Questions_and_Answers_REVISED_W91WFU-16-T-0010_31_May_2016.pdf
PDF 80 KB Posted
- Attached to
- IT/AV Install and Build-out Bldg 3436
- Solicitation number
- W91WFU-16-T-0010
About this file
Q A REVISED 31 MAY 2016
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers W91WFU-16-T-0010: 27 May 2016
a) Q: Is the furniture going to be new? A: Yes.
b) Q: Within Rm 121, will there be a false wall? A: Yes, DPW will provide raceways/pathways within the false wall.
c) Q: What kind of ceiling will be installed in Rm 121? A: Partial gypsum board (around the perimeter); the middle will be tiles, providing access to the cabling trays. DPW design is still in progress.
d) Q: Will TR 120 have raised floor? A: No.
e) Q: Will TR 120 have false ceiling? A: No.
f) Q: Line 103 of the government provided LOM in the IDP identifies the Thinklogical TLX12 12x12 AV Fiber Matrix Switch. The manufacturer has identified this switch as still in development and it will not be available for some time. Please clarify the requirement for the AV Fiber Matrix Switch.
A: The release of the TLX12 equipment is indeed delayed. The following is the substitute for the TLX12 Part Number:
‐MFR: Thinklogical ‐Part #: MXR‐000048‐FM REV B ‐Description: Multi‐Media Router 48 Chassis with One Multi‐Mode Data Input/Output Card (MXM‐D00016) and One Power Supply ‐Qty: 1 ea
File details come from the government source that posted it. Updated .