Washakie Roadwork Site Visit Info.pdf
PDF 1 MB Posted
- Attached to
- UNITED STATES FOREST SERVICE, ROCKY MOUNTAIN REGION 2, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
- Solicitation number
- Not on record
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a site visit information sheet for the Washakie Road Work federal contract opportunity. The project scope involves roadway reconditioning, removal and replacement of existing culverts, installation of new culverts, placement and compaction of aggregate, and maintenance and reconstruction of drainage features on several National Forest System Roads in the Shoshone National Forest, Washakie Ranger District, Wyoming. The work includes 19.7 miles of roadway reconditioning on NFSR 300 Louis Lake Road, 3.7 miles on NFSR 302 Roaring Fork Road, 0.9 miles on NFSR 307 Fiddler Lake Road, 1.4 miles on NFSR 308 Louis Lake Access Road, and 6.7 miles on NFSR 326 Limestone Road, as well as work on other minor roads and campground areas. The project is part of a larger Multiple Award Task Order Contract (MATOC) being solicited by the USDA Forest Service, Rocky Mountain Region 2. No formal site visit is planned, but contractors are encouraged to visit the project site on their own using the information provided. Offers are required on at least one of the seed projects to be considered for the MATOC.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Washakie LRT Roadwork Maps:
Forest: Shoshone National Forest
District: Washakie Ranger District
Project Name: Washakie Road Work 2024
Scope:
Roadway reconditioning existing roads, removal and replacement of existing culverts, installation of new culverts, placement and compaction of aggregate, and maintenance and reconstruction of drainage features.
General Summary of Work:
NFSR 300 Louis Lake Road 19.7 miles of roadway reconditioning Level III NFSR 300 from end of pavement at Junction 302/300 (Mile 0.0) to pavement at parking area at Junction 300/HWY 28 South Pass. Place 250 tons of compacted aggregate. Remove and replace 1 existing culvert.
Install 3 new culverts. Clean 13 existing culverts.
NFSR 302 Roaring Fork Road 3.7 miles of roadway reconditioning Level III NFSR 302 from end of pavement at Junction 302/300 (Mile 0.0) to end of road (Mile 2.6), plus campground loop, plus trailhead parking loop (Mile 3.7). Place 78 tons of compacted aggregate. Install one culvert.
Clean 5 existing culverts.
NFSR 307 Fiddler Lake Road 0.9 miles of roadway reconditioning Level III NFSR 307 from Junction 300/307 to end of road, plus campground loop, plus boat dock spur. Clean 2 existing culverts.
NFSR 308 Louis Lake Access Road 1.4 miles of roadway reconditioning Level III NFSR 308 from Junction 300/308 to end of road, plus campground loop, plus boat dock spur. Clean 2 existing culverts. Place 30 tons of compacted aggregate on slumping section of road.
NFSR 300.2E Little Popo Agie Campground: Re-establish 2 rolling dips. Place 50 tons of compacted aggregate on rocky section of campground road.
NFSR 326 Limestone Road (Ed Young Rd): 6.7 miles of roadway reconditioning Level III NFSR 326 from HWY 28 (Mile 0.0) to Junction 326/352. Clean 6 culverts.
NFSR 327 Wild Iris Road: 0.8 miles of roadway reconditioning Level III NFSR 327 from Junction 326/327 (Mile 0.0) to Wild Iris Parking Area (Mile 0.7). Remove 2 abandoned culverts at Mile 0.3 and 0.4.
NFSR 351 Fairfield: 0.3 miles of roadway reconditioning Level III NFSR 326 from HWY 131/NFSR 300 (Mile 0.0) to Parking Area (Mile 0.3).
Place 100 tons of compacted aggregate. Install two culverts at Mile 0.03 and 0.12.
Project Map:
NFSR 300:
NFSR 302:
NFSR 307:
NFSR 308 & NFSR 300.2E Little Popo Agie Campground :
NFSR 326 & 327: