Wage Determination - MI20260101 05-18-2026 - 553-21-204.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25026B0037
About this file
This document is a General Decision (GD) MI20260101 issued by the U.S. Department of Labor on May 18, 2026, establishing prevailing wage rates for construction work in Wayne County, Michigan. The decision applies to building construction projects and supersedes previous wage determinations, with Modification 1 effective May 18, 2026.
The document establishes hourly wage rates and fringe benefits for 35+ skilled trade classifications required for federal construction contracts in the specified geographic area. Classifications covered include asbestos workers, boilermakers, tile setters, carpenters (multiple specializations), electricians, elevator mechanics, equipment operators (multiple power equipment groups), ironworkers, laborers (multiple specializations), painters, glaziers, cement masons, plasterers, plumbers, pipefitters, roofers, sprinkler fitters, sheet metal workers, and truck drivers. Wage rates range from $13.57 to $65.01 per hour, with corresponding fringe benefit rates ranging from $0.00 to $40.85 per hour. The document includes detailed footnotes explaining special conditions such as paid holidays, vacation pay eligibility based on years of service, and height-related pay premiums for equipment operators. The prevailing wage rates are identified by their source (union rates, survey rates, state-adopted rates, or union average rates) through specific identifier codes. The document concludes with guidance on wage determination appeals processes and contact information for the Department of Labor's Wage and Hour Division and Branch of Construction Wage Determinations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S04 Pre-Bid Attendance Log - 553-21-204.pdf | ||
| 36C25026B0037 0001.docx | DOCX document | |
| 36C25026B0037_1.docx | DOCX document | |
| VAAR 852.219-75 DEVIATION Jan 2023 LIMITATIONS OF SUBCONTRACTING.pdf | ||
| RFI Form - 553-21-204.doc | DOC document | |
| Contractor EMR Certification Form - 553-21-204.docx | DOCX document | |
| Specs - Relocate Controls for Sewer Pump Station No 3 - 553-21-204.pdf | ||
| Drawings - Relocate Controls for Sewer Pump Station No 3 - 553-21-204.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .