Attach2.pdf
PDF 166 KB Posted
- Attached to
- CST training - Guam & Alaska locations Federal contract opportunity
- Solicitation number
- W91ZRU-15-R-0001
About this file
Attachment 2 103rd CST - Alaska
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 15R0001_questions_and_answers.pdf | ||
| Attach1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
For
103rd Civil Support Team (CST) Alaska Collective Training Event (CTE) and Task Proficiency Evaluation (TPE)
1.0 Objective: The objective of the task is to assist and execute a 24 hour, full scale, Chemical/Biological/Radiological Weapons of Mass Destruction Collective Training
Event (CTE) for the 103rd CST (AK) from 03-07 Aug 15 and Task Proficiency Evaluation
(TPE) from 14-18 Sep 15 in the town of Anchorage in the state of Alaska. Exercises will create an environment to facilitate the accurate assessment of the twelve National
Guard Mission Essential Tasks outlined in the DTMS Civil Support Team Unit Task List
Mission Essential Tasks dated Jan 13.
2.0 Specific Tasks: The contractor will provide the necessary personnel, labor, materials, supplies, and equipment as indicated below to perform the tasks outlined:
2.1 Scenario Development-The CTEs will not only measure the training and readiness level of the team in accordance with Civil Support Team Unit Task List
Mission Essential Tasks, but will also reinforce interoperability, communications, and RIP/TOA procedures and aid in the development of standard operating guidelines (SOGs). The scenarios must include at least one (1) Chemical, one
(1) Biological, and one (1) Radiological hazard that will allow each team to challenge all of their capabilities and equipment. The scenarios should be designed to aid in the identification of possible team shortcomings and weak areas, and to re-train those areas as necessary. It must also provide an environment ready for on-the-fly injects as necessary to ensure all of the Civil
Support Team Unit Task List Mission Essential Tasks are completed to standard.
Should any weak areas be found, the scenario should provide for immediate re-training in those areas. The scenario must provide the complexity and realism to represent an actual Weapons of Mass Destruction (WMD) event. Contractor provides realistic training aid, devices, and simulators that properly stimulate current CST detection and analytical equipment enabling the CST to make sophisticated assessments and decisions. Realism and technical exactitude are crucial for all training aid, devices, simulators, and locations. The full scenario should provide for one complete and continuous demanding day of training not to exceed 24 hours.
2.2 Scenario Staffing- The contractor will provide experienced and certified staff to create target sites that replicate chemical and biological laboratory production, radiological and explosives manufacturing labs, and act as role players in the scenario. The minimal roles include Incident Commander (IC), FBI or local law enforcement, Explosives Ordnance Disposal (EOD), Safety Officer, Staging
Officer, and Medical reach back. All staff must have a full understanding of the
Incident Command System (ICS) and their role in WMD event. Since staff will be playing the roles of trained Hazardous Materials (HAZMAT) professionals and reacting to the decisions of the CST, they must be fully trained in HAZMAT operations to the level of “Technician” in accordance with National Fire Protection
Association (NFPA) 472. As these exercises are to assist in SOG construction and implementation, as well as reinforce Training and Evaluation Tasks enforced at a national certification level, prior participation in at least three (3) national level training exercises is vital to plenary understanding of the training requirements. All staff must be well versed in CST Operations and all governing regulations to supplement the training and reinforcement of standard CST operating principals during the exercise. The contractor will have a licensed heavy equipment operator available for target site adjustments (see 3.1 and 3.2 below)
3.0 Place of Performance. The contractor ensures locations/buildings meet the requirements for target location, vehicle footprint, communications equipment, egress, and functioning utilities (electricity, water supply) in accordance with the Civil Support
Team Unit Task List Mission Essential Tasks, ATP 3-11.46 dated May 14, and unit
Standard Operating Guidelines (SOG).
3.1 Target Site. The contractor will prepare the target sites as necessary to enhance the realism of the scenario. All heavy equipment, furniture, decorations, props, chemical toilets with servicing etc. will be provided by the contractor.
3.2 Site Adjustments. Any necessary adjustments to the site (to include major building construction, inoperable vehicle placement, demolition, fabrications) will be made by the contractor. In addition, if any adjustments are deemed necessary by 196th IN BDE, the contractor shall make the changes. At the conclusion of the exercise, the contractor will return the site to its previous state.
All clean-up will be done by the contractor.
4.0 Period of Performance. It is estimated that ten (10) days will be needed to complete the task with seven (7) days for preparation of elaborate chemical, biological, radiological, and explosives labs, two (2) days for execution, and one (1) day for clean-up.
5.0 Reporting Requirements and Deliverables: Contractor will provide the following deliverables:
5.1 Refined Scenario Summary. The contractor will provide copies of refined scenario summaries for each exercise to 196th IN BDE CST/CERFP Training and
Readiness Division no later than 10 days prior to the exercises execution.
5.2 Master Scenario Events List (MSEL). The contractor will provide the 196th IN
BDE CST/CERFP Training and Readiness Division a draft of the MSEL no later than 5 days prior to exercises execution. As revisions are made, updated copies will be provided to the 196th IN BDE CST/CERFP Training and Readiness
Division.
5.3 After Actions Review (AAR). The contractor will provide a detailed after actions review of the exercise to include any deficiencies noted as they pertain to the
Civil Support Team Unit Task List Mission Essential Tasks and/or SOG within 7 days after execution. Any major deficiencies will be noted and provided immediately the day after execution.
5.4 Task Deliverable Schedule Table.
Deliverable Req. Ref. Due Date
5.5 Exercise Scenario Summary
5.1 10 days prior to exercise execution
MSEL 5.2 5 days prior to exercise execution
AAR 5.3 1 day after execution/7 days after execution
6.0 Government Furnished Information/Equipment. The Government will provide all training facilities/classrooms required outside of the scenario.
7.0 Contractor Manpower Reporting Statement
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address "https://contractormanpower.army.pentagon.mil”. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative;
(2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including sub-contractor); (6) Estimated direct labor dollars paid this reporting period (including sub-contractor); (7) Total payments (including subcontractor); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);
(11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest City, Country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language, and, (13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement.
Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year.
8.0 Special Provisions
8.1 Quality Control. A representative from the 196th IN BDE CST/CERFP Training and Readiness Division will oversee conduct of training and skills test to ensure effective and appropriate training is being conducted.
8.2 Performance Assessment. The WMD-CST teams participating will be accurately assessed based on the twelve National Guard Mission Essential Tasks outlined in the DTMS Combined Armed Training Strategy (CATS) Civil Support Team Mission Essential Tasks dated May 09 in a Maritime environment to certify effective scenario development and facilitation by the contractors.
8.3 Hours of Operation: Normal Duty Hours. The contractors will prepare the target sites from 0800-1600 daily for seven (7) days and facilitate the exercise for no more than 36 continuous hours.
8.4 Contractor Employees. The contractor will determine the suitable number of contractors needed to prepare all target sites and facilitate the 24 hour exercise.
8.5 Special Qualifications. The contractors must have qualifications that enable them to construct a plausible WMD target site(s) and assess teams in accordance with DTMS CST CATS Tasks. (see 2.0, 2.1, and 2.2 above)
8.6 Security Requirements. Contractor personnel will not be required to obtain security clearances. However, all personnel involved must be able to obtain installation pass or be signed on by another member.
8.7 Identification of Employees. Identification of Employees will be at the discretion of the contractor.
8.8 Utilities. N/A.
9.0 Applicable Documents. N/A.
10.0 Points of Contact.
1LT Lindsay Chvilicek, Contract Specialist, lindsay.m.chvilicek.mil@mail.mil
Mr. Michael Conner, Contracting Officer, michael.p.conner.civ@mail.mil
File details come from the government source that posted it. Updated .