIZATION REQUIREMENTS: MONETARY INCENTIVE
Should the Contractor, and/or subcontractors, achieve 15% apprentice utilization without any good faith efforts, a monetary assessment of $2,000 will be paid to the Contractor for proportional distribution to all employers of apprentices on the Project.
8. FAILURE TO COMPLY WITH APPRENTICE UTILIZATION REQUIREMENTS: DISINCENTIVE
ASSESSMENT
Failure to comply with requirements for apprentice utilization, without a good faith effort, is a material breach of the Contract for which the Contractor, or its subcontractors, are subject to damages. If the Owner determines that the Contractor, or any of its subcontractors, are non-compliant, a monetary disincentive assessment of a monetary disincentive assessment will be calculated for every minimum apprentice hour not achieved, will be subtracted from monies otherwise owed to the Contractor. If no additional monies are owed, an invoice will be sent for remittance prior to filing the Notice of Completion with the state. Apprenticeship Utilization Penalty will be calculated as described below:
Percent of goal met Penalty per hour of unmet goal 100% $0.00 90% - 99% $1.00 75% - 89% $2.00 50% - 74% $3.50 1% - 49% $5.00 0% $7.50
AUP-7
Apprentice Utilization Plan Date Submitted
Contract Number Contract Title
Prime Contractor
Utilization based on planned values
Contract Total Labor Hours
Contract Total Apprentice Hours
Anticipated
Start Date Occupation (Trade)
Total labor hours
(including apprentices)
Apprentice hours Contractor
Apprenticeship Utilization
Requirement
Updated 1/1/2020
15%
100.00%
0.00
0.00
AUP-8
Apprentice Utilization Plan Anticipated
Start Date Occupation (Trade)
Total labor hours
Apprentice hours
Totals
Printed Name: Date:
Signature:
Contractor
Updated 1/1/2020
0.00 0.00
AUP-9
PART 2
AGREEMENT AND BONDS
(FOR INFORMATION ONLY)
A-1
AGREEMENT
THIS AGREEMENT is entered into by and between the LAKE STEVENS SEWER
DISTRICT (hereinafter called the Owner) and
__________________________________________ (hereinafter called the Contractor).
The Owner and the Contractor agree as follows:
ARTICLE 1. WORK.
[Include description of all schedules, alternate or additive items awarded]
ARTICLE 2. CONTRACT TIME.
The Contractor shall substantially complete the Work required by the Contract within
________ working days (the Substantial Completion Date) and physically complete the
Work within _____working days (the Physical Completion Date).
ARTICLE 3. LIQUIDATED DAMAGES.
The Owner and the Contractor recognize that time is of the essence and that the Owner will suffer financial loss if the Work is not completed within the time, plus any extensions thereof, allowed in accordance with the Contract. They also recognize the inconvenience, expense, and difficulties involved in a legal proceeding to prove the actual loss suffered by the Owner if the Work is not completed within the time allowed in the Contract. Accordingly, the Owner and the Contractor agree that as liquidated damages for delay, and not as a penalty, the Contractor shall pay the Owner
($_____________) per day for each working day beyond the Substantial Completion
Date until the Contractor achieves substantial completion of the Work and
($____________) per day for each working day beyond the Physical Completion Date until the Contractor achieves physical completion of the Work.
ARTICLE 4. CONTRACT PRICE.
The Owner shall pay the Contractor the amount(s) set forth in the Proposal (in United
States dollars) for completion of the Work in accordance with the Contract.
AGREEMENT – Continued
A-2
ARTICLE 5. CONTRACT.
The Contract, which comprises the entire agreement between the Owner and the
Contractor concerning the Work, consists of the following:
• This Agreement;
• The Contractor’s Proposal including the bid, bid schedule(s), information required of bidder, Proposal bond, and all required certificates and affidavits;
• The Performance Bond and the Public Works Payment Bond;
• The Contract Provisions;
• The Plans (or drawings) consisting of __________ sheets, as listed in the index on sheet ________ of the Plans;
• Addenda numbers ________, inclusive; and
• Change Orders issued after the effective date of this Agreement.
There are no Contract Documents other than those listed in this Article 5. The Contract may be amended only in writing by Change Order as provided in the Contract.
ARTICLE 6. MISCELLANEOUS.
For purpose of indemnifying and defending any work place injury claims by employees of the Contractor and Subcontractors, the Contractor waives any immunity granted under the State Industrial Insurance Law, RCW Title 51. This waiver has been specifically negotiated between the parties and is hereby acknowledged by the Contractor.
________________________(Contractor’s initials)
The Contractor shall not assign any rights under or interests in the Contract, including but not limited to rights to payment, without the prior written consent of the Owner. Unless specifically stated in a written consent to an assignment, no assignment will release or discharge the Contractor-assignor from any duty or responsibility under the Contract.
The Contract is binding upon the Owner and the Contractor, and their respective partners, successors, assigns and legal representatives.
AGREEMENT – Continued
A-3
IN WITNESS WHEREOF, Owner and Contractor have caused this Agreement to be executed the day and year indicated below.
LAKE STEVENS SEWER DISTRICT CONTRACTOR
License No.
By By
Date Title
Attest
Name and Address for giving notices (print)
DOT Form 272-002A
12/2019 B-1
PUBLIC WORKS PERFORMANCE BOND
to LAKE STEVENS SEWER DISTRICT, WA
Bond No. _____________
The LAKE STEVENS SEWER DISTRICT, Washington, (District) has awarded to __________________________
(Principal), a contract for the construction of the project designated as Wastewater Treatment Facility Blower
Improvements in Lake Stevens, Washington (Contract), and said Principal is required under the terms of that Contract to furnish a bond for performance of all obligations under the Contract.
The Principal, and ___________________________________ (Surety), a corporation organized under the laws of the
State of ___________________ and licensed to do business in the State of Washington as surety and named in the current list of “Surety Companies Acceptable in Federal Bonds” as published in the Federal Register by the Audit
Staff Bureau of Accounts, U.S. Treasury Dept., are jointly and severally held and firmly bound to the District, in the sum of _______________________________________________ US Dollars ($________________ amount to include sales tax) Total Contract Amount, subject to the provisions herein.
This statutory performance bond shall become null and void, if and when the Principal, its heirs, executors, administrators, successors, or assigns shall well and faithfully perform all of the Principal’s obligations under the
Contract and fulfill all the terms and conditions of all duly authorized modifications, additions, and changes to said
Contract that may hereafter be made, at the time and in the manner therein specified; and if such performance obligations have not been fulfilled, this bond shall remain in full force and effect.
The Surety agrees to indemnify, defend, and protect the District against any claim of direct or indirect loss resulting from the failure of the Principal, its heirs, executors, administrators, successors, or assigns (or any of the employees, subcontractors, or lower tier subcontractors of the Principal) to faithfully perform the Contract.
The Surety for value received agrees that no change, extension of time, alteration or addition to the terms of the
Contract, the specifications accompanying the Contract, or to the work to be performed under the Contract shall in any way affect its obligation on this bond, and waives notice of any change, extension of time, alteration or addition to the terms of the Contract or the work performed. The Surety agrees that modifications and changes to the terms and conditions of the Contract that increase the total amount to be paid the Principal shall automatically increase the obligation of the Surety on this bond and notice to Surety is not required for such increased obligation.
This bond may be executed in two (2) original counterparts, and shall be signed by the parties’ duly authorized officers.
This bond will only be accepted if it is accompanied by a fully executed and original power of attorney for the officer executing on behalf of the surety.
The Surety agrees to be bound by the laws of the state of Washington and subjected to the jurisdiction of the state of
Washington.
PRINCIPAL SURETY
Principal Signature Date Surety Signature Date
Printed Name Printed Name
Title Title
Local office/agent of Surety Company:
Name _____________________________________ Telephone _________________________________
Address _________________________________________________________________________________
DOT Form 272-003A EF
12/2019 B-2
PUBLIC WORKS PAYMENT BOND
to LAKE STEVENS SEWER DISTRICT, WA
Bond No. _____________
The LAKE STEVENS SEWER DISTRICT, Washington, (District) has awarded to __________________________
(Principal), a contract for the construction of the project designated as Wastewater Treatment Facility Blower
Improvements in Lake Stevens, Washington (Contract), and said Principal is required under the terms of that Contract to furnish a payment bond in accord with Title 39.08 Revised Code of Washington (RCW) and (where applicable)
60.28 RCW.
The Principal, and ___________________________________ (Surety), a corporation organized under the laws of the
State of ___________________ and licensed to do business in the State of Washington as surety and named in the current list of “Surety Companies Acceptable in Federal Bonds” as published in the Federal Register by the Audit
Staff Bureau of Accounts, U.S. Treasury Dept., are jointly and severally held and firmly bound to the District, in the sum of _______________________________________________ US Dollars ($________________ amount to include sales tax) Total Contract Amount, subject to the provisions herein.
This statutory payment bond shall become null and void, if and when the Principal, its heirs, executors, administrators, successors, or assigns shall pay all persons in accordance with RCW Titles 60.28, 39.08, and 39.12 including all workers, laborers, mechanics, subcontractors, lower tier subcontractors, and material suppliers, and all persons who shall supply such contractor or subcontractor with provisions and supplies for the carrying on of such work, and all taxes incurred on said Contract under Title 50 and 51 RCW and all taxes imposed on the Principal under Title 82
RCW; and if such payment obligations have not been fulfilled, this bond shall remain in full force and effect.
The Surety agrees to indemnify, defend, and protect the District against any claim of direct or indirect loss resulting from the failure of the Principal, its heirs, executors, administrators, successors, or assigns, (or the subcontractors or lower tier subcontractors of the Principal) to pay all laborers, mechanics, subcontractors, lower tier subcontractors materialpersons, and all persons who shall supply such contractor or subcontractors with provisions and supplies for the carrying on of such work.
The Surety for value received agrees that no change, extension of time, alteration or addition to the terms of the
Contract, the specifications accompanying the Contract, or to the work to be performed under the Contract shall in any way affect its obligation on this bond, except as provided herein, and waives notice of any change, extension of time, alteration or addition to the terms of the Contract or the work performed. The Surety agrees that modifications and changes to the terms and conditions of the Contract that increase the total amount to be paid the Principal shall automatically increase the obligation of the Surety on this bond and notice to Surety is not required for such increased obligation.
This bond may be executed in two (2) original counterparts, and shall be signed by the parties’ duly authorized officers.
This bond will only be accepted if it is accompanied by a fully executed and original power of attorney for the officer executing on behalf of the surety.
The Surety agrees to be bound by the laws of the state of Washington and subjected to the jurisdiction of the state of
Washington.
PRINCIPAL SURETY
Principal Signature Date Surety Signature Date
Printed Name Printed Name
Title Title
Local office/agent of Surety Company:
Name _____________________________________ Telephone _________________________________
Address _________________________________________________________________________________
PART 3
SUPPLEMENTARY GENERAL CONDITIONS
AND GENERAL CONDITIONS
SGC-1
The General Conditions shall be supplemented as follows:
3.03.4(3.1) Apprentice Utilization
Under the subheading Apprentice Utilization Plan delete the first paragraph and replacement it with the following:
“The Contractor shall submit an “Apprentice Utilization Plan” by filling out the
Apprentice Utilization Plan Form (WSDOT Form 424-004) or (L&I Form F100-
538) or other form approved by the Contracting Agency with the Bid Proposal.
The Apprentice Utilization Plan must demonstrate how and when they intend to achieve the Apprentice Utilization Requirement. The Plan shall be in sufficient detail for the Engineer to track the Contractor’s progress in meeting the utilization requirements. An Apprentice Utilization Plan shall be updated and resubmitted as the Work progresses or when requested by the Engineer or other Contracting
Agency representative.”
November 12, 2026 – General Conditions i
TABLE OF CONTENTS PAGE
GENERAL INFORMATION APPLICABLE TO PROPOSAL AND
CONTRACT ............................................................................................................................... 1-1
1.01 DEFINITIONS AND TERMINOLOGY ..................................................................... 1-1
1.02 ABBREVIATIONS AND TERMINOLOGY ............................................................. 1-1
1.02.1 REFERENCED STANDARDS AND CODES ................................................... 1-1
1.02.2 TERMINOLOGY ................................................................................................ 1-3
1.02.3 ITEMS OF WORK AND UNITS OF MEASUREMENT .................................. 1-3
1.03 DEFINITIONS ............................................................................................................. 1-4
INSTRUCTIONS FOR PREPARATION OF PROPOSAL (OR BID) ........ 2-1
2.01 BID PROCEDURES AND CONDITIONS ................................................................ 2-1
2.01.1 QUALIFICATIONS OF BIDDERS .................................................................... 2-1
2.01.2 CONTRACT PROVISIONS AND CONTRACT PLANS ................................. 2-1
2.01.3 ESTIMATED QUANTITIES .............................................................................. 2-1
2.01.4 EXAMINATION OF CONTRACT AND SITE ................................................. 2-1 2.01.4(1) General ......................................................................................................... 2-1
2.01.4(2) Interpretation of the Contract Provisions and Contract…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .