Ware River Park construction bid map.pdf

PDF 2 MB Posted

Attached to
Rail Trail construction
Solicitation number
BD-20-1622-HARDW-HARDW-82924
Issued by
Worcester County, Massachusetts

About this file

This document is a bid map related to the construction of the Ware River Park for the Mass Central Rail Trail in the town of Hardwick, Massachusetts. The project aims to formalize the former railroad bed located on the Ware River Park to meet accessibility standards for the Mass Central Rail Trail. The work includes addressing storm water drainage and trail width adjustments before a firm, stable surface of stone dust is applied. Construction must be completed by June 30, 2023. This segment of the MCRT includes sweeping views of the Ware River and is within easy walking distance of residents of the village of Gilbertville.

The bid map indicates the proposed eastern and western access parking areas for the project. The construction area is located within Worcester County, Massachusetts. Interested bidders should be aware of the project timeline, which requires completion by the end of the 2023 fiscal year.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IA

Rte. 32/Lower Road

Proposed eastern access parking area

Proposed western access on Main St.

Main St.

± 0 0.20.1 Miles

Legend MCRT construction

IA Parking east ! ! ! MCRT active construction 2022

Parcels

Mass Central Rail Trail Construction Ware River Park

Town of Hardwick Gilbertville, MA

File details come from the government source that posted it. Updated .