3 April 2017 RFIS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIs_27_March_17.pdf | ||
| RFIs_20_March_17.pdf | ||
| RFIs_13_March_17.pdf | ||
| Wage_Determination_15-4111.pdf | ||
| W91ZRS-17-R-0001_Final_8_March_2017.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91ZRS‐17‐R‐0001
RFIs 13 March 2017
Requests for Information:
0001. Will the government be amending the solicitation to identify training requirements?
Answer: NO
0002. is this a new requirement or is there an incumbent?
Answer: There is an incumbent, currently the incumbent SUNRISE BEACH CORPORATION doing business as M2. Contract: W91ZRS‐16‐C‐0003
0003. The NAIC for this effort is not reflected in the RFP. Can the government please confirm that the effort is an 8(a) set‐aside under NAIC 488190 as identified in FBO?
Answer: North American Industry Classification System (NAICS) Codes: 488190 Aircraft maintenance and repair services (except factory conversion, factory overhaul, factory rebuilding). The Small Business Size Standard is $32,500,000, IS THE CORRECT CODE. This is 8(a) set‐aside
0004. The technical exhibits identified in the RFP identified the frequency of the workload quantities;
however they do not identify the man‐hours associated with each effort. Can the government provide the man‐hours associated with each workload requirement or the anticipated team compliment for each technical exhibit? If not and if there is an incumbent, this seems to offer the incumbent an advantage.
Answer: Government will provide no response, proposals should review PWS etc. to come up with their best approach to accomplish the requirements according to the solicitation.
0005 According to government wage determination web‐site, there is a more recent wage determination posted. Can the government please verify that offerors are to propose to the 2015 wage determination? If so, will offerors be allowed to submit an REA once award is made?
Answer: a NEW wage determination will be posted
20 March 2017
006 Modal/s of aircraft?
Answer: Phase One of OCM Aircraft is only H‐60 series Aircraft. Any deviation to OCM Phase One would require a Mod. RM components are sourced from H‐60 as specified in PWS. Paint Shop airframes as specified in PWS and RFP
007 Quantity per aircraft model?
Answer: As specified in PWS.
008 scope of work for the aircraft maintenance?
Answer: The government does not understand this question, please read PWS
009 other requirements as per the Solicitation?
Answer: The government does not understand this question
0010 Groton, CT is listed as the primary location. Is there any travel or anticipated travel requirements?
Answer: No travel, work will be completed at the Groton, CT facility.
0011 What is the experience of the current workforce? Total years, years at that location? What is the average tenure of the current workforce? What is the total number of personnel on the current contract?
Answer: 80 employees on the present contract, average experience of 10 years.
0012 Will there be a site survey, industry day, or other opportunities for the vendors to visit the location?
Answer: There will be no opportunities to visit the location
0013 While not specified in the contract, what is the number of estimated personnel (FTE) compliment that is expected of contract?
Answer: No number is expected
0014 Does the 1109th TASMG support HH‐60G Pave Hawks as stated?
Answer: No HH‐60G
0015 Does the 1109th TASMG support the CH‐47D Chinook or just the modernized CH‐47F Chinook?
Answer: CH‐47F
0016 Does the 1109th TASMG support the AH‐64A Apache or just the modernized AH‐64D Apache
Longbow?
Answer: AH‐64D and AH‐64E
0017 Does this contract require any engine shop or Flexible Engine Diagnostics System (FEDS) qualified operator support?
Answer: No, FEDS is run by Military personnel
0018 Will the Government provide a copy of the 1109th TASMG’s current Quality Assurance Surveillance
Plan (QASP)?
Answer: The government will not provide as it is our document to use to rate performance.
0019 This paragraph Ref Para 1.4.4.2 states that the contractor must comply with all regulations and orders which may affect performance. What are the regulations and orders to which this requirement is referring to?
Answer: All regs are specified in PWS and RFP documents
0020 Background Investigations. Are new background investigations required on existing CFT employees if they transition to a new contractor? This paragraph further states that there is a 2 to 6 week turnaround for background checks. How soon after award of the contract will the 1109th TASMG be able to begin processing background checks?
Answer: Immediately, Trusted agents are on site.
0021 Please confirm beyond a National Agency Check (NAC), are there any further security clearances requirements?
Answer: No, requirement is for NAC.
0022The PWS states that GCSS‐A use will be required when fielded. Has GCSS‐A been fielded to the
1109th TASMG? IF not, when is it expected?
Answer: GCSS‐A is fielded and in use.
0023 This paragraph Ref Para 5.2.4 states that the contractor will process MIPRs. Is this the contractors responsibility to actually receive and exchange funds between agencies? Does the 1109th TASMG retain signature authority?
Answer: It is not the contractor’s responsibility to receive and exchange funds between agencies.
0024 This paragraph Ref Para 5.3.5 states that the contractor shall implement methodologies to ensure
Continuity of Operations. Does the 1109th TASMG have a existing unit/facility Continuity of Operations
Plan (COOP )?
Answer: Yes, the TASMG has a COOP.
0025 What are the current waste streams that the 1109th TASMG uses? Is the unit/facility a large or small generator of hazardous waste?
Answer: Facility is a Large Generator of hazardous waste. Inspections include: Chemical Rags, Adhesive/Sealant Desbris, Paint Filters, Paint Waste Liquid, Paint Masking Desbris, Fuel Cell Desbris, Paint Waste Stripper Desbris, VAR/ADH Chemical LQ Primers, Amines Adhesive Desbris, Media Fine
Filters (Chromium), Paint Related Debris.
0026 Are the most recent Environmental Inspections/Evaluations by National Guard Bureau or other entities available for review?
Answer: Inspections include: NGB Inspection, EPAS Environmental Performance Assessment, IPAS
Internal Performance Assessment by CTNG FMO, CT DEEP and EPA inspection. All records available.
0027 This paragraph Ref Para 5.4.5 states that the contractor shall implement an integrated contingency spill plan. Does the 1109th TASMG have one in place at this time? Is it available for review?
Answer: TASMG has in place, Yes is available for review.
0028 What are the current NIINs, part numbers, nomenclatures, and quantities that make up the current kitting (kits) that are being assembled?
Answer: Yes. List exists and is available.
0029 Do military technicians, AGR Soldiers, or Traditional National Guardsmen also work/operate in the welding shop?
Answer: Yes, one Mil Tech Welder works in this shop, Traditional Guardsman as part of Military Duties.
0030 Do military technicians, AGR Soldiers, or Traditional National Guardsmen also work/operate in the graphics shop?
Answer: Yes, but rarely on exception as part of Military Duties. There are no Technicians or AGR’s assigned to this shop.
0031 Do military technicians, AGR Soldiers, or Traditional National Guardsmen also work/operate in the machine shop?
Answer: Yes, Military Technicians are assigned to this shop. Traditional Guardsmen will perform duties in a Military capacity.
0032 The RFP states that the CFT will administer the data and voice networks. Is this done independently or at the direction of a military technician or AGR Soldier?
Answer: Independently.
0033 Environmental Support Services. Is this done independently or at the direction of a military technician or AGR Soldier?
Answer: Independently.
0034 What types of special tools and fixtures would be required to be fabricated?
Answer: Special Tools Common to Aviation Maintenance. Blue Prints and instructions will be provided by the government.
0035 Will all offerors be provided access to a technical Library and or an electronic Technical Data
Repository (TDR) that identifies important background data required for responding the solicitation?
Answer: No.
0036 Throughout the PWS, ARMMIS (Aviation Roundout Maintenance Management Information
System) is often referred to for maintenance and logistics operations in the 1109th TASMG. As this is the system of record for the 1109th TASMG and is a unique program utilized only by the TASMGs and NGB, is there is operations or users manual or a SOP on ARMMIS available for review
Answer: Yes, current system has a manual. Current ARMMIS system is under review and its replacement system will also have a manual.
0037 We officially request a 2 week extension of the proposal due date so that offerors can continue to analyze data and additional requirements that are established during the Questions and Answers period?
Answer: Request for extension will not be granted.
0038 Will the Government provide a copy of the program guidance, local SOP, program directives, workflow, or other documentation for accomplishing the UH‐60 OCM Program at the 1109th TASMG?
Answer: Documents exist. TASMG will not provide at this time.
0039 Ref 3.4 and Annex C – Transition Plan Is the offeror to include pricing for the 60 Day Transition period in the CLIN for the base year of services, or should the Transition be priced separately?
Answer: This should be priced in your base year pricing
0040 Technical Exhibit 3a ‐ 3L Will the Government please provide the average maintenance man‐hours per transaction for each of the items listed in technical exhibits 3a through 3L?
Answer: No.
0041 Ref Para 5.1.4 Will the Government please provide document TB 1‐1520‐237‐30‐1? The PWS states that the Contractor shall perform corrosion protection in accordance with TB 1‐1520‐237‐30‐1, paragraphs 7d (1‐3). Currently TB 1‐1520‐237‐30‐1 is not available at the Army Publications Directorate website and is only available via Electronic Media (ETMs and IETMs) and cannot be found on‐line.
Answer: This TB can be located in and is downloadable under LOGSA ETM.
0042 Is the offeror permitted to alter Tables ES‐1 and ES‐2? i.e., if we do not have more than one subcontractor, are we allowed to delete the rows for Subcontractor B and Subcontractor N in table ES‐ 2?
Answer: YES
0043 Can the government provide more information on contractor provided, other direct costs (vehicles, equipment, tools, parts, supplies, employee uniform requirements, etc) associated with this solicitation?
Answer: Question is unclear and the government does not have an answer
27 March 2017
0044 Is the offeror permitted to combine Annex A, Annex B and Annex C into one 3‐ring binder and separate contents by tabs, or does the government prefer each Annex be contained in their own separate 3‐ring binder?
Answer: Proposals can be submitted according to the solicitation
0045 The RFP states "1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO." 3.2.2 states the following:
The Offeror shall identify and include in its proposal resumes for each person the Offeror will employ to fill the specific Program Manager (PM), Supervisor, and QA manager key personnel positions. Is it the PM or the CM? Or are they two different and distinct people?
Answer: Para 1.4.9 refers to the PWS however para 3.2 refers to section L Instructions to offerors. The intent is to ensure senior personnel of the company have resumes with the proposal.
0046 Reference the first page of the PWS, it identifies a base year start date of June 1, 2017. Reference Section L.3.4.6 that states “all mobilization activities shall be completed 60 days post award”. Based on this information, mobilization will start prior to the proposal due date. Can the Government confirm mobilization is 60 days?
Answer: You have read this information incorrectly, the prospective awardee will be complete with all mobilizing activities 60 days after (post) award. The government will not allow the prospective awardee to continue conducting mobilization activities after 60 days.
0047 Page 106 of 116 of Solicitation W91ZRS‐17‐R‐0001: 3.2 2 Key Personnel a) The Offeror shall identify and include in its proposal resumes for each person the Offeror will employ to fill the specific Program Manager, Supervisor, and QA manager. Can you please clarify?
Is it Government’s intent for industry to propose and price a Program Manager to operate/function at CT TASMG Groton, CT?
Answer:
No it is not the intent for industry to propose and price a Program Manager to operate/function at CT TASMG Groton, CT.
Is it Government’s intent for industry to propose and price a Quality Assurance Manager or a Quality Control Auditor?
Answer:
No it is not the Government’s intent for industry to propose and price a Quality Assurance Manager or a Quality Control Auditor.
The requirement is more clearly defined in 1.4.9.
3 April 2017
0048 We request clarification from the government regarding the responses on Questions 0047.
Key Personnel “2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor inbest value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.”
Please confirm that key personnel are part of the Lowest Price Technically Acceptable Award since this paragraph references a Best Value type procurement.
Answer: Typo this is LPTA, Lowest Price Technically Acceptable Award
“3.2 2 Key Personnel
a) The Offeror shall identify and include in its proposal resumes for each person the Offeror will employ to fill the specific Program Manager, Supervisor, and QA manager key personnel positions. The Offeror shall demonstrate relevant experience of the proposed key personnel, limited to 2 pages each;
contractor format acceptable. The following minimum information shall be contained within contractor submitted resumes:
� Employee name
� Years of professional experience
� Current position/title
� Educational history
� Chronology of relevant professional experience
� Current level of security clearance
We understand that the Program Manager, Supervisor and QA Manager are key positions and require resumes. What is not clear is how these positons fit into the proposal and pricing of the proposal. Nor was it clear why we were referenced back to PWS 1.4.9 since this paragraph references only the Contract Manager and does not discuss the Program Manager, Supervisor or QA Manager.
A) Program Manager – per Q&A #47 this is not to be a person onsite or priced into the proposal. Is this correct? Could this person also fill the CM role? ? If not, please explain how this position fits into the proposal process.
B) QA Manager – per Q&A #47 this is not to be a person onsite or priced into the proposal. Is this correct? If not, please explain how this position fits into the proposal process.
C) Supervisor – Q&A #47 was silent on this position. It is correct that this position is to be onsite at all times and included in the pricing of the proposal? If not, please explain how this position fits into the proposal process.
Answer: We have seen all terms in the industry and wanted to attempt to encompass all potential leadership terms so that bidders could ID them as they need in their proposal. The government is not sure what the requester is asking by how these positions will fit into the proposal. The potential offeror needs to figure this out in their proposal. Leadership and management usually will fall into a proposal but again it is the Offer’s decision on how and where.
0049 We request clarification from the government regarding the responses on Questions 0045.
Contract Manager and Alternate
“1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.
The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, (or the KO if a COR is not assigned), to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.”
A) Can you explain the difference between the CM and PM? Would the Government consider allowing the same person to fill the CM and PM positions?
B) Please confirm that these positions, the CM and alternate CM, are to be identified after award and are not part of the proposal process. If this is not true please explain how they fit into the proposal process in terms of pricing and evaluation for Award.
Answer: PM and CM can be used interchangeably. Provide the requested information according to the solicitation.