This performance work statement and combined synopsis/solicitation describes requirements for compressed industrial gases and specialty calibration gases for the U.S. Army Aberdeen Test Center. The contractor shall provide compressed gas products including refilling government-owned cylinders of gases such as argon, nitrogen, oxygen, and welding mixtures. The contractor must also furnish specialty calibration gas mixtures in cylinders according to the tables provided, certified to specified concentrations and tolerances. The period of performance is one base year starting 15 April 2020 with four option years through 14 April 2025. Pricing shall be provided as firm fixed prices for the base year and each option year. Quotes are due by 3:00 PM Eastern on 10 March 2020 and shall be submitted to the named contracting officer and contract specialist via email. The contract will be awarded as lowest price technically acceptable to the offeror who meets the requirements of the performance work statement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Compressed Industrial Gases and Specialty Gases Requirements, U.S. Army Aberdeen Test Center 20 February 2020 Updated

General Information

1. GENERAL: This is a non-personnel services contract to provide the compressed gas products and services specified in the scope. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide the compressed industrial gases and specialty calibration gases as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: The mission of ATC is to plan, conduct, analyze, and report the results of developmental tests, production tests, and other tests to include providing test and test support services for authorized customers, within Department of Defense (DOD) and outside DOD, including government and non-government organizations, domestic and foreign in the support of the warfighter. ATC is one of the DOD’s premier test and training ranges supporting both military and commercial materiel developers by testing a broad spectrum of equipment throughout the life cycle, from concept through deployment. ATC is a tenant on APG and encompasses land and water totaling approximately 70,000 acres with an extensive inventory of facilities. ATC is organized by Directorate competencies with approximately 2500 personnel that consists of government civilian, military, and contractors.

1.3 Objective: The contractor shall provide the specified compressed gas products required for the normal operations of ATC.

1.3.1 Requirements:

1.3.1.1 Deliveries can only be made Mon – Thurs between the hours of 7:00 AM and 3:30 PM. Your delivery personnel must call the appropriate TPOC/COR, prior to delivery to ensure someone will be available to process the delivery.

1.3.1.1.1 All drivers must meet security requirement to enter onto APG along with accessing the Restricted Area.

1.3.1.2 All cylinders supplied must be labeled in accordance with applicable Federal and State regulations.

1.3.1.2.1 Contractor will be required to label any cylinders without DOT stickers. Contractor must be prepared and have stickers available to remove cylinders from government facility.

1.3.1.3 Ensure that all vendor supplied cylinders are hydrostatically tested and inspected as required by CGA, Federal, and State regulations.

1.3.1.4 Any and all applicable costs you incur to meet the terms of this contract must be factored into the unit price of the gas. We will not pay demurrage on cylinders. The length of time we might keep any given cylinder is indefinite; for instance, cylinders containing specialty (calibration) gas mixtures may be held until their expiration date. All vendor provided cylinders will be returned upon termination of this contract.

1.3.1.5 As part of your proposal, you shall include as a separate line item provisions for returning unused, but expired, calibration gases for re-certification and re-issue to ATC. Re-certified gases shall meet all provisions of paragraph 1.6.2.2.

1.3.1.6 Contractor must respond within 24 business hours via email or telephone to any emergency requests.

1.3.1.7 All gases are to meet or exceed MIL SPECS where applicable.

1.3.1.8 Contractor must supply gases within 5 business days of receiving request.

1.4 Scope: Provide compressed industrial gases and specialty calibration gases to Aberdeen Test Center at the US Army Aberdeen Proving Ground.

1.4.1 Compressed Industrial Gas Cylinder Refilling (i.e. pure gases and welding gas mixtures). Contractor to refill, service, re-inspect and re-valve government-owned cylinders for the gases listed on an “as needed” basis; as requested by the activity TPOC/COR. Only government owned bottles will be utilized. If quantity request exceeds government owned cylinders the remainder will be made up of contractor owned cylinders. Possible locations of cylinder pickup and delivery will be at either the Building 315, 6350 Gillon Street, or Building 363, 6901 Lanyard Road APG, MD 21005.

1.4.1.1 Argon Gas, Technical Grade (≥ 99.99% purity), nominal pressure 2000 psig, est. annual quantity = 20 cylinder refills.

1.4.1.2 Laser Cutting Gas, (5% Carbon Dioxide / 40% Helium / Balance Nitrogen), nominal pressure 2000 psig, 200 ft3 steel cylinder with CGA-580 valve, est. annual quantity = 20 cylinders.

1.4.1.3 Nitrogen Gas, Technical Grade (≥ 99.99% purity), nominal pressure 2000 psig, est. annual quantity = 20 cylinder refills.

1.4.1.4 Oxygen Gas, Technical Grade (≥ 99.5% purity), nominal pressure 2000 psig, est. annual quantity = 2000 cylinder refills.

1.4.1.5 Shielding Gas – 95/5, (5% Carbon Dioxide / Balance Argon), nominal pressure 2400 psig, est. annual quantity = 500 cylinder refills.

1.4.1.6 Propylene, Industrial Grade (≥ 99.5% purity), 60 lb. steel cylinder with CGA-510 valve, est. annual quantity = 75 cylinders.

1.4.1.7 P10 Gas, (10% Methane / 90% Argon), nominal pressure 2000 psig, 200 ft3 steel cylinder with CGA-580 valve, est. annual quantity = 10 cylinders.

1.4.1.8 Other Commonly used Industrial / Welding Gases. Contractor will supply any other commonly used industrial and welding gases upon request. est. annual quantity = 100 cylinders.

1.4.2 Compressed Specialty Gases (i.e. certified calibration gas mixtures). Contractor will furnish the following specialty gases listed in Tables 1 and 2 the specified cylinder size and type on an “as needed” basis as requested by the activity TPOC/COR. Location of cylinder pickup and delivery will be at the Building 363, 6901 Lanyard Road, APG, MD 21005.

Table 1 – Two Component Calibration Gas Mixtures – Nitrogen Balance Gas Item Minor Component Nominal Concentration Cylinder Size and Type Nominal Blend Tolerance Nominal Certification Accuracy Estimated Annual Quantity (# Cyl)

1
Acetaldehyde
100 ppm
150 ft3 / Aluminum
± 5%
± 1%
0-1
2
Acetylene
1000 ppm
150 ft3 / Aluminum
± 5%
± 1%
0-1
3
Acrolein
100 ppm
150 ft3 / Aluminum
± 5%
± 2%
0-1
4
Ammonia
300 ppm
150 ft3 / Aluminum
± 5%
± 1%
2
5
Carbon Dioxide
10%
150 ft3 / Aluminum
± 5%
± 1%
1
6
Carbon Monoxide
10%
150 ft3 / Aluminum
± 5%
± 1%
1
7
Carbon Monoxide
1000 ppm
150 ft3 / Aluminum
± 5%
± 1%
1
8
Carbonyl Fluoride
2000 ppm
200 ft3 / Nickel Plated Steel
± 10%
± 5%
2
9
Carbonyl Sulfide
100 ppm
150 ft3 / Aluminum
± 5%
± 1%
0-1
10
Ethane
1000 ppm
150 ft3 / Aluminum
± 5%
± 1%
1
11
Ethylene
2000 ppm
150 ft3 / Aluminum
± 5%
± 1%
1
12
Ethylene
20 ppm
150 ft3 / Aluminum
± 5%
± 1%
1
13
Formaldehyde
100 ppm
150 ft3 / Aluminum
± 20%
± 5%
0-1
14
Hydrogen Bromide
2000 ppm
200 ft3 / Nickel Plated Steel
± 10%
± 5%
0-1
15
Hydrogen Chloride
2000 ppm
200 ft3 / Nickel Plated Steel
± 10%
± 2%
2
16
Hydrogen Cyanide
2000 ppm
150 ft3 / Aluminum
± 5%
± 1%
1
17
Hydrogen Cyanide
50 ppm
150 ft3 / Aluminum
± 5%
± 1%
1
18
Hydrogen Fluoride
2000 ppm
200 ft3 / Nickel Plated Steel
± 10%
± 5%
2
19
Methane
1000 ppm
150 ft3 / Aluminum
± 5%
± 1%
1
20
Nitric Oxide
1000 ppm
150 ft3 / Aluminum
± 5%
± 1%
1
21
Nitrogen Dioxide
500 ppm
150 ft3 / Aluminum
± 5%
± 1%
1
22
Nitrogen Dioxide
50 ppm
150 ft3 / Aluminum
± 5%
± 1%
1
23
Nitrous Oxide
500 ppm
150 ft3 / Aluminum
± 5%
± 1%
1
24
Oxygen
25%
150 ft3 / Aluminum
± 5%
± 1%
0-1
25
Phosgene
2000 ppm
200 ft3 / Nickel Plated Steel
± 10%
± 5%
0-1
26
Phosphine
100 ppm
150 ft3 / Aluminum
± 5%
± 2%
0-1
27
Propane
1000 ppm
150 ft3 / Aluminum
± 5%
± 1%
0-1
28
Sulfur Dioxide
250 ppm
150 ft3 / Aluminum
± 5%
± 1%
1
29
Sulfur Hexafluoride
5000 ppm
150 ft3 / Aluminum
± 5%
± 1%
1
30
Sulfur Hexafluoride
10 ppm
150 ft3 / Aluminum
± 5%
± 1%
1

Table 2 – Five Component Calibration Gas Mixtures – Nitrogen Balance Gas Item

ID

Minor Components Nominal Concentration Cylinder Size and Type Nominal Blend Tolerance Nominal Certification Accuracy Estimated Annual Quantity (# Cyl)

LF

Mix

Nitrogen Dioxide
500 ppm
150 ft3 / Aluminum
± 5%
± 1%
2
Carbon Monoxide
1%
Carbon Dioxide
5%
Oxygen
25%

WF

Mix

Sulfur Dioxide
50 ppm
150 ft3 / Aluminum
± 5%
± 1%
2
Nitric Oxide
250 ppm
Carbon Monoxide
5000 ppm
Carbon Dioxide
1%

1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years. The Period of Performance reads as follows:

Base YearStart: April 15, 2020End: April 14, 2021
Option Year IStart: April 15, 2021End: April 14, 2022
Option Year IIStart: April 15, 2022End: April 14, 2023
Option Year IIIStart: April 15, 2023End: April 14, 2024
Option Year IVStart: April 15, 2024End: April 14, 2025

1.6 General Information

1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.

1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.2.1 All pure gases (regardless of grade) shall be batch analyzed and the batch analysis identifier must be affixed to each cylinder.

1.6.2.2 All calibration mixtures shall be single-certified to meet the specified concentrations within the tolerances stated in Table 1. You shall provide a certificate of analysis (COA) for each cylinder. At a minimum, COAs shall state:

i) National Institute of Standards and Technology (NIST) traceability,

ii) certification or analysis date,

iii) expiration date, and

iv) certified concentration(s).

1.6.2.3 The balance gas for all calibration mixtures listed in Table 1 and 2 will be nitrogen.

1.6.2.4 For gases having a shelf life, a minimum of 90% of the shelf life must remain at the time of delivery to the government.

1.6.3 Recognized Holidays: The vendor will not be required to make compressed gas deliveries on the following Federal Holidays.

New Year’s DayLabor Day
Martin Luther King Jr.’s BirthdayColumbus Day
President’s DayVeteran’s Day
Memorial DayThanksgiving Day
Independence DayChristmas Day

1.6.4 Hours of Operation: ATC is currently working an alternate work schedule as described in ATC regulation 690-9. The contractor shall be required to make cylinder deliveries and pickups during these hours.

INSTALLATION CLOSURES. Inclement weather conditions may force a temporary shutdown of APG. The contractor shall call the Post Operation telephone (410-278-SNOW) to get APG operation status and report to work accordingly. In addition, the local radio stations will announce any such delays or closures.

1.6.5 Place of Performance: Delivery and pick-up of compressed under this contract will be performed at Aberdeen Test Center, APG MD 21005. Refer to section 1.4 (Scope) for building locations for specific compressed gas product delivery/pickup.

1.6.6 Type of Contract: The government will award a Firm Fixed Price (FFP) contract.

1.6.7 Security Requirements: The contractor must ensure that the driver for all deliveries is a US Citizen and is able to gain access to the Aberdeen Test Center Restricted Area (RA).

1.6.7.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment/property provided for contractor use.

1.6.8 Special Qualifications: Question for Scott Sattler...does the weld shop want to specify anything here?

1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.11 Key Personnel: The follow personnel are considered key personnel by the government: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 4:00p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.

1.6.12 Identification of Contractor Employees: NA

1.6.13 Contractor Travel: NA

1.6.14 Other Direct Costs: NA

1.6.15 Data Rights: NA

1.6.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.