waa-skaman92135-1_plan_preAd.pdf
PDF 28 MB Posted
- Solicitation number
- 69056725B000013
About this file
This document is a preliminary engineering plan set for the Wind River Road Slide Reconstruction project in Skamania County, Washington. The Federal Highway Administration's Western Federal Lands Highway Division is preparing plans for a 0.32-mile road reconstruction project involving multiple infrastructure improvements, including retaining walls (mechanically-stabilized earth and soldier pile walls), guardrail replacement, culvert lining, and asphalt overlay. The project will reconstruct Wind River Road between stations 10+00.00 and 27+08.00, with a design speed of 50 MPH and projected average daily traffic of 5,341 vehicles in 2025 and 7,337 vehicles in 2045. The project includes detailed staging area plans, temporary traffic control phasing with single-lane closures, and comprehensive roadway typical section drawings showing precise construction techniques and materials specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WA FLAP SKAMAN 92135(1)_Prelim Letter.pdf | ||
| PROJECT DESCRIPTION_WA FLAP SKAMAN 92135(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
PROJECT MANAGER
B. Roche
N
PROJECT LOCATION
Scale in miles
1 0 1 2 3
PARK
NATIONAL
CASCADES
NORTH
u n d o S t e g u
P
P A
C I F I C
O C
A E
N tS raitof Juan de Fuca
OC
LU
MBIA
R
IV
ER
A S N
KE
R
VERI
M
COLU B
I A
V R I
E R
Lakes
Banks
Lakes
Moses
Reservoir
Potholes
PARK
NATIONAL
OLYMPIC
N.P.
RAINIER
MOUNT
MON.
NAT'L VOLC.
ST. HELENS
MOUNT
BELLINGHAM
Forks
Aberdeen
Chehalis
Longview
OLYMPIA
TACOMA
SEATTLE
EVERETT
Wenatchee
Lake
Moses
SPOKANE
Pullman
Pasco
RICHLAND
Kennewick Walla Walla
ANGELES
PORT
Townsend
Port Vernon
Mt.
VANCOUVER
WASHINGTON KEY MAP
YAKIMA
BRITISH COLUMBIA
I D
A H
O
OREGON
UNITED STATES
CANADA
N O
T
FO
R
CO
N
STRU
CTI
O
N
See Sheet A.5
Staging Area
PLANS PREPARED BY
PRELI
M
IN
ARY
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
SLIDE RECONSTRUCTION
WIND RIVER ROAD
TYPE OF CONSTRUCTION:
culvert lining asphalt overlay, guardrail replacement, and
Soldier pile wall, mechanically-stabilized earth wall, DESIGN DESIGNATION:
e (max)
V
SADT (2045)
SADT (2025)
0.06
50 MPH
SPECIFICATION:
on Federal Highway Projects, FP-24
Construction of Roads and Bridges
Standard Specifications for
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
LENGTH 0.32 MILES
PLANS FOR PROPOSED PROJECT
WA FLAP SKAMAN 92135(1)
WASHINGTON
SKAMANIA COUNTY
APPROVED:
Western Federal Lands Highway Division
Chief of Engineering, DATE
See Sheet A.4
CARSON
HOME VALLEY
STEVENSON
W in d iv e r
Co lumbia
Ri ver
OREGON
WASHINGTON
NATIONAL FOREST
GIFFORD PINCHOT
MOUNT HOOD NATIONAL FOREST
R.8.E R.9.E
T .3
.N
T .2
.N
Rock Creek
NATIONAL SCENIC AREA
COLUMBIA RIVER GORGE
R d
See Sheet A.2 for complete Sheet Index.
:1
A
M
F e b r u a r y
T it le
S h e e t c p w w o r k
\d
\w a a s k a m a n p ln g e n
.d g n
PROJECT
NUMBER
SHEET
WA FLAP SKAMAN 92135(1) A.1
PRELIMINARY - N
OT FOR CONSTRUCTION
:1
P
A u g u s t
S
H E
E T
I N
D
X p w w o r k
\d
\w a a s k a m a n p ln g e n
.d g n
SHEET INDEX
PROJECT
NUMBER
A.2
WA FLAP SKAMAN 92135(1)
BH
TP
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
M.P.
M.L.
monument minimum thousand gallon maximum material mile post main line
W
RIP
DI
G W G WV
CP GPS
36 31
36 31
N
E
N 1000EL. 1234.56
TP
TP
SEC.
SEC.
θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
between bearing bridge balance point bench mark back face back btwn brg.
br.
BP
BM
b.f.
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
NO SCALE
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
W west drwg(s).
dist.
diaph.
dia.
DHV
D exp. jt.
exc.
EW
EQ or eq.
EOP
emb.
elev.
El. 94.16 e.f.
e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge) jt.
IE
ID
joint invert elevation inside diameter ftg.
flg.
fin.
f.f.
footing flange finish front face
LW
lt. or LT Ls
LPSM
long.
LNFT
lat.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph V vertical point of intersection vehicles per hour design speed (velocity)
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sect.
SC
SADT
S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
KSI
square inch thousand pounds per pvmt.
PT
PST
PSC
PSI
PSF
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve
OHWM
OG
OD
o. to o.
o.c.
ordinary high water mark original ground outside diameter out to out on center
NC
N normal crown north
A A
DI
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Control Point (Terrestrial and GPS)
Gas & Water Meter; Gas & Water Valve
Flagpole; Fire Hydrant
Cooking Grate; Garbage Can; Picnic Table
Boulder; Well; Antenna; Grave
Above Ground Tank; Underground Tank
Spot Elevation; Coordinate Grid Tick
Material Source; Bore Hole; Test Pit
Treeline; Individual Trees
Spring or Seep
Section Line 4
Section Corner (Found, Projected) 4
Section Line 16
Section Corner (Found, Projected)16
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
North Arrow
Slope Stake Limits Top of Cut
Toe of Fill
Construction Limits
Bottom of Ditch
Fence
Gate with Fence
Cattleguard
Guardrail
Concrete Barrier and Guard Wall
Retaining Wall wall face
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
Overhead/Above Ground Utilities
Underground Utilities
Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
- no symbol -
Section A-A
EXISTING PROPOSED
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,
- no symbol -
ABBREVIATIONS
PLAN SYMBOLS AND
101-1W
FP-14
6/2022
WFLHD DETAIL
:4
J a n u a ry
D e t W
-1 p w
-w o rk
\d \w a a -s k a m a n -1
W
-1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
A.3
Scale in feet
500 0 500 1000 1500
N
WILLIE'S RDEND PROJECT
BEGIN PROJECT
to S ta b le r m il s to S te ve ns on m ile s
Columbia River
NATIONAL SCENIC AREA
COLUMBIA RIVER GORGE
HOME VALLEY
to Cook
±6 m iles
CARSON
HOT
M E
T Z
G E
R R
D
FREDRICKSON
SPRINGS AVE
AVE
S M I T
H B
E C
K O
N R
D
W
IN
D
R
IV
E R
RD.
LE
W
IS
AND CLARK
HWY.
GUE
LAN
R D
S P R
A
DING
Carson
Creek
GLUR RD.
C O
LU
M B
IA
D
R
OLD AIRPORT RD
M O
N A
G H
A N
R D
P E
Y R
O L
L A
Z R
D
C A
R S
O N D
E P
O T
CARSON CREEK RD
W e r
Little
R iv e r
W in d
R D to S ta g in g a r e a
.9 m il
"MAIN 01" 10+00.00
"MAIN 01" 27+08.00
:3
J u ly
V ic in it y M a p p w w o r k
\d
\w a a s k a m a n p ln g e n
.d g n
VICINITY MAP
PROJECT
A.4
Project Limits
0.5 1.000.250.5
Scale in miles
N
W
IN
D R
IV
E R R
D
ESTABROOK LOOP
ES
TABROOK LOOP
M A
T H
A N
Y R
D
J O
H N
S O
N R
D
W
IN
D R
IV
E R R
D
N
Scale in feet
100 0 100 200 300
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
(45°44'49.11"N, 121°49'21.22"W)
Staging Area (County stockpile area)
W
IN
D R
IV
E
R R
D
CO will mark area prior to use
(45°44'49.11"N, 121°49'21.22"W)
Staging Area (County stockpile area)
T R
A
IL
E R D
U M
P R
D
Staging Area Entrance
:0
J u n e
S ta g in g
A r p w w o r k
\d
\w a a s k a m a n p ln g e n
.d g n
STAGING AREA
PROJECT
A.5
LC
C o n s tr u c ti o n l im it
3-inch compacted depth, overlay
Asphalt concrete pavement, type 1, See Sheet C.2
See overlay edge detail
Existing ground
Varies Varies
Existing grade
12'
Varies
10+00.00 to 13+80.00 class A steel posts (8' Post)
Guardrail system MGS, type 2, 12' [1]
Varies (0'-12')
Match existing road section
Varies
Existing ground
Varies
C o n s tr u c ti o n l im it
1.
Profile grade
Traveled lane Traveled lane Traveled lane
"MAIN 01"
Match existing Match existing Match existing
Shldr.Shldr.
Match existing
NOTE:
FOOTNOTE:
Match existing width [1] surface and proposed overlay
Apply tack coat between existing asphalt
:4
A u g u s t
T y p ic a l
S e c ti o n
O v e rl y p w w o r k \d
\w a a s k a m a n p ln ty p .d g n
SHEET 1 OF 6
TYPICAL SECTION
PROJECT
NUMBER
C.1 with tack coat between lifts
(bottom lift = 3"; middle lift = 3"; top lift = 3")
9-inch compacted depth, placed in three lifts
Asphalt concrete pavement, type 1, Roadway aggregate, method 2, 6-inch compacted depth
Existing ground
Existing ground
C o n s tr u c ti o n l im it
3-inch compacted depth, overlay
Asphalt concrete pavement, type 1, ground
Existing with tack coat between lifts
(bottom lift = 3"; middle lift = 3"; top lift = 3")
9-inch compacted depth, placed in three lifts
Asphalt concrete pavement, type 1, Roadway aggregate, method 2, 6-inch compacted depth
[4]
Varies
Slope to drain
Excavate and backfill, 4'
4'
Tack coat at joint
See Safety Edge
See overlay edge detail
C o n s tr u c ti o n l im it
Existing grade Sawcutting pavement
3-inch compacted depth, overlay
Asphalt concrete pavement, type 1, Existing ground
1'
Edge of pavement
Aggregate base course
First lift of asphalt
Second lift of asphalt
Third lift of asphalt
Edge of pavement
30°
Existing pavement
Roadway aggregate, method 2
3-inch compacted depth, overlay
Asphalt concrete pavement, type 1, 12' [1]
Varies 12'
C o n s tr u c ti o n l im it
Varies Shldr. (match existing)
[2] ment lim it
Varies [4]
[3]
21+26.50 to 27+08.00, RT class A steel posts
Guardrail system MGS, type 2, Turf establish
±10' ment limitTurf establish
Varies
Varies Shldr. (match existing)
C o n s tr u c ti o n l im it
Varies class A steel posts
Guardrail system MGS, type 2, SAFETY EDGE
OVERLAY EDGE DETAIL
6" min.
Existing shoulder width
1:3
Profile grade
Traveled lane Traveled lane Traveled lane
13+80.00 to 15+40.00
17+06.00 to 18+20.00
20+31.00 to 27+08.00
"MAIN 01"
Match existing Match existing Match existing
Shldr.
Shldr.
20+31.00 to 22+65.00, LT
17+06.00 to 17+61.00, LT
FOOTNOTE:
1V:2H "MAIN 01" 17+29 to 27+08
1V:3H to 1V:2H "MAIN 01" 17+09 to 17+29
1V:2H to 1V:3H "MAIN 01" 15+20 to 15+40
1V:2H "MAIN 01" 13+98 to 15+20
Safety edge foreslope varies as follows:
Match existing slope of adjacent traveled lane.
1' "MAIN 01" 21+33 to 27+08
4.52' "MAIN 01" 19+00 to 20+33
2.52' - 4.52' "MAIN 01" 18+36 to 19+00
1.52' "MAIN 01" 17+09 to 18+36
1.52' "MAIN 01" 13+98 to 15+40
Safety edge width varies as follows:
Match existing lane width. [1]
NOTE:
pavement edge.
guardrail posts are embedded in soil beyond station limits shown in the plans. Ensure
2. Omit paved safety edge within guardrail surface and proposed overlay.
1. Apply tack coat between existing asphalt
:4
A u g u s t
T y p ic a l
S e c ti o n p w w o r k \d
\w a a s k a m a n p ln ty p .d g n
SHEET 2 OF 6
TYPICAL SECTION
PROJECT
NUMBER
C.2
Existing ground with tack coat between lifts
6-inch compacted depth, placed in two lifts
Asphalt concrete pavement, type 1, ground
Existing with tack coat between lifts
(bottom lift = 3"; middle lift = 3"; top lift = 3")
9-inch compacted depth, placed in three lifts
Asphalt concrete pavement, type 1, Roadway aggregate, method 2, 6-inch compacted depth
Slope to drain
Excavate and backfill, 4'
Tack coat at joint See overlay edge detail
C o n s tr u c ti o n l im it
Existing grade Sawcutting pavement
3-inch depth
Asphalt pavement milling, 12' [1]
Varies 12'
C o n s tr u c ti o n l im it
Varies Shldr. (match existing)
Guardrail system MGS, type 2, ment limitTurf establish
Varies
Profile grade
Traveled lane Traveled lane Traveled lane
18+20.00 to 18+36.25
"MAIN 01"
Match existing Match existing Match existing
Shldr.
NOTE:
FOOTNOTE:
Match existing width [1] pavement edge.
guardrail posts are embedded in soil beyond station limits shown in the plans. Ensure
2. Omit paved safety edge within guardrail surface and proposed overlay.
1. Apply tack coat between existing asphalt
:4
A u g u s t
T y p ic a l
S e c ti o
-3 p w w o r k \d
\w a a s k a m a n p ln ty p .d g n
SHEET 3 OF 6
TYPICAL SECTION
PROJECT
NUMBER
C.3
1:3
Existing ground
3-inch compacted depth, overlay
Asphalt concrete pavement, type 1, with tack coat between lifts
(bottom lift = 3"; middle lift = 3"; top lift = 3")
9-inch compacted depth, placed in three lifts
Asphalt concrete pavement, type 1, Roadway aggregate, method 2, 6-inch compacted depth
LC
C o n s tr u c ti o n l im it
Tack coat at joint
1:3
See Sheet C.2
See overlay edge detail
Existing ground
Existing grade
Sawcutting pavement
3-inch compacted depth, overlay
Asphalt concrete pavement, type 1, Existing ground
12'
Varies Shldr. (match existing) 4' Shldr.
1.52' class A steel posts
Guardrail system MGS, type 2, 12' 12' structure design
Contractor provided retaining
Varies per wall excavation
.7
Top of wall (Layout line)
Turf establishment limit
[1]
±5' o n s tr u c ti o n l im it
Varies
Varies Shldr. (match existing)
C o n s tr u c ti o n l im it
Varies class A steel posts
Guardrail system MGS, type 2, Profile grade
Traveled lane Traveled lane Traveled lane
15+40.00 to 17+06.00
"MAIN 01"
Match existing Match existing Match existing
16+28.00 to 17+06.00, LT
FOOTNOTE:
Match existing slope of adjacent traveled lane. [1]
NOTE:
pavement edge.
guardrail posts are embedded in soil beyond station limits shown in the plans. Ensure
2. Omit paved safety edge within guardrail surface and proposed overlay.
1. Apply tack coat between existing asphalt
:4
A u g u s t
T y p ic a l
S e c ti o n
M S
E W ll p w w o r k \d
\w a a s k a m a n p ln ty p .d g n
SHEET 4 OF 6
MSE WALL
TYPICAL SECTION
PROJECT
NUMBER
C.4
Excavate and backfill concrete in place
Permanent fascia, LC
C o n s tr u c ti o n l im it with tack coat between lifts
(bottom lift = 3"; middle lift = 3"; top lift = 3")
9-inch compacted depth, placed in three lifts
Asphalt concrete pavement, type 1, 6-inch compacted depth
Roadway aggregate, method 2, Approximate slip plane
Existing ground
Existing grade
See Sheet C.2
See overlay edge detail
Tack coat at joint with tack coat between lifts
6-inch compacted depth, placed in two lifts
Asphalt concrete pavement, type 1, Turf establishment limits
Ground anchor class A steel posts
Guardrail system MGS, type 2, Sawcutting pavement
Drilled shaft
Asphalt pavement milling, 3-inch depth
:1 .5 m a x
V aries
10' r/ w
80' max o n s tr u c ti o n li m it
Varies 4' [1]Varies
12'12'
1.52'
1:2 m in
6" min.
Varies Shldr. (match existing) pavement edge.
guardrail posts are embedded in soil beyond station limits shown in the plans. Ensure
2. Omit paved safety edge within guardrail surface and proposed overlay.
1. Apply tack coat between existing asphalt
LC
"MAIN 01"
18+36.25 to 19+40.00
Profile grade
Traveled lane
Match existing
Traveled lane Traveled lane
Match existing Match existing
Shldr.
ane width. Match existing l
NOTE:
:2
A u g u s t
T y p ic a l
S e c ti o n
S o ld ie r
P il p w w o r k \d
\w a a s k a m a n p ln ty p .d g n
SHEET 5 OF 6
SOLDIER PILE WALL
TYPICAL SECTION
PROJECT
NUMBER
C.5
Excavate and backfill concrete in place
Permanent fascia, LC
C o n s tr u c ti o n l im itwith tack coat between lifts
(bottom lift = 3"; middle lift = 3"; top lift = 3")
9-inch compacted depth, placed in three lifts
Asphalt concrete pavement, type 1, Roadway aggregate, method 2, 6-inch compacted depth
Approximate slip plane
Existing ground
Existing grade
See Sheet C.2
See overlay edge detail
Tack coat at joint
3-inch compacted depth, overlay
Asphalt concrete pavement, type 1, Turf establishment limits
Ground anchor class A steel posts
Guardrail system MGS, type 2, Sawcutting pavement
Drilled shaft
3-inch compacted depth, overlay
Asphalt concrete pavement, type 1, Existing ground
:1 .5 m a x
V aries
10' r/ w
80' max o n s tr u c ti o n li m it
Varies 4' [1]Varies
12'12'
1.52'
1:2 m in
6" min.
C o n s tr u c ti o n li m it
Varies class A steel posts
Guardrail system MGS, type 2, Varies Shldr. (match existing)
Varies Shldr. (match existing) pavement edge.
guardrail posts are embedded in soil beyond station limits shown in the plans. Ensure
2. Omit paved safety edge within guardrail surface and proposed overlay.
1. Apply tack coat between existing asphalt
LC
"MAIN 01"
19+40.00 to 20+31.00
Profile grade
Traveled lane
Match existing
Traveled lane Traveled lane
Match existing Match existing
Shldr.
19+90.00 to 20+31.00, LT ane width. Match existing l
:2
A u g u s t
T y p ic a l
S e c ti o n
S o ld ie r
P il p w w o r k \d
\w a a s k a m a n p ln ty p .d g n
SHEET 6 OF 6
SOLDIER PILE WALL
TYPICAL SECTION
PROJECT
NUMBER
C.6
K VALUE TABLE (ft/in)
>45
50 100K
(MPH)
POSTED SPEED
NOTE:
length.
Use K*[e -e ]=T, to obtain the transition the posted speed of the roadway.
elevations) by the K value from the Table for
(difference between the existing and overlaid the effective overlay thickness in inches less than the value obtained by multiplying
Provide a transition length in feet that is not
Existing asphalt pavement
Existing base course
Asphalt concrete pavement, type 1, 10-inch compacted depth
Roadway aggregate, method 2, 6-inch compacted depth
Existing asphalt pavement
Existing base course
Asphalt pavement milling (overlay transition)
OVERLAY TRANSITION DETAIL
(Final course)
Asphalt overlay
(Depth equals overlay thickness)
Saw cut
Overlaid elevation (e )
(Full depth of existing asphalt pavement) Saw cut
K Transition length variable (See Table)
(For Table e - e = effective overlay thickness)
METHOD OF FEATHERING ACP AT GRAVEL APPROACHES
1 2
1 2
Tack coat at joint
Tack coat at joint Existing elevation (e )
<45
Overlay
Existing gravel surfaceRoadway aggregate, method 2
E d g e o f p a v e d s h o u ld e r
Approach per CO layout a p p r o a c h
E d g e o f a s p h lt
Approach taper 1" in 5'
Asphalt concrete pavement, type 1
NEW PAVEMENT
LC
:5
J u ly
S h e p w w o r k \d
\w a a s k a m a n P a v e m e n t-
T r a n s it io n .d g n
PAVEMENT TRANSITION
PROJECT
NUMBER
SHEET
WA FLAP SKAMAN 92135(1) C.7
PROJECT UNITS : US SURVEY FOOT
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER
NORTH EAST ELEVATION LATITUDE LONGITUDE
ELLIPSOID
HEIGHT
COMBINED
FACTOR
DESCRIPTION NOTE:
22101 141939.850 1300723.835 282.222 45°42'52.952816"N 121°49'47.356658"W 211.335 1.0000189 5/8" ir w/fhwa alum cap 1.
22102 142121.687 1300977.798 293.739 45°42'54.789940"N 121°49'43.821355"W 222.859 1.000018215 5/8" ir w/fhwa alum cap
22103 142475.101 1301451.474 331.091 45°42'58.357133"N 121°49'37.230735"W 260.2242 1.00001617 5/8" ir w/fhwa alum cap
22104 142902.488 1301763.153 364.122 45°43'02.627517"N 121°49'32.940128"W 293.28 1.000014281 5/8" ir w/fhwa alum cap
22105 143058.438 1302261.375 386.699 45°43'04.249476"N 121°49'25.956456"W 315.8647 1.000013084 5/8" ir w/fhwa alum cap
22106 143499.176 1302840.089 403.310 45°43'08.695714"N 121°49'17.905669"W 332.4851 1.000011967 5/8" ir w/fhwa alum cap
22107 143751.051 1303065.076 408.643 45°43'11.219123"N 121°49'14.794666"W 337.8264 1.000011529 5/8" ir w/fhwa alum cap
PROJECT : Wind River Road slide Reconstruction DATE OF FIELD WORK :May 2022 DATE OF FINAL ADJUSTMENT : May 2022
COORDINATE SYSTEM : Washington South SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
EPOCH DATE : 2010.000
CADD COORDINATE SYSTEM : WA83/2011-SF NSRS11(NAD83/2011) Washington, South Zone, US Foot
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
\W A F
LA
P
S K A M
A N
(1
W in d R iv er
R oa d S lid e
R ec on st ru ct io n \9
P S
E P ac ka g e\
D
-J u n -2
:5 P
M W
FL
H
D S u rv ey
W
FL
H
D S u rv ey
D es ig n ed b y:
C h ec ke d b y:
PROJECT
D.1
SHEET
NUMBER
WA FLAP SKAMAN 92135(1)
SURVEY CONTROLPRELIMINARY - N
3 1/2" BRASS CAP
G
PS
22102
W
E S
T
E
A S
T
S P E
E D L I
M I T
W D
O
T PIN
K
CL LID
B E F I R
E S
A F E
CO
N C
M P
H
18" O U
TLET
R
O U
G H R
O A
D
M
P H
18" IN
LET
CL LID
C1
SLO
W
ER TRAFFIC KEEP RIG
H T
M O
T O
R C
Y C
L E S U
S E E
X T
R E
M E C
A U
T I O
N
W
ATER VAU
LT
3X3 CO
N
CRETE PO
ST
12" FIR
CP
22103
Y T I L I T U
D E I R U B
G N I N R A W
12" FIR
TP
12" FIR
JB+
8"
MONUMENT L
ID
(UNABLE
TO O
PEN)
POSS
IBLE
PT&PC P
OIN
TS
W
SD
O
T PK2
1873.82 3 1/2" CRASS CAPD
N
Existing ground
Profile grade
BEGIN PROJECT
"MAIN 01" Line to be constructed Adjust to grade
Monument (case and cover riser)
Edges of paved shoulder
Edges of traveled way
Protect existing culvert
13+70
Slope stake limit
Slope stake limit
Construction limit clearing limits
Construction and
Adjust to grade
Monument (case and cover riser)
Protect existing 3x3 concrete post
Construction limit
PI 14+11.96
Δ = 15°37'13" (LT)
R = 1,000.00' T = 137.16' L = 272.63'
N52°36'05"E
P C
.8
8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00
298 298
300 300
302 302
304 304
306 306
308 308
310 310
312 312
314 314
316 316
318 318
320 320
322 322
324 324
326 326
328 328
330 330
332 332
334 334
336 336
338 338
340 340
HLSD = INF'
K = 1,583
352' VC
.2
+6.4 6%
+6.06
+6.08
.7
.2
WIND RIVER RD
"MAIN 01" 10+00.00"
LEGEND:
See Sheet C.7 for detail Gravel Transition
Asphalt Overlay Transition
E=1301092.1188 N=142226.6619
14+97 to 17+36, RT Removal of guardrail
See sheet C.6 for pavement transition detail Overlay transition
Removal of guardrail
Guardrail system MGS, type 2, class A steel posts (8' Post)
10+00 to 14+21, RT class A steel posts Guardrail system MGS, type 2, 14+21 to 17+06, RT
10+00 to 13+00
10+00 to 14+31, RT
:5
A u g u s t
W
IN
D
R
IV
E R
P
L A p w
-w o rk
\d \w a a -s k a m a n -1 p ln
.d g n
PROJECT
D.4
O
U T
L E
T
3X 3 C
O N C R
ETE PO
S T
O
U T L E T
O
U T L E
T
3X 3 C
O N C R
ETE PO
S T
I
N L E
T
20" A
LD
ER
3X 3 C
O N C R
ETE PO
S T
B H
22-01 PR
O
PO
S
ED
8" M
ONUMENT L
ID
(UNABLE
TO O
PEN)
POSSI
BLE
PT&PC P
OIN
TS?
O
U T
L E
T
W S D
O
T PK
O
U T
L E
T
I
N L E
T
C
IN
L E T
G O
LF &
S
PA
R
ES
O
RT
TP
9118.9
Y T I L I T U
D E I R U B
G N I N R A W
JB
C A R S O
N M
IN
ER
A L H
O T S
PR
IN
G S
8" M
ONUMENT LI
D (U
NABLE T
O O
PEN) P
OSSI
BLE P
T&PC P
OIN
TS?
IN
L E T
18" OUTLET
14" A
LD
ER
18" IN
LET
24" FIR
8" H
EM
LO
C K
C O
U N
T Y B
U I L
D I N
G P
E R
M I T S R
E Q
U I R
E D
" F
IR
6" H
EM
LO
C K
B H
22-02 PR
O
PO
S
ED
10" IN
LET
10" H
EM
LO
C K
C P
22104 W
D O T R
PC
B H
22-04 PR
O
PO
S
ED
18" OUTLET
18" INLET
8" MONUMENT LID (UNABLE TO OPEN) POSSIBLE PT&PC POINTS?
TP
TP
25309 122
8" MONUMENT LID (UNABLE TO OPEN) POSSIBLE PT&PC POINTS?
3X 3 C
O N C R
ETE PO
S T
N
Profile grade
Existing ground
Adjust to grade cover riser)
Monument (case and
Adjust to grade cover riser)
Monument (case and
Adjust to grade cover riser)
Monument (case and
Adjust to grade
Monument (case and cover riser)
Lining 36-inch pipe culvert 20+67 pavement Sawcutting "APPR 01"
Edges of traveled way
Construction limit
Protect existing culvert 16+72 clearing limits
Construction and
Edges of paved shoulder
Slope stake limit
Protect existing 3x3 concrete post concrete post
Protect existing 3x3
See H sheets for details structure design (MSE wall)
Contractor provided retaining
Protect existing 3x3 concrete post to be constructed
"MAIN 01" Line
Plug, existing pipe
16+78
Plug, existing pipe
16+78 structure design (soldier pile wall)
Contractor provided retaining limit
Slope stake clearing limits
Construction and clearing limits
Construction and
PI 19+02.41
Δ = 31°55'59" (RT)
R = 750.00' T = 214.59' L = 418.00'
N36° 58'5
2"E N68°54'51"E
P T
.4
P C
.2
P C
.8
P T
.8
9 2
15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50
336 336
338 338
340 340
342 342
344 344
346 346
348 348
350 350
352 352
354 354
356 356
358 358
360 360
362 362
364 364
366 366
368 368
370 370
372 372
374 374
376 376
+6.23
.7
.4
SSD = 745'
K = 257
801' VC
WIND RIVER RD
"APPR 01" 99+71.75
"MAIN 01" 21+44.45 =
14+21 to 17+06, RT
Guardrail system MGS, type 2, class A steel posts
15+40 to 17+06, RT
(MSE Wall) Contractor Provided Retaining Structure Design
Removal of guardrail
14+97 to 17+36, RT
17+06 to 18+36, RT
Terminal system, type MGS-BAT
19+00 to 19+52, RT type MGS tangent Terminal system, 19+52 to 21+14, RT
Guardrail system MGS, type 2, class A steel posts
Terminal system 21+14 to 21+27, RT
(anchor system)
LEGEND:
See Sheet C.7 for detail Gravel Transition
Asphalt Overlay Transition
18+36 to 20+31, RT
Soldier Pile Retaining Wall Contractor Provided Retaining Structure Design (Soldier Pile Wall)
Removal of guardrail
[1]16+37 to 17+48, LT
[1]19+90 to 21+49, LT
Removal of guardrail
[1]16+40 to 17+61, LT
Terminal system, type MGS-BAT (anchor system) Terminal system
[1]16+28 to 16+40, LT
(anchor system)
[1]19+90 to 20+02, LT
Guardrail system MGS, type 2, class A steel posts
[1]20+02 to 22+15, LT type MGS tangent
[1]22+15 to 22+65, LT installation of new guardrail posts.
Buried fiber optic lines in the vicinity of guardrail. Locate lines and use caution to avoid conflicts during
Verify access to culvert ends with CO before beginning culvert lining work.
:5
A u g u s t
W
IN
D
R
IV
E R
P
L A
-2 p w
-w o rk
\d \w a a -s k a m a n -1 p ln
.d g n
PROJECT
D.5
8" MONUMENT LID (UNABLE TO OPEN) POSSIBLE PT&PC POINTS?
O
T O
R C
Y C
L E S U
S E E
X T
R E
M E C
A U
T I O
N
3X3 CONCRETE POST
R O
U G
H R
O A
D
18" OUTLET
18" INLET
CP
22105
WILLIES RD
TP
S P
E E
D L I
M I T
TP
TP
1/2" IR
N
Existing ground
Profile grade
END PROJECT
to be constructed
"MAIN 01" Line
Sawcutting pavement
"APPR 02"
Construction limit clearing limits
Construction and
Slope stake limit
Edges of traveled way
Edges of paved shoulder
Slope stake limit
"APPR 02" 199+70.29
"MAIN 01" 24+93.60 =
Protect existing culvert pavement
Sawcutting
PI 25+19.42
Δ = 19°42'37" (LT)
R = 1,400.00' T = 243.21' L = 481.61'
P C
.2
P T
.8
4 2
23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50
364 364
366 366
368 368
370 370
372 372
374 374
376 376
378 378
380 380
382 382
384 384
386 386
388 388
390 390
392 392
394 394
396 396
398 398
400 400
402 402
404 404
406 406
.2
+3.12%
WIND RIVER RD
W
IL
L
IE
S R
O
[1] Overlay transition detail
24+08 to 27+08
See sheet C.7 for pavement transition detail
"MAIN 01" 27+08.00
E=1302447.5171 N=143223.1417
[1] Do not construct overlay transition if Option X is awarded.
LEGEND:
See Sheet C.7 for detail Gravel Transition
Asphalt Overlay Transition
:5
A u g u s t
W
IN
D
R
IV
E R
P
L A p w
-w o rk
\d \w a a -s k a m a n -1 p ln
.d g n
PROJECT
D.6
O N d ia
"16
CASE
COVER
TOTAL
60 LBS
19 LBS
79 LBS
PLAN VIEW
A
"2
1 2" 3"
WEIGHTS
APPROXIMATE
(Size)
A
RISER RING DIMENSIONS
RISER RING
SECTION
COVER
SECTION
SECTION OF LETTER
CASE
SECTION
INSTALLATION
SECTION A-A
ISOMETRIC
" dia2
"4
" R4
Concrete base
Concrete base
Soil
Grout steel pipe
2" O.D. galvanized m a x
10" R m in
6"
" dia2
8" dia
9" dia
A
A
1" dia
" dia8
" R8
" R8
" R4
" R8
" R4
4" R
" R4
"2
" R4 m in
1"
"4
NOTE:
2.
1.
Install concrete base on a well compacted foundation.
Dimensions may vary according to manufacturer.
:1
A u g u s t
W
S D
O T
P la n S h e p w w o r k \d
\W
S D
O T
M o n u m e n t
C a s e a n d C o v e r .d g n
DETAIL
MONUMENT CASE AND COVER
PROJECT
D.7 with tack coat between lifts
(bottom lift = 3"; middle lift = 3"; top lift = 3")
9-inch compacted depth, placed in three lifts
Asphalt concrete pavement, type 1, Roadway aggregate, method 2, 6-inch compacted depth
LC
LC
Edge of gravel shoulder
Driveway matchline
Edge of paved shoulder, E d g e o f p a v h o u ld e r
Approach length (L1)
V a ria b le
R 2R
W
Approach tie-in
A p p r o a c h l e n g th
L
ASPHALT CONCRETE PAVEMENT SURFACINGTYPICAL ASPHALT CONCRETE PAVEMENT
APPROACH ROAD PLAN
:0
A u g u s t
A
P P
R O
A C
H R
O A
D C
O N
N E
C T
IO
N
D E
T A
IL
p w w o r k \d
\w a a s k a m a n p ln ty p a p p r .d g n
DETAILS
APPROACH ROAD CONNECTION
PROJECT
E.2
-1
R
O
U T
L E
T
I
N L E
T
M
O N
U M
E N
T L I D
U N
A B
L E T
O O
P E
N P
O S
S I B
L E P
T
P C P
O I N
T S
N
S28°45'49"E
99+70 99+80 99+90 100+00 100+10
345 345
350 350
355 355
360 360
365 365
370 370
375 375
380 380
385 385
-12.31%
.3
100+20 100+30 100+40
.0
ROUGH R
OAD
O
U T L E T
C P
I
R W
F
H W
A A
L U
M C
A P
W I L L I E S R
D
N
BEGIN CONSTRUCTION
BEGIN CONSTRUCTION
END CONSTRUCTION
END CONSTRUCTION
"APPR 01" 99+71.75
"APPR 02" 199+70.29
Existing ground
Existing ground
Profile grade
Profile grade pavement
Edge of pavement
Edge of pavement
Edge of
Slope stake limit pavement
Edge of to be constructed
01" LineAPPR" to be constructed
02" LineAPPR"
"MAIN 01""MAIN 01"
Protect existing gate
Construction limit
Construction limit
Slope stake limit
S10°14'30"E
199+70 199+80 199+90 200+00 200+10
365 365
370 370
375 375
380 380
385 385
390 390
395 395
400 400
405 405
-8.74%
.9
200+20 200+30 200+40
.4
"APPR 01" 100+00.00
"APPR 01" 100+19.26
"APPR 02" 200+00.00
"APPR 02" 200+18.07
"MAIN 01" 21+44.45
"MAIN 01" 24+93.60
W I N
D R I V
E R R
D
W
IN
D R
IV
E R R
D
R
R
R
R
E= 1301965.2957
N= 142936.3427
E= 1301974.5620
N= 142919.4620
E= 1302275.8807
N= 143072.8870
E= 1302279.0934
N= 143055.1058
:0
A u g u s t
A
L I
A p p r o a c h
D r iv e w a y
S h e t] p w w o r k \d
\w a a s k a m a n p ln a p p r .d g n
PROJECT
E.3
10.4 x 16 20310 -1000
60707 -0700
Station E S T
IM
A T E D
M A X
IM
U M
C O
V E R
S T R U
C T U
R A L
E X C
A V A T
IO
N
PL
U
G
E X
IS
T
IN
G P
IP
E
LI
N
IN
G
-I
N C
H P
IP
E C
U
LV
E R T
S K E W
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el o w
B E V E
LS
V :n
H
B E V E
LS
V :n
H
REMARKS
FEET CUYD EACH LNFT Lt Rt 16+78 7 7 1 20+67 30 168 Do not begin culvert lining work until approved by the CO.
PROJECT TOTAL 7 1 168
Allowable Pipe Material A Aluminum AS Aluminized steel C Concrete DI Ductile Iron GS Galvanized steel P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
-A u g -2
:3
A
M c:
\p w -w o rk
\d w a a -s ka m a n -1
D ra in a g e
T a b u la ti o n .x ls x]
S h ee t
TABULATION OF DRAINAGE QUANTITIES
PROJECT
F.1WA FLAP SKAMAN 92135(1)
SHEET
NUMBERNote: The quantities shown hereon are approximate and are subject to field adjustments.
NO SCALE
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
T o e o f s lo p e
PLAN
ELEVATION
4.
3.
2.
1.
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Geotextile
Steel or wood post
Backfilled and compacted soil f o r s p a c in g
S e e N o te
Limits of clearing
(undisturbed)
Existing ground
Silt fence reinforcement
NOTE:
Staple or tie
Section B
Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric See Note 3
End Posts Detail
End posts, see
End Posts Detail
End posts, see
See Note 3 fabric, Section A
Geotextile
Flow
Flow
Flow running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed m in m in m in
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
4" min.
6" min. trench
DETAIL APPROVED FOR USE 10/2016
REVISED:
157-1W
WFLHD DETAIL
SILT FENCE9
:2
A u g u s t
D e t
W p w w o r k \d
\w a a s k a m a n W
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
G.4 are similar for flat-bottom ditches
Check dam installation details
V-ditch design shown.
uphill side of fiber roll trench material on
Place excavated See Note 5
Flow line the ends. See Note 6 to prevent flow around
Curve ends upstream
Gravel bag
Filter rock
Filter rock
Trench 2" min.
Trench 2" min.
Fiber roll 9" Ø min.
NO SCALE
NOTE:
conditions.
Adjust check dam spacing based on site-specific around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Drive stakes into undisturbed soil of trench bottom.
stakes. Drive stakes at each end of the fiber roll and at
Install check dams in ditches perpendicular to the flowline.
installation.
Repair all rills or gullies and properly compact prior to requirements of the check dam device.
gravel bags as approved, to meet the functional
Construct check dams from fiber rolls, filter rock, or
7.
6.
5.
4.
3.
2.
1.
FIBER ROLL CHECK DAM
GRAVEL BAG CHECK DAM
FILTER ROCK CHECK DAM
CROSS SECTION
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
CROSS SECTION
V-DITCH
CROSS SECTION
FLAT-BOTTOM DTICH
STAKING DETAIL
FIBER ROLL
PLAN
CROSS SECTION
(See Note 7)
CHECK DAM SPACING
FILTER ROCK
(See Note 7)
CHECK DAM SPACING**
GRAVEL BAG
than 6%.
dams on ditch grades steeper
** Do not use gravel bag check on ditch grades steeper than 5%.
Do not use fiber roll check dams
* Spacing calculated based on
Flow
F lo w
Se e N ote m in m in m in .6 m in
-inch wood8
-inch x 18
Stake fiber rolls in place with 1
Expose stakes 2-inches minimum above top of fiber roll.
2-foot maximum spacing.
9" Ø minimum fiber roll.
GRADE
DITCH
SPACING (max.)
CHECK DAM
5%
4%
3%
2%
GRADE
DITCH
SPACING (max.)
CHECK DAM
6%
5%
4%
3%
2%
GRADE
DITCH
SPACING (max.)
CHECK DAM
6%
5%
4%
3%
2%
(FT)
(FT)
(FT)
MODERATE GRADES
CHECK DAM
157-15W
FP-24, FP-14
7/2016
WFL STANDARD
:2
A u g u s t
S td W p w w o r k \d
\w a a s k a m a n W
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
G.5
EROSION CONTROL PRODUCT
CHECK DAM WITH ROLLED
m in
"6 m in
"6
3.
2.
1.
PROFILE VIEW
V-DITCH
CROSS SECTION
FLAT-BOTTOM DITCH
CROSS SECTION
(G)
GRADE
DITCH
≥10%
8% and 9%
7%
Rolled erosion control product
1:
(t yp
Rolled erosion control product Rolled erosion control product
NOTE:
Adjust check dam spacing based on site-specific conditions.
Install check dams in ditches perpendicular to the flowline.
to installation.
Repair all rills or gullies and properly compact prior
Filter rock
Filter rock
Ponded water
(See Note 3)
CHECK DAM SPACING
FILTER ROCK
Filter rock
SPACING (S)
MAX. CHECK DAM
ROLLED EROSION CONTROL PRODUCT
FILTER ROCK CHECK DAM WITH
(FT)
Check Dam spacing (S)
Ditch Grad e (G)
WFLHD DETAIL
DETAIL APPROVED FOR USE 7/2016
157-16W
REVISED:
:2
A u g u s t
D e t W p w
-w o rk \d
\w a a
-s k a m a n
-1
W
-1 d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
G.6 length requirements culverts table for
See Fiber rolls at around culvert outlet
Install fiber rolls end section with flared
Culvert outlet uphill side of fiber roll
Place excavated material on
Fill slope on uphill side of fiber roll
Place excavated material Wood stakes
Fiber roll
Slope
Fill or cut slope uphill side of fiber roll
Place excavated material on
Fiber roll roll 2" min.
Trench fiber
Stagger joints (typ.)
along contours
Install fiber rolls flared end section
Culvert inlet with table for length requirements
See Fiber rolls at culverts around culvert inlet
Install fiber rolls
See note 6 control runoff culvert as needed to
Install fiber rolls below
Fiber roll
A A
151V:2H and steeper
30Between 1V:3H and 1V:2H
45Between 1V:4H and 1V:3H
601V:4H or flatter spacing (ft)
Fiber Roll Maximum �9" Slope Gradient
FIBER ROLL SPACING TABLE*
site-specific conditions.
*Approximate spacing shown. Adjust spacing as needed due to specific conditions.
Adjust length as needed due to site-across the top of the culvert inlet only.
*Approximate length shown for rolls
3054" or larger
2030" to 48"
1024" or smaller
Fiber Roll length (ft)�9" Culvert Size
FIBER ROLL AT CULVERTS*
NO SCALE
AT CULVERT OUTLET
FIBER ROLL
AT CULVERT INLET
FIBER ROLL
FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
FIBER ROLL SLOPE LAYOUT
INSTALLATION DETAIL
FIBER ROLL AS PERIMETER CONTROL STAKE DETAIL
SECTION A-A
Flow m in .Trench 2" min.
L im it C le a ri g ta k e
S lo p
Flow irection of ru n off
Pay lim its
Pay lim its ove rlap12" mi n.
m in
Flow
Trench 2" min.
Flow
Flow
See fiber roll spacing table Flow
Se e n ote
Se e n ote culvert is crossing the disturbance.
on both the road and around the culvert and all water entering the
6. Place fiber rolls all the way around the inlet when the disturbance is water is forced to flow through fiber roll rather than under it.
Tamp soil backfill against upstream side of fiber roll to ensure storm Place fiber rolls in continuous contact with trench bottom and sides.
5. For fiber rolls on bare soil, construct trenches parallel to the contour.
stakes 2 inches above top of fiber roll.
4. Drive stakes into undisturbed soil at least 12 inches deep. Expose max. at culverts. Stake fiber rolls 6 inches from each end.
stakes. Space stakes 4-foot o.c. max. on slopes and 2-foot o.c.
3. Stake fiber rolls in place with 1-inch x 1-inch or 1-inch Ø wood level.
fiber roll, do not allow the fiber roll to vary more than 5% from
2. Install fiber rolls along slope contours. For any 20-foot section of
1. Repair all rills and gullies and properly compact before installation.
NOTE:
:3
A u g u s t
D e t
C
-5 p w
-w o rk \d
\w a a
-s k a m a n
-1
C
-5
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USEFIBER ROLL
C157-55
DRAFT: 06/2024
CFLHD DETAIL
PROJECT
G.7 with plastic liner or riprap
Temporary diversion channel
NO SCALE
temporary barrier
Use sandbags to construct A
A
Flow
PLASTIC LINED DIVERSION CHANNEL
SECTION B-B
SECTION A-A
W
B
W
B
SandbagsPlastic liner
SSSS
D D SS
SS
Flow
Plastic liner when scheduled)
Silt fence (typ.
and secure with sandbags (typ.)
6.
5.
4.
3.
2.
1.
Flow
Provide geotextile filter conforming to Subsection 714.01(c).
using one of the methods listed in Subsection 204.11(a).
temporary culvert. Compact temporary culvert backfill channel through the roadway embankment with
When specified replace the portion of the diversion liner. Bury the upstream edge of the liner a minimum of
Do not construct with longitudinal joints if using a plastic
Construct channel at a minimum grade of 0.5 percent.
width of the temporary diversion channel.
Use plastic liner or riprap along the entire length and diameter, riprap class, channel dimensions and quantities.
See Erosion Control Section for temporary culvert
NOTE:
Permanent culvert
Roadway centerline
BB
See Note 5 when scheduled)
Silt fence (typ.
backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits
DIVERSION CHANNEL
PLAN
TEMPORARY CULVERT
SECTION B-B
Ø embankment
Roadway embankment
Roadway
Temporary culvert backfill
Subgrade
Bedding
Natural ground
RIPRAP LINED DIVERSION CHANNEL
SECTION A-A SECTION B-B
W
B B
W
T T when scheduled)
Silt fence (typ.
Sandbags
Riprap lining Riprap lining
SS SSD D
SS SS
FlowFlow
Geotextile filterGeotextile filter
6" deep and secure with riprap or sandbags.
Bury plastic liner 6" deep
2' 2'2'2'
DIVERSION CHANNELS
TEMPORARY STREAM
628-1
FP-24
1/2024
FLH STANDARD
:3
A u g u s t
S td p w w o r k \d
\w a a s k a m a n S td .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
G.8
Compacted native soil
Erosion control blanket
Erosion control blanket
Compacted native soil
Erosion control blanket
12" spacing
12" spacing
6" x 6" Trench
6" x 6" Trench
NOTE:
Overlap in the direction of the prevailing wind.
recommendations.
Install fasteners according to the manufacturer's
2.
1.
Se e
Not e
Pr ev ai lin g wi nd
AT TOP OF SLOPE
ANCHOR TRENCH
DETAIL A
AT TOE OF SLOPE
ANCHOR TRENCH
DETAIL B
SHINGLE SPLICE
DETAIL C
PERSPECTIVE VIEW
Fasteners @
Fastener
Fastener
Flow
Fastener (typ)
Fasteners @
Toe of slope of slope. See Detail A
Anchor trench at top
Slope stake
Blanket edge
Shingle splice. See Detail C edge overlap of slope. See Detail B
Anchor trench at toe
Blanket ends
S ee N ote 1
Fasten er sp acin g
6"
6"
3'
' m
ax. c to c
4" min.
overlap
6" m in.
12" max. c to c
12" max. c to c
12" max. c to c
PRODUCT ON SLOPES
ROLLED EROSION CONTROL
629-1W
:3
A u g u s t
D e t
W p w w o r k
\d
\w a a s k a m a n
W
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
G.9
Fasteners
Fastener
Fastener
6" max c to c
NOTE:
PERSPECTIVE VIEW
INITIAL ANCHOR
DETAIL A
See Note 2
CHECK SLOT
DETAIL B
SHINGLE SPLICE
DETAIL C
ANCHOR TRENCH
DETAIL D
native soil
Compacted control blanket
Erosion control blanket
Erosion native soil
Compacted control blanket
Erosion
Anchor Trench. See Detail D control blanket
Erosion native soil
Compacted for a V-ditch.
Trapezoidal ditch shown. Similar details
Roll ends may be spliced in a check slot.
manufacturer's recommendations.
Provide check slots according to the manufacturer's recommendations.
Install fasteners according to the
4.
3.
2.
1.
Fastener
Flo w
Fastener
See Detail D
Anchor trench
See Detail C
Shingle splice edges
Blanket
Fastener (typ.)
Flow
Flow ends
Blanket
See Detail B
Check Slot.
See Detail A
Initial Anchor
See Note 1
Fastener spacing
Fastener end overlap
6"
6" ed ge ov er lap6" m in
6"
12" max. c to c
12" max. c to c
36" max c to c
6" max c to c
12" max c to c
6" min.
PRODUCT IN CHANNELS
ROLLED EROSION CONTROL
629-2W
:0
J u ly
D e t
W p w w o r k \d
\w a a s k a m a n W
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
G.10
O
U T L E
T
+ 18" OUTLET
18" INLET
Existing ground
Top of wall
Bottom of wall at wall face
Final grade
N
BEGIN MSE WALL END MSE WALL
Slope stake limit
Slope stake limit clearing limits
Construction and
Construction limit
Edge of paved shoulder
Edge of paved shoulder Edge of travel way
Edge of travel way
"Main 01" design (MSE wall)
Contractor provided retaining structure
M1
M2
M3
M4
M5
M6
M7
M8
M9 M10
M11
M12
M13
M14
M15
M16 M17
M18
M19
M20 clearing limits
Construction and
N36°58'52"E
PI 201+56.75
Δ = 01°23'19" (RT)
R = 715.23' T = 8.67' L = 17.33'
PI 200+03.84
Δ = 00°25'32" (LT)
R = 1,034.77' T = 3.84' L = 7.68'
P T
.6
P C
.0
199+50 200+00 200+50 201+00 201+50
328 328
330 330
332 332
334 334
336 336
338 338
340 340
342 342
344 344
34.77' 15+40.00 (Main 01) 200+00.00 =
34.77' 17+06.00 (Main 01) 201+65.42 =
E= 1301525.0364 N= 142559.4043
E= 1301624.7319 N= 142691.3989
WIND RIVER RD
NOTE:
1. See Sheet H.4 for wall profile data.
:4
A u g u s t
M
S E
W a ll
M S
E W a ll
S h e p w
-w o rk \d
\w a a
-s k a m a n
-1 p ln m s e w a ll .d g n
PROJECT
H.2
CP
22104
PC
TP
TP
N
BEGIN SOLDIER PILE WALL END SOLDIER PILE WALL
paved shoulder
Edge of
Edge of travel way
Edge of travel way paved shoulder
Edge of
Slope stake limit
Slope stake limit
Construction limit structure design (soldier pile wall)
Contractor provided retaining
Existing ground
Bottom of concrete fascia wall
Drilled shaft (typ.)
Soldier pile (typ.)
Existing culvert g.s. at 359'
Boring BH23-02 clearing Limits
Construction and clearing Limits
Construction and
S1
S2
S3
S4 S5 S6
S7
S8
S9
S10
S11
S12
S13
S14
S15S16S17S18
S19
S20
N90°00'00"E
PI 301+23.75
Δ = 10°00'28" (RT)
R = 716.48' T = 62.73' L = 125.15'
P C
.0
P C
C
.1
P O
B
.0
302+00 303+00298+00 299+00 300+00 301+00
300 300
310 310
320 320
330 330
340 340
350 350
360 360
370 370
380 380
.1
.4
30.52' 300+00.00 = 18+36.25 (Main 01)
30.52' 301+86.82 = 20+31.00 (Main 01)
WIND RIVER RD
fascia wall Top of concrete
NOTE:
Submit wall design per Section 257.
2. Soldier pile spacing shown for illustration.
1. See Sheet H.4 for wall profile data.
E= 1301707.0556 N= 142784.7911
E= 1301861.0660 N= 142889.6180
:3
A u g u s t
A
L I_
S P
W
A L L
S P
W a ll
P la n S h e p w
-w o rk \d
\w a a
-s k a m a n
-1 p ln s p w a ll .d g n
PROJECT
H.3
:0
A u g u s t
P o in t T a b le p w w o r k \d
\w a a s k a m a n p ln s p w a ll
.d g n
POINT DATA
WALL PROFILE
PROJECT
NUMBER
H.4
87°
Existing ground form (typ.)
Welded wire
WITH WELDED WIRE FORM FACE
MECHANICALLY-STABILIZED EARTH WALL
sheet drain, 50% coverage
Geocomposite
Unclassified borrow H
Select granular backfill
Grid length, "L"
Mainline profile grade
6" (min.)
(min.)
4' Set back
W a ll p a y m e n t li m it s
See Detail A
Underdrain system
[2]Varies
Wall excavation, .7
H
H e ig h t v a r ie s
1:3
See Sheet C.3 for details
Pavement structure at mid height of panel at face 12" (min.)
Gabion rock
FACING DETAIL - ROCK FILL
Select granular backfill
Select granular backfill grid, 3 per panel (typ.)
on facing and
Tie transverse bars m
4' Return (min.)
Welded wire form facing
WELDED WIRE FORM
adjoining wire form for support, 4"
Place edge of wire inside of
4 x 4 W5 x W5
Inset end struts 6"
24" C to C or as needed.
Support struts spaced maximum
NOTE:
FOOTNOTE:
Min. gradient = 2.0%
UNDERDRAIN SYSTEM
PERFORATED PIPE
DETAIL A
Granular backfill
Leveling course
12"
Flow
24"
Geocomposite drain towards rigid outlet pipe drain beneath leveling course. Minimum gradient 0.5%
6" Ø Perforated pipe underdrain system pipe drain every 100 feet (max.)
6" Ø Rigid outlet
2%
See Facing Detail
8'-0" ± whichever is greater
8' or 70% of H, class 2, non-woven
Geotextile filter, class 2, non-woven
Geotextile filter, 18" m in
(2) 45° Elbows
Friction angle = 34° for backfill material.
Unit weight of backfill material 125 pcf
Design assumptions:
The heights and quantities are subject to field adjustment.
2.
1.
Guardrail system MGS, type 2, 3" - 6"
4' shoulder
Top of wall (TW) (Layout line)
24" Embankment
Slope (1:3)
[3]Extend 6" (min.) beyond facing grading D.
Leveling course base, leveling pad (BLP)
Bottom of
Bottom of wall (BW)
[1]Rodent guard drain towards underdrain system.
Slope bottom of excavation at a minimum 2 percent grade to [3] accordance with Section 208.03.
1:1 Slope shown. Construct slopes at stable inclinations in[2] per manufacturer's recommendation
-inch. Install2
Opening in rodent guard not to exceed [1] geogrid
Reinforcement geogrid
Reinforcement
LC1.52'
SHEET 1 of 2
EARTH WALL DETAILS
MECHANICALLY-STABILIZED1
:5
J u n e
M
S E
W a ll
D e ta p w w o r k \d
\w a a s k a m a n w a ll d e ta il
.d g n
:5
J u n e
M
S E
W a ll
D e ta p w w o r k \d
\w a a s k a m a n w a ll d e ta il
.d g n
PROJECT
H.5
Underlying mats
Return mat
Welded wire form
(PLAN VIEWS)
GEOGRID BUTT DETAIL
Adjacent geogrids
TANGENT WALL FACE
backside without overlap
Butt adjacent geogrids at
Wall face
CURVE LEFT WALL FACE
Adjacent geogrids
Backside overlap acceptable
Wall face
CURVE RIGHT WALL FACE
Adjacent geogrids
Backside separation acceptable
Wall face wall face without overlap
Butt adjacent geogrids at wall face without overlap
Butt adjacent geogrids at
Reinforcement length (L) wall face without overlap
Butt adjacent geogrids at
4' (min.)
recommended method.
with hog rings, wire ties, spiral binders, or the manufacturers
Connect adjacent welded wire reinforcement facing elements[1]
[1]Connect reinforcement
AND RETURN MAT DETAILS
MSE WALL FACING , CORNER
Reinforcement geogrid length (L)
Machine
(roll direction)
Machine
(roll direction)
Reinforcement length (L) Reinforcement length (L) wall face perpendicular to front with strongest axis
Reinforcement geogrid, Wall face
SHEET 2 of 2
:0
J u n e
M
E C
H A
N
IC
A L
L Y
-S T
A B
IL
IZ
R
T H
W A
L L
D E
T A p w w o r k \d
\w a a s k a m a n w a ll d e ta il
.d g n
EARTH WALL DETAILS
MECHANICALLY-STABILIZED
PROJECT
H.6 with Section 617 and Section 724.
Galvanize anchor metal components in accordance of the rail.
nuts and washers. Place the washer on the face side
Use eight 5/8" x 1 1/2" (in) machine bolts with hex dimensions shown.
plates welded to match the strength and
Fabricate the anchor plate from 1/4" (in) thick
100 ft.-lbs.
outside nut against the inside nut to a minimum of washers at both ends of the cable. Torque the
Fasten the Anchor Cable using two 1" (in) nuts and
See Sheet I.2 for additional details.
element and post details.
Refer to Standard Plans 617-32 for typical rail
NOTES:
6.
5.
4.
3.
2.
1.
:2
J u n e
G
W
-B E
A M
G U
A R
D R
A
IL
C A
B L
E R
E L
E A
S
IN
G T
E R
M
IN
A L
T Y
P E
G
-C R
T
C o p y p w w o r k \d
\w a a s k a m a n S td c .7
.d g n
SHEET 1 of 2
(ANCHOR SYTEM) DETAILS
TERMINAL SYSTEM
PROJECT
I.1
:2
A u g u s t
G
W
-B E
A M
G U
A R
D R
A
IL
C R
T A
N C
H O
R A
G E
A S
S E
M B
L Y
D E
T A p w w o r k \d
\w a a s k a m a n S td c .7
.d g n
SHEET 2 of 2
(ANCHOR SYSTEM) DETAILS
TERMINAL SYSTEM
PROJECT
I.2
2.
1.
Steel post
Wood blockout Wood blockout
Wood blockout
Steel post Steel post
Steel post
V ditch (typ.)
Steel post Wood blockout bolt and nut guardrail steeper
1V:4H or
Rub rail (typ.)
See Standard 617-31 (wood posts) and 617-32 (steel
Typical post spacing is 6'-3" unless otherwise noted.
" span2
12 ga. W-beam, 9'-4
" x 5" Bolt8
" dia. hole in post4
Field drill "2
12 ga. W-beam, 9'-4
NOTE:
PLAN
ALONG RAIL
ELEVATION
SECTION A-A SECTION B-B
DETAIL A
SECTION C-C
SECTION D-D
BLOCKOUT DETAIL
STEEL POST ANDDETAIL B
ELEVATION
D
C
BA
B C
D
A
See Detail A
Field bend
See Detail B
Ditch bottom
Edge of shoulder
S e e T a b le
Mid-span splice (typ.)
Top of cut
See Note 1
Washer
Pipe sleeve spacer
Shoulder Shoulder VariesShoulder
VariesShoulder w h e n r u b r a il i s r e q u ir
Terminal system, Type MGS-BAT
Pay Limits
Guardrail system MGS
Pay limits
Length of Need posts) for other details.
M in im u m p o s t le n g th
" x 2"8
6'-3
"21
3'-1
"21
3'-1
8" W6 x 8.5
W6 x 9 or c o v e r m in
POST DISTANCE
FROM EDGE OF SHOULDER
POST OFFSETS
22 13 or st ee pe r1V:
3H or st ee pe r1V:
3H or steeper
1V:4H
4681012141618202224 or steeper
1V:4H or steeper
1V:4H
NO SCALE
"4
13'-11
10'-11"
"4
8'-10
5'-9"
75'-0"
25'-0"
12'-6
12'- 6"
Sheet 1 of 2
MGS-BATTYPE
BACK SLOPE ANCHOR TERMINAL
MGS W-BEAM GUARDRAIL
617-18
2/2024
:4
J u n e
S td p w w o r k
\d
\S td
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
I.3
Posts 1 -3 and rub rail at Post 4.
Anchor plate and hardware are typical on top rail of
Use zinc rich paint to coat field drilled holes.
See Sheet 1 of 2 for terminal layout.
3.
2.
1.
Steel plate (see Detail)
Washer of post� slots (typ.)
hole (typ.)
" dia. (typ.)4
" dia. (typ.)4
" dia. (typ.)4
" dia. (typ.)4
" dia.16
" dia. (typ.)16 13 " dia. (typ.)16
1" dia.
W6 x 8.5 W6 x 9 or W6 x 8.5
W6 x 9 or W6 x 8.5 W6 x 9 or
" bolts8 7as needed for
Field drill 1" holes
" x 2" bolt (typ.)8
" Nut (typ.)8
1" dia. hole
1" dia.
AT POSTS 1, 2, AND 3
SPECIAL RAIL TO POST CONNECTION
GALVANIZED SQUARE WASHER
GALVANIZED STEEL PLATE
See Note 3
STEEL PLATE AND WASHER
POSTS 5-21POST 4POSTS 1-3
4"
" Thickness2 1 Thickness"16
14"
"2 12"2
12"4 12"4
31"2 12"2
"8 16"8
" 8
4" 4"
"4
"4
"4 12 "4
"8
"4 31" x 1
" dia.4
"4
"4
"8
617-18
:4
J u n e
S td
-1 b p w
-w o rk
\d \S td -1
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
Sheet 2 of 2
MGS-BATTYPE
BACK SLOPE ANCHOR TERMINAL
MGS W-BEAM GUARDRAIL
PROJECT
I.4
6.
5.
4.
3.
2.
1.
embankment
Edge of widened post section. See Note 4 face of the rail in the standard
Tangent line projected from the embankment
Edge of widened post section. See Note 4 face of the rail in the standard
Tangent line projected from the
Varies by manufacturer end of terminal not shown.
Terminal posts and
Varies by manufacturer end of terminal not shown.
Terminal posts and terminal grading extents where practical.
Construct a 1V:4H slope outside of the guardrail terminal.
Install a reflectorized object marker on the end of the according to the manufacturer's recommendations.
end farther from the edge of shoulder, or use a taper
Install terminal at a 1:25 taper or flatter to position the the manufacturer's recommendations.
necessary to install the tangent terminal according to manufacturer for a specific product. Adjust grading as begin at post 3. Verify the length of need with the
For design purposes, the length of need is assumed to of site limitations, use the alternative grading layout.
as practical within site constraints. If necessary because are provided, use the preferred grading layout as much staking notes or model. If no staking notes or model
Construct the terminal grading layout as shown in the other details.
recommendations. See manufacturer's drawings for
Install tangent terminal according to the manufacturer's
See Note 6
Guardrail terminal grading o r f la tt e r
V
:1 H
Front of rail face
PLAN
PREFERRED GRADING
Post section
Standard
L
See Note 6
Guardrail terminal grading o r f la tt e r
V
:1
H
Hinge point line
See Note 3
Length of Need
Guardrail system
Pay…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .