Price Proposal format. Please use this spreadsheet to submit pricing for this proposal.

View the file

Other files

File Type Posted
A01_QASP_POL_MR_2017_rev1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Testing Base Year-0001

Contractors should input information in highlighted cells
BASE YEAR : 18 MAY 2017 - 17 MAY 2018
SCHEDULE OF SERVICES - REGULATORY TESTING
The contractor shall provide STANDARD response unit prices & total amounts given the projected quantities for the following services:

ITEM Regulatory Testing Requirement Projected QTY U/M Base Year U/P TOTAL AMOUNT

1Veeder Root Alarm Calibration6ea$0.00
2Gasoline Dispenser Calibration1ea$0.00
3Bulk Dispenser Calibration15ea$0.00
4Containment Sump1ea$0.00
5Pressurized Line Leak Detector Test/Piping Tightness Test9ea$0.00
6Spill Catchment Basins9ea$0.00
Surcharge % for High Priority (i.e. 10%)=================>
Total Price
$0.00
% of Total SamplesSurcharge MultiplierPrice Per Priority (STD TAT Price X % of Total Sample X surcharge multiplier)
Standard Priority100%1$0.00
High Priority0%1$0.00

Total Base Year Price With Priority surcharge calculations $0.00

SCHEDULE OF SERVICES

METALS CONTRACT

INORGANICS/METALS CONTRACT

&P of &N

Labor BASE YR-0002

Contractors should input information in highlighted cells
BASE YEAR : 18 MAY 2017 - 17 MAY 2018
SCHEDULE OF SERVICES - REPAIR SERVICE
The contractor shall provide STANDARD response unit prices & total amounts given the projected quantities for the following services:
ITEMRegulatory Testing RequirementProjected QTYU/MBase Year U/PTOTAL AMOUNT
CLIN 0002
1Routine Repair - Service Technician160hr$0.00
2Routine Repair - Service Helper80hr$0.00
3Routine Repair - Mechanic20hr$0.00
4Routine Repair - Foreman16hr$0.00
Surcharge % for High Priority (i.e. 10%)=================>
Total Price
$0.00
% of Total SamplesSurcharge MultiplierPrice Per Priority (STD TAT Price X % of Total Sample X surcharge multiplier)
Standard Priority90%1$0.00
High Priority10%1$0.00

Total Base Year Price With Priority surcharge calculations $0.00

CLIN 0003 Materials - amount set by the Government NTE $10,000.00

Testing Option Yr 1-1001

Contractors should input information in highlighted cells
OPTION YEAR 1 : 18 MAY 2018 - 17 MAY 2019
SCHEDULE OF SERVICES - REGULATORY TESTING
The contractor shall provide STANDARD response unit prices & total amounts given the projected quantities for the following services:

ITEM Regulatory Testing Requirement Projected QTY U/M Base Year U/P TOTAL AMOUNT

1Veeder Root Alarm Calibration6ea$0.00
2MDE Third Party Inspection9ea$0.00
3Containment Sumps9ea$0.00
4Presurrized Line Leak Detector Test/Piping Tightness Test9ea$0.00
5Spill Catchment Basins9ea$0.00
Surcharge % for High Priority (i.e. 10%)=================>
Total Price
$0.00
% of Total SamplesSurcharge MultiplierPrice Per Priority (STD TAT Price X % of Total Sample X surcharge multiplier)
Standard Priority100%1$0.00
High Priority0%1$0.00

Total Base Year Price With Priority surcharge calculations $0.00

Labor OPT YR 1-1002

Contractors should input information in highlighted cells
OPTION YEAR 1 : 18 MAY 2018 - 17 MAY 2019
SCHEDULE OF SERVICES - REPAIR SERVICE
The contractor shall provide STANDARD response unit prices & total amounts given the projected quantities for the following services:

ITEM Regulatory Testing Requirement Projected QTY U/M Base Year U/P TOTAL AMOUNT

1Routine Repair - Service Technician160hr$0.00
2Routine Repair - Service Helper80hr$0.00
3Routine Repair - Mechanic20hr$0.00
4Routine Repair - Foreman16hr$0.00
Surcharge % for High Priority (i.e. 10%)=================>
Total Price
$0.00
% of Total SamplesSurcharge MultiplierPrice Per Priority (STD TAT Price X % of Total Sample X surcharge multiplier)
Standard Priority90%1$0.00
High Priority10%1$0.00

Total Base Year Price With Priority surcharge calculations $0.00

CLIN 1003 Materials - amount set by the Government NTE $10,000.00

Sheet2

Sheet3

Testing Option Yr 2-2001

Contractors should input information in highlighted cells
OPTION YEAR 2 : 18 MAY 2019 - 17 MAY 2020
SCHEDULE OF SERVICES - REGULATORY TESTING
The contractor shall provide STANDARD response unit prices & total amounts given the projected quantities for the following services:

ITEM Regulatory Testing Requirement Projected QTY U/M Base Year U/P TOTAL AMOUNT

1Veeder Root Alarm Calibration6ea$0.00
2Gasoline Dispenser Calibration1ea$0.00
3Bulk Dispenser Calibration15ea$0.00
4Pressurized Line Leak Detector Test/Piping Tightness Test9ea$0.00
5Spill Catchment Basins9ea$0.00
Surcharge % for High Priority (i.e. 10%)=================>
Total Price
$0.00
% of Total SamplesSurcharge MultiplierPrice Per Priority (STD TAT Price X % of Total Sample X surcharge multiplier)
Standard Priority100%1$0.00
High Priority0%1$0.00

Total Base Year Price With Priority surcharge calculations $0.00

Labor OPT YR 2-2002AB

Contractors should input information in highlighted cells
OPTION YEAR 2 : 18 MAY 2019 - 17 MAY 2020
SCHEDULE OF SERVICES - REPAIR SERVICE
The contractor shall provide STANDARD response unit prices & total amounts given the projected quantities for the following services:

ITEM Regulatory Testing Requirement Projected QTY U/M Base Year U/P TOTAL AMOUNT

1Routine Repair - Service Technician160hr$0.00
2Routine Repair - Service Helper80hr$0.00
3Routine Repair - Mechanic20hr$0.00
4Routine Repair - Foreman16hr$0.00
Surcharge % for High Priority (i.e. 10%)=================>
Total Price
$0.00
% of Total SamplesSurcharge MultiplierPrice Per Priority (STD TAT Price X % of Total Sample X surcharge multiplier)
Standard Priority90%1$0.00
High Priority10%1$0.00

Total Base Year Price With Priority surcharge calculations $0.00

CLIN 2003 Materials - amount set by the Government NTE $10,000.00

Option Yr 3-0004AA

OPTIONAL CLIN OPT YR 3-0004AB

Contractors should input information in highlighted cells
BASE YEAR : 01 Jan 2010 - 31 Dec 2010
SCHEDULE OF SERVICES
The contractor shall provide STANDARD TAT unit prices & total amounts given the projected quantities for the following services:
ICPMS 6020 FOR WATERS AND SOIL
ITEMDESCRIPTION/METHODProjected QTYU/MBase Year U/PTOTAL AMOUNT
Water
1Zinc by ICPMS - EPA 200.8/6020ea$0.00
2Lead by ICPMS - EPA 200.8/6020ea$0.00
3Volatile Organic Compounds by GC/MS - EPA 624ea$0.00
4Ammonia by Distillation/Titration - SM (20) 4500NH3 B+Cea$0.00
5Priority Pollutants (silver, arsenic, beryllium, cadmium, chromium, copper, nickel, lead, antimony, selenium, thallium, zinc, total mercury)10ea$0.00
6RECRA Metals by ICPMS (barium, Total Mercury, cadmium, chromium, lead, selenium, arsenic, silver)10ea$0.00
7Asbestos - TEM/EPA 100.2/ELAP 198.210ea$0.00
8Total Mercury - EPA 245.1/7470Aea$0.00
9Beryllium by ICPMS - EPA 200.7/6010Bea$0.00
10Cadmium by ICPMS - EPA 200.8/6020ea$0.00
11Total Petroleum Hydrocarbons (SGT-HEM) - EPA 1664A10ea$0.00
12Chromium by ICPMS - EPA 200.8/6020ea$0.00
13Silver by ICPMS - EPA 200.8/6020ea$0.00
14Copper by ICPMS - EPA 200.8/6020ea$0.00
15Nickel by ICPMS - EPA 200.8/6020ea$0.00
16TCLP Metals by ICP (lead, mercury, chromium, cadmium, barium, silver, selenium, arsenic)ea$0.00
17Volatile Organic Compounds by GC/MS - EPA 8260Bea$0.00
18PCBs by GC/ECD - EPA 808210ea$0.00
Explosives - EPA 833010ea$0.00
Total Suspended Solids - EPA 160.210ea$0.00
BOD - SM 5210B10ea$0.00
19Total Cyanide - EPA 335.410ea$0.00
Solid
20Copper by ICPMS - EPA 6020ea$0.00
21TCLP Metals by ICP (lead, mercury, chromium, cadmium, barium, silver, selenium, arsenic)ea$0.00
22Total Cyanide - SW846 9010B/9014ea$0.00
23Nickel by ICPMS - EPA 6020ea$0.00
24Total Petroleum Hydrocarbons (SGT-HEM) - SW846 9071Bea$0.00
25PCBs by GC/ECD - EPA 808210ea$0.00
26Chromium by ICPMS - EPA 6020ea$0.00
27Volatile Organic Compounds by GC/MS - EPA 8260Bea$0.00
28Cadmium by ICPMS - EPA 6020ea$0.00
29Lead by ICPMS - EPA 6020ea$0.00
30Zinc by ICPMS - EPA 6020ea$0.00
31Ammonia by Distillation/Titration - SM (20) 4500NH3 B+C(M)ea$0.00
32Priority Pollutants (silver, arsenic, beryllium, cadmium, chromium, copper, nickel, lead, antimony, selenium, thallium, zinc, total mercury)ea$0.00
33RECRA Metals by ICPMS (barium, Total Mercury, cadmium, chromium, lead, selenium, arsenic, silver)ea$0.00
34Asbestos - TEM/EPA 100.2/ELAP 198.210ea$0.00
35Asbestos Bulk - PLMea$0.00
36Explosives - EPA 833010ea$0.00
37Total Mercury - SW 846 7471Aea$0.00
38Silver by ICPMS - EPA 6020ea$0.00
39Beryllium by ICPMS - EPA 6010Bea$0.00
ICPMS 200.8 (Rev 5.4) 1994 (FOR NPDES WATERS & Other non-drinking waters)
Paint
39Lead by ICPMS - EPA 6020ea$0.00
40Lead in Paint by FAA - EPA 7420ea$0.00
41Priority Pollutants (silver, arsenic, beryllium, cadmium, chromium, copper, nickel, lead, antimony, selenium, thallium, zinc, total mercury)ea$0.00
42ea$0.00
Organic Liquid
43PCBs by GC/ECD - EPA 600/4-81-045ea$0.00
44Beryllium by ICPMS - EPA 6010Bea$0.00
45Volatile Organic Compounds by GC/MS - EPA 8260Bea$0.00
46Total Mercury - SW 846 7470Aea$0.00
47Silver by ICPMS - EPA 200.8/6020ea$0.00
48Lead by ICPMS - EPA 200.8/6020ea$0.00
49RECRA Metals by ICPMS (barium, Total Mercury, cadmium, chromium, lead, selenium, arsenic, silver)ea$0.00
50Ammonia by Distillation/Titration - SM (20) 4500NH3 B+C(M)ea$0.00
51Zinc by ICPMS - EPA 200.8/6020ea$0.00
52TCLP Metals by ICP (lead, mercury, chromium, cadmium, barium, silver, selenium, arsenic)ea$0.00
53Total Halides (Cl) - ASATM D 808 M/ASTM D 512ea$0.00
54Total Organic Halides (Cl) - ASATM D 808 M/ASTM D 512ea$0.00
55Total Petroleum Hydrocarbons (SGT-HEM) - EPA 1664Aea$0.00
56Nickel by ICPMS - EPA 200.8/6020ea$0.00
57Cadmium by ICPMS - EPA 200.8/6020ea$0.00
58Chromium by ICPMS - EPA 200.8/6020ea$0.00
59Priority Pollutants (silver, arsenic, beryllium, cadmium, chromium, copper, nickel, lead, antimony, selenium, thallium, zinc, total mercury)ea$0.00
60Copper by ICPMS - EPA 200.8/6020ea$0.00
213Surcharge % for High Priority (i.e. 10%)=================>
214Surcharge % for Top Priority==========================>Total Price
215Surcharge % for Urgent Priority=======================>$0.00
% of Total SamplesSurcharge MultiplierPrice Per Priority (STD TAT Price X % of Total Sample X surcharge multiplier)
Standard Priority90%1$0.00
High Priority9%1$0.00
Top Priorty0.50%1$0.00
Urgent Priority0.50%1$0.00

Total Base Year Price With Priority surcharge calculations $0.00

Option Yr 4-0005AA

OPTIONAL CLIN OPT YR 4-0005AB

Contractors should input information in highlighted cells
OPTIONAL CLIN FOR Option Year 4: 30 Sept 2013 - 29 Sept 2014
SCHEDULE OF SERVICES
The contractor shall provide STANDARD TAT unit prices & total amounts given the projected quantities for the following services:

ICPMS 6020 FOR WATERS AND SOIL

ITEMDESCRIPTIONProjected QTYU/MOptional CLIN Option Year 4 U/PTOTAL AMOUNT
Water
1Sb-6020A10ea$0.00
2As-6020A10ea$0.00
3Ba-6020A10ea$0.00
4Be-6020A10ea$0.00
5Cd-6020A10ea$0.00
6Cr-6020A10ea$0.00
7Co-6020A10ea$0.00
8Cu-6020A10ea$0.00
9Pb-6020A10ea$0.00
10Mn-6020A10ea$0.00
11Mo - 6020A10ea$0.00
12Ni-6020A10ea$0.00
13Se-6020A10ea$0.00
14Ag-6020A10ea$0.00
15Tl-6020A10ea$0.00
16V-6020A10ea$0.00
17Zn-6020A10ea$0.00
Soils/Sediment/Bulk
18Sb-602010ea$0.00
19As-602010ea$0.00
20Ba-602010ea$0.00
21Be-602010ea$0.00
22Cd-602010ea$0.00
23Cr-602010ea$0.00
24Co-602010ea$0.00
25Cu-602010ea$0.00
26Pb-602010ea$0.00
27Mn-602010ea$0.00
28Mo-602010ea$0.00
29Ni-602010ea$0.00
30Se-602010ea$0.00
31Ag-602010ea$0.00
32Tl-602010ea$0.00
33V-602010ea$0.00
34Zn-602010ea$0.00

ICPMS 200.8 (Rev 5.4) 1994 (FOR NPDES WATERS & Other non-drinking waters)

ITEMDESCRIPTIONProjected QTYU/MOptional CLIN Option Year 4 U/PTOTAL AMOUNT
Water
35Sb-200.825ea$0.00
36As-200.825ea$0.00
37Ba-200.85ea$0.00
38Be-200.825ea$0.00
39Cd-200.825ea$0.00
40Cr-200.810ea$0.00
41Co-200.810ea$0.00
42Cu-200.825ea$0.00
43Pb-200.825ea$0.00
44Mn-200.85ea$0.00
45Mo-200.85ea$0.00
46Ni-200.85ea$0.00
47Se-200.825ea$0.00
48Ag-200.810ea$0.00
49Tl-200.825ea$0.00
50V-200.85ea$0.00
51W-200.85ea$0.00
52Zn-200.85ea$0.00
TCLP FOR WATERS
ITEMDESCRIPTIONProjected QTYU/MOptional CLIN Option Year 4 U/PTOTAL AMOUNT
53As-6010C5ea$0.00
54Ag-6010C10ea$0.00
55Ba-6010C5ea$0.00
56Cd-6010C5ea$0.00
57Cr-6010C5ea$0.00
58Hg-7471B5ea$0.00
59Pb-6010C5ea$0.00
60Se-6010C5ea$0.00
61TCLP Metals to include 1311 Prep (all 8)5ea$0.00

MERCURY BY EPA 200 (Incl. NPDES) AND 7000 SERIES-SOILS, SEDIMENTS, SLUDGES, and WATERS

ITEMDESCRIPTIONProjected QTYU/MOptional CLIN Option Year 4 U/PTOTAL AMOUNT
62Hg-7471 B15ea$0.00
63Hg-7470A5ea$0.00
64Hg-245.115ea$0.00
TCLP FOR SOLIDS
ITEMDESCRIPTIONProjected QTYU/MOptional CLIN Option Year 4 U/PTOTAL AMOUNT
65As-6010C5ea$0.00
66Ag-6010C5ea$0.00
67Ba-6010C5ea$0.00
68Cd-6010C5ea$0.00
69Cr-6010C5ea$0.00
70Hg-7471B5ea$0.00
71Pb-6010C5ea$0.00
72Se-6010C5ea$0.00
73TCLP Metals to include 1311 Prep (all 8)10ea$0.00

EPA METHOD 200.7 Ver. 4.4 1994 (FOR NPDES WATERS and other Non-Drinking Waters)

ITEMDESCRIPTIONProjected QTYU/MOptional CLIN Option Year 4 U/PTOTAL AMOUNT
Waters
74Al-200.710ea$0.00
75Sb-200.710ea$0.00
76As-200.710ea$0.00
77Ba-200.710ea$0.00
78Be-200.710ea$0.00
79B-200.710ea$0.00
80Cd-200.710ea$0.00
81Ca-200.710ea$0.00
82Cr-200.710ea$0.00
83Co-200.710ea$0.00
84Cu-200.710ea$0.00
85Fe-200.710ea$0.00
86Pb-200.710ea$0.00
87Mg-200.710ea$0.00
88Mn-200.710ea$0.00
89Mo-200.710ea$0.00
90Ni-200.710ea$0.00
91K-200.710ea$0.00
92Se-200.710ea$0.00
93Ag-200.710ea$0.00
94Na-200.710ea$0.00
95Tl-200.710ea$0.00
96Sn-200.710ea$0.00
97V-200.710ea$0.00
98Zn-200.710ea$0.00

EPA METHOD 6010C FOR SOILS, SEDIMENTS, SLUDGES, WATER AND BULK

ITEMDESCRIPTIONProjected QTYU/MOptional CLIN Option Year 4 U/PTOTAL AMOUNT
Soils/Sediment/Bulk
99Al-6010C15ea$0.00
100Sb-6010C5ea$0.00
101As-6010C5ea$0.00
102Ba-6010C15ea$0.00
103Be-6010C15ea$0.00
104B-6010C5ea$0.00
105Cd- 6010C15ea$0.00
106Ca-6010C15ea$0.00
107Cr-6010C15ea$0.00
108Cu-6010C15ea$0.00
109Co-6010C15ea$0.00
110Fe-6010C15ea$0.00
111Pb-6010C15ea$0.00
112Mg-6010C15ea$0.00
113Mn-6010C5ea$0.00
114Mo-6010C5ea$0.00
115Ni-6010C15ea$0.00
116K-6010C15ea$0.00
117Se-6010C15ea$0.00
118Ag-6010C15ea$0.00
119Na-6010C15ea$0.00
120Sr-6010C15ea$0.00
121Tl-6010C5ea$0.00
122V-6010C5ea$0.00
123Zn-6010C15ea$0.00
124Sn-6010C15ea$0.00
125Ti-6010C5ea$0.00

EPA METHOD 6010C FOR SOILS, SEDIMENTS, SLUDGES, WATER AND BULK

ITEMDESCRIPTIONProjected QTYU/MOptional CLIN Option Year 4 U/PTOTAL AMOUNT
Waters
126Al-6010C5ea$0.00
127Sb-6010C5ea$0.00
128As-6010C5ea$0.00
129Ba-6010C5ea$0.00
130Be-6010C5ea$0.00
131B-6010C5ea$0.00
132Cd- 6010C5ea$0.00
133Ca-6010C5ea$0.00
134Cr-6010C5ea$0.00
135Cu-6010C5ea$0.00
136Co-6010C5ea$0.00
137Fe-6010C5ea$0.00
138Pb-6010C5ea$0.00
139Mg-6010C5ea$0.00
140Mn-6010C5ea$0.00
141Mo-6010C5ea$0.00
142Ni-6010C5ea$0.00
143K-6010C5ea$0.00
144Se-6010C5ea$0.00
145Ag-6010C5ea$0.00
146Na-6010C5ea$0.00
147Sr-6010C5ea$0.00
148Tl-6010C5ea$0.00
149V-6010C5ea$0.00
150Zn-6010C5ea$0.00
151Sn-6010C5ea$0.00
152Ti-6010C5ea$0.00

SAMPLE PREPARATIONS

ITEMDESCRIPTIONProjected QTYU/MOptional CLIN Option Year 4 U/PTOTAL AMOUNT
153EPA 1311-TCLP-SO/SS/Bulk10ea$0.00
154EPA 1311-TCLP-WA10ea$0.00
155EPA 3050B-SO/SS/Bulk OR EPA 3051A-microwave-SO/SS/Bulk10ea$0.00
156EPA 3010A or 3015 or 3020A-GW/SW/WD/WI as appropriate for the analytical method10ea$0.00
157EPA 200.2-GW/SW/WD/WI (only before 200.7/200.8 analysis)10ea$0.00

Miscellaneous Procedures

ITEMDESCRIPTIONProjected QTYU/MOptional CLIN Option Year 4 U/PTOTAL AMOUNT
158Total Coliform - Qualitative SM 9223B5ea$0.00

159 Total Coliform - Quantitative SM 9221B 10 ea $0.00

160 Fecal Coliform - Quantitative SM9221E 10 ea $0.00

161 Enterococcus SM 9230B 10 ea $0.00

162 Chromium VI (CrVI) EPA 218.6 or 7199 or 7196 5 ea $0.00

163 SM2340B (Ca+Mg Hardness) 15 ea $0.00

164 Asbestos - EPA 100.2 5 ea $0.00

BUNDLED PROCEDURES
ITEMDESCRIPTIONProjected QTYU/MOptional CLIN Option Year 4 U/PTOTAL AMOUNT
165Deployment PM 10 Bundle - 40CFR 50 Digestion or equivalent- Method 6020A for - As, Be, Sb, Cr, Cd, Mn, Ni, Pb, V, and Zn20ea$0.00

166 Deployment Surface Water Bundle - Method 200.2 Digestion - Method 200.7 for Al, B, Ca, Fe, Mg, Na, Zn - AND - Method 200.8 for Sb, As, Ba, Be, Cd, Cr, Cu, Pb, Mn, Ni, Se, Ag, Tl, U, V - AND - Method 245.1 for Hg - AND - Method SM 2340B for Total Hardness 20 ea $0.00

167 Deployment Soil Bundle - Method 3050B Digestion or 3051A- Method 6010C for As, Ba, Be, Ag, Cd, Cr, Pb, Ni, Se, Sr - AND - Method 7471B for Hg 20 ea $0.00

168 RCRA Metals WATER Bundle - Methods 3010A, 3020A or 3015 Digestion - Methods 7471B (Hg) and 6010C or 6020A for As, Ba, Cd, Cr, Pb, Se, and Ag 20 ea $0.00

169 RCRA Metals SOILS Bundle - Method 3050B or 3051A Digestion - Methods 7471B (Hg) and 6010C or 6020A for As, Ba, Cd, Cr, Pb, Se, and Ag 20 ea $0.00

INORGANIC PROCEDURES

ITEMDESCRIPTIONProjected QTYU/MOptional CLIN Option Year 4 U/PTOTAL AMOUNT
170Alkalinity, Total (water) - EPA SM 2320B25ea$0.00
171Ammonia (water) - EPA 350.1 (rev 2.0) or SM 4500 B/C, D, E, F, G, or H25ea$0.00
172BOD (water) - SM 5210B25ea$0.00
173Bromide (water) - EPA 300.0 (rev 2.1) or EPA 300.1 (rev 1.0)5ea$0.00
174Chloride (water) - EPA 300.0 (rev 2.1) or EPA 300.1 (rev 1.0)20ea$0.00
175Chlorine Demand (water) - SM2350B20ea$0.00
176COD (water) - EPA 410.4 or SM 5220D25ea$0.00
177Conductivity (water) (Specific Conductance) - EPA 120.1 or SM 2510B25ea$0.00
178Color (water) - SM 2120 B, C or E25ea$0.00
179Cyanide, Available (water) - OIA 16775ea$0.00
180Cyanide, Total (soil) - Current SW846 Method5ea$0.00
181Cyanide, Total (water) - EPA 335.4 or SM 4500 CN C/D, E or F25ea$0.00
182Fluoride (water) - EPA 300.0 (rev 2.1) or EPA 300.1 (rev 1.0)20ea$0.00
183Moisture (soil, sludge)25ea$0.00
184MBAS (water) - SM 5540C25ea$0.00
185NO3/NO2 (water) - EPA 300.0 (rev 2.1) or EPA 300.1 (rev 1.0) or EPA 353.2 or SM 4500 NO3F25ea$0.00
186NO3 only (water) - EPA 300.0 (rev 2.1) or EPA 300.1 (rev 1.0) or EPA 353.2 or SM 4500 NO3F10ea$0.00
187NO2 only (water) - EPA 300.0 (rev 2.1) or EPA 300.1 (rev 1.0) or EPA 353.2 or SM 4500 NO3F10ea$0.00
188o-PO4 (water) - EPA 300.0 (rev 2.1) or EPA 300.1 (rev 1.0) or SM 4500 P F5ea$0.00
189pH (>20% water) - EPA SW846 9040C10ea$0.00
190pH (<20% soil) - EPA SW846 9045D10ea$0.00
191pH (water) - EPA 150.2 or SM 4500 H+ B25ea$0.00
192Phenolics (water) - EPA 420.1 or 420.45ea$0.00
193Phosphorous, Total (soil) - EPA 365.1 or equivalent (adapted for soil)5ea$0.00
194Phosphorous, Total (water) - EPA 365.1 or SM 4500 P B.5/F25ea$0.00
195Sulfate (water) - EPA 300.0 (rev 2.1) or EPA 300.1 (rev 1.0)20ea$0.00
196Sulfide (water) - SM 4500 S2 D, F, or G5ea$0.00
ITEMDESCRIPTIONProjected QTYU/MOptional CLIN Option Year 4 U/PTOTAL AMOUNT
197TKN (water) - EPA 351.1 (1978) or 351.2 (1993) or equivalent Standard Method10ea$0.00
198TOC (water) - SM 5310B, C, or D10ea$0.00
199TOC (soil) - MSA 29-3.5.2 or approved high temperature combustion method10ea$0.00
200Total Halogen ASTM D808M10ea$0.00
201Total Solids (water) - SM2540B10ea$0.00
202Total Dissolved Solids (TDS) (water) - SM 2540C10ea$0.00
203Total Suspended Solids (TSS) (water) - SM 2540D10ea$0.00
204Total Volatile Solids (water) - EPA 160.410ea$0.00
205Turbidity (water) - EPA 180.1 or SM 2130B10ea$0.00
206DOC (water) - EPA 415.3 (rev 1.1) or SM5310C (with 48 hour hold time)10ea$0.00
207UV 254 (water) - SM 5910B10ea$0.00
208Anions (F, Cl, SO4) (water) - EPA 300.0 (rev 2.1) or EPA 300.1 (rev 1.0)10ea$0.00
209Flashpoint (liquid or solid) - EPA 1020 or ASTM D382810ea$0.00
210Perchlorate - EPA 6850 or 686010ea$0.00
211Silica - SM 4500 SiO2 D10ea$0.00

212 Custom EDD prep/Consulting Services (cost/hr) 2 hours $0.00

213Surcharge % for High Priority (i.e. 10%)=================>
214Surcharge % for Top Priority==========================>Total Price
215Surcharge % for Urgent Priority=======================>$0.00
% of Total SamplesSurcharge MultiplierPrice Per Priority (STD TAT Price X % of Total Sample X surcharge multiplier)
Standard Priority39.50%1$0.00
High Priority50%1$0.00
Top Priorty10%1$0.00
Urgent Priority0.50%1$0.00

Total Option Year FOUR Price With Priority surcharge calculations $0.00 blank blank2

Totals for all Years

Total of Base Year and All Option Years:
$ - 0

Sheet1

File details come from the government source that posted it. Updated .