W91ZLK-17-T-0068
0011003150
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Correct the fan measurements in the specifications from inches to feet.
2. Provide the Government's response to questions and answers.
The POC for this action is Mr. David Humfleet, david.a.humfleet.civ@mail.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jun-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91ZLK-17-T-0068
X 9B. DATED (SEE ITEM 11)
27-Jun-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jun-2017
CODE
ACC-APG - TENANT DIVISION (W91ZLK)
ACC-APG TENANT DIVISION
6001 COMBAT DRIVE
2ND FLOOR, ROOM C2-101
ABERDEEN PROVING GROUND MD 21005-1846
W91ZLK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
PERFORMANCE WORK STATEMENT
Specifications and Requirements Revision 01 (28 June 2017)
W91ZLK-17-T-0068
Building Fan Installation for ECBC Building E-4301 Edgewood, Maryland
SUMMARY:
1. The US Army Edgewood Chemical and Biological Center (ECBC) at Aberdeen Proving Ground, Maryland requires the purchase, installation and operational training of 20 ceiling-mounted, circulation fans Brand Name or Equal to Big Ass Fans (BAF) in accordance with specifications below. The fans shall be furnished with standard mounting hardware and variable speed control to provide cooling and desertification. Contractor will be required to provide all required parts and materials and install the fans ensuring operation.
The contractor will provided the following:
- Six (6) each 24 foot ceiling fans Brand Name or Equal to BAF Powerfoil X 3.0
- Two (2) each 20 foot ceiling fans Brand Name or Equal to BAF Powerfoil X 3.0
- Five (5) each 18 foot ceiling fans Brand Name or Equal to BAF Powerfoil X 3.0
- One (1) each 16 foot ceiling fan Brand Name or Equal to BAF Powerfoil X 3.0
- Five (5) each 14 foot ceiling fans Brand Name or Equal to BAF Powerfoil X 3.0
- One (1) each 12 foot ceiling fan Brand Name or Equal to BAF Powerfoil X 3.0
Summary of Work:
1. Installation of all fans, miscellaneous or structural metal work (if required), field electrical wiring, cable, conduit, fuses and disconnect switches, will be provided by Contract Company for a Factory installation.
- Install fire wire per NEC from fire control panel to installed junction box within 15 feet of fan mounting location (applicable only if Fire Relay Installation not purchased)
- Provide 11OV power source within 6 linear feet of Smart Sense Wall Controller designated location (or equal)
- Provide final tie-in of fire wire at the fire control panel
- Obtain all required electrical permits and inspections
- Install AC power wiring per NEC, from power source to fan mounting location, not to exceed 250 linear feet
- Install and wire per NEC, a junction box with appropriate size
NEMA Twistlock receptacle within 3 feet of fan mounting location
- Attach upper yoke to I-beam, or to angle iron spans between steel bar joists or z-purlins
- Attach extension tube to upper yoke, and secure upper safety cable
- Attach lower yoke to extension tube, and attach main fan unit to lower yoke
- Secure guy wires as required
- Install wall control keypad to accessible surface (column, concrete wall or wood) within 150 feet of fan
- Install CAT-5 data communications cable per NEC, between fan and wall control keypad (in EMT conduit to ceiling height only) not to exceed 150 linear feet
- Install fire wire per NEC between fan VFD and a junction box to be located within 15 feet of fan mounting location (if Fire Relay Installation is purchased, fire wire will be installed per the Fire Relay Scope of Work)
- Install Smart Sense Wall Controller to accessible surface (column, concrete wall or wood) per Smart Sense Installation (or equal)
- Guide
- Install Smart Sense Remote Temperature Sensor per Smart Sense
Installation Guide (within 1,000 feet of Smart Sense Wall Controller) (or equal)
- Provide, Install & Connect Smart Sense wiring per NEC (2 conductor shielded cable 18 - 22 AWG Stranded) from Smart Sense Wall Controller to VFD(s) and from Smart Sense Wall Controller to Smart Sense Remote Temperature Sensor per Smart Sense Installation Guide (or equal)
- Attach winglets to airfoils (or equal)
- Attach airfoils and airfoil retainers to fan hub, and tighten Per the Manufacture recommendation (or equal)
- Secure hub cover
- The maximum fan diameter shall be 24ft
- Each Fan will be centered approximately between four adjacent sprinklers
- Vertical clearance from the fan to the sprinkler deflector shall be a minimum of 3 feet
- All fans shall be interlocked to shut down immediately upon received a water flow signal from the Alarm System.
- Train all designated customer personnel on start-up and operation of fan and all fan controls
Fire Box Connection:
Contractor will provide and install all necessary equipment to connect Fans to building Fire Alarm System, install fire alarm cable from fan VFD to next fan in chain or fire alarm panel, install protective conduit from fire relay location to ceiling height and free air installation of fire alarm cable to ceiling height, Contractor will verify fire relay operation using temporary power. Contractor will contact Aberdeen Fire Dept, Edgewood operations prior to any work on Fire Panel, and receive there written approval prior to any work in Fire Panel.
SUBMITTALS Required:
Contractor will provide the following items with their offers:
A. Shop Drawings: Drawings detailing product dimensions, weight, and attachment methods.
B. Specification sheets on the ceiling-mounted fan, specifying electrical and installation
(End of Summary of Changes)