AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to add a Vendor Questions and Answ ers section in order to answ er any questions vendors have concerning the solicitation. The due date for solicitations and all other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF20Q0116

X 9B. DATED (SEE ITEM 11)

18-Sep-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Sep-2020

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

ZACKERY A. HOFFER

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

brooke.n.fowler@usace.army.milEMAIL:509-527-7913TEL:

BROOKE N FOWLER / CONTRACTING OFFICER

W912EF20Q0116

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by full text:

QUESTIONS AND ANSWERS

VENDOR QUESTIONS & ANSWERS

Can the poly floats be black? The specs do not specify.

A: Yes black The specs call for 12 8inch boat ties, is that 12 ties per 20 foot section or 12 total with 4 on each 20 foot section?

A: Two cleats on each side that way a boat can tie up bow and stern, 4 on each 20 section.

Will the 1 hinge connection be new or will it need to match existing abutment?

A: I will see if I can get a picture of it day.

The specs mention 8 rubber black connectors, the vendor needs more information on where they will be required and what the purpose of the 8 rubber block connects will be.

A: I believe this is the cushion between each dock section that will also hold the dock sections together.

Are we requiring an engineering stamp?

A: No Stamp required.

I have read thru your solicitation request and performance specification. I see nothing that relates to an anchorage requirement beyond being able to attach to a concrete abutment hinge assembly. Is it the agency's intention to use PVC pipes on the farthest most float (either side) to prevent lateral drift of the far sections to the centerline of abutment?

A: We will use a cross chains the anchors, so docks stay straight at the far end. PVC is for old wood piles which are rotten.

I see no pile guide frames for attachment to piles by others, or do you plan to anchor as pictured?

A: we will use some piling attachments later for another dock, not worried about the anchoring right now.

Are all these 6 docks being used at one site to reach 120 Ft offshore / or do you plan to break up for multiple abutment attachments (say 60Ft) at each abutment, please clarify.

A: 3 sections will be used at one location, and another 3 sections at another location.

(End of Summary of Changes)