6/17/2019 Statement of Work Page 1

Purchase Description

Purpose The purpose of this procurement is to replace/install water fountains and fixtures in MARFOR EUR/AF Headquarters buildings with fixtures that operate as water fountains, as well as reusable water bottle fillers.

Scope This is a supply purchase with incidental installation services. This procurement includes the removal and proper disposal of 3 water fountains in Building 2901, to include the refrigerant that may exist in the water fountains. New water fountains will be installed in place of the units removed; the new fountains shall include a cabinet capable of filling a 10 inch (25cm) water bottle and an infrared or similar sensor that will control the flow of water.

In Building 2900, there are five (5) water fountains that are still well within their useful service life. These water fountains shall be retrofitted with cabinets that are capable of filling a 10 inch (25cm) water bottle and shall include an infrared or similar sensor that will control the flow of water. The water fountains shall be installed by a qualified and insured plumber. All necessary tools, parts and materials needed for the proper install of fixtures shall be the responsibility of the installing plumber. The water fountains and water bottle fillers are electrically powered and will require a qualified and insured electrician to assist with the installation of the water fountains and water bottle fillers.

The electrician shall be responsible for providing all necessary tools, parts and materials required for the electrical portion of the proper installation. The installation of the retrofit water bottle fillers specifically in Building 2900 will likely require the installation of an additional 220V CEE 7/5 Type F (Shuko Type) Earth Grounded, Ground Fault Circuit Interrupted(GFCI) outlet for each unit; five (5) total.

Location All work will be conducted on Panzer Kaserne, USAG Stuttgart, Böblingen 71032, Germany, and only in Buildings 2900 and 2901. Technicians and other personnel delivering parts and materials or performing installation activities must have unescorted access to the installation. Escorts while inside Buildings 2900 and 2901 will be provided by HQ MARFOR EUR/AF.

Salient Characteristics New water fountains and water bottle fillers will be constructed primarily out of stainless steel. Other visible parts of the units that are not stainless steel may be gray in color.

Replacement water fountains must be similar in size to those being replaced. Retrofit water cooler cabinets must be from the same manufacturer of the existing water fountains or be explicitly compatible with the existing water fountains. All fixtures will be 220V with the exception of one water fountain with bottle filling cabinet on the third floor of 2901. This water fountain and bottle filling cabinet will be 110V. Water fountains should be wall mounted, ADA compliant, self-contained, vandal resistant pressure water cooler that shall deliver a minimum of 8.0 GPH (30.3 LPH) of water at

Statement of Work

6/17/2019 Statement of Work Page 2

50°F (10°C) cooled from 80°F (26.7°C) inlet water and 90°F (32.2°C) ambient.

Unit shall be activated from an anti-microbial front or side pushbutton(s) using less than 5 pounds of force. Bubbler shall be low flow and have an anti-microbial flexible guard with an integrally designed non-squirt feature and operate on a water pressure range of 20 - 105 psig. The basin shall be constructed from 304 stainless steel and have an integral drain. The cabinet shall be stainless steel. Cooling system shall use R-134a (or EU equivalent) refrigerant and be capillary tube controlled. An adjustable thermostat with an off position shall control the refrigeration system. Unit shall be listed by Underwriters Laboratories for both the US and Canada, compliant to the Air Conditioning and Refrigeration Institute Standard 1010(or EU equivalent). Unit is certified to ANSI A117.1 and ANSI/NSF 61, Section 9 requirements and CHSC 1162875. Fixture must meet ADA and ADA Standing Person requirements when mounted appropriately. Bottle filler must meet all above specifications as well as be constructed primarily out of Stainless Steel and must be sensor operated(cannot be lever operated).

Testing All work must be inspected for completeness and correctness by the USAG Stuttgart Department of Public Works (DPW) prior to Government acceptance of project completion.

Other Any deviation from the above listed requirements or salient characteristics must be approved in writing by the MARFOR EUR/AF, G-4 Engineer Branch Head.