Statement of Work (SOW)
1. General Description:
This acquisition will cover the purchase, delivery, disassembled existing unit and installation of one (1) Oil-less Rotary Scroll Air Compressor equipment. This requirement is for BRAND NAME specific for Powerex equipment.
2. Purpose and Background:
The purpose of this requirement is to provide the U.S. Army Combat Capabilities Development Command (DEVCOM) Chemical Biological Center (CBC), Chemical Biological (CB) Protection, Respiratory Protection Branch, an Oil-less Rotary Scroll Air Compressor to provide laboratory experiments using air as zero degree air, mass spectrometer and gas chromatographs electronic flow controllers usually 30l/min for each controller and requires the purchase, delivery, and installation of the following equipment:
Quantity of One (1) – Powerex model SEH60B74 oil-less rotary scroll air compressor to include the following specifications/upgrades:
· 6-10 Hp scroll pumps totaling 60 horsepower 3 phase
· 460 volt TEFC motor delivering 187.2 CFM @ 100 PSIG
· Scroll Enclosure 60 HP system, complete with six 10-HP oil-less scroll compressors, mounted inside of a rigid steel enclosure. Enclosure to have a powder coat finish, and shall include sound deadening insulation
· Each compressor pump has a 1750 rpm, TEFC motor, V-belt drive, and air-cooled after cooler
· Installation of the equipment
· BACNet Gate way included to tie to Johnson controls metasys system.
· Must be able to connect to drainage, city water and system airline
· Include Service Packet with warranty information and “technician level operating manual”
Installation will consist of the following:
· Disconnect existing electric and piping from existing Atlas Copco unit
· Disconnect old unit ducts (intake and discharge). Please refer to photos below.
· Rig Atlas Copco off of concrete pad
· Disassemble the existing unit to get out of double doors
· Rig new Powerex unit into place
· Rig old unit out from loading dock onto a rollback truck for disposal
· Disconnect and remove existing disconnect switch and conduit from the old compressor
· Supply and install new EMT conduit and wiring system to provide service to the new compressor rated at 71 amps, 480 volts, 3 phase
· Connect new unit to existing ducts
· Add supports to existing disconnect rack and install new fused disconnect
· Extend existing floor conduit and wiring to new disconnect / Install new conduit and wiring from new compressor to new disconnect
· Install safety relief valve between new unit and existing pipe
· Install new conduit from load side on compressor unit and avoid all maintenance access panels
· Test and label all new items when completed
· Braise medical cleaned copper to existing piping system Install new medically cleaned copper piping that will by brazed in place
· Run new drain lines to floor drain
· Perform factory approved startup
· Test operation of system
· Provide training after work is completed
3. Delivery Details:
The vendor is responsible for shipping to the following address/point of contact:
US Army Edgewood Chemical Biological Center
ATTN: FCDD-CBR-P
Building E3400 - Room 504 Aberdeen Proving Ground, MD 21010-5424
Telephone Number: 410-436-4390
Expected delivery and installation is within 4 weeks after contract award.
4. Additional Details:
Contractor shall get post visit permit and escort required for access the building.