Text version
The U.S. Army Edgewood Chemical Biological (ECBC) Aberdeen Proving Ground, Maryland, is a subordinate command of the U.S. Army Research and Engineering Development Command (RDECOM). The Veterinary Services Team is under the Research and Technology Directorate of ECBC. One of the VST’s main responsibilities is to take care of all research animals within the R & T directorate. There are laws, rules and guidelines that need to be followed in carrying out our responsibilities, which includes sterilizing caging, carts, and anything else used in animal rooms.
CLIN 0001 Requirement is to remove existing MTP 2100 cage rack from Room 233 and install a new cage/ rack washer to fit into existing space, in accordance with the following requirements and specifications.
| CLIN0001 Removal of existing rack washer | Price: | |||
| CLIN0002 New Cage and Rack Washer | Price: | |||
| CLIN0003 Installation of New Cage and Rack Washer | Price: | |||
| CLIN0004 Shipping | Price: |
W91ZLK-18-T-CAGE
Attachment 1
New Cage and Rack Washer System Requirement and Specifications
SPECIFICATIONS:
| • | Pit mounted |
| • | All stainless steel unit, using 304 stainless or compatible to withstand all types of acids, alkaline, and detergents. |
| • | Insulated double wall cabinet and doors |
| • | 2 door pass-thru |
| • | Manual swing-out hinged doors |
| • | Stainless steel threshold plates at each door (304 or compatible) |
| • | Spring loaded safety door latch |
| • | Stainless steel floor grating in lift up sections, using 304 stainless or compatible to withstand all types of acids, alkaline, and detergents. |
| • | Stainless steel Pump and circulatory piping, using 304 stainless or compatible to withstand all types of acids, alkaline, and detergents. |
| • | Steam heat exchanger 120-180 degrees Fahrenheit |
| • | Temperature guarantee during all cycle phrases |
| • | Drain discharge cool down |
| • | Fully drained and flushed solution sump |
| • | Automatic sump level controls |
| • | Overlapping rotary spray system with adjustable spray patterns |
| • | External self-cleaning debris filter |
| • | Pneumatic operated exhaust damper |
| • | Drain surge tank |
| • | PH neutralizer controlled by microprocessor |
| • | At least one sampling port |
| • | Pressure gauge on main pump and all water and steam lines |
| • | Shut off valves at all water and steam lines |
| • | Interior emergency stop cable on both sides of unit |
| • | Emergency stop button at each door |
| • | Signs on each side of unit that state how to pull cable in an emergency |
| • | 5 chemical injection ports, contacts and fitting |
| • | Automatic multi-phase treatment cycles |
| • | Interior side bumper rail on both sides of the unit |
| • | Illuminated interior chamber |
| • | 8 fully adjustable programmed cycles |
| • | Multi-cycle microprocessor control system |
| • | Color touchscreen control panel |
| • | Pin number access to control panel |
| • | Built in advanced diagnostics |
| • | Non-proprietary components |
Security Requirements
| • | Does not require a CAC, but do require access to DOD facility or installation. |
| • | Contractor and all associated subcontractor employees shall comply with adjudication standards and processes using the National Crime Information Center Interstate Identification Index (NCICIll) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations. |
| • | Access and general protection/security policy and procedures. |
• Contractor and all associated subcontractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.