WAHOO (WPB 87345) BLANK SCHEDULE OF SERVICES.xls
XLS spreadsheet 55 KB Posted
- Attached to
- USCGC WAHOO (WPB 87345) DRYDOCK REPAIRS Federal contract opportunity
- Solicitation number
- 70Z080-21-Q-P4500600
About this file
This document contains a schedule of services and pricing template for the drydock repairs of USCGC Wahoo at a cost estimate of an unspecified total. The Coast Guard is soliciting bids under solicitation number 70Z080-21-Q-P4500600 to perform work including structural analysis, hull preservation, tank cleaning, deck preservation, engine maintenance, shaft and propeller renewal, sea water system maintenance, rudder assembly renewal, drydocking, sea trials support, and other repairs. Bids are due by an unspecified date. The schedule includes line items for labor rates and material/subcontracting costs. Pricing and incurrence of costs must be in accordance with the terms and conditions of the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 AMEND A00001 70Z080-21-Q-P4500600 USCGC WAHOO DD.pdf | ||
| WAHOO SOLICITATION.docx | DOCX document | |
| WAHOO (WPB 87345) DD SPEC.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC WAHOO (WPB-87) DRYDOCK AVAILABILITY FY2021 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Structural Analysis, 3D Laser Scan, Perform | JOB | 1 | $0.00 | |
| D-002 | Hull Plating (Side Scan), Ultrasonic Testing | JOB | 1 | $0.00 | |
| O-003 | Ultrasonic Thickness Measurements, Perform | JOB | 1 | $0.00 | |
| D-004 | U/W Body, Preserve (100%) | JOB | 1 | $0.00 | |
| D-005 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | $0.00 | |
| D-006 | Tank, Dirty Oil, Clean and Inspect | JOB | 1 | $0.00 | |
| D-007 | Tank, Oily Water, Clean and Inspect | JOB | 1 | $0.00 | |
| D-008 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | $0.00 | |
| D-009 | Decks, Exterior (Main Deck), Preserve | JOB | 1 | $0.00 | |
| O-010 | Capastic Fairing, Depth Sounder, Renew | JOB | 1 | $0.00 | |
| D-011 | Mast, Preserve (“100%”) – Contractor Interference Removal | JOB | 1 | $0.00 | |
| D-012 | Main Diesel Engine Assemblies, Perform W-5 Maintenance And Update Control System Configuration | JOB | 1 | $0.00 | |
| O-013 | Main Engine/Reduction Gear, Realign | JOB | 1 | $0.00 | |
| D-014 | Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | $0.00 | |
| D-015 | Aft Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | $0.00 | |
| O-016 | Intermediate Bearing Carriers, Renew | JOB | 1 | $0.00 | |
| O-017 | Aft Bearing Carriers, Renew | JOB | 1 | $0.00 | |
| D-018 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | $0.00 | |
| D-019 | Propellers, Renew | JOB | 1 | $0.00 | |
| D-020 | Speed Log, Skin Valve, Renew | JOB | 1 | $0.00 | |
| D-021 | Sea Water System, Perform Maintenance | JOB | 1 | $0.00 | |
| D-022 | Rudder Assemblies, Renew | JOB | 1 | $0.00 | |
| D-023 | Stern Launch Door, Remove, Inspect and Reinstall | JOB | 1 | $0.00 | |
| D-024 | Cathodic Protection/Zinc Anodes, Renew | JOB | 1 | $0.00 | |
| D-025 | Drydock | JOB | 1 | $0.00 | |
| D-026 | Temporary Services, Provide - Cutter | JOB | 1 | $0.00 | |
| D-027 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-028 | Fathometer Transducer, Renew | JOB | 1 | $0.00 | |
| D-029 | HVAC 2-Stage Intake Separator, Modify | JOB | 1 | $0.00 | |
| D-030 | Main Mast, Modify | JOB | 1 | $0.00 | |
| D-031 | Oily Water Separator, Remove | JOB | 1 | $0.00 | |
| D-032 | Propulsion Shaft and Shaft Seals, Replace | JOB | 1 | $0.00 | |
| D-033 | 24VDC Distribution System, Upgrade | JOB | 1 | $0.00 | |
| D-034 | Coupling, Sewage Tank TLI, Renew | JOB | 1 | $0.00 | |
| D-035 | Interior Deck Covering System, Reseal | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | $0.00 | Hour | $0.00 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | $0.00 | Day | 5 | $0.00 |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(4/6/2020) Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .