PWS-Med_Gas.pdf

PDF 63 KB Posted

Attached to
Medical Gas Services
Solicitation number
W91YTZ19R0021
Issued by

View the file

Other files

File Type Posted
Technical_Exhibit_1_-_Price_List.xlsx XLSX spreadsheet
QASP.pdf PDF
Technical_Exhibit_1_-_Gas_List.pdf PDF
PRS.pdf PDF
PWS.pdf PDF
PRS.pdf PDF
QASP.pdf PDF
Exhibit_1.pdf PDF
Exhibit_1_-_Pricing_Sheet.xlsx XLSX spreadsheet
A.09.03_Combo_Synopsis_&_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

MEDICAL GASES

DWIGHT DAVID EISENHOWER ARMY MEDICAL CENTER

FORT GORDON, GEORGIA 30905

1. GENERAL

1.1. General: This is a non-personnel services contract to provide Medical grade gases. The contractor shall perform all pick-up, refill, and delivery of medical gases to include compressed oxygen, compressed nitrogen, liquid oxygen, propane, special gas mixes and medical compressed gas to the Dwight David Eisenhower Army Medical Center (DDEAMC) Bldg. 300, TMC#4 Bldg. 21712, Connelly Clinic Bldg. 29709, Hyperbaric Clinic Bldg. 298, Area Dental Lab Bldg.

322, Tingay Dental Clinic Bldg. 328, Clinical Investigations Bldg. 38713, Vet Clinic Bldg. 500, and Snyder Dental Clinic Bldg. 25501 as directed by the Contract. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.2. Background: Requirement for medical gases. Medical gases are critical to the functions of DDEAMC’s mission. These medical gases are used throughout the clinics at Eisenhower Army Medical Center and its outlying clinics for patient care, medical treatment and research.

1.3. Objectives: Medical gases are essential to the functions of DDEAMC’s mission of providing five star healthcare for DDEAMC staff, family members, veterans, retirees and all other DDEAMC patients.

1.4. Scope: The Contractor shall furnish all labor, supervision and transportation for delivery of the medical gases as required. This contract includes all functions, task and responsibilities normally inherent to a hospital’s medical gas deliveries.

1.5. Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years. The Period of Performance reads as follows:

Base Year Award Date – 31January 2020 Option Year I 01 February2020 – 31January 2021 Option Year II 01 February2021 – 31January 2022 Option Year III 01 February2022 – 31January 2023 Option Year IV 01 February2023 – 31January 2024

1.6. General Information:

1.6.1. Quality Control The contractor shall establish and maintain a complete Quality Control Plan to ensure that the requirements of the contract are provided as specified in Section 5. The plan shall describe the methods for identifying and preventing defects before the level of performance becomes unacceptable. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS.

1.6.2. Quality Assurance: The government will evaluate the contractor’s Performance under this contract using the method of surveillance specified in the Quality Assurance Surveillance Plan (QASP). All surveillance observations will be recorded by Government Contracting office representative.

1.6.3. Recognized Holidays: DDEAMC observes all Federal Holidays as follows:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

Contractor may be required to deliver on a federal holiday in the event of an emergency situation only.

1.6.4. Hours of Operation: DDEAMC hours of operation are 0700 to 1630 EST Monday through Friday. The contractor is responsible for conducting business, between these hours except for emergency cases.

1.6.5. Emergency Services. The contractor shall be able to provide and comply with a 24-hour emergency, urgent on-site response when required.

1.6.6. Security Requirements: Contractor personnel performing work under this contract shall maintain the level of security required for the life of the contract.

1.6.6.1. All contractor employees performing work on site shall report to the Security office and obtain vendor credentials for the duration of the work.

Contractor employees shall wear their badge credentials at all times while on site.

1.6.6.2. The contractor and all associated subcontractors' employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.6.6.3. The contractor shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 15 calendar days of new contract employees' commencing performance, with the results reported to the COR no later than 45 calendar days after contract award.

1.6.6.4. All contractor employees with access to a government information system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services and must successfully complete the DoD Information Assurance Awareness training prior to access to the information system and then annually thereafter.

1.6.6.5. AT level 1 (general) all contractor employees requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected contractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 15 calendar days after completion of training by all employees and subcontractor personnel.

1.6.6.6. Cyber Awareness (Information Assurance (IA)/Information technology (IT) training. All contractor employees and associated sub-contractor employees must complete the DoD Cyber awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of appointment to IA/IT functions. DoD Cyber Awareness Challenge Training is available at the following website:

https://ia.signal.army.mil/DoDIAA/

1.6.6.7. Cyber (Information assurance (IA)/information technology (IT)) certification. Per DoD 8570.01-M , DFARS 252.239.7001 and AR 25-2, the contractor employees supporting Cyber (IA/IT) functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award

2. DEFINITIONS AND ACRONYMS

https://ia.signal.army.mil/DoDIAA/

2.1 Medical compressed air: A colorless, odorless gas stored in cylinders under pressure.

2.1.1. Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime vendor.

2.1.2. Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. Contracting Officer’s Representative (COR): An employee of the U.S.

Government appointed by the Contracting Officer to administer the contract.

Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. Defective service: A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. Deliverable: Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. Quality assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7. Quality control: All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.8. Physical security: Actions that prevent the loss or damage of Government property.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1. The government shall make available to the contractor, all government owned cylinders, valves and cylinder valve protection caps to be serviced and/or refilled.

3.2. The government property made available under this contract shall be for use only in the performance of the resulting contract.

4. CONTRACTOR FURNISHED ITEMS AND SERVICES

4.1. The contractor shall provide to the government, all cylinders, valves and cylinder valve protection caps to be serviced and/or refilled that are not government owned.

4.2. The contractor shall provide all labor and equipment necessary to perform the required medical gas refill services.

5. SPECIFIC TASKS

5.1. Contractor Management Reporting (CMR). The Contractor shall report ALL Contractor manpower required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address https://Contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different);

(9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, using standardized nomenclature provided on website); (12) As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year.

5.2. Medical Oxygen, Medical compressed air, Liquid Oxygen, Medical Nitrogen, Nitro oxide, Nitrous Oxide shall conform to standards in the United States Pharmacopoeia/National Formulary (USP/NF) unless otherwise stated.

5.2.1. Contractor shall make availability or accommodations for a variety of gas types to include propane, known gases and specialty gas mixtures as requested by the COR. Contractor shall deliver specialty gas mixtures according to the percentages of the mix as specified by DDEAMC and the COR. Contractor shall provide all of the medical gases, propane and special gas type and percentages of gas mixtures listed below (Exhibit 1) and as requested by the customer when necessary.

a. Blood Gas Mix - C02 4%, 02 16%

b. Blood Gas Mix - AH 26% 02 Bal NZ

c. Blood Gas Mix - known 2.054% C02, Bal N2

d. Lung Diff 179 - .3 C0, 0.3% Methane, 02 21%

e. Anerobic Mix 210 cf – 5% C02, 5% Hyd Bal N2

f. Gas Mix – 0.5% C02, 20% 02, 79.5% N2

g. Mixture Balance Nitro mix – 5% CO2, 20% 02

h. Liquid Medical Nitrogen NF AQ 240LT

i. Med Carbon Dioxide PN MCDE AV A

j. Med Carbon Dioxide AW

k. Medical Helium UHP 6000 psig 512 001BA

l. Medical Nitrogen PN MNIG BC m.Medical Nitrous Oxide PN MNOG BE

n. Medical Oxygen Alum PN MOAD BH X

o. Med Oxygen Aluminum PN MOAE BJ

p. Medical Oxygen 251 CF PN MO200 BK

q. Med Oxygen Aluminum PN MOM BN

r. Gas MBAG Med Breathing Air CT

s. Gas MN020C Med Nitro Oxide CY

t. Gas MNOAE Medical Nitro Oxide CZ

u. Argon 6K UHP 6000 PSI DW

v. Al USP300 Air Medical USP 0lEA

w. Medical Oxygen Size M

x. Medical Helium

y. Argon FS 40 CF

z. LOX Dewar

aa. HP O2

bb. Liquid Nitrogen 34 Liters every 2 months

cc. Industrial Oxygen

dd. Propane 88AL

ee. Argon FS AR150 CG

ff. Med Nitrous Oxide

gg. C02 Research Grade Sipho Tube 50

hh. N2 Nitrogen FS 80 CF N180 II. Anerobic Mix - 5% H2, 5% C02, 90% N2

jj. Custom Gas Mixes – To Be Determined

5.2. Medical Nitrogen shall be of Medicinal Grade A and shall conform to the latest version of BB-N-411C, “Federal Specification for Nitrogen”.

5.2.3. The Contractor shall provide custom mixed gases upon request from the COR. These gas mixes are for unpredictable mission essential requirements that will arise. The Contractor shall respond with availability of gas mix and price to be charged against the 'Custom Mix CLIN' within 48 hours of the COR’s request.

The Contractor shall only proceed with the requested mix and delivery upon the COR's acceptance of the terms.

5.4. Contractor shall deliver required cylinder type and size for all medical gases to include specialty gas mixtures and known gases as requested by the COR. All cylinders shall be delivered and picked up from Dwight D. Eisenhower Army Medical Center as well as all clinics listed in Section 1 (General Statement) as directed by the COR.

5.5. Deliveries will be scheduled between the Contractor and the Government during normal duty hours Monday through Friday. Contractor shall deliver to DDEAMC at a minimum of once a week and to all outlying clinics at least twice a month, or at the direction of the COR based on need.

5.6. All cylinders shall be refilled, picked up, and delivered upon request of the COR. The contractor shall also give 30 day notice prior to any non-federal holiday the contractor might observe. Coordination shall be made with the COR.

5.7. Emergency Service. The contractor shall be available 24 hours a day, seven days a week, including all holidays, to meet emergency requirements. The contractor shall provide an on-call number, acknowledge receipt of call within one hour, and make required deliveries within 24 hours of emergency call.

5.8. Inspection/Acceptance. The contractor shall provide those items that conform to the requirements of this contract. The government shall inspect or test any supplies or services that have been tendered for acceptance. The government may require repair or replacement of non-conforming supplies/equipment or re-performance of non-conforming services at no increase in contract price. The government must exercise its post-delivery acceptance rights (1) within 24 hours after the defect was discovered or should have been discovered; and (2) before substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

5.9. The contractor shall inspect government owned cylinders received for charging or reconditioning in accordance with the Product Item Description (PID), applicable DOT Regulations, the assigned gas service, and as specified in MIL- STD-1411A “DOD Standard Practice, Inspection and Maintenance of Compressed Gas Cylinders”. The number of acceptable cylinders and serial numbers shall be recorded to identify a specific contract. Accepted cylinders shall be forwarded for charging. Cylinders not meeting inspection levels shall be scheduled for proper maintenance in accordance with.

5.10. Cylinders received by the contractor for maintenance/reconditioning or recharging with a specific gas shall be inspected for legible and accurate identifications, markings, dimensions, color coding and stenciling. Monitors shall ensure presence of a valve protection cap, as applicable, the proper cylinder, valve, valve outlet and that the cylinder is in the gas service as specified.

5.11. The contractor’s paperwork (e.g., shipping order) accompanying each delivery shall give the total amount by type, including list of serial numbers (if applicable), lot numbers, and expiration dates of product for all cylinders delivered.

5.12. Contractor shall provide all applicable Safety Data Sheets (SDS) upon initial delivery or as revisions, updates, or amendments become available for each product/end item, applicable materials, components and supplies requiring a SDS, to include but not limited to gases by type, paint, threading compound/ sealant, lubricant, etc. IAW the fill contract delivery order/contract delivery requirements.

5.13. Cylinder Maintenance/Reconditioning - Periodic Testing/Hydrostatic Testing, Ultrasonic Examination (UE), External Visual Examination and serviceability inspections, Internal Cylinder Evaluation (any time a valve is removed from a cylinder for any reason), Hammer Testing (if applicable) and Leakage Testing shall be provided by the contractor. The Contractor shall be responsible to conduct all periodic testing by hydrostatic test procedures and IAW Compressed Gas Association Pamphlet (CGA); “Methods for Hydrostatic Testing of Compressed Gas Cylinders”, CGA C-5 “Wall Stress Requalification Criteria for High Pressure Seamless Steel Cylinders”, CGA C-6 “Standards for Visual Inspection of Steel Compressed Gas Cylinders”, CGA G-4.1 “Cleaning Equipment for Oxygen Service”, and MIL-STD-1411A.

5.14. Cylinders will undergo periodic hydrostatic/UE testing IAW Code of Federal Regulations (CFR) 49 180.605 “Requirements for Periodic Testing, Inspection and Repair of Portable Tanks”.

5.15. Compressed gas cylinders shall not be refilled if Hydrostatic/UE test date has expired.

5.16. Leakage testing shall be performed on all cylinders that have been filled with a compressed gas IAW the fill contract delivery order. Each cylinder shall be tested at all points that may provide a point of escape for cylinder contents.

Points to inspect are the head and bottom of each cylinder, the cylinder valve including the stem, the valve inlet threads, and the valve outlet. Tests shall be performed IAW MIL-STD-1411A.

5.17. Cylinders that are unacceptable at serviceability inspection shall be tagged for proper maintenance. Cylinders that have been scheduled for maintenance procedures shall be serviced IAW 49 CFR 180-205 “General Requirements for Requalification of Specification Cylinders” and MIL-STD-1411A. After maintenance, each cylinder shall pass the detailed serviceability requirements outlined in MIL-STD-1411A, paragraph 5.3.

5.18. Rejected and/or condemned cylinders shall be handled IAW MIL-STD- 1411A, paragraph 4.

5.19. Records of scheduled maintenance shall be made available and provided by the contractor.

5.20. Cylinders requiring Hydrostatic/UE retesting must be taken out of service 9 months prior to expiration.

5.21. Cylinder Hydrostatic/UE test date must not be within 36 months of expiration upon delivery.

5.22. Cylinders shall be retested as required by applicable Department of Transportation (DOT) Title 49 of the CFR, CGA C-1 and MIL-STD-1411A.

Contractor shall be required to retest any government/ contractor-owned cylinder when requested by DDEAMC, regardless of scheduled retest date.

5.23. Hydrostatic test equipment will be capable of performing the desired testing in a range of 25 to 75 percent of its designated maximum capability with an accuracy of 1 percent of any designated test pressure and resultant expansion valve.

5.24. All cylinder valves will be checked/inspected for serviceability by designated DDEAMC warehouse supply technicians and contractor representative (delivery/driver personnel/designee) prior to cylinder delivery acceptance and receipt IAW CGA V-1 “Standard for Compressed Gas Cylinder Valve Outlet and Inlet Connections”, MIL-DTL-2G and MIL-STD-1411A.

5.25. Each valve will be inspected for damaged hand wheels, bent or leaking stems and damaged or nicked outlet seats or threads. Further inspection shall be made for dirt, grease, or insect residue. Packing nuts shall be snug to control leakage and bonnet nuts shall be locked tight. Valve inlet threads should expose more than one thread between the cylinder neck and the wrenching boss of the valve. The valve shall be functional and shall control the gas flow at the valve seat when residual gas is checked.

5.26. Valve outlets shall be IAW MIL-DTL-2G and the applicable specification sheet as specified in the PID. Damaged or faulty valves shall be scheduled for maintenance or replaced by the contractor IAW MIL-DTL-2G..

5.27. Damaged government and contractor owned cylinder valves on all government and contractor owned cylinders will be replaced at the expense of the contractor if damaged during transport, delivery and/or prior to designated DDEAMC warehouse supply technician delivery receipt and acceptance.

5.28. Cylinder/valve protection caps shall be installed on all cylinders designed with neck rings or flanges. Valve hood protection caps for cylinders designed to receive such caps shall be the correct size and securely attached with full thread engagement to the cylinders in a manner to protect the valves from damage during transit, delivery, and storage. Refer to 49 CFR 173-301 (h) “General Requirements for Shipment of Compressed Gases in Cylinders and Spherical Pressure Vessels”, and MIL-STD-1411A.

5.29. Replacement valves shall be threaded IAW CGA V-1.

5.30. Cylinder/valve protection caps will be inspected for cracks, dents, and/or a mismatch in size. Caps with internal threads that are stripped or damaged, making hand mounting on the cylinder impractical and/or showing rust and corrosion shall be rejected. Hydrocarbon lubrication is not allowed on cap or flange threads; however, fire resistant fluorocarbon or silicon lubricants are permissible, if approved for use on medical gas cylinders.

5.31. The permanent marking requirements for compressed gas cylinders will be IAW DOT specification in part 178.255-14 of Title 49 CFR, and in the government procurement specifications. These markings must be maintained in a legible condition as required by Part 173 of Title 40 CFR. All cylinders shall be appropriately labeled, tagged, and/or marked IAW MIL-STD-1411A, and Title 49 CFR by contractor utilizing required lettering, stenciling, decals, metal lettering, and/or number stamping when required by applicable regulation. Contractor shall verify before delivery receipt and acceptance by DDEAMC that all required identifying medical gas labels; including lot number, labels, and/or tags are properly affixed or secured to the cylinders.

5.32. Cylinders shall be labeled or tagged and shipping documents annotated IAW requirements of contract delivery order to comply with MIL-STD-129, Military Marking for Shipment and Storage. Cylinders shall also have a label to tag attached with the statement “Dangerous-Compressed Gas Cylinder-Only Trained Personnel Should Handle”. Condition Codes A, D, F, H, J, K, or L as defined in Title 49 CFR will be assigned as applicable.

5.33. Cylinder and cylinder/valve protection cap paint shall conform to Federal Specification A-A-3165 “Lacquer, Gloss for Aircraft Use”. The use of color coding is mandatory for all departments and agencies of the Department of Defense, with regards to the purchase and use of compressed gas cylinders IAW MIL-STD-101B, “Color Code for Pipelines and Compressed Gas Cylinders”, and the specified PID. Medical gas cylinder colors shall be IAW CGA Pamphlet C-9, “Standard Color Markings for Compressed Gas Cylinders for Medical Use”.

5.34. Cylinder/valve protection caps shall be painted to comply with the color code requirements of the cylinder on which they are installed. Cylinders and cylinder valve protection caps shall be sandblasted and primed prior to painting if required by the applicable paint specification. Refer to MIL-STD-101B, MIL-STD- 1411A, DOD-P-15328D “Military Specification Primer (Wash), Pretreatment (Formula No. 117 for Metals) and Amendment 1 to DOD-P-15328D.

Sandblasting and painting of cylinders and cylinder/valve protection caps will be completed and shipped back to DDEAMC within 21 days of pick-up by contractor or upon the requested pick-up date from DDEAMC.

5.35. Contractor shall replace and repaint any cylinder showing signs of rust, scale, cracked paint, chipping, scratches, chalking, and/or peeling paint IAW MIL- STD-1411A, “Notice 1 “Inspection and Maintenance of Compressed Gas Cylinders”. Cylinders displaying a random pattern of chipping or peeling shall be stripped/ sandblasted and repainted. Cylinders displaying localized chipping for a specific use pattern may be spot painted to seal the denuded metal. When a cylinder requires coverage of more than 10 percent of its area, stripping/sandblasting and painting must be performed. Cylinder/valve protection caps shall be considered a part of the cylinder package and is to be repainted along with the cylinder when it is to be repainted. Bore, throat, and threads of the valve outlet shall be free of any paint splatter or paint over spray. Paint, if found on other parts of the valve, must not affect the valve operation.

5.36. Cylinders shall be free of oil, grease and all foreign matter. All excess threading compound shall be removed and the area wiped clean. Rust, scale, caked paint and all remnants of adhesive labels, decals and tags will be removed prior to painting as outlined in MIL-STD-1411A, Notice 1, “Inspection and Maintenance of Compressed Gas Cylinders”. Valves shall be free of insects, insect webs/residue, dirt, corrosion, oil or grease. Do not mistake thread compound as oil or grease or vice versa. Cleaning shall be performed IAW MIL-

STD-1411A.

5.37. Government Owned Cylinders. Any necessary cylinder services to be furnished at additional cost under the terms of this contract shall be performed by the contractor.

EXHIBIT 1

Gas Type Gas Mixture Percentage Cylinder Size Blood Gas Mix CO2 4%, 02 16%) Size E Blood Gas Mix AH 26% 02 Bal NZ Size E lung Diff 179 .3 CO, 0.3% METHANE, 02

21% Size 200 AV

Anerobic Mix 210 cf 10% CO2 10% Hyd Bal N2 CYL Gas Mix 0.5% CO2 20% O2 79.5%

N2

CYL

Blood Gas Mix known 2.054% C02, Bal N2 Size E Anerobic Mix 5% H2, 5% CO2, 90% N2 CYL Custom Gas Mixes To Be Determined CYL Blood Gas Mix 2% C02, 98% N2 Size E

Gas Type Cylinder Size

Liquid Medical Nitrogen NF AQ 240LT 240LT Med Carbon Dioxide PN MCDE AV A Size E Med Carbon Dioxide AW Size G Medical Helium UHP 6000 psig 512

001BA

CYL

Medical Nitrogen PN MNIG BC Size G Medical Nitrous Oxide PN MNOG BE Size G Medical Oxygen Alum PN MOAD BH X Size D Med Oxygen Aluminum PN MOAE BJ Size E

Medical Oxygen 251 CF PN MO200 BK CYL Med Oxygen Aluminum PN MOM BN Size M Gas MBAG Med Breathing Air CT Size G Gas MN020C Med Nitro Oxide CY Size 201b Gas MNOAE Medical Nitro Oxide CZ Size E Argon 6K UHP 6000 PSI DW CYL Al USP300 Air Medical USP 0lEA Size 300 Medical Oxygen Size M Size M Medical Helium Size G Argon FS 40 CF Size 35 LOX Dewar CYL HP O2 Size G Liquid Nitrogen 34 Liters every 2 months Liters Industrial Oxygen Size 80 lb Propane Size 88AL Argon FS AR150 CG Size 150 Med Nitrous Oxide CYL C02 Research Grade Sipho Tube 50 Size G N2 Nitrogen FS 80 CF N180 Size E

Cylinder Type High Pressure Cylinder Liquid Cylinder

File details come from the government source that posted it.