ATD_PWS__2019.docx
DOCX document 19 KB Posted
- Solicitation number
- W91ZLK19R0028
About this file
Performance Work Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_1.pdf | ||
| Bid_Sheet_final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement for Anthropomorphic Test Device Maintenance and Repair Contract
1.0 BACKGROUND:
The Anthropomorphic Test Device (ATD) provides the ability to measure crew causality during live fire testing of military vehicles. Due to this requirement a maintenance contract is required to maintain the Anthropomorphic Test Device.
2.0 SCOPE
Contractor shall provide all personnel, equipment, supplies, facilities, tools, materials, and other items necessary to perform calibration maintenance, repair services and replacement/spare parts for the Anthropomorphic Test Devices.
3.0 TASKS
3.1 ATD CALIBRATION
3.1.1 The contractor shall provide calibration services for ATD load cells (gage) on a yearly basis or as needed due to excessive loads, excessive loads may occur during test events when the load cell exceeds the injury criteria standard, for the following Government property: (See serial number, Attachment 1, for complete listing)
| Humanetics Model 1716A | 6-Channel |
| Humanetics Model 7502J | 6-Channel |
| Humanetics Model 1708J | 6-Channel |
| Humanetics Model 4664J | 1-Channel |
| Humanetics Model 3643 | 5-Channel |
| Humanetics Model 3644 | 5-Channel |
| Humanetics Model 1583M | 2-Channel |
| Humanetics Model 3114 | 4-Channel |
| Humanetics Model 3115 | 4-Channel |
| Humanetics Model 3255TF | 1-Channel |
| Humanetics Model 2121A | 1-Channel |
| Humanetics Model 1914Q | 6-Channel |
| Humanetics Model 1587 | 2-Channel |
3.1.2 Contractor shall provide calibration of accelerometer (gage) on a yearly basis or as needed due to excessive stress for the following Government property:
Endevco Model 7264D-2KTZ
3.1.3 Calibration of all instrumentation will conform to the standards identified in the current revision of SAE J211-1standard for surface vehicle recommended practice to include all SAE standards referenced in the primary SAE J211-1 document.
3.1.4 Calibration shall be completed within 7 business days of receipt unless the contractor notifies COR of reason for delay ie: repairs required.
3.2 ATD REPAIR
3.2.1 The contractor shall repair Government owned accelerometer or load cells (gage) and Anthropomorphic Test Device (ATD) parts.
3.2.2 Repairs and maintenance will be done to the level that calibrations and Anthropomorphic Test Device tolerances in SAEJ211-1 can be maintained.
3.2.3 When the need for repair is discovered during calibration, contractor shall obtain authorization from COR before repair work is started.
3.2.4 COR must review and approve all proposed repairs before repair work can be started.
3.3 ATD PARTS
3.3.1 Contractor shall provide all Anthropomorphic Test Device (ATD) parts as needed in accordance with contractor provided parts list
3.3.2 Proprietary Humanetics replacement parts must be manufactured by Humanetics to maintain compatibility with current ATD inventory and test specifications.
3.3.3 COR must approve all parts and part replacement.
4.0 DELIVERABLE. The contractor shall provide a compact disc (CD) with all calibration data for each gage returned from calibration. Multiple gages calibration data can be on one CD.
5.0 SECURITY. Security requirements are not required due to all parts and procedures are available to the public and there will not be any identifiable security information with the transfer of parts for calibration, repair or purchase. All task under this contract will be performed at vender’s location therefore personnel security requirements will not be required.
6.0 PLACE OF PERFORMANCE. The contractor shall perform calibrations and repairs tasks under this contract at the contractor’s facilities.
7.0 SHIPPING COSTS The Government will pay shipment cost of gages sent out for calibration to the contractor’s facility.
The contractor is responsible for shipment cost of gages returned from calibration. F.O.B Destination.
8.0 PERIOD OF PERFORMACNE From date of contract award, 22 APR 2019 to 21 APR 2022.
File details come from the government source that posted it.