Wage_Decision_MC-24-3507-B.pdf
PDF 312 KB Posted
- Attached to
- Detox Waterline Replacement and Train Station Boiler Replacement-City of Gallup Facilities
- Solicitation number
- 2025-ITB-011
- Issued by
- San Juan County, New Mexico
About this file
This is a Wage Decision Approval Summary document issued by the New Mexico Department of Workforce Solutions Labor Relations Division for the City of Gallup's Detox Waterline Replacement and Train Station Boiler Replacement project. The project involves two facility improvements: replacing waterlines at the Na' Nizhoozhi Center Inc (NCI) Detoxification Center located at 2205 E. Boyd Avenue and replacing the boiler at the George Galanis Multicultural Center (Gallup Train Station) at 201 E. Hwy 66. The total estimated project cost is $200,000, with an estimated contract award date of 12/20/2024 and a wage decision expiration date of 03/04/2025. The project will involve removing existing copper waterlines and installing new type L copper lines, as well as procuring and installing a new high-efficiency condensing boiler system to enhance operational efficiency and meet environmental standards.
The wage decision document provides detailed wage rates for various construction trade classifications effective January 1, 2024, including base rates, fringe rates, and apprenticeship rates for trades such as electricians, plumbers, carpenters, and laborers. The rates vary by zone and county, with specific rates for different worker classifications and skill levels. The document notes that contractors are required to pay subsistence, zone, and incentive pay according to specific trade requirements. No federal funds are involved in the project, and it is not part of a larger construction plan. The project aims to improve the infrastructure of city facilities by ensuring water distribution system integrity and providing a reliable, energy-efficient heating source for the train station.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Detox_Waterline_Replacement_and_Train_Station_Boiler_Replacement-City_of_Gallup_Facilities.pdf | ||
| Gallup_Sample_Contract.pdf | ||
| Detox_Blueprints.pdf | ||
| IMG_5705.jpg | JPG image | |
| IMG_5701.jpg | JPG image | |
| IMG_5707.jpg | JPG image | |
| IMG_5702.jpg | JPG image | |
| IMG_5704.jpg | JPG image | |
| IMG_5709.jpg | JPG image | |
| IMG_5706.jpg | JPG image | |
| IMG_5699.jpg | JPG image | |
| GALLUP_PERFORMANCE_BOND.pdf | ||
| GALLUP_PAYMENT_BOND.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wage Decision Approval Summary
1) Project Title: Detox Waterline Replacement and Train Station Boiler Replacement-City of Gallup Facilities Requested Date: 10/28/2024 Approved Date: 11/04/2024 Approved Wage Decision Number: MC-24-3507-B
Wage Decision Expiration Date: 03/04/2025
2) Physical Location of Jobsite for Project:
Job Site Address: 2205 E. Boyd Avenue, 201 E. Hwy 66 Job Site City: Gallup Job Site County: McKinley
3) Contracting Agency Name (Department or Bureau): City of Gallup Contracting Agency Contact's Name: Frances Rodriguez Contracting Agency Contact's Phone: (505) 863-1334 Ext.
4) Estimated Contract Award Date: 12/20/2024
5) Estimated total project cost: $200,000.00
a. Are any federal funds involved?: No
b. Does this project involve a building?: Yes - 1) Building affected will be the detoxification center.
Project consists of the complete removal of existing copper waterlines and installation of new copper lines, adhering to all relevant regulations and standards applicable in the state of New Mexico. 2) Additional building affected is the George Galanis Multicultural Center. Project consists of enhancement of operational efficiency, ensure safety, and comply with updated environmental standards. This project will include the removal of the old boiler, procurement and installation of a new, high efficiency condensing boiler system, and necessary upgrades to ensure compatibility with the infrastructure. The goal is to provide a reliable heating source that meets the demands of the train station while minimizing energy consumption.
c. Is this part of a larger plan for construction on or appurtenant to the property that is subject to this project?: No
d. Are there any other Public Works Wage Decisions related to this project?: No
e. What is the ultimate purpose or functional use of the construction once it is completed?: This project aims to ensure the integrity of the city's water distribution system and enhance the overall quality of water service provided to the Detox facility. This Project aims to enhance operational efficiency, ensure safety, and comply with updated environmental standards
6) Classifications of Construction:
Classification Type and Cost Total
Description
General Building (B) Cost: $200,000.00
This project aims to ensure the integrity of the city's water distribution system and enhance the overall quality of water service provided to the Detox facility. The selected contractor will be responsible for the complete removal of existing copper waterlines and installation of new copper lines, adhering to all relevant regulations and standards applicable in the state of New
LABOR RELATIONS DIVISION WWW.DWS.STATE.NM.US
401 Broadway NE Albuquerque, NM 87102 Phone: 505-841-4400 Fax: 505-841-4424
226 South Alameda Blvd Las Cruces, NM 88005 Phone: 575-524-6195 Fax: 575-524-6194
An Equal Opportunity Employer Page 1 of 2
Mexico. This Project aims to enhance operational efficiency, ensure safety, and comply with updated environmental standards. This project will include the removal of the old boiler, procurement and installation of a new, high efficiency condensing boiler system, and necessary upgrades to ensure compatibility with the infrastructure.
The goal is to provide a reliable heating source that meets the demands of the train station while minimizing energy consumption.
An Equal Opportunity Employer Page 2 of 2
TYPE “B” – GENERAL BUILDING
Effective January 1, 2024
Trade Classification
Base Rate
Fringe Rate
Apprenticeship
Asbestos Workers/Heat and Frost insulators 35.86 12.46 0.60
Asbestos Workers/Heat and Frost insulators: Los Alamos County 38.29 12.46 0.60 Boilermaker/blacksmith 35.88 32.28 0.60 Boilermaker/blacksmith: San Juan County 36.83 31.88 0.60
Bricklayer/Block layer/Stonemason 27.03 10.99 0.60 Bricklayer/Block layer/Stonemason Curry, DeBaca, Quay and Roosevelt counties 23.10 8.98 0.60 Bricklayer/Block layer/Stonemason Dona Ana, Otero, Eddie and Lea counties 26.42 8.98 0.60 Carpenter/Lather 29.11 12.79 0.60 Carpenter: Los Alamos County 33.18 13.58 0.60 Millwright/pile driver 39.00 29.40 0.60 Cement Mason 24.31 11.16 0.60 Electricians-Outside Classifications: Zone 1 Ground man 26.32 12.79 0.60 Equipment Operator 37.76 17.13 0.60 Lineman/technician 47.70 19.92 0.60 Cable Splicer 48.87 20.22 0.60
Electricians-Outside Classification: Zone 2 Ground man 26.32 12.79 0.60 Equipment Operator 37.76 17.13 0.60 Lineman/technician 47.70 19.92 0.60 Cable Splicer 48.87 20.22 0.60 Electricians-Outside Classifications: Los Alamos County
Ground man 27.07 12.81 0.60 Equipment Operator 38.85 17.17 0.60 Lineman/technician 48.95 20.24 0.60 Cable Splicer 53.75 21.44 0.60 Electricians-Inside Classifications: Zone 1 Wireman/low voltage technician 38.30 12.60 0.60 Cable Splicer 42.13 12.71 0.60 Electricians-Inside Classification:
Zone 2 Wireman/low voltage technician 41.75 12.70 0.60 Cable Splicer 45.58 12.82 0.60 Electricians-Inside Classification:
Zone 3 Wireman/low voltage technician 44.05 12.72 0.60 Cable Splicer 47.88 12.89 0.60 Electricians-Inside Classification:
Zone 4 Wireman/low voltage technician 48.26 12.90 0.60 Cable Splicer 52.09 13.01 0.60 Electricians-Inside Classification:
Dona Ana, Hidalgo, Luna and Otero Counties Wireman/low voltage technician 32.72 9.65 0.60 Cable splicer 32.72 9.65 0.60
Electricians-Inside Classification:
Los Alamos County Wireman/low voltage technician 44.05 14.97 0.60 Cable Splicer 47.88 15.28 0.60
Elevator Constructor 49.77 39.19 0.60
Elevator Constructor Helper 34.84 39.19 0.60 Glazier/Fabricator 21.75 7.10 0.60 Glazier: Los Alamos county 21.75 7.10 0.60 Ironworker Ironworker Journeyman 28.49 18.71 0.60 Probationary Ironworker 22.79 18.71 0.60 Painter 21.00 5.75 0.60 Painter: Los Alamos county 31.18 11.50 0.60 Paper Hanger 21.00 5.75 0.60 Paper Hanger: Los Alamos county 32.06 11.50 0.60 Drywall Finisher/Taper - Light Commercial & Residential Ames tool operator 27.40 8.86 0.60 Hand finisher/machine texture 26.40 8.86 0.60 Drywall Finisher/Taper – Light Commercial & Residential: Los Alamos county 21.18 11.50 0.60 Plasterer 24.76 9.99 0.60 Plumber/Pipefitter 36.91 14.75 0.60 Roofer Roofer Journeyman 26.94 9.36 0.60 Roofer Helper 16.16 9.36 0.60 Sheet metal worker Zone 1 37.50 19.08 0.60 Zone 2 – Industrial 38.50 19.08 0.60 Zone 3 – Los Alamos County 39.50 19.08 0.60 Soft Floor Layer 21.00 9.20 0.60
Soft Floor Layer: Los Alamos county 31.20 11.62 0.60 Sprinkler Fitter 35.75 24.56 0.60 Tile Setter 24.46 8.81 0.60 Tile Setter Helper/Finisher 16.53 8.81 0.60 Laborers Group I- Unskilled 20.44 7.96 0.60 Group II – Semi-skilled 20.44 7.96 0.60 Group III- Skilled 21.44 7.96 0.60 Group IV - Specialty 23.69 7.96 0.60 Operators Group I 24.49 8.22 0.60 Group II 26.76 8.22 0.60 Group III 27.24 8.22 0.60 Group IV 27.70 8.22 0.60 Group V 27.90 8.22 0.60 Group VI 28.12 8.22 0.60 Group VII 28.23 8.22 0.60 Group VIII 31.43 8.22 0.60 Group IX 33.94 8.22 0.60 Group X 37.51 8.22 0.60 Truck Drivers Group I-VII 16.65 8.27 0.60 Group VIII 16.71 8.27 0.60 Group IX 18.65 8.27 0.60
NOTE: All contractors are required to pay SUBSISTENCE, ZONE AND INCENTIVE PAY according to the particular trade. Details are located in a PDF attachment at
WWW.DWS.STATE.NM.US. Search Labor Relations/Labor Information/Public Works/Prevailing Wage Rates.
For more information about the Subsistence, Zone, and Incentive Pay rates, or to file a wage claim, contact the Labor Relations Division at (505) 841-4400 or visit us online at www.dws.state.nm.us.
http://www.dws.state.nm.us/ http://www.dws.state.nm.us/
File details come from the government source that posted it. Updated .