A01_Statement_of_Work_Anthro_2015_rev1.docx
DOCX document 15 KB Posted
- Attached to
- Anthropomorphic Test Device Maintenance
- Solicitation number
- W91ZLK-16-R-0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_2_10_2016.pdf | ||
| Price_Schedule_for_Parts.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for Anthropomorphic Test Device Maintenance Contract
The Anthropomorphic Test Device (ATD) provides the ability to measure crew causality during live fire testing of military vehicles. Due to this requirement a maintenance contract is required to maintain the Anthropomorphic Test Device.
Contractor shall provide the following maintenance, repair and parts for the Anthropomorphic Test Device: Calibration of load cells and accelerometers on a yearly rotation or as needed basis. Repair of damaged load cells, accelerometers and Anthropomorphic Test Device parts. Contractor will supply replacement of ATDs, load cells, accelerometers and Anthropomorphic Test Device parts. Replacement proprietary Humanetics parts must be manufactured by Humanetics to maintain compatibility with current ATD inventory and test specifications. For detailed breakdown see below for primary calibrated models and attached serial number, parts and calibration list for complete listing. Calibration of all instrumentation will conform to the standards indentified in the current revision of SAE J211-1standard for surface vehicle recommended practice to include all SAE standards referenced in the primary SAE J211-1 document. Repairs and maintenance will be done to the level that calibrations and Anthropomorphic Test Device tolerances in SAEJ211-1 can be maintained.
I. ATD Calibration( See serial number attachment for complete listing) Contractor shall provide calibration of ATD load cells (gage) on a yearly basis or as needed due to excessive loads for the following Government property:
| Humanetics Model 1716A | 6-Channel |
| Humanetics Model 7502J | 6-Channel |
| Humanetics Model 1708J | 6-Channel |
| Humanetics Model 4664J | 1-Channel |
| Humanetics Model 3643 | 5-Channel |
| Humanetics Model 3644 | 5-Channel |
| Humanetics Model 1583M | 2-Channel |
| Humanetics Model 3114 | 4-Channel |
| Humanetics Model 3115 | 4-Channel |
| Humanetics Model 3255TF | 1-Channel |
| Humanetics Model 2121A | 1-Channel |
| Humanetics Model 1914Q | 6-Channel |
| Humanetics Model 1587 | 2-Channel |
Contractor shall provide calibration of accelerometer (gage) on a yearly basis or as needed due to excessive stress for the following Government property:
Endevco Model 7264D-2KTZ
Place of performance for calibrations and repairs will be at the contractor facility.
Government is responsible for shipment cost of gages sent out for calibration.
Contractor is responsible for shipment cost of gages returned from calibration. F.O.B Destination.
Calibration shall be completed within 7 business days of receipt unless COR is notified of reason for delay ie: repairs required.
CD will be provided with all calibration data for each gage returned from calibration. Multiple gages calibration data can be on one CD.
Maintenance and repair procedures required will be documented in WAWF invoice.
II. ATD Repair Contractor shall provide repair for Government owned accelerometer or load cells (gage) and Anthropomorphic Test Device (ATD) parts.
When repairs are discovered during calibration, authorization from COR must be obtain before repair work is started.
COR must review and approve all repairs before repair work can be started.
Maintenance and repair procedures required will be documented in WAWF invoice.
III. ATD Parts Contractor shall provide all ATD parts as needed in accordance with contractor provided parts list.
Replacement proprietary Humanetics parts must be manufactured by Humanetics to maintain compatibility with current ATD inventory and test specifications.
COR must approve all parts and part replacement.
The base year Period of Performance will be from March 1, 2016 to February 28, 2017. Option year 1will be from March 1, 2017 to February, 28, 2018 and Option year 2 will be from March 1, 2018 to February 28, 2019.