Walker County Government has issued a Request for Proposal (RFP #2025-07) for the Walker Rocks Park Trail Resurfacing project located at the Walker County Civic Center Campus in Rock Spring, Georgia. The project involves replacing approximately 3,215 linear feet of existing crushed/compacted stone trail with a solid surface (such as asphalt or bonded rubber) and installing 475 feet of new trail section. The existing trail will be resurfaced to a minimum of 1.5" thick and 8' wide with beveled edges, while the new trail section will be 1.5" thick and 4' wide. A pre-bid site visit is scheduled for September 5, 2025, at 9:00 a.m., and bids are due by September 23, 2025, at 12:01 p.m. The project must be completed within 90 days after the notice to proceed is issued.
The bid schedule includes pricing options for different surface materials (asphalt, bonded rubber, and other surfaces) for the entire trail length, as well as additional pricing for expanding the width of the new 475-foot trail section. Bidders are required to submit comprehensive documentation, including company history, similar project references, project team qualifications, proposed methodology, project timeline, and itemized pricing. The county prefers vendors with at least three years of construction experience and will evaluate proposals based on various factors beyond just price. Additional requirements include providing E-Verify documentation, safety measures, insurance certificates, and compliance with the Georgia Security and Immigration Compliance Act.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Walker County
Request for Proposal
2025-07
Walker Rocks Park Trail Resurfacing
Bid Posted: August 22, 2025
Bid Opening: September 23, 2025, 12:01 p.m.
101 S. Duke Street
LaFayette, GA 30728
Inquiries:
Inquiries regarding this project and the bidding process should be sent by email to: j.legge@walkerga.us.
Only inquiries received in writing will receive a response. All such written inquiries must be submitted by
September 9, 2025 at 9:00 a.m. EDT. Walker County will publish a response to all inquiries on its website at walkercountyga.gov/public-notices on September 11, 2025.
https://walkercountyga.gov/public-notices/
INTRODUCTION:
Walker County Government (hereinafter referred to as “WCG”) is soliciting proposals from qualified vendors to provide all necessary service and materials for the resurfacing and extension of the Walker Rocks Park Trail on the Walker County Civic Center
Campus, 10052 Hwy 27, Rock Spring, Georgia.
PROJECT INFORMATION AND PROJECT SCOPE:
The project consists of replacing approximately 3,215 feet of crushed/compacted stone with a solid surface, such as asphalt or bonded rubber, along with the installation of approximately 475 feet of new trail section. (see attached map)
1. Aggregate surface to be installed on existing 3,215 LF gravel trail shall be a minimum of 1.5” thick
2. Aggregate surface to be installed on existing 3,215 LF trail shall be a minimum of
8’ in width with beveled edges (preferred)
3. New 475 linear foot trail section shall be a minimum of 1.5” thick and a minimum of 4’ in width with beveled edges (preferred)
ADDITIONAL ITEMS TO INCLUDE IN PRICING AS OPTIONS:
a. Pricing based on different aggregate surface materials, such as asphalt and bonded rubber (WCG would like to explore the various surface options)
b. Pricing per additional 12” width for new 475 linear foot trail (WCG would like to explore the option to provide more width on this section of the trail)
Note: pricing should not include the following:
· Permitting and inspection fees (permits and inspections will be required, but the fees will be waived by the county)
· Sub-base preparation to be handled by the county
· Location of existing utilities
· Landscaping
SITE VISIT MEETING:
There will be a pre-bid site visit for all interested parties to review the site and ask questions at 9:00 a.m. local time on Friday, September 5, 2025 at the Walker Rocks
Park Pavilion on the Walker County Civic Center Campus, 10052 Highway 27, Rock
Spring, GA 30739
COMPLETION TIME:
The project must be completed 90 days after a notice to proceed is issued, unless the parties agree to an extension of time.
OTHER REQUIREMENTS:
The successful bidder will be responsible for providing an executed E-Verify S.A.V.E.
document. Sub-contractors that are part of the project team must be clearly identified in the submission, including roles, resumes of key personnel and project references. The
Contractor is responsible for obtaining E-verify Affidavits from its subcontractors and submitting verification to WCG prior to executing a contract with any subcontractor.
The successful bidder will provide safety measures such as fencing, barriers, signs, etc.
that are required to ensure the public’s safety during this project.
I. CONTENT AND FORMAT OF PROPOSALS
WCG will evaluate all written submittals. It is incumbent upon the proposers to demonstrate within their proposals how each requirement will be satisfied. All
Proposals must meet the specifications outlined in this Proposal. WCG reserves the right to investigate the qualifications and experience of the proposers, or to obtain new proposals. Proposals not sufficiently detailed or are in an unacceptable form may be rejected by WCG. Dates and documentation included in the proposal become public record upon selection of a proposal by the Walker County Board of Commissioners.
Interested firms must follow the process outlined in the following pages in submitting their proposal. WCG prefers to accept proposals from vendors with three (3) years’ experience minimum; however, this factor and the following will be reviewed to assist
WCG in deciding the most favorable vendor. Along with the Bid Schedule, please submit the following:
a. A discussion of the history of the firm, including the number of years in business
b. Documentation of two (2) similar or comparable projects completed within the past five (5) years, including photographs of each project.
c. Firm’s proposed project team including qualifications and experience of each member with projects of this nature; provide a minimum of 2 projects;
d. Provide at least three (3) references for similar projects (including numbers and addresses);
e. Proposed methodology for the development and completion of the project.
Describe in detail your approach and scope and how the proposal will satisfy all criteria of the project;
f. Proposed project timeline;
g. Provide itemized pricing based upon your proposed methodology
II. ASSEMBLE IN THIS ORDER
a. BID SCHEDULE
b. CONTRACTOR REGISTRATION & REFERENCES
c. SUPPORTING PROJECT NARRATIVE & DOCUMENTATION
d. GEORGIA SECURITY & IMMIGRATION COMPLIANCE ACT AFFADAVIT
(Contractor & Subcontractors)
e. IRS Form W-9
BID SCHEDULE: Locate this page at the front when assembling documents for your proposal.
For furnishing all labor, materials & equipment necessary to resurface a 3,690 LF trail.
BID SCHEDULE
RFP #2025-07
No. Item Description Amount
01 Asphalt - 3,690 LF trail
(3,215 at 8’ width and 475 at 4’ width)
02 Bonded rubber - 3,690
LF trail (3,215 at 8’ width and 475 at 4’ width)
03 Other surface - 3,690 LF trail (3,215 at 8’ width and
475 at 4’ width)
Please note type of other surface:____________
04 Asphalt - Each additional
12” of width over 475 LF
05 Bonded rubber - Each additional 12” of width over 475 LF
06 Other surface - Each additional 12” of width over 475 LF
Please note type of other surface:____________
RFP #2025-07
BIDDERS RESPONSE:
Date of Bid: ____________________
The undersigned agrees, if this bid is accepted within ninety (90) days after the date of the opening, to furnish all supplies or services in strict accordance with provisions of this RFP at the price in the Bid
Schedule.
Prices are to remain firm for ninety (90) calendar days after the date of the opening.
I certify that this bid is made without prior understanding, agreement, or connection with any corporation, firm or person submitting a bid for the same supplies or services and is in all respects fair and without collusion or fraud. I understand that collusive bidding is a violation of state and federal law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of this bid and certify that I am authorized to sign this bid for the bidder.
Signature: _______________________________ Title: _________________
Printed name: ____________________________
WALKER COUNTY GOVERNMENT
101 S. DUKE STREET
LAFAYETTE, GA 30728
OFFICE: 706-638-1437
CONTRACTOR REGISTRATION Date: ________________
Name of Contractor: ____________________________
Does your company have employees: Yes No How many: ___________
Is your company licensed to do business in the State of Georgia: Yes No
City or County of Business License: ________________________________
Business Information:
Contact Name: ______________________________________________
Complete Street Address: _______________________________________
City/State/Zip: ______________________________________________
Mailing address (if different from above): ____________________________
City/State/Zip: ______________________________________________
E-mail: _____________________________ Phone: _________________
Website: ____________________________ Fax: ___________________
Organized As: Individual Partnership Corporation Limited Liability Company Other
(Circle one)
Federal EIN: ________________________________________________
Summary of Products/Services provided to the County: ___________________
Applicant Signature: ________________________ Date: ______________
Printed Name: ____________________________ Title: ______________
Walker County Government prefers to accept proposals from vendors with three (3) years’ construction experience.
Number of years in construction business: ____________________________
Firm’s facilities and equipment:
Firm Name: ____________________________________________
Address: ______________________________________________
Equipment: ____________________________________________
Firm’s experience with similar projects: Provide a minimum of 2 projects:
Project: _______________________________________________
Location Address: ________________________________________
Point of Contact: _________________________________________
Project: _______________________________________________
Location Address: ________________________________________
Point of Contact: _________________________________________
References:
1) Company/Organization: ____________________________________
Address: _______________________________________________
Contact: _______________________________________________
E-mail: ___________________________ Phone: _______________
2) Company/Organization: ____________________________________
3) Company/Organization: ____________________________________
Describe in detail your approach and scope and how the proposal will satisfy all criteria of the project: ________________________________________________
Attach the following:
A. List of subcontractors and their contact information
GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT
Systematic Alien Verification for Entitlements (SAVE) Program
Contract No. and Name: Walker Rocks Park Trail Resurfacing 2025-07
Contractor’s Name: _____________________________________________________________
STATE OF GEORGIA
CONTRACTOR AFFIDAVIT
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm, or corporation which is contracting with Walker County and attests to the following:
a) The Contractor has registered with, is authorized to use and uses the federal work authorization program commonly referred to as E-Verify, or any subsequent replacement program;
b) The Contractor will continue to use the federal work authorization program throughout the contract period, including any renewal or extension thereof;
c) The Contractor will notify Walker County in the event the Contractor ceases to utilize the federal work authorization program during the contract period;
d) The Contractor understands that ceasing to utilize the federal work authorization program constitutes a material breach of Contract;
e) The Contractor will contract for the performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the Contractor with the information required by O.C.G.A. § 13-10-91(a),
(b) and (c);
f) The Contractor acknowledges and agrees that this Affidavit shall be incorporated into any contract(s) subject to the provisions of O.C.G.A. § 13-10-91 for the project listed above to which Contractor is a party after the state hereof without further action or consent by Contractor;
g) Contractor acknowledges its responsibility to submit copies of any affidavits, drivers’ licenses, and identification cards required pursuant to O.C.G.A. § 13-10-91 to Walker County within five business days of receipt.
EEV / E-verifyTM User Id (Account) Number Date of Authorization
BY: Authorized Officer or Agent Date (Contractor Name)
Title of Authorized Officer or Agent of Contractor
Printed Name of Authorized officer or Agent
SUBSCRIBED AND SWORN BEFORE ME ON THIS THE
______ DAY OF _____________________, 20_____
Notary Public
My Commission Expires: _____________________________
GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT
Systematic Alien Verification for Entitlements (SAVE) Program
Contract No. and Name: : Walker Rocks Park Trail Resurfacing 2025-07
Contractor’s Name: _____________________________________________________________
STATE OF GEORGIA
SUBCONTRACTOR AFFIDAVIT
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm, or corporation which is contracting with Walker County and attests to the following:
a) The Contractor has registered with, is authorized to use and uses the federal work authorization program commonly referred to as E-Verify, or any subsequent replacement program;
b) The Contractor will continue to use the federal work authorization program throughout the contract period, including any renewal or extension thereof;
c) The Contractor will notify Walker County in the event the Contractor ceases to utilize the federal work authorization program during the contract period;
d) The Contractor understands that ceasing to utilize the federal work authorization program constitutes a material breach of Contract;
e) The Contractor will contract for the performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the Contractor with the information required by O.C.G.A. § 13-10-91(a),
(b) and (c);
f) The Contractor acknowledges and agrees that this Affidavit shall be incorporated into any contract(s) subject to the provisions of O.C.G.A. § 13-10-91 for the project listed above to which Contractor is a party after the state hereof without further action or consent by Contractor;
g) Contractor acknowledges its responsibility to submit copies of any affidavits, drivers’ licenses, and identification cards required pursuant to O.C.G.A. § 13-10-91 to Walker County within five business days of receipt.
EEV / E-verifyTM User Id (Account) Number Date of Authorization
BY: Authorized Officer or Agent Date (Contractor Name)
Title of Authorized Officer or Agent of Contractor
Printed Name of Authorized officer or Agent
SUBSCRIBED AND SWORN BEFORE ME ON THIS THE
______ DAY OF _____________________, 20_____
Notary Public
My Commission Expires: _____________________________
Terms and Conditions:
1. Bid Identification: All bids submitted for this RFP must be returned in a sealed envelope with the following information in the lower left-hand corner of the envelope:
RFP #2025-07 / Walker Rocks Park Trail Resurfacing
All bids must be submitted in hard copy, one original and two copies by 12:00 p.m. on
Tuesday, September 23, 2025, at the Walker County Administration Office located at
101 South Duke Street, P.O. Box 445, LaFayette GA 30728. Submittals received after this time and date will not be considered. An additional copy of the submission on digital media is appreciated.
All bidders must fill out and sign a Completed Affidavit of Contractor’s
E-Verify Compliance and any applicable Affidavit for subcontractors and submit it with your bid.
All bidders must fill out and sign an IRS Form W-9 and submit it with your bid.
2. Withdrawal of Bids: Bids may be withdrawn by written request only if the request is received PRIOR to the time and date set for the opening of bids. Negligence on the part of the bidder in preparing their bid confers no right of withdrawal or modification of their bid once the bid has been opened. No bid may be withdrawn for a period of ninety (90) days after time has been called on the date of opening.
3. Bonds: Construction bidders are required to post performance and payment bonds in an amount equal to the contract award.
4. Award of Contract: Award will be made to the responsible bidder whose bid, conforming to the request for proposals, will be most advantageous to WCG; price and other factors considered. WCG reserves the right to reject any and/or all bids submitted and to waive any technicalities or minor irregularities in bids received. A written award shall be deemed to result in a binding contract without further action by either party.
5. Exceptions to Specifications: Any award resulting from this request for proposals shall bind the proposer to all terms, conditions, and specifications set forth in this request for proposals. Proposers whose proposals do not conform should note on a separate page if necessary and/or on the bid schedule. While WCG reserves the right to make an award to a nonconforming proposer, when in the best interest of WCG, such awards will not be readily made, and proposers are urged to conform to the greatest extent possible. No exceptions will be considered to have been taken by proposer unless it is properly set out as provided above. No exception will be deemed to have been taken by WCG unless incorporated in an award resulting from this request for proposals and so stated.
6. Proposal Results: Interested parties may request, in writing, a bid tabulation after award has been approved by the Walker County Board of Commissioners by sending a self-addressed, stamped envelope with their request to: Walker County Clerk, P.O. Box
445, LaFayette, GA 30728.
7. Payment: Payments will be made upon all items completed each month or completion of all work and acceptance by WCG on invoices submitted and approved by the appropriate WCG representative(s). All invoices must have a Purchase Order (PO) number and shall be itemized. All invoices submitted will be closely monitored for accuracy. Any invoice found to be incorrect will be returned to the vendor for correction.
8. Taxes: Items on this order are exempt from Federal Excise Tax and Georgia Sales and Use tax. A certificate will be furnished if requested. WCG is exempt from taxes, but the successful bidder shall pay all taxes required of him by law and WCG cannot exempt others from tax.
9. Retainage: WCG shall retain 10% of the amount of each payment until final completion and acceptance of all work covered by the contract documents.
10. Inquiries Regarding Payment: All inquiries regarding payment of invoices are to be directed to Accounts Payable, (706) 638-1437 or: Walker County Government, Attn:
Accounts Payable, P.O. Box 445, LaFayette, GA 30728.
11. Execution of Contract: Subsequent to the award, the successful proposer will be presented with a “Notice of Award”. The date of presentation shall be deemed to be the postmark or sent date, if emailed. The successful proposer’s proposal and this request for proposals shall serve as the contract for this project.
12. Certificate of Insurance: The Contractor agrees to procure all of the insurance specified below:
A. Workers’ Compensation Insurance for all employees who are engaged in work under the contract.
B. Public Liability and Motor Vehicle Liability Insurance: The Contractor shall take out and maintain during the life of this contract, such public liability and motor vehicle liability insurance as shall protect him glide performing work covered by this contract from claims for damages which may arise from operations by himself or by any other person directly or indirectly employed by him and the amounts of such insurance shall be as follows:
i. Public Liability Insurance in an amount not less than $1,000,000.00 on account of one occurrence.
ii. Motor Vehicle Liability Insurance on all motor vehicles owned, leased or otherwise used by the Contractor in an amount not less than $500,000.00
(combined single limit) for bodily injury including death and property damage combined.
C. Professional Liability Insurance: The Contractor shall procure and maintain during coverage in the amount not less than $1,000,000.00.
13. Insurance Conditions:
A. The insurance company must be licensed to do business in the state of
Georgia.
B. The Contractor shall furnish to WCG a certificate of insurance covering the work as required above as evidence that the insurance required will be maintained in force for the entire duration of the work performed under this agreement.
C. The cancellation of any policy of insurance required by this agreement shall meet the requirements of notice under the laws of the State of Georgia as presently set forth in O.C.G.A. 33-24-44.
D. Each policy of insurance required under this agreement shall provide for notice requirements under the laws of the State of Georgia as set forth in
O.C.G.A. 33-24-44 and by endorsement shall provide that WCG will receive a copy of said notice of cancellation.
E. A certificate of insurance with a cancellation provision which provides for less notice than that required by O.C.G.A. 33-24-44, or which provides that failure to give the written notice will not impose any responsibility upon the insurer, shall constitute a basis for insurance rejection of the insurance by WCG.
F. In addition to its agreement to obtain and maintain the insurance as set forth herein above, the Contractor agrees to indemnify and hold harmless WCG, its officers, agents and employees from any and all claims against the WCG, its officers, agents, and employees, which arise out of any act or omission of the
Contractor or any consultant employed by the Contractor or any of their officers, agents or employees, and any and all claims which result from any condition created or maintained by the Contractor or any consultant employed by the
Contractor or any of their officers, employees or agents, which condition which a result of work performed under the contract.
14. Cancellation of Insurance: If the insurance is canceled, the contractor shall deliver to WCG new policies of insurance. Should the Contractor neglect to obtain and maintain in force such insurance and deliver such policy or policies, then it shall be lawful for WCG to obtain and maintain such insurance at Contractors expense.
15. Inclusion: All items and/or services standard, expected, necessary, and/or routine to such a project as this and not actually stated in this request for proposals will be the responsibility of the successful proposer to provide at no other cost to WCG unless so stated on the successful proposer’s proposal as additional cost items and accepted by WCG at the time of the award.
16. Regulatory Agencies: Successful proposer will be responsible for all required permits or licenses required by the regulatory agency of the county, state, or federal governments. Further, successful proposer will be responsible for meeting all requirements of any regulation(s) or guideline(s) of any of the said governments or any independent agency recognized by said governments as publisher of any such regulation(s) or guideline(s).
17. Independent Contractors: The proposer represents to WCG that he is fully experienced and properly qualified to perform the functions provided herein and that he is properly equipped, organized, and financed to perform such functions. The proposer shall finance his own operations hereunder, shall operate as an independent contractor and not as an agent of WCG and nothing contained in this request for proposals or a contract resulting from same shall be construed to constitute the proposer or any of his employees, servants, agents, or subcontractors as a partner, employee, servant, or agent of the county nor shall either party have any authority to bind the other in any respect; it being intended that each shall remain an independent contractor.
18. Assignment of Contractual Rights: It is agreed that the successful proposer will not assign, transfer, convey, or otherwise dispose of a contract that results from an award stemming from this request for proposals or his right, title, or interest in or to the same, or any part thereof, without written consent of WCG.
19. Starting Time: Work will commence within fourty-five (45) calendar days after being issued a “Notice to Proceed” on the project and commence in a routine, orderly manner until completion and acceptance by WCG.
20. Change Orders: Any and all change order requests by the successful bidder must be approved through the WCG Procurement Policy. For any work performed outside the contract agreement for which compensation over and above the agreement occurs, there must be an accompanying approved change order. If work is done before change order approval, the change may be rejected or denied for compensation.
21. Indemnity: Successful proposer agrees to defend, indemnify, and hold harmless
WCG from any and all courses of action or claims of damages arising out of or related to proposer’s performance or actions or those of his employees or agents, under said contract.
22. Cancellation for Cause: Should either party fail to comply with the terms and conditions of this contract, the aggrieved party must give, in writing, to the other party any complaint for non-compliance to the terms and conditions of this contract. The other party shall have fifteen (15) calendar days to correct the matter. If corrected to the satisfaction of both parties within the fifteen (15) calendar days and stated in writing, then the contract will continue uninterrupted. Failure to correct the matter will result in termination of this contract at the end of thirty (30) calendar days following the date of the initial letter of complaint.
23. Liquidated Damages: Contractor shall complete all work in the time stated as the
“completion time”. In the event that the contract is not completed within the specified time, the Contractor agrees to default of contract and by reason of this default, contractor shall pay to WCG, not as a penalty, but as liquidated damages, in the sum of
$500 for each day of overrun in contract time.
24. Weather Days: Completion time will not be extended for normal bad weather.
The time for completion as stated in the Contract Documents includes due allowance for calendar days on which work cannot be performed outdoors. For the purpose of this
Contract, the Contractor agrees that he may expect to lose calendar days due to weather in accordance with the following table:
January – 22 days April – 7 days July - 8 days October – 5 days
February - 16 days May – 4 days August – 6 days November – 9 days
March – 11 days June – 6 days September – 4 days December – 15 days
The Contractor agrees an extreme weather day shall be defined as a day that rain exceeds one tenth (0.10) of an inch and the average temperature fails to exceed 40 degrees F, and the maximum temperature does not exceed 50 degrees F. The temperature and rain data should come from appropriate local weather stations. A weather day will also be defined as a day in which less than seventy-five percent (75%) of the normal labor and equipment force can operate for five (5) hours due to weather-related site conditions. Contract time will be extended by the number of days in which actual weather days in a given month exceed the number of weather days given in the table above.
Delays caused by acts of God, (e.g., fire, unusual storms, floods, tidal waves, earthquakes,) strikes, labor disputes, freight embargoes and shortages of materials shall be considered as unavoidable delays insofar as they prevent the Contractor from proceeding with at least seventy-five percent (75%) of the normal labor and equipment force for at least five (5) hours per day toward completion of the current controlling item on the accepted work schedule.
Should abnormal conditions prevent the work from beginning at the usual starting time, or prevent the Contractor from proceeding with seventy-five percent (75%) of the normal labor and equipment force for a period of at least five (5) hours per day, and the crew is dismissed as a result thereof, the Contractor will not be charged for a working day whether or not conditions change so that the major portion of the day could be considered to be suitable for work on the controlling item.
For delays which the Contractor considers to be unavoidable he/she shall submit to the
Community Development Director of Walker County complete information demonstrating the effect of the delay on the controlling operation in his construction schedule. The submission shall be made within three (3) calendar days of the occurrence claimed to be responsible for the unavoidable delay.
25. Changes to Contract: No change will be made to this contract except by written modification by WCG.
Map of Construction Area:
Existing stone surface trail depicted in BLACK
New trail section area depicted in GREEN