WA-022 Project Manual.pdf
PDF 15 MB Posted
- Attached to
- Water Well No. 13
- Solicitation number
- WA-022
- Issued by
- Caldwell County, Texas
About this file
Summary: WA-022 Water Well No. 13 Project Manual
This is a project manual and bidding document issued by the City of Mont Belvieu, Texas for the construction of Water Well No. 13, a new groundwater treatment facility. The project encompasses installation of a 1,500 gallons per minute (gpm) lineshaft vertical turbine pumping system, groundwater well construction, chemical feed systems, electrical infrastructure including a diesel generator, site improvements such as roadways and grading, and piping connections to the distribution system. The bid deadline is 2:00 P.M. on Thursday, September 10, 2026, with bids to be opened publicly immediately thereafter at City Hall, 1 Town Center Boulevard, Mont Belvieu, Texas 77580. A non-mandatory pre-bid conference was scheduled for August 27, 2026 at 2:00 P.M. at the same location. Substantial completion is required within 420 calendar days of work commencement, with final completion within 480 calendar days. The contractor will be responsible for all labor, materials, equipment, superintendence, and site restoration. Liquidated damages are assessed at $1,000 per day for each day work exceeds the contract timeline.
Bidders must submit a 5 percent bid security (either certified check or bid bond), qualification statements, financial statements, non-collusion affidavits, bonding company information, and a completed Texas Ethics Commission Form 1295 with a certificate number. The contract will be awarded based on best-value competitive bidding using scoring criteria that evaluate bid price (50 points), contractor's prior work within City of Mont Belvieu (15 points), superintendent's experience on similar projects (10 points), past project references (15 points), and contractor location (10 points). The successful bidder must furnish 100 percent performance and payment bonds within 15 days of the Notice of Award. All bid unit prices are fixed for the duration of the project regardless of material, labor, or equipment cost fluctuations. The documents are available for viewing at www.civcastusa.com at no cost, with hard copies not sold. The city contact for all project matters is Judah Neu, Project Manager, at jneu@montbelvieu.net.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Mont Belvieu
CONTRACT NO. WA – 022 JOB NO. WA - 022
PROJECT MANUAL, SPECIFICATIONS AND BID
FOR
WATER WELL NO. 13
Notice To Bidder: ALL BIDS ARE TO BE SUBMITTED TO THE CITY OF MONT BELVIEU, 11607 EAGLE DRIVE, MONT BELVIEU, TEXAS, BY 2:00 P.M. on Thursday, September 10, 2026.
BIDDER IS REQUIRED TO FILL IN ALL INFORMATION BELOW:
BIDDER (Company Name)
TOTAL AMOUNT OF BASE BID (Project Total) $____________________
Garver LLC (F-5713)
12141 Wickchester Lane
Suite 200
Houston, TX 77079
TEL 713.491.8333
www.GarverUSA.com
CITY OF MONT BELVIEU
CHAMBERS COUNTY, TEXAS
PROJECT MANUAL
WA-022
JOEY McWILLIAMS
MAYOR
MIKE POMYKAL
CITY COUNCIL POSITION 1
MARK ABLES
CITY COUNCIL POSITION 2
ARNOLD PETERS
CITY COUNCIL POSITION 3
TIM DUREE
CITY COUNCIL POSITION 4
DON PRICE
CITY COUNCIL POSITION 5 / MAYOR PRO-TEM
JABO LEONARD
CITY COUNCIL POSITION 6
BRIAN WINNINGHAM
CITY MANAGER
FRANCISCO CARRILLO, PE, CFM
ENGINEERING DIRECTOR/CITY ENGINEER
AUGUST 2026
CERTIFICATIONS
Project No. 2501080 1 Section 00 00 01 Mont Belvieu Water Wells No. 13 Certifications
WA-022
MONT BELVIEU WATER WELL NO. 13
GARVER PROJECT NO. 2501080
CLIENT PROJECT NO. WA-022
I hereby certify that the applicable portions of this project’s specifications, details, and plans were prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Texas.
SEAL AND SIGNATURE
APPLICABLE DIVISION OR
PROJECT RESPONSIBILITY
Alec R. Macmanus, PE
Digitally Signed:
Division 00 Division 01 Section 33 22 00
Division 03 Division 04 Division 05 Division 07 Division 08
Joe A. Danko, PE
07/01/2026
ALEC R. MACMANUS
154827 L I C E N S E D
PR O F E S S I O N A L E NG I N
EER
S T A T E O F T E X A S
8/19/2026
Project No. 2501080 2 Section 00 00 01
Nicole E. Rowlette, PE
Division 09 Division 40 Division 43 Division 44
Brian S. Chong, PE
Division 23 Division 26
BRAIN S. CHONG
108528
BRIAN S. CHONG
07-01-2026
7/1/26
Project No. 2501080 3 Section 00 00 01
Genesis R. Gaona, PE
Division 31 Division 32 Division 33
GARVER, LLC CERTIFICATE OF AUTHORIZATION:
TX ENGINEERING REGISTRATION NO. F-5713
Expiration Date: 01/31/2027
07-01-2026
TABLE OF CONTENTS
C-000 PLAN SET INDEX
C-100 NOTICE TO BIDDERS
C-200 INSTRUCTIONS TO BIDDERS
C-300 NON-COLLUSION AFFIDAVIT
SUBCONTRACTORS AND MAJOR SUPPLIERS FORM
STATEMENT OF QUALIFICATIONS
C-410 BID FORM
00202 SCORING CRITERIA
C-430 BID BOND
00440 PROHIBITED ACTIVITIES
C-510 NOTICE OF AWARD
C-520 STIPULATED PRICE AGREEMENT
C-550 NOTICE TO PROCEED
C-555 BOND COMPANY INFORMATION
C-610 PERFORMANCE BOND
C-615 PAYMENT BOND
MAINTENANCE BOND
C-625 CERTIFICATE OF SUBSTANTIAL COMPLETION
C-700 GENERAL CONDITIONS
C-800 SUPPLEMENTARY CONDITIONS
HB-89 VERIFICATION FORM
FORM 1295
TECHNICAL SPECIFICATIONS
DIVISION 1 – GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 25 00 SUBSITUTION PROCEDURES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 16 CONSTRUCTION PROGRESS DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 45 24 SPECIAL TESTS AND INSPECTIONS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 60 00 PRODUCT REQUIREMENTS
01 70 00 EXECUTION REQUIREMENTS
01 75 00 START UP TESTING AND TRAINING
01 75 00.1 MANUFACTURER’S CERTIFICATE OF PROPER INSTALLATION
01 75 00.2 UNIT PROCESS STARTUP FORM
01 75 00.3 FACILITY PERFORMANCE DEMONSTRATION CERTIFICATION
01 77 00 CLOSEOUT PROCEDURES
01 78 36 WARRANTIES AND BONDS
DIVISION 3 – CONCRETE
03 01 00 MAINTENANCE OF CONCRETE
03 10 00 CONCRETE FORMING
03 15 00 CONCRETE JOINTS AND ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 35 00 CONCRETE FINISHING
03 39 00 CONCRETE CURING
03 60 00 GROUT
03 63 00 CONCRETE DOWELING – ADHESIVE
DIVISION 4 – MASONRY
04 20 00 UNIT MASONRY
04 26 13 MASONRY VENEER
DIVISION 5 – METALS
05 09 15 POST-INSTALLED ANCHORS
05 50 00 METAL FABRICATIONS
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
07 21 00 BUILDING INSULATION
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 50 00 ROOFING, INSULATION, AND DAMP PROOFING
07 54 00 THERMOPLASTIC MEMBRANE ROOFING
07 62 00 SHEET METAL FLASHING AND TRIM
07 71 00 MANUFACTURED ROOF SPECIALITIES
07 92 00 JOINT SEALANTS
DIVISION 8 – OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
08 80 00 GLAZING
08 90 00 LOUVERS AND VENTS
DIVISION 9 – FINISHES
09 90 00 PAINTING AND PROTECTIVE COATINGS
09 96 00 HIGH-PERFORMANCE COATINGS
09 96 00.1 HIGH-PERFORMANCE COATING SYSTEMS SCHEDULE
09 97 23 CONCRETE OR MASONRY COATINGS
DIVISION 23 – HVAC
23 05 00 COMMON WORK RESULTS FOR MECHANICAL
23 05 17 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
23 05 29 HANGERS AND SUPPORTS FOR MECH PIPING AND EQUIP
23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 07 00 DUCTWRAP INSULATION
23 07 13 MECHANICAL INSULATION
23 31 13 METAL DUCTS
23 33 00 AIR DUCT ACCESSORIES
23 37 13 AIR OUTLETS AND INLETS
23 74 13 PACKAGED ROOFTOP AIR CONDITIONING UNITS
DIVISION 26 – ELECTRICAL
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 05 43 UNDERGROUND DUCTS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 05 93 ELECTRIC MOTORS
26 22 00 LOW VOLTAGE TRANSFORMERS
26 24 13 SWITCHBOARDS
26 24 16 PANELBOARDS
26 27 26 WIRING DEVICES
26 28 13 FUSES
26 28 16.13 ENCLOSED CIRCUIT BREAKERS
26 28 16.16 ENCLOSED SWITCHES
26 29 23 VARIABLE FREQUENCY MOTOR CONTROLLERS
26 32 13.13 DIESEL ENGINE GENERATORS
26 36 23 AUTOMATIC TRANSFER SWITCHES
26 41 13 LIGHTNING PROTECTION FOR STRUCTURES
26 43 13 SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
26 67 05 COMMUNICATION CABLE AND EQUIPMENT
DIVISION 31 – EARTHWORK
31 05 19.13 GEOTEXTILE FILTER FABRIC
31 11 00 SITE PREPARATION
31 22 13 SUBGRADE PREPARATION
31 22 19 GRADING
31 23 16 EXCAVATION
31 23 16.13 TRENCHING FOR SITE UTILITIES
31 23 19 DEWATERING
31 23 23.13 FILL AND BACKFILL
31 23 23.16 TRENCH BACKFILL
31 32 00 SOIL EROSION STABILIZATION
31 50 00 EXACAVATION SUPPORT SYSTEMS
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 10 00 CONCRETE SIDEWALKS
32 13 13 PORTLAND CEMENT CONCRETE PAVING
32 31 21 DECORATIVE METAL GATE SYSTEM
32 92 19 SEEDING, FERTILIZING, AND MULCHING
DIVISION 33 – UTILITIES
33 13 00 DISINFECTION OF WATER SYSTEMS
33 22 00 WATER SUPPLY WELLS
33 39 13.13 PRE-CAST CONCRETE MANHOLES
DIVISION 40 – PROCESS INTEGRATION
40 05 00 PIPING SYSTEMS TESTING
40 05 06 PROCESS PIPING SPECIALTIES
40 05 07 HANGERS AND SUPPORTS FOR PROCESS PIPING
40 05 51 COMMON REQUIREMENTS FOR PROCESS VALVES
40 05 57 ACTUATORS FOR PROCESS VALVES AND GATES
40 05 61 GATE VALVES
40 05 63 BALL VALVES
40 05 64 BUTTERFLY VALVES
40 05 65.23 CHECK VALVES
40 05 78 AIR RELEASE VALVES
40 23 39 PROCESS PIPING - GENERAL
40 23 39.1 PROCESS PIPING SCHEDULE
40 23 39.13 DS - CM LINED DIP AND FITTINGS
40 23 39.40 C900 POLYVINYL CHLORIDE PIPE AND FITTINGS DATA SHEET
40 23 39.43 POLYVINYL CHLORIDE PIPE AND FITTINGS DATA SHEET
40 41 13 HEAT TRACING
40 42 00 PROCESS MECHANICAL INSULATION
40 61 13 PROCESS CONTROL SYSTEM GENERAL PROVISIONS
40 61 96 PROCESS CONTROL DESCRIPTIONS - GENERAL
40 61 96.10 PROCESS CONTROL DESCRIPTIONS – WATER WELL NO. 13
40 63 43 PROGRAMMABLE LOGIC CONTROLLERS
40 66 13 NETWORKING EQUIPMENT
40 66 33 FIBER OPTIC COMMUNICATION SYSTEMS
40 67 23 CONTROL PANELS
40 68 63 PLC AND HMI PROGRAMMING
40 70 00 INSTRUMENTATION FOR PROCESS SYSTEMS
40 71 13 MAGNETIC FLOW METERS
40 73 13 PRESSURE GAUGES
40 73 26 DIFFERENTIAL AND GAUGE PRESSURE TRANSMITTERS
40 73 36 PRESSURE AND DIFFERENTIAL PRESSURE SWITCHES
DIVISION 43 – PROCESS GAS & LIQUID HANDLING, PURIFICATION & STORAGE
EQUIP
43 23 26 VERTICAL TURBINE PUMPS
43 24 13.1 DS VERTICAL TURBINE PUMPS
DIVISION 44 – POLLUTION CONTROL EQUIPMENT
44 44 20 CHEMICAL FEED SYSTEMS
PLAN SET INDEX
SHEET DRAWING NAME
1 COVER SHEET
2 INDEX OF DRAWINGS
3 GENERAL CONVENTIONS AND ABBREVIATIONS
4 CIVIL NOTES AND LEGEND 1
5 CIVIL NOTES AND LEGEND 2
6 PROCESS & INSTRUMENTATION DIAGRAM NOTES,
7 STRUCTURAL LEGEND AND NOTES 1
8 STRUCTURAL LEGEND AND NOTES 2
9 STRUCTURAL NOTES 1
10 SPECIAL INSPECTIONS 1
11 SPECIAL INSPECTIONS 2
12 SPECIAL INSPECTIONS 3
13 PROCESS MECHANICAL NOTES, LEGENDS, AND ABBR
14 ELECTRICAL SYMBOL LEGEND 1
15 ELECTRICAL SYMBOL LEGEND 2
16 ELECTRICAL NOTES, LEGENDS, AND ABBREVIATION
17 EXISTING SITE PLAN - OVERVIEW
18 PROPOSED SITE PLAN - OVERVIEW
19 PROPOSED SITE PLAN
20 PROPOSED GRADING PLAN
21 YARD PIPING PLAN - OVERVIEW
22 16" FW PLAN AND PROFILE (STA. 10+00 TO STA.
23 16" FW PLAN AND PROFILE (STA. 13+00 TO STA.
24 16" FW PLAN AND PROFILE (STA. 17+00 TO STA.
25 16" FW PLAN AND PROFILE (STA. 21+00 TO STA.
26 16" FW PLAN AND PROFILE (STA. 25+00 TO STA.
27 16" FW PLAN AND PROFILE (STA. 29+00 TO STA.
28 16" FW PLAN AND PROFILE (STA. 33+00 TO STA.
29 16" FW PLAN AND PROFILE (STA. 37+00 TO END)
30 CIVIL DETAILS 1
31 CIVIL DETAILS 2
32 CIVIL DETAILS 3
33 CIVIL DETAILS 4
34 CIVIL DETAILS 5
35 CIVIL DETAILS 6
36 CIVIL DETAILS 7
37 OVERALL ELECTRICAL SITE PLAN
38 PROCESS & INSTRUMENTATION DIAGRAM 1
39 PROCESS & INSTRUMENTATION DIAGRAM 2
40 GROUNDWATER WELL PLAN VIEW
41 GROUNDWATER WELL SECTIONS
42 PROCESS DETAILS 1
43 WATER WELL PROFILE AND DETAIL
44 STRUCTURAL DETAILS 1
45 WELL PUMP NO. 13 POWER & GROUNDING PLAN
46 ELECTRICAL BUILDING STRUCTURAL FLOOR PLAN
47 ELECTRICAL BUILDING STRUCTURAL ROOF FRAMING
48 ELECTRICAL BUILDING STRUCTURAL ELEVATIONS 1
49 ELECTRICAL BUILDING STRUCTURAL ELEVATIONS 2
50 ELECTRICAL BUILDING STRUCTURAL SECTIONS
51 ELECTRICAL BUILDING DOOR SCHEDULE AND DETAI
52 STRUCTURAL DETAILS I
53 STRUCTURAL DETAILS II
54 STRUCTURAL DETAILS III
55 STRUCTURAL DETAILS IV
56 STRUCTURAL DETAILS V
57 STRUCTURAL DETAILS VI
58 ELECTRICAL BUILDING CHEMICAL ROOMS - PLAN
59 ELECTRICAL BUILDING EXTENSION CHEMICAL ROOM
60 HVAC FLOOR PLAN
61 HVAC SCHEDULES
62 HVAC DETAILS
63 AIRFLOW SCHEMATIC
64 MAIN ELECTRICAL BUILDING POWER PLAN
65 MAIN ELECTRICAL BUILDING LIGHTING PLAN
66 MAIN ELECTRICAL BUILDING GROUNDING PLAN
67 ONE-LINE DIAGRAM
68 ELECTRICAL SCHEDULES
69 ELECTRICAL CONDUIT SCHEDULE
70 ELECTRICAL I/O LIST
71 WELL PUMP VFD CONTROL SCHEMATIC
72 WELL PUMP VFD CONTROL SCHEMATIC (CONT.)
73 200CP001 CONTROL PANEL SCHEMATIC
74 ELECTRICAL DETAILS 1
75 ELECTRICAL DETAILS 2
76 ELECTRICAL DETAILS 3
77 ELECTRICAL DETAILS 4
78 ELECTRICAL DETAILS 5
77 ELECTRICAL DETAILS 4
78 ELECTRICAL DETAILS 5
NB-1 of 2
NOTICE TO BIDDERS
Sealed proposals addressed to the City of Mont Belvieu will be received at the Mont Belvieu City Hall, l
Town Center, Mont Belvieu, Texas 77580, attention Allison Dunning, City Secretary: for furnishing all necessary materials, equipment, superintendence, and labor for the construction of the WA-022 Water
Well No. 13, until 2:00 P.M. on Thursday, September 10th, 2026. Bids will, immediately thereafter, be publicly opened and read aloud in the City of Mont Belvieu City Hall, 1 Town Center Blvd, Mont
Belvieu, Tx 77580. Any bids received after closing time will be returned unopened.
The project consists of the construction of a new groundwater treatment plant for the City of Mont
Belvieu. The contractor shall furnish all labor, equipment, material, and supervision necessary for the installation of groundwater well and 1,500 gpm lineshaft vertical turbine pumping system, connect to the distribution system piping, electrical equipment, chemical feed system, roadways, and other site improvements as outlined in the drawings and specifications.
Each proposal shall be accompanied by a bid guarantee of not less than 5% of total bid amount, as a guarantee that the bidder will enter a contract and execute the required bonds within ten days after notice of award. At the option of the bidder, the guarantee may be one of the following:
- Cashier's check or certified check upon a national or state bank, payable to the City of Mont
Belvieu.
- Negotiable U.S. Government bonds (at par value).
- Bid bond from a surety company listed in the latest issue of U.S. Treasury Circular 570, such bid bond being within the maximum amount specified for such company in that publication.
Bids without such guarantee will not be considered.
Any questions and communication related to this project shall be directed to the following City contact:
Judah Neu
Project Manager, City of Mont Belvieu jneu@montbelvieu.net
This shall be the bidder’s sole point of contact in all matters related to the project. Any attempt by bidder to obtain information related to the project by any other means shall be considered bidder misconduct and is basis for bidder disqualification.
Award of this contract will be based on the best-value competitive bidding method. The City may use the following criteria to evaluate each bid: bid price, bidder’s experience and reputation, bidder’s references’ feedback, quality of the bidder’s services, bidder’s safety record, bidder’s proposed personnel, and any other relevant factors specific to the project. The right is reserved as the interest of the Owner may require, to reject any or all bids, and to waive any informality in bids received. The Contract will be awarded based on the Scoring Criteria contained in Document 00202. A copy of the specific Scoring
Criteria for this project is included in the bidding documents. The successful bidder must furnish
Performance Bond and Payment Bond on the forms provided in the amount of one hundred percent
(100%) of the total contract price from a Surety or other Sureties acceptable to the Owner. Owner reserves the right to award the contract at any time within sixty (60) days after bid opening.
NB-1 of 2
A Non-Mandatory Pre-Bid Conference will be held to review the scope of work. The Pre-Bid Conference will be held on Thursday, August 27th, at 2:00 P.M. at City Hall, 1 Town Center Blvd. Mont Belvieu, Texas 77580. Attendance by each prospective bidder or its representative at the pre-bid conference is
NOT MANDATORY.
Equal Opportunity in Employment — all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, age, handicap or national origin. Bidders on this work will be required to comply with the President’s Executive Order No. 11246, as amended by Executive Order
11375, and as supplemented in Department of Labor regulations 41 CFR Part 60.
The Contract Documents, Specifications, and Plans may be examined at the following locations:
A Complete set of the bidding documents are on file at www.civcastusa.com. There is no cost to view the plans, and printing can be done through the website. Sets of hard copies of Bidding Documents will not be sold. Complete sets of Bidding Documents shall be used in preparing Bids; neither
Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. Owner and Engineer, in making copies of Bidding
Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
First Publication: August 20th, 2026 Second Publication: August 27th, 2026 http://www.civcastusa.com/
EJCDC C-200 Suggested Instructions to Bidders for Construction Contracts Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
00200 – i
BID FORM
TABLE OF CONTENTS
ARTICLE 1 - DEFINED TERMS
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE
ARTICLE 5 - PRE-BID CONFERENCE
ARTICLE 6 - SITE AND OTHER AREAS
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
ARTICLE 8 - BID SECURITY
ARTICLE 9 - CONTRACT TIMES
ARTICLE 10 - LIQUIDATED DAMAGES
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
ARTICLE 13 - PREPARATION OF BID
ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS
ARTICLE 15 - SUBMITTAL OF BID
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
ARTICLE 17 - OPENING OF BIDS
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE
ARTICLE 21 - SIGNING OF AGREEMENT
ARTICLE 22 - SALES AND USE TAXES
ARTICLE 23 - RETAINAGE
ARTICLE 24 – PROJECT MANAGEMENT SOFTWARE
ARTICLE 25 – TEXAS ETHICS COMMISSION FORM 1295
ARTICLE 26 – TIME OF COMPLETION
ARTICLE 27 – ATTACHMENTS TO THIS BID
ARTICLE 28 – DEFINED TERMS
00200 – ii
ARTICLE 29 – BID SUBMITTAL
TABLE OF ARTICLES (Alphabetical by Subject)
SUBJECT ARTICLE
AWARD OF CONTRACT
BASIS OF BID; COMPARISON OF BIDS
BID SECURITY
BIDS TO REMAIN SUBJECT TO ACCEPTANCE
CONTRACT SECURITY AND INSURANCE
CONTRACT TIMES
COPIES OF BIDDING DOCUMENTS
DEFINED TERMS
EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE
INTERPRETATIONS AND ADDENDA
LIQUIDATED DAMAGES
MODIFICATION AND WITHDRAWAL OF BID
OPENING OF BIDS
PRE-BID CONFERENCE
PREPARATION OF BID
QUALIFICATIONS OF BIDDERS
RETAINAGE
SALES AND USE TAXES
SIGNING OF AGREEMENT
SITE AND OTHER AREAS
SUBCONTRACTORS, SUPPLIERS AND OTHERS
SUBMITTAL OF BID
SUBSTITUTE OR “OR-EQUAL” ITEMS
00200 – 1
ARTICLE 1 - DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General
Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office--The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered: 11607 Eagle Drive, Mont Belvieu, Texas 77580.
B. Additional Items – Various additional items that may be used during this contract.
C. Engineer – The word “Engineer” shall be understood as referring to the City of Mont Belvieu
Engineering, Engineer of the Owner, or such other Engineer, as may be authorized by said
Owner to act in any particular position.
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
2.01 Complete set of the bidding documents are on file at www.civcastusa.com. There is no cost to view the plans, and printing can be done through the website. Sets of hard copies of Bidding
Documents will not be sold.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor
Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
3.01 Each proposal must be accompanied by a statement of the qualification of the bidder to properly execute the work shown in the plan set.
3.02 Each proposal must be accompanied by a statement of the financial condition of the bidder as reflected by his most recently prepared statement. Submit in a sealed envelope marked, "Financial
Statement of (name of bidder) for WA-022 Water Well No. 13, City of Mont Belvieu. This statement will be examined only if the bidder's proposal is actively considered for award.
3.03 The bidder shall submit with his bid the name, address, and telephone number of a person, firm, or corporation who has agreed to execute the required payment and performance bonds in the event that this contract is awarded to the bidder. A form is included in these contract documents for that purpose.
A. Such surety company shall be authorized to operate in Texas, shall have all necessary authorization and resources required to issue payment and performance bonds required for the amount of the contract, and shall have a rating of at least B from Best's Key Rating Guide.
3.05 Each bidder submitting a bid for any portion of the work contemplated by the documents on which bidding is based shall execute and attach thereto, an affidavit substantially in the form http://www.civcastusa.com/
00200 – 2 provided in the Contract Documents, to the effect that he has not entered into a collusive agreement with any other person, firm, or corporation in regard to any Bid submitted. Before executing any subcontract, the successful Bidder shall submit the name of any proposed subcontractor for prior approval along with an affidavit substantially in the form provided in the
Contract Documents.
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND
SITE
4.01 Subsurface and Physical Conditions
A. The Supplementary Conditions identify:
1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Engineer has used in preparing the Bidding Documents.
2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that Engineer has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in Paragraph 4.01.A will be made available by
Owner to any Bidder on request. Those reports and drawings are not part of the Contract
Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02 of the General Conditions has been identified and established in
Paragraph 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions or information contained in such reports or shown or indicated in such drawings.
4.02 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in
Paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous
Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in Paragraph 4.06 of the General Conditions.
4.03 On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid.
Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates.
4.04 Reference is made to Article 7 of the Supplementary Conditions for the identification of the general nature of other work that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) that relates to the Work contemplated by these Bidding
Documents. On request, Owner will provide to each Bidder for examination access to or copies of
Contract Documents (other than portions thereof related to price) for such other work.
4.05 It is the responsibility of each Bidder before submitting a Bid to:
00200 – 3
A. examine and carefully study the Bidding Documents, the other related data identified in the
Bidding Documents, and any Addenda;
B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work;
D. obtain and carefully study (or accept consequences of not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by
Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto;
E. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;
F. become aware of the general nature of the work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Bidding Documents;
G. correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding
Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that
Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by
Engineer is acceptable to Bidder; and
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
4.06 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given
Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 - PRE-BID CONFERENCE
5.01 A Non-Mandatory Pre-Bid conference will be held at 2:00 p.m. local time on August 27, 2026 at
1 Town Center Blvd, Mont Belvieu. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are recommended to attend and participate in the conference.
00200 – 4
Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 6 - SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor.
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to
Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda and emailed via Civcast to all parties recorded by
Engineer as having received the Bidding Documents. Questions received less than five days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer.
ARTICLE 8 - BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of
Bidder’s maximum Bid price and in the form of a certified check or bank money order or a Bid bond (on the form attached) issued by a surety meeting the requirements of Paragraphs 5.01 and
5.02 of the General Conditions.
8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the
Contract Documents, furnished the required contract security and met the other conditions of the
Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Agreement or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be returned.
8.03 Bid security of other Bidders whom Owner believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening.
ARTICLE 9 - CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
00200 – 5
ARTICLE 10 - LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, are set forth in the Agreement.
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, or those substitutes or “or-equal” materials and equipment approved by Engineer and identified by Addendum. The materials and equipment described in the Bidding
Documents establish a standard of required type, function and quality to be met by any proposed substitute or “or-equal” item. No item of material or equipment will be considered by Engineer as a substitute or “or-equal” unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date for receipt of Bids. Each such request shall conform to the requirements of Paragraph 6.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the
Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of all such
Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by Owner. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent
Successful Bidder to submit a substitute,
12.02 If apparent Successful Bidder declines to make any such substitution, Owner may award the
Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the
Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Paragraph 6.06 of the
General Conditions.
12.03 Contractor shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom Contractor has reasonable objection.
ARTICLE 13 - PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents.
00200 – 6
13.02 All blanks on the Bid Form shall be completed by printing in ink or by typewriter and the Bid signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form.
A Bid price shall be indicated for each bid item and additional item listed therein, or the words
“No Bid,” “No Change,” or “Not Applicable” entered.
13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.
13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature.
13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown below the signature.
13.06 A Bid by an individual shall show the Bidder’s name and official address.
13.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on the
Bid Form. The official address of the joint venture shall be shown below the signature.
13.08 All names shall be typed or printed in ink below the signatures.
13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.10 The address and telephone number for communications regarding the Bid shall be shown.
13.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the
Contract. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
13.12 Name of bidder and total bid price must be on cover sheet of bid documents.
ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS
14.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid schedule.
B. The total of all estimated prices will be the sum of the products of the estimated quantity of each item and the corresponding unit price. The final quantities and Contract Price will be determined in accordance with Paragraph 11.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.
00200 – 7
14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in Paragraph
11.02 of the General Conditions.
ARTICLE 15 - SUBMITTAL OF BID
15.01 The Bid Package is to be completed and submitted with the following data:
A. Signed Bid Proposal with Addenda Acknowledgements
B. Bid Bond
C. Bid Opening Sheet
D. One Year Maintenance Bond
E. Qualification Statement
F. Financial Statement
G. Bonding Company Information
H. Non-collusion affidavit for Prime Contractor
IF ANY OF THE ABOVE ITEMS ARE NOT SUBMITTED WITH THE BID, THE BID WILL BE CONSIDERED NON-
RESPONSIVE AND WILL NOT BE READ.
15.02 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the Advertisement or Invitation to Bid and shall be enclosed in an opaque sealed envelope plainly marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate envelope plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid shall be addressed to City of Mont
Belvieu, P.O. Box 1048, Mont Belvieu, TX 77580, Attention: City Secretary. Physical address is
11607 Eagle Drive.
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids.
16.02 If within 24 hours after Bids are opened, any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
ARTICLE 17 - OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the Advertisement or Invitation to Bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids
00200 – 8 and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but
Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible.
Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.
19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
19.03 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
19.04 In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions.
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents.
19.06 If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Project.
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE
20.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the
Successful Bidder delivers the executed Agreement to Owner, it shall be accompanied by such bonds.
ARTICLE 21 - SIGNING OF AGREEMENT
21.01 When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by the
00200 – 9 required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within 15 days thereafter, Successful
Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner. Within ten days thereafter, Owner shall deliver one fully signed counterpart to Successful Bidder.
ARTICLE 22 - SALES AND USE TAXES
22.01 Owner is exempt from state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Bid. Refer to Paragraph SC-6.10 of the
Supplementary Conditions for additional information.
ARTICLE 23 - RETAINAGE
23.01 Provisions concerning Contractor’s rights to deposit securities in lieu of retainage are set forth in the Agreement.
ARTICLE 24 – PROJECT MANAGEMENT SOFTWARE
24.01 The City of Mont Belvieu uses an internet-based software called ManageIT to maintain consistent administrative and technical control for its projects throughout the City. The Contractor must have access to a computer and will be required to use ManageIT on this project in accordance with procedures provided (the User's Guide and Quick Reference Guide in Construct-It under
Help link) by the City. ManageIT stores electronic project correspondence and related project documents such as RFI's (requests for information) and submittals. ManageIT provides the ability to view contract bid items/pay estimate status, submittal status, RFI status, and change order history, etc. At no cost to the Contractor, the City will provide system login account(s) and provide training for Contractor personnel. The Contractor must update ManageIT with any new or changed information within 24 hours of that information becoming known to Contractor.
ARTICLE 25 – TEXAS ETHICS COMMISSION FORM 1295
25.01 Effective January 1, 2016, pursuant to Texas Government Code § 2252.908 (the “Interested Party
Disclosure Act” or the “Act”), the City may not award the contract to a bidder unless the bidder has provided to the City a completed, signed and notarized TEC Form 1295 which has been assigned a certificate number by the Texas Ethics Commission (the “TEC”). Pursuant to the rules prescribed by the TEC, the TEC Form 1295 must be completed online through the TEC’s website
(https://www.ethics.state.tx.us/tec/1295-Info.htm), assigned a certificate number, printed, signed and notarized, and provided to the City. The TEC Form 1295 may accompany the bid or may be submitted separately but must be provided to the City prior to the award of the contract. For purposes of completing the TEC Form 1295, the entity’s name is City of Mont Belvieu; the contract ID number is FC-027-04; and the description of goods and services is City Hall Site
Work. Neither the City nor its consultants have the ability to verify the information included in a
TEC Form 1295, and neither have an obligation nor undertake responsibility for advising any bidder with respect to the proper completion of the TEC Form 1295.
NOTE: BIDS NOT ACCOMPANIED BY THIS AFFIDAVIT WILL NOT BE CONSIDERED.
NON-COLLUSION
AFFIDAVIT
STATE OF TEXAS}
COUNTY OF CHAMBERS}
BEFORE ME, the undersigned authority, on this day personally appeared
, known to me to be the person whose name is subscribed to the following, who upon oath, says:
I am the Manager, Secretary or other agent or officer or Principal of the Bidder in the matter of the bids to which this affidavit is attached, and I have full knowledge of the relations of the Bidder with the other firms in this same line of business, and the Bidder is not a member of any trust, pool or combination to control the price of supplies bid on, or to influence any person to bid or not to bid thereon.
I further affirm that the Bidder has not given, offered to give, nor intends to give at any time hereafter any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, or service to a public servant in connection with the submitted bid.
Affiant
SWORN TO AND SUBSCRIBED BEFORE ME by the above Affiant, who on oath states that the facts contained in the above are true and correct, this_________Day of_______________________, 2026
Notary Public in and for
County, Texas
Name of Bidder
Signed by
(Sign Name in Writing) (Title)
Address
(Zip Code)
Telephone Number: Date:
The City of Mont Belvieu does not discriminate on the basis of race, color, national origin, sex, religion, age, or disability in employment or in the provision of services.
00200 – 1
WA - 022
SUBCONTRACTORS AND MAJOR SUPPLIERS FORM
SUBCONTRACTORS AND TYPE OF WORK TO BE PERFORMED
LOCAL SUBCONTRACTORS
(PRINCIPAL BUSINESS LOCATION IN CHAMBERS COUNTY)
MAJOR SUPPLIERS
LOCAL MAJOR SUPPLIERS
(PRINCIPAL BUSINESS LOCATION IN CHAMBERS COUNTY)
QS - 1 of 4
QUALIFICATION STATEMENT
Submitted to: _____________________________________________________________ (Corporation)
By: ___________________________________________________________________ (Co-partnership)
(An Individual)
Principal Office:______________________________________________________________________
The signatory of this questionnaire guarantees the truth and accuracy of all statements and of all answers.
1. How many years has your organization been in business as a general contractor under your present business name? ______________________________________________________________________
2. How many years' experience in this type of construction work has your organization had:
(a) As a general contractor? ______________________________________________________
(b) As a sub-contractor? _________________________________________________________
3. What projects has your organization completed?
Contract Amount Class of
Work Date Completed Name and Address of Owner
4. Have you ever failed to complete any work awarded to you? Yes or No (Circle one)
If so, where and why?
QS - 2 of 4
5. In what manner have you inspected this proposed work?
6. Explain your plan or layout for performing the proposed work.
7. The work, if awarded to you, will have the personal supervision of whom?
(a) For administrative management
(b) For construction superintendence
8. What portions of the work do you intend to sub-let? State names and addresses of sub-contractors, and general portion to be performed by each in this project.
QS - 3 of 4
9. What equipment do you own that is available for the proposed work?
Quan. Item Description, Size, Capacity Condition Present
Location
10. Have you received firm offers for all major items of equipment within prices used in preparing your proposal?
11. List the construction projects your organization has under way at this date.
Contract
Amount
Class of Work Percent Complete Name of Address of Owner or Contracting Officer
QS - 4 of 4
Dated at this day of
, 20 .
BIDDER: .
BY: .
ADDRESS: .
PHONE: .
Attest:
Secretary of Corporation
Bidder's Signature
(Seal) If Bidder is a Corporation
EJCDC No. C-610 (2002 Edition) 00610-1
Originally prepared through the joint efforts of the Surety Association of America, Engineers Joint Contract Documents Committee, the
Associated General Contractors of America, and the American Institute of Architects.
BID FORM
WA - 022
TABLE OF ARTICLES
Article Page
Article 1- Bid Recipient
Article 2- Bidder’s Acknowledgements
Article 3- Bidder’s Representations
Article 4- Further Representations
Article 5- Basis of Bid
Article 6- Time of Completion
Article 7- Attachments To This Bid
Article 8- Defined Terms
Article 9- Bid Submittal
EJCDC C-410 Suggested Bid Form for Construction Contracts
00410 – 2
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
The City of Mont Belvieu
1 Town Center Blvd
Mont Belvieu, Texas 77580
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and
Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.
D. Bidder has carefully studied all drawings of physical conditions which have been identified in
SC-4.02
E. Bidder has obtained and carefully studied (or accepts the consequences for not doing so) all additional or supplementary…