Page 1 of 3 – Water Immersion Tank for Small Arms Weapon Systems Testing

Aberdeen Test Center Water Immersion Tank for Small Arms Weapon Systems Testing

Performance Work Statement

I. Background

The Small Arms Systems Field Branch (SASFB) of the Aberdeen Test Center (ATC) provides various environmental conditioning testing for the Department of the Army (DA).

This testing is crucial in the evaluation of a system’s performance, durability, and life cycle expectancy through potential operational conditions. Test items typically include a wide variety of small and medium caliber Army materiel, ranging from ammunition, weapon systems and related accessories.

As part of testing guidelines set forth by the Department of Defense (DOD), immersion in water testing is required for some small and medium caliber weapon systems equipment likely to be submerged in water at moderate depths. The SASFB has the need to have an immersion tank manufactured for this testing.

II. Work Scope

The Contractor shall manufacture and deliver a water immersion tank that meets the technical design and performance standards defined in this Performance Work Statement (PWS). The final product of this effort shall be delivered to ATC at APG, MD.

III. Technical Specifications

1. WATER IMMERSION TANK: the contractor shall provide a 120 Gallon Dished Bottom, Dished Top Single Shell tank that meets the following design specifications.

a. Dimensions 24” ID by 66” height straight wall tank.

b. Material: Tank shall be constructed of T-304 Stainless Steel

c. Rim: Sanitary flanged rim

2. TOP HEAD: the top head shall be made of T-304 Stainless Steel that is swingbolted, dished top head with FDA silicone O-ring gasket. Head is hinged for manual tilt with spring assist.

Page 2 of 3 – Water Immersion Tank for Small Arms Weapon Systems Testing

3. Connections: The tank shall have the following connections:

QTY SIZE TYPE LOCATION SERVICE NOTES

1 1.5" 3000# Half

Coupling Top Head Inlet Connection only

1 .5" 3000# Half Coupling

Top Head Gauge Vacuum/pressure gauge (30" Hg/0 PSIG/45 PSIG)

1 1" Nipple Top Head Manual Relief

Includes a globe valve for manual relief

1 1" 3000# Half Coupling

Top Head Pressure Relief

Includes a bronze pressure relief valve (set to 45 PSIG)

1 1.5" Nipple Top Head Vacuum Connection only with 90 degree elbow

1.5" Nipple Bottom Head

Outlet Connection only

1 1.25” 90° elbow Outlet Outlet Manual, inline ball valve installed on the outlet connection with threaded end connections

4. INSULATION: None

5. FINISH: Mill finish inside with welds ground smooth and flush and mill finish outside with welds wire brushed

6. THERMOMETER: None

7. TANK BOTTOM: the Tank shall include a removable flat bottom resting on mounting tabs just above bottom head. This bottom shall Include lifting rings located near vessel I.D.

8. OUTLET: See Connections

9. SUPPORT: The tank shall be supported by (3) stainless steel tubular legs mounted on forklift channels (15" outlet to floor)

IV. General Requirements

1. Equipment, components and materials produced by this effort shall be designed for a minimum 10-year life expectancy. All equipment replacement parts and components shall be readily available in the U.S. market; foreign manufactured major parts/components that are not ETL certified and UL listed, shall be identified in the final report.

2. CALIBRATION: N/A

3. Shipping terms are delivery-at-place (DAP) at ATC.

Page 3 of 3 – Water Immersion Tank for Small Arms Weapon Systems Testing

4. The Contractor shall supply an electronic copy of manufacturing design drawings with a complete parts list.

5. The Contractor shall provide detailed recommendations for equipment and parts that requires periodic maintenance.

6. The required timeline and deliverable schedule is as follows:

a. Water Immersion Tank (Section III.2 above) shall be delivered within 180 days after task order award.

b. Documentation (section IV.4 and 5 above) shall be delivered within 210 days after task order award.

File details come from the government source that posted it.