DCFT162001_-_ARNG_SPRINGFIELD_DWG_SET.pdf

PDF 27 MB Posted

Attached to
Repair Supply Roof & HVAC, Building 15
Solicitation number
W91SMC-18-B-7001
Issued by

About this file

PROJECT No: DCFT162001 (Drawings) REPAIR SUPPLY ROOF & HVAC, P15

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE LOCATION MAP SITE LOCATION PLAN

SPRINGFIELD

ABRAHAM LINCOLN

CAPITAL AIRPORT

SPRINGFIELD, IL. 62707

G1 COVER SHEET

S1 STRUCTURAL ROOF PLAN

S2 STRUCTURAL DETAILS

S3 STRUCTURAL DETAILS AND SCHEDULES

AR1 PARTIAL KEY PLAN, ASBESTOS PLAN, NOTES, AND

LEGEND OF SYMBOLS

A1 FLOOR PLAN, GENERAL NOTES, KEY NOTES AND

FINISH SCHEDULE

A2 EXTERIOR ELEVATIONS - DEMOLITION, GENERAL

NOTES, AND KEY NOTES

A3 EXTERIOR ELEVATIONS - RENOVATION, GENERAL

NOTES, AND KEY NOTES

A4 REFLECTED CEILING PLAN - DEMOLITION, REFLECTED

CEILING PLAN - RENOVATION, GENERAL NOTES AND

LEGEND OF SYMBOLS

A5 ROOF PLAN - DEMOLITION, GENERAL NOTES AND

KEY NOTES

A6 ROOF PLAN - RENOVATION, GENERAL NOTES, KEY

NOTES, AND LEGEND OF SYMBOLS

A7 WALL SECTIONS AND DETAILS

A8 PARTIAL FLOOR PLAN, DOOR SCHEDULE, AND

DETAILS

H0 GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS

H1 SCHEDULES

H2 HEATING DEMOLITION PLAN

H3 HEATING DEMOLITION ROOF PLAN

H4 HEATING PLAN

H5 HEATING ROOF PLAN

H6 DETAILS

H7 PIPING SCHEMATICS

H8 PIPING SCHEMATICS

E0 GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS

E1 SCHEDULES

E2 ELECTRICAL DEMOLITION PLAN

E3 ELECTRICAL DEMOLITION ROOF PLAN

E4 ELECTRICAL ROOF PLAN

E5 WIRING SCHEMATICS

E6 WIRING SCHEMATICS

PROJECT LOCATION

BUILDING 15

REPAIR SUPPLY ROOF AND HVAC, BUILDING 15

183rd CIVIL ENGINEER SQUADRON

SPRINGFIELD, ILLINOIS

PROJECT NO. DCFT162001

MARK B. DILLON,

AIA ARCHITECT

G. WILLIAM WHITLOW

MECHANICAL &

ELECTRICAL ENGINEER

PROJECT LOCATION

SPRINGFIELD, ILLINOIS

INDEX OF DRAWINGS

McDonough-Whitlow, P.C.

Consulting Engineers & Land Surveyors

Taylor Springs, IL 62089

Phone: 217.532.9233

Fax: 217.532.6300

9025 Illinois Route 127

P.O. Box A

KEN McDONOUGH, STRUCTURAL ENGINEER

Street Address

Name of Unit Name of Facility 3rd Line if Needed

NOTE: SUBMIT DESIGN

TO CONTRACTING

OFFICER FOR APPROVAL

PRIOR TO FABRICATION

1. TEXT AND RULES SHALL APPEAR ON BOTH SIDES OF SIGN

2. ALL FASTENERS SHALL BE HARDENED ALUMINUM.

3. LETTERING SHALL BE PAINTED WHITE OR WHITE HIGH PERFORMANCE ADHESIVE VINYL. LOGOS

AND GRAPHICS SHALL BE DIGITAL OUTPUT ON HIGH PERFORMANCE ADHESIVE VINYL.

4. "Name of Unit" AND "Street Address" LETTERING SHALL BE "HELVETICA MEDIUM", ALL OTHER

LETTERING SHALL BE "HELVETICA REGULAR".

5. COORDINATE SIGN LOCATION WITH CONTRACTING OFFICER AND SUBMIT DESIGN FOR REVIEW

AND APPROVAL PRIOR TO FABRICATION.

PROJECT SIGN

SECTION SECTION

KEYED NOTES (SIGN ONLY) :

BREAK-AWAY OR YIELDING POST - 3"x 3"x 18" ALUMINUM OR STEEL TUBE.

2 14"x 1"x 18" ALUMINUM CHANNEL (TYP. AT EACH VERTICAL SIDE)

3" HIGH WHITE LETTERING

8" WIDE TAPE RULE

FINISH GRADE

4" HIGH WHITE LETTERING

8" ALUMINUM OR STEEL CAP BONDED TO POST

8" ALUMINUM SHEETING SIGNBOARD - PAINT STANDARD "AWARD BLUE" SEMI GLOSS

BAKED ENAMEL.

1 34"x 1"x 18" ALUMINUM CHANNEL (TYP. 4 SIDES)

#10x 12" dia. FLAT HEAD SOCKET THREAD CUTTING SCREW.

10" dia. CONCRETE PIER

APPLY BITUMINOUS COATING TO PORTION OF POST TO BE EMBEDDED IN CONCRETE G1

C O

V E

R S

H E

E T

3029 South Park Ave.

P.O. Box 1640

Herrin, IL 62948

IDPR 184-000255

618.988.2380 618.988.2381 eggemeyer-architects.com

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-M

A Y

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

S o u th

P ar k A v e.

P .O

B o x

H er ri n

IL

ID

P

R

-0

.9

.2

.9

.2 eg g em ey er -a rc h it ec ts .c o m

SHEET

IDENTIFICATION

SHEET OF

E J K

B H

B M

B D

-M

A Y

-2

PROJECT NO. 1626

D C

F T

-C

S -C

S -1

.0 .D

W G

SNE

TA

DILLON

CI

L

T S

T H I

ADE CR

001-017877

E T

C

NIE

MARK B.

FO LLI

O

SI

100% SUBMITTAL

11/MAY/2017

B-3

J:

\2

P ro je ct s\

A R

N G

S p ri n g fi e ld

\D W

G S \C

D \B

S u b m it ta l\

C o ve r

S h e e t.

d w g , 5

/1 /2

:3 :5

A

M , B

H B

KENNETH

C."McDONOUGH

081Î005950

DATE: 5/11/2017

EXP. DATE: 11/30/2017

DATE: 5/11/2017

EXP. DATE: 11/30/2018

B3 100% SUBMITTAL

46'-11"

46'-11"

MECHANICAL

OFFICE

OFFICE

SERVER

OFFICE

OFFICE

OFFICE

OFFICE

CUSTOMER

SERVICE

OFFICE

MANAGEMENT

AND SYSTEMS

OFFICE

CORRIDOR

BREAK

ROOM

JAN.

MENS

RESTROOM

WOMENS

RESTROOM

INDIVIDUAL

EQUIPMENT

SHOWER

AR1

1 PARTIAL FLOOR PLAN

3/32" = 1'-0"

MECHANICAL

OFFICE

OFFICE

SERVER

32'-13 4"±

'-0

P A

R T

IA

L K

E Y

P L A

N

A B

A T

E M

E N

T P

L A

N

D C

F T

-A

B -F

P A

B -1

.0 .D

W G

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-M

A Y

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

S o u th

P ar k A v e.

P .O

B o x

H er ri n

ID

P

R

-0

.9

.2

.9

.2 eg g em ey er -a rc h it ec ts .c o m

SHEET

IDENTIFICATION

SHEET OF

E J K

B H

B M

B D

-M

A Y

-2

AR1

N O

T E

S

A N

D L

E G

E N

D O

F S

Y M

B O

L S

1. THESE DRAWINGS HAVE BEEN PREPARED BASED ON EXISTING RECORD DOCUMENTS FURNISHED BY THE ILLINOIS AIR NATIONAL GUARD, ASBESTOS SAMPLING PERFORMED BY THE A/E, AND FIELD REVIEW OF THE BUILDING BY THE A/E.

THESE DRAWINGS ARE INTENDED TO REPRESENT THE EXISTING CONDITIONS. CONTRACTOR TO VERIFY EXACT

CONDITIONS, LOCATIONS, AND EXTENT OF ACM AND COORDINATE REMOVAL.

2. THE ABATEMENT CONTRACTOR SHALL VISIT THE SITE TO FAMILIARIZE AND VERIFY CONDITIONS AND DIMENSIONS

AND BE RESPONSIBLE FOR ALL INCIDENTAL WORK ASSOCIATED WITH THE ABATEMENT.

3. TRUCKS OR DUMPSTERS CONTAINING ABATED MATERIALS SHALL BE LOCKED.

4. THE ABATEMENT CONTRACTOR SHALL DISCONNECT POWER FROM AREAS TO BE ABATED AND OBTAIN POWER FROM A POWER SOURCE OUTSIDE THE CONTAINMENT AREA USING G.F.C.I.'S DURING ABATEMENT ACTIVITIES.

COORDINATE WITH ELECTRICAL CONTRACTOR

5. ALL WORK SHALL BE CONDUCTED TO COMPLY WITH OSHA, FEDERAL, STATE AND LOCAL REGULATIONS FOR

ASBESTOS DEMOLITION.

6. ASBESTOS CONTRACTOR SHALL COORDINATE DISCONNECTION OF GAS SERVICE TO UNIT HEATER PRIOR TO

ABATEMENT. COORDINATE WITH MECHANICAL CONTRACTOR.

7. COORDINATE WITH AIR NATIONAL GUARD, GENERAL CONTRACTOR, HEATING AND ELECTRICAL CONTRACTORS FOR

SCHEDULING OF WORK.

8. INSTALL CRITICAL BARRIERS AT ALL DOORS, DUCTWORK, SHAFTS, ETC. WITHIN THE CONTAINMENT AREA.

9. NEGATIVE AIR MACHINES SHALL BE LOCATED AS NECESSARY TO PROVIDE REQUIRED AIR PRESSURE DIFFERENCE. SEE

SPECIFICATIONS FOR NEGATIVE AIR REQUIREMENTS.

10. LOCATE 2 STAGE LOAD OUT & 3 STAGE DECON OUTSIDE ENTRANCE.

11. ALL ITEMS NOTED TO REMAIN SHALL BE PROTECTED AND CLEANED. COORDINATE WITH GENERAL CONTRACTOR.

12. ALL WORK SHOWN ON THIS DRAWING SHALL BE THE RESPONSIBILITY OF THE ABATEMENT CONTRACTOR UNLESS

OTHERWISE NOTED.

REMOVE PIPING, PIPE INSULATION, AND JOINT INSULATION AND DISPOSE OF AS ACBM. PERFORM WORK

UNDER FULL NEGATIVE PRESSURE AIR.

SEALANT MATERIAL AT PIPE CONNECTION TO EQUIPMENT TESTED POSITIVE FOR ASBESTOS. ABATE SEALANT

MATERIAL AND DISPOSE OF AS ACBM. PERFORM WORK UNDER FULL NEGATIVE PRESSURE AIR.

REMOVE BOILER EXHAUST AND DISPOSE OF AS ACBM.

EXISTING CEILING TO REMAIN

NEGATIVE AIR MACHINE (FRIABLE REMOVAL)

CRITICAL BARRIER

RIGID BARRIER

LOAD OUT UNIT

3 STAGE DECON UNIT

EXISTING PIPE WITH ASBESTOS CONTAINING INSULATION

JOINT COVER

AR1

2 ENLARGED ABATEMENT PLAN

1/4" = 1'-0"

PICTURE NO. 1

PICTURE NO. 2

PICTURE NO. 3

PICTURE NO. 4

100% SUBMITTAL

11/MAY/2017

B-3

J:

\2

P ro je ct s\

A R

N G

S p ri n g fi e ld

\D W

G S \C

D \B

S u b m it ta l\

A B

_A

B A

T E P la n

_D

FC

T -B

-F P

B ld g .d w g

, 5 /1

/2

:0 :5

A

M , B

H B

VAULT

46'-11"

46'-11" 209'-8"

MECHANICAL

OFFICE

OFFICE

SERVER

115OFFICE

OFFICE

OFFICE

OFFICE

CUSTOMER

SERVICE

OFFICE

MANAGEMENT

AND SYSTEMS

OFFICE

CORRIDOR

BREAK

ROOM

JAN.

MENS

RESTROOM

WOMENS

RESTROOM

INDIVIDUAL

EQUIPMENT

SHOWER

STORAGE

OFFICE

STORAGE

AR1

A8

42'-3"

1 2

1 2

1 4

1 2

17'-10"

17'-10"

18'-11"

18'-11"6'-4"

32'-13 4"9'-81

4"

6" dia. CONCRETE FILLED

SCHEDULE 80 STEEL BOLLARD -

PRIME AND PAINT

EXTEND BOLLARD BELOW

GRADE IN CONCRETE FILLED

POST HOLE

FINISH GRADE

1'-0"

DIA.

3'-0" SQUARE

VERIFY W/ EQUIPMENT

" 4

PATCH EXISTING

ASPHALT PAVING

4" THK. CONCRETE PAD

REINFORCED W/ 1.4x 1.4

W.W.F.

COMPACTED CRUSHED

STONE BASE

8"

F L O

O R

P L A

N

G E

N E

R A

L N

O T

E S

K

E Y

N O

T E

S

D C

F T

-A

B -F

P A

B -1

.0 .D

W G

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-M

A Y

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

S o u th

P ar k A v e.

P .O

B o x

H er ri n

ID

P

R

-0

.9

.2

.9

.2 eg g em ey er -a rc h it ec ts .c o m

SHEET

IDENTIFICATION

SHEET OF

E J K

B H

B M

B D

-M

A Y

-2

GENERAL NOTES KEY NOTES ' '

1. CONTRACTOR SHALL VISIT THE JOB SITE TO FAMILIARIZE

THEMSELVES WITH THE SCOPE OF THE PROJECT AND TO

VERIFY EXISTING CONDITIONS. CONTRACTOR SHALL MAKE

MINOR ADJUSTMENTS AS NECESSARY TO COMPLETE THE

WORK AS DESCRIBED.

2. CONTRACTOR SHALL PROTECT EXISTING

SURFACES/EQUIPMENT FROM DUST, DIRT, ETC. DURING ALL

CONSTRUCTION ACTIVITIES. AFTER ALL WORK IS COMPLETED,

CONTRACTOR SHALL CLEAN ALL AREAS AFFECTED SO THAT

THEY ARE FREE OF ANY AND ALL CONSTRUCTION DEBRIS AND

DIRT.

3. EXISTING FLOORING TO REMAIN, TAKE PRECAUTIONS TO

PROTECT DURING CONSTRUCTION ACTIVITIES, SEE

SPECIFICATIONS FOR ADDITIONAL INFORMATION REGARDING

PROTECTING EXISTING SURFACES.

4. EXISTING FINISHES TO REMAIN, EXCEPT AS NOTED. TAKE CARE

NOT TO DAMAGE.

5. GENERAL CONTRACTOR SHALL COORDINATE ALL WORK WITH

ABATEMENT, MECHANICAL AND ELECTRICAL CONTRACTORS.

6. REPAINT ALL WALLS DISTURBED BY CONSTRUCTION. PAINT

FROM CORNER TO CORNER, FLOOR TO CEILING

7. EXTERIOR

a. INSTALL NEW METAL FASCIA AND MANSARD SIDING. RE-USE

EXISTING FRAMING, SEE DETAILS, SHEET A7.

b. EXISTING HOLLOW METAL DOORS, ALUMINUM WINDOWS AND

STOREFRONT SHALL REMAIN.

c. THE LANDSCAPING AROUND THE BUILDING SHALL BE CLEANED

OF ALL CONSTRUCTION DEBRIS.

8. PROTECT EXISTING FLOORS DURING CONSTRUCTION

ACTIVITIES. CONTRACTOR SHALL REPAIR EXISTING FINISHES TO

MATCH EXISTING FOR ANY DAMAGE THAT OCCURS.

9. TEMPORARILY DISCONNECT ALL BRACING, CLAMPS, PIPE

SUPPORT HANGERS, ELECTRICAL COMPONENTS, ETC AT BTM

OF EXISTING ROOF PURLINS IN STORAGE 118, FOR

INSTALLATION OF NEW SIMPLE SAVER ROOF INSULATION

SYSTEM (R-30). RE-INSTALL COMPONENTS ONCE INSTALLATION

IS COMPLETE. TAPE ALL PENETRATIONS AT MEMBRANE WITH

MATERIAL SUPPLIED BY MANUFACTURER. RELOCATE

BRACING/CLAMPS TO BOTTOM OF PURLIN WHERE POSSIBLE.

COORDINATE WITH ELECTRICAL AND PLUMBING CONTRACTORS

FOR RELOCATION OF RECEPTACLES MOUNTED TO THE ACE OF

PURLINS AT THE GAS HEATERS AND OVERHEAD DOOR

OPERATORS, AND MODIFICATION OF THE GAS PIPE

CONNECTION TO THE RADIANT HEATERS

REPAIR/ INFILL EXISTING CMU AFTER FIN TUBE CABINET REMOVAL. PRIME AND

PAINT WALL, CORNER TO CORNER, FLOOR TO CEILING.

PATCH EXISTING GYPSUM BOARD AT FLOOR DUE TO REMOVAL OF BASEBOARD

HEAT. PAINT ENTIRE WALL, CORNER-TO-CORNER, FLOOR TO CEILING.

REMOVE VINYL BASE WHERE OCCURS AND INSTALL NEW VINYL BASE FOR

LENGTH OF WALL.

REMOVE / REPLACE EXISTING 24"x 24" CEILING GRID AND LAY-IN PANELS IN

ENTIRE SPACE. SEE REFLECTED CEILING PLAN, SHEET A4.

WALL HEATER AND ASSOCIATED PIPING TO BE REMOVED BY MECHANICAL

CONTRACTOR.

REMOVE EXISTING 24"x 48" CEILING GRID AND LAY-IN PANELS. INSTALL NEW 24"x

24" CEILING GRID AND LAY-IN PANELS. SEE REFLECTED CEILING PLAN, SHEET A4

CONSTRUCT METAL STUD PARTITION AND BULKHEAD FOR NEW DOOR. SEE

ENLARGED FLOOR PLAN AND DETAILS, SHEET A8.

MECHANICAL EQUIPMENT, SEE H SHEETS FOR ADDITIONAL INFORMATION.

EXISTING ELECTRICAL TRANSFORMER TO REMAIN. TAKE CARE NOT TO DAMAGE.

REMOVE AND DISPOSE OF EXISTING FREE STANDING CANOPY.

SEAL ALL PARTITION PENETRATIONS WITH FIRE-STOPPING SEALANT FOR AN

AIR-TIGHT CONDITION. SEE SPECIFICATION SECTION 07 84 00 AND H SHEETS FOR

LOCATIONS AND ADDITIONAL INFORMATION.

NOT USED

INFILL 24"x 36" OPENING OF EXISTING PORTABLE BUILDING WALL AFTER REMOVAL

OF THROUGH WALL A/C UNIT. PATCH USING 1x WOOD FRAMING, BATT

INSULATION, AND FINISHED PLYWOOD ON BOTH SIDES. TRIM AND PAINT SEE

DETAIL 1, SHEET A1

PAINT EXISTING HOLLOW METAL DOOR AND FRAME.

BOLLARDS FURNISHED AND INSTALLED BY GENERAL CONTRACTOR. SEE SHEET

DETAIL 2, SHEET A1.

SAW-CUT AND REMOVE EXISTING PAVING AND PROVIDE NEW CONCRETE

EQUIPMENT PAD - SEE DETAIL 3, SHEET A1.

EXISTING WALL IS A 2 HR. RATED ASSEMBLY. PROVIDE FIRE-STOPPING SEALANT

AT ALL NEW PENETRATIONS.

INFILL OPENING IN 6" CMU WALL WITH 6" CMU, FROM REMOVAL OF EXISTING

DUCTWORK - SEE H-SHEETS. INFILL WITH 2 12" METAL STUDS AND 2 LAYERS OF 5 8"

THK. TYPE 'X' GYPSUM BOARD EACH SIDE, FOR 1-HOUR CONSTRUCTION. A1

A N

D F

IN

IS

H S

C H

E D

U L E

GRAPHIC SCALES

SCALE: 3/32" = 1'-0"

SCALE: 3/4" = 1'-0"

SCALE: 1 1/2" = 1'-0"

100% SUBMITTAL

11/MAY/2017

B-3

J:

\2

P ro je ct s\

A R

N G

S p ri n g fi e ld

\D W

G S \C

D \B

S u b m it ta l\

A _F lo o rP la n _D

FC

T -B

-F P

B ld g .d w g

, 5 /1

/2

:3 :0

A

M , B

A2

1 EXISTING SOUTH ELEVATION

SCALE: 1/8" = 1'-0"

8' -0

3 8

1 2

A2

2 EXISTING NORTH ELEVATION

SCALE: 1/8" = 1'-0"

1 2

1 2

A2

3 EXISTING EAST ELEVATION

SCALE: 1/8" = 1'-0"

8' -0

1 2

A2

4 EXISTING WEST ELEVATION

SCALE: 1/8" = 1'-0"

8' -0

1 2

3 4

E

X T

E R

IO

R

E L E

V A

T

IO

N S

D C

F T

A

A

-2

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-M

A Y

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

S o u th

P ar k A v e.

P .O

B o x

H er ri n

ID

P

R

-0

.9

.2

.9

.2 eg g em ey er -a rc h it ec ts .c o m

SHEET

IDENTIFICATION

SHEET OF

E J K

B H

B M

B D

-M

A Y

-2

KEY NOTES ' '

REMOVE AND DISPOSE OF EXISTING ROOFING AND TRIM. PHASE WORK TO COINCIDE

WITH NEW ROOF INSTALLATION SO THAT NO AREAS ARE UN-PROTECTED OVERNIGHT

OR DURING INCLEMENT WEATHER.

REMOVE EXISTING INSULATED METAL WALL PANELS FOR NEW ROOF FRAMING

INSTALLATION. MODIFY PANELS AS NECESSARY FOR RE-INSTALLATION. PHASE WORK

TO COINCIDE WITH NEW ROOF INSTALLATION SO THAT NO AREAS ARE

UN-PROTECTED OVERNIGHT OR DURING INCLEMENT WEATHER.

REMOVE AND DISPOSE OF EXISTING FASCIA PANELS, TRIM, AND SOFFIT AT MANSARD.

EXISTING FRAMING TO REMAIN. SALVAGE CLOSURE STRIPS AT EXISTING

SIDING/SOFFIT JUNCTURE AND STORE FOR RE-INSTALLATION.

REMOVE AND DISPOSE OF FREESTANDING CANOPY.

REMOVE EXISTING SPEAKER - STORE FOR RE-INSTALLATION.

EXISTING CAMERA TO REMAIN.

REMOVE EXISTING SHEET METAL EXHAUST COVER AND DUCTWORK.

EXISTING AREA LIGHT TO REMAIN - TAKE CARE NOT TO DAMAGE.

REMOVE EXISTING ROOF EDGE, GUTTER, DOWNSPOUTS AND SHEET METAL

FLASHING.

REMOVE EXISTING ROOF VENTILATOR AND CURB

EXISTING GAS LINE TO BE REMOVED. SEE H SHEETS FOR ADDITIONAL INFORMATION.

EXISTING ELECTRICAL CONDUIT TO REMAIN

EXISTING EXHAUST FAN TO BE REMOVED AND DISPOSED OF, SEE H SHEETS FOR

ADDITIONAL INFORMATION.

EXISTING METAL WALL PANELS, WINDOWS, AND DOORS TO REMAIN. TAKE CARE NOT

TO DAMAGE.

REMOVE EXISTING LIGHT FIXTURE AND STORE FOR RE-INSTALLATION.

REMOVE EXISTING SENSOR - SEE ELECTRICAL PLANS FOR ADDITIONAL INFORMATION.

REMOVE EXISTING ANTENNA AND STORE FOR RE-INSTALLATION.

A2

GRAPHIC SCALES

SCALE: 1/8" = 1'-0"

100% SUBMITTAL

11/MAY/2017

B-3

J:

\2

P ro je ct s\

A R

N G

S p ri n g fi e ld

\D W

G S \C

D \B

S u b m it ta l\

A _D

E M

O E le va ti o n s_

D

FC

T -B

-F P

B ld g .d w g

/1

/2

:3 :1

A

M , B

A3

1 SOUTH ELEVATION - RENOVATION

SCALE: 1/8" = 1'-0"

3 8

3 8

A3

2 NORTH ELEVATION - RENOVATION

SCALE: 1/8" = 1'-0"

3 8

3 8

A3

3 EAST ELEVATION - RENOVATION

SCALE: 1/8" = 1'-0"

3 8

A3

4 WEST ELEVATION - RENOVATION

SCALE: 1/8" = 1'-0"

3 8

3 4

E

X T

E R

IO

R

E L E

V A

T

IO

N S

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-M

A Y

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

S o u th

P ar k A v e.

P .O

B o x

H er ri n

ID

P

R

-0

.9

.2

.9

.2 eg g em ey er -a rc h it ec ts .c o m

SHEET

IDENTIFICATION

SHEET OF

E J K

B H

B M

B D

-M

A Y

-2

GENERAL NOTES

KEY NOTES ' '

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND MAKE MINOR

ADJUSTMENTS AS NECESSARY TO WORK WITH EXISTING CONDITIONS. NOTIFY C.O.R. OF

ANY DISCREPANCIES WHICH MAY AFFECT THE OUTCOME OF THE WORK.

2. REPAIR ALL LAWN AREAS DISTURBED BY WORK PERFORMED UNDER THIS CONTRACT.

3. CONTRACTOR SHALL PROTECT EXISTING WINDOWS, DOORS, EQUIPMENT, ETC. FROM

DAMAGE.

NEW METAL ROOF SYSTEM OVER NEW METAL FRAMING. SEE STRUCTURAL FOR NEW

FRAMING SYSTEM. ROOF PANELS, TRIM, GUTTERS AND DOWNSPOUT COLOR TO BE

"AWARD BLUE".

INSTALL THERMAL BLOCKS AND NEW METAL ROOF SYSTEM TO EXISTING PURLINS.

PHASE WORK TO COINCIDE WITH REMOVAL OF EXISTING ROOFING SO THAT NO

AREAS ARE UN-PROTECTED OVERNIGHT OR DURING INCLEMENT WEATHER. ROOF

PANELS, TRIM, GUTTERS AND DOWNSPOUT COLOR TO BE "AWARD BLUE".

RE-FRAME AND INSTALL NEW METAL FASCIA AND SOFFIT PANELS. SEE DETAILS 1 AND

2, SHEET A7. FASCIA AND SOFFIT PANELS, TRIM, GUTTERS AND DOWNSPOUT COLOR

TO BE "AWARD BLUE".

NEW 6" GUTTER AND DOWNSPOUTS TO GRADE. COLOR TO MATCH ROOF AND WALL

PANELS. SECURE TO STEEL COLUMN - SEE KEY NOTE 5.

EXISTING STEEL COLUMN LOCATED BEHIND DOWNSPOUT. WIRE BRUSH, CLEAN,

PRIME, AND (2) FINISH COATS PAINT (COLOR TO BE "AWARD BLUE").

MODIFY EXISTING INSULATED METAL SIDING PANELS AS NECESSARY FOR NEW ROOF

INSTALLATION. INSTALL NEW ROOF/WALL FLASHING AND TRIM AS NECESSARY FOR A

COMPLETE WATERTIGHT SYSTEM. DETAIL 3, SHEET A7.

EXISTING CAMERA TO REMAIN. TAKE CARE NOT TO DAMAGE.

EXISTING AREA LIGHT TO REMAIN. TAKE CARE NOT TO DAMAGE.

RE-INSTALL EXISTING AREA LIGHT ON NEW WALL PANELS. SEE ELECTRICAL PLANS

RELOCATE EXISTING GAS LINE TO NEW LOCATION - (PAINT). SEE H SHEETS FOR

ADDITIONAL INFORMATION.

RE-INSTALL EXISTING ANTENNA. MODIFY EXISTING BRACKETS TO ATTACH TO NEW

CONSTRUCTION.

PREP, PRIME, AND PAINT EXISTING HOLLOW METAL DOORS AND FRAMES

A3

A7

A7

A7

A7

A7

A7

A7

A7

GRAPHIC SCALES

SCALE: 1/8" = 1'-0"

A7

A7

A7

A7 D C

F T

-A

B -E

L A

-3 .0

.D

W G

100% SUBMITTAL

11/MAY/2017

B-3

J:

\2

P ro je ct s\

A R

N G

S p ri n g fi e ld

\D W

G S \C

D \B

S u b m it ta l\

A _E le va ti o n s_

D

FC

T -B

-F P

B ld g .d w g

, 5 /1

/2

:4 :3

A

M , B

A4

2 REFLECTED CEILING PLAN - RENOVATION

SCALE: 1/8" = 1'-0"

MECHANICAL

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CUSTOMER

SERVICE

OFFICE

MANAGEMENT

AND SYSTEMS

OFFICE

CORRIDOR

BREAK

ROOM

JAN.

INDIVIDUAL

EQUIPMENT

SHOWER

MENS

RESTROOM

WOMENS

RESTROOM

SERVER

8'-0"

8'-0"

"4'-0"

A4

1 REFLECTED CEILING PLAN - DEMOLITION

SCALE: 1/8" = 1'-0"

MECHANICAL

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CUSTOMER

SERVICE

OFFICE

MANAGEMENT

AND SYSTEMS

OFFICE

CORRIDOR

BREAK

ROOM

JAN.

INDIVIDUAL

EQUIPMENT

SHOWER

MENS

RESTROOM

WOMENS

RESTROOM

SERVER

R

E F

L E

C T

E D

C E

IL

IN

G P

L A

N

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-M

A Y

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

S o u th

P ar k A v e.

P .O

B o x

H er ri n

ID

P

R

-0

.9

.2

.9

.2 eg g em ey er -a rc h it ec ts .c o m

SHEET

IDENTIFICATION

SHEET OF

E J K

B H

B M

B D

-M

A Y

-2

GENERAL NOTES

LEGEND OF SYMBOLS

1. CONTRACTOR SHALL VISIT THE JOB SITE TO FAMILIARIZE THEMSELVES WITH

THE SCOPE OF THE PROJECT AND TO VERIFY EXISTING CONDITIONS.

CONTRACTOR SHALL MAKE MINOR ADJUSTMENTS AS NECESSARY TO

COMPLETE THE WORK AS DESCRIBED.

2. CONTRACTOR SHALL REMOVE AND REPLACE ALL EXISTING CEILING TILE AND

GRID AS SHOWN ON PLANS. INSTALL AT EXISTING CEILING HEIGHT (8'-0"±)

TYPICAL.

3. TEMPORARILY REMOVE EXISTING SPEAKERS, SMOKE DETECTORS, AND ALL

CEILING MOUNTED FIXTURES AS NECESSARY FOR NEW CEILING TILE AND GRID.

ALL EQUIPMENT TO BE REINSTALLED AT EXISTING LOCATIONS - TYPICAL.

GENERAL CONTRACTOR SHALL COORDINATE WITH ELECTRICAL AND

MECHANICAL CONTRACTORS TO ENSURE THAT LIGHT FIXTURES AND HVAC

RETURN/SUPPLY GRILLES ARE CENTERED AND ALIGNED AS SHOWN ON THE

REFLECTED CEILING PLAN.

4. SEE FLOOR PLAN FOR ROOM DIMENSIONS

EXISTING 2x4 RECESSED LIGHT FIXTURE

EXISTING 1x4 RECESSED LIGHT FIXTURE

EXISTING RETURN GRILLE TO BE REMOVED, SEE H SHEETS FOR

ADDITIONAL INFORMATION

EXISTING SUPPLY DIFFUSER TO BE REMOVED, SEE H SHEETS FOR

ADDITIONAL INFORMATION

EXISTING SPEAKER TO REMAIN, INSTALL IN NEW CEILING TILE.

EXISTING SMOKE DETECTOR OR HEAT DETECTOR TO REMAIN. INSTALL IN

NEW CEILING TILE

EXHAUST FAN GRILLE - SEE H SHEETS FOR ADDITIONAL INFORMATION

NEW FAN COIL UNIT - COORDINATE WITH H SHEETS.

AREA OF EXISTING GYP. BOARD CEILING TO BE PATCHED. (2) LAYERS OF

8" THK. TYPE X GYP. BOARD. SECURE TO EXISTING FRAMING. (PAINT)

A4

RENOVATION KEY NOTES ' '

METAL STUD AND GYPSUM BOARD BULKHEAD ABOVE DOOR - SEE DETAIL,

SHEET A8.

REPAIR / PATCH GYPSUM BOARD CEILING (TWO LAYERS EAST) AS

NECESSARY AFTER ABATEMENT / DEMOLITION OF EXISTING EQUIPMENT.

REPAIR CEILING WITH (2) LAYERS - 5 8" THICK TYPE X GYP. BOARD. TAPE AND

FINISH EDGES AND BLEND INTO EXISTING CEILING. PRIME PAINT AND APPLY

2 COATS OF FINISH PAINT TO ENTIRE CEILING (CORNER TO CORNER).

GRAPHIC SCALES

SCALE: 1/8" = 1'-0"

D C

F T

-A

B -R

C P

A -4

.0 .D

W G

100% SUBMITTAL

11/MAY/2017

B-3

J:

\2

P ro je ct s\

A R

N G

S p ri n g fi e ld

\D W

G S \C

D \B

S u b m it ta l\

A _R

C P

_D

FC

T -B

-F P

B ld g .d w g

, 5 /1

/2

:4 :1

A

M , B

G G

G G

G G

G G

A5

1 ROOF PLAN - DEMOLITION

SCALE: 1/8" = 1'-0"

1'-0" 1'-0"45'-0"

47'-0"

210'-0"2'-6" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0"

3'-0"

2'-4"

2'-6" 1'-0"

4'-3" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0"

1'-6"

TYP

T Y

P

A7

A7

A7

A7

T Y

P

1'-6"

TYP

T Y

P

3'-6"

4'-0" 2'-3"

1'-6"

TYP

T Y

P

T Y

P

1'-6"

TYP

T Y

P

1'-0"

A7

A7

R

O O

F P

L A

N

D E

M O

L

IT

IO

N

A N

D D

E T

A

IL

S

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-M

A Y

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

S o u th

P ar k A v e.

P .O

B o x

H er ri n

ID

P

R

-0

.9

.2

.9

.2 eg g em ey er -a rc h it ec ts .c o m

SHEET

IDENTIFICATION

SHEET OF

E J K

B H

B M

B D

-M

A Y

-2

GENERAL NOTES KEY NOTES ' '

1. CONTRACTOR SHALL VISIT THE JOB SITE TO FAMILIARIZE THEMSELVES WITH THE SCOPE

OF THE PROJECT AND TO VERIFY EXISTING CONDITIONS. CONTRACTOR SHALL MAKE

MINOR ADJUSTMENTS AS NECESSARY TO COMPLETE THE WORK AS DESCRIBED.

2. CONTRACTOR SHALL ONLY REMOVE THE AREA OF ROOFING WHICH CAN BE REPLACED IN

A SINGLE WORKING DAY. MAKE TEMPORARY FLASHING WITH EXISTING ROOFING AS

NECESSARY TO PROVIDE WATERTIGHT CONSTRUCTION AT THE END OF EACH DAY.

3. ALL ROOF PITCHES SHOWN ARE STRUCTURAL SLOPE UNLESS NOTED OTHERWISE.

4. EXISTING OFFICE BUILDING ROOF CONSISTS OF 2-3 LAYERS OF RIGID INSULATION,

COVER BOARD, BUILT-UP ROOF SYSTEM AND BALLAST. THICKNESS VARIES.

5. EXISTING STORAGE BUILDING ROOF SYSTEM CONSISTS OF EXPOSED FASTENER METAL

PANELS AND BLANKET INSULATION SYSTEM.

6. SEE DETAIL 7/A7 FOR PATCHING OF BUILT-UP ROOF.

A5

EXISTING PLUMBING VENT STACK TO BE EXTENDED THROUGH NEW

ROOF, TAKE CARE NOT TO DAMAGE DURING DEMOLITION ACTIVITIES.

REMOVE AND DISPOSE OF EXISTING EXHAUST VENT.

EXISTING GAS LINE TO BE REMOVED, COORDINATE WITH MECHANICAL

CONTRACTOR.

DISCONNECT AND REMOVE EXISTING ROOFTOP VENTILATION UNITS.

COORDINATE ELECTRICAL DISCONNECTION WITH ELECTRICAL

CONTRACTOR.

REMOVE EXISTING ROOFING, TRIM, AND INSULATION. PHASE WORK TO

COINCIDE WITH NEW ROOF INSTALLATION SO THAT NO AREAS ARE

UN-PROTECTED OVERNIGHT OR DURING INCLEMENT WEATHER.

REMOVE EXISTING GUTTERS AND DOWNSPOUTS. SEE ELEVATIONS

REMOVE EXISTING PEA GRAVEL BALLAST JUST PRIOR TO INSTALLATION

OF NEW STANDING SEAM ROOF PANELS.

REMOVE EXISTING ROOFING SYSTEM DOWN TO METAL DECK AS

NECESSARY FOR METAL FRAMING INSTALLATION. SEE STRUCTURAL

SHEETS AND RENOVATION ROOF PLAN. REMOVE ONLY THAT WHICH IS

NECESSARY FOR NEW WORK TO BE INSTALLED DURING EACH WORK DAY.

SEE DETAIL 7, SHEET A7 FOR PATCHING.

COORDINATE WITH MECHANICAL CONTRACTOR FOR REMOVAL AND

STORAGE OF EXISTING EXHAUST FAN. COORDINATE WITH ELECTRICAL

CONTRACTOR FOR ELECTRICAL DISCONNECT.

REMOVE METAL ROOF EDGE AND SHEET METAL PANNING

GRAPHIC SCALES

SCALE: 3/32" = 1'-0"

D C

F T

-A

B -R

D A

.0

.D

W G

100% SUBMITTAL

11/MAY/2017

B-3

J:

\2

P ro je ct s\

A R

N G

S p ri n g fi e ld

\D W

G S \C

D \B

S u b m it ta l\

A _R o o fD E M

O P la n

_D

FC

T -B

-F P

B ld g .d w g

, 5 /1

/2

:5 :3

A

M , B

3 8

1 4

1 4

1'-111 4" 1'-111

4"45'-0"

48'-101 2"

A6

1 ROOF PLAN - RENOVATION

SCALE: 1/16" = 1'-0"

209'-01 2"

A7

A7

A7

A7

A7

A7

1 4

1 4

A6

A6

A6

A6

A7

CLIP BY METAL

ROOFING

MANUFACTURER

ROOF

INSULATION

R-30

CLIP BY METAL ROOF MANUFACTURER

GUTTER

EXISTING EAVE STRUT

DOWNSPOUT

EXISTING INSULATED METAL PANEL

STANDING SEAM

METAL ROOF

LAP SCREWS

EXISTING PURLIN

STANDING SEAM

METAL ROOF

RIDGE CAP

GABLE TRIM

EXISTING INSULATED

METAL WALL PANEL

EXISTING WALL

INSULATION

NEW STANDING SEAM

METAL ROOFING

EXISTING EAVE

STRUT

EXISTING

PURLIN

EXISTING STEEL MAINFRAME

METAL ROOFING

SYSTEM.

CON'T.

SEALANT.

CON'T. SEALANT.

PIPE BOOT.

SHORT SCREW

OR POP RIVET

VENT PIPE

FLASHING CAP

CURB COUNTER FLASHING FASTENED

TO FIXED UNIT AND FLASHED OVER

VERTICAL LEG OF CURB FLASHING.

CURB SIDE FLASHING IS SUPPLIED

WIDE. FIELD CUT AND BEND

A 2" VERTICAL LEG TO SUIT

ADJACENT PANEL RIB.

M

IN

SIMPLE SAVER ROOF

LINER SYSTEM AND

DOUBLE LAYER

INSULATION SYSTEM R-30

SIMPLE SAVER ROOF

LINER SYSTEM AND

ROOF INSULATION R-30

THERMAL SPACER

BLOCK (TYPICAL)

THERMAL SPACER

BLOCK (TYPICAL)

THERMAL SPACER BLOCK

STAINLESS STEEL CLAMP

WITH TAPE SEALANT

R

O O

F P

L A

N

R E

N O

V A

T

IO

N A

N D

D E

T A

IL

S

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-M

A Y

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

S o u th

P ar k A v e.

P .O

B o x

H er ri n

ID

P

R

-0

.9

.2

.9

.2 eg g em ey er -a rc h it ec ts .c o m

SHEET

IDENTIFICATION

SHEET OF

E J K

B H

B M

B D

-M

A Y

-2

KEY NOTES ' '

LEGEND OF SYMBOLS

EXISTING PLUMBING VENT STACK LOCATION - EXTEND THROUGH NEW

ROOF. SEE SHEET H5

EXHAUST FAN TO BE EXTENDED THROUGH NEW ROOF, SEE SHEET H5.

ATTIC VENTS

DOWNSPOUT

NEW PRE-FINISHED STANDING SEAM METAL ROOFING OVER

LIGHT-GAUGE METAL FRAMING.

NEW PRE-FINISHED STANDING SEAM METAL ROOFING OVER THERMAL

BLOCKS, OVER EXISTING METAL BUILDING FRAMING.

PLUMBING VENT, SEE SHEET H3 AND H5 FOR ADDITIONAL INFORMATION

- PROVIDE AND INSTALL NEW BOOT FLASHING AT METAL ROOF PANELS

SEE DETAIL 5, SHEET A6, BELOW.

NEW ROOF/WALL FLASHING - SEE DETAIL 3, SHEET A7

PROVIDE AND INSTALL NEW GUTTERS AND DOWNSPOUTS. SEE

DETAILS, SHEET A7

NEW RIDGE CAP - SEE DETAIL 1/A6.

NEW BAR TYPE SNOW GUARD - SEE SPECIFICATIONS 07 41 010

NEW HIP CAP - SEE DETAIL 1/A6 FOR SIMILAR CONDITION.

VENTED SOFFIT BELOW, TYPICAL

EXHAUST FAN AND ROOF CURB, SEE DETAIL 4, THIS SHEET AND H AND

E SHEETS FOR ADDITIONAL INFORMATION

INSTALL ATTIC VENTS AT METAL ROOF PANELS.

PARAPET RAKE TRIM AT ROOF/WALL JUNCTURE

A6

GRAPHIC SCALES

SCALE: 1/16" = 1'-0"

SCALE: 1 1/2" = 1'-0"

D C

F T

-A

B -R

P A

-6 .0

.D

W G

REMOVE CLAMPS AT THE

BTM. OF PURLINS FOR

SIMPLE SAVER INSULATION

SYSTEM INSTALLATION AND

RE-INSTALL CLAMPS ONCE

SIMPLE SAVER HAS BEEN

INSTALLED - TYPICAL

TEMPORARILY REMOVE BRACING AT

THE SIDES OF PURLINS FOR SIMPLE

SAVER INSULATION SYSTEM

INSTALLATION AND RE-INSTALL AT

BOTTOM OF PURLIN ONCE SIMPLE

SAVER HAS BEEN INSTALLED - TYPICAL

PICTURE NO. 1

PICTURE NO. 2

TEMPORARILY REMOVE OVERHEAD

DOOR HARDWARE / OPENER BRACING

AT THE SIDES OF PURLINS FOR SIMPLE

SAVER INSULATION SYSTEM

INSTALLATION AND RE-INSTALL ONCE

SIMPLE SAVER HAS BEEN INSTALLED

AND TAPE ALL PENETRATIONS - TYPICAL

REFER TO SHEET A1 FOR LOCATION OF PICTURE

REFER TO SHEET A1 FOR LOCATION OF PICTURE

MODIFY GAS LINES AS NECESSARY FOR

INSTALLATION OF SIMPLE SAVER

INSULATION SYSTEM - TYPICAL

REFER TO SHEET A1 FOR LOCATION OF PICTURE

PICTURE NO. 3

REFER TO SHEET A1 FOR LOCATION OF PICTURE

PICTURE NO. 4

RELOCATE OUTLETS TO BOTTOM OF

PURLINS - TYPICAL

REMOVE CLAMPS AT THE BTM. OF

PURLINS FOR SIMPLE SAVER

INSULATION SYSTEM INSTALLATION

AND RE-INSTALL CLAMPS ONCE SIMPLE

SAVER HAS BEEN INSTALLED - TYPICAL

TEMPORARILY REMOVE

BRACING AT THE SIDES OF

PURLINS FOR SIMPLE SAVER

INSULATION SYSTEM

INSTALLATION AND RE-INSTALL

AT BOTTOM OF PURLIN ONCE

SIMPLE SAVER HAS BEEN

INSTALLED - TYPICAL

100% SUBMITTAL

11/MAY/2017

B-3

J:

\2

P ro je ct s\

A R

N G

S p ri n g fi e ld

\D W

G S \C

D \B

S u b m it ta l\

A _R o o fP la n _D

FC

T -B

-F P

B ld g .d w g

, 5 /1

/2

:5 :0

A

M , B

2'-0"

8' -0

TO

F

IN

IS

H F

LO

O

R

4'-0"

1'-0"

4'-0" 1"

1'-0"

A7

1 PARTIAL WALL DETAIL

SCALE: 1" = 1'-0"

8' -0

TO

F

IN

IS

H F

LO

O

R

4"

1'-0"

A7

2 PARTIAL WALL DETAIL

SCALE: 1" = 1'-0"

8' -0

TO

F

IN

IS

H F

LO

O

R

A7

4 PARTIAL WALL DETAIL

SCALE: 1" = 1'-0"

A7

3 PARTIAL WALL DETAIL

SCALE: 1" = 1'-0"

5'-0" 1"

1'-0"

8' -0

(T

O F

IN

IS

H F

L O

O R

A7

5 PARTIAL WALL DETAIL

SCALE: 1" = 1'-0"

V A

R

IE

S

4"

1'-0"

1'-0"

1'-0"

4'-0"

4'-0"

A6

A6

A7

6 PARTIAL WALL DETAIL

SCALE: 1" = 1'-0"

2'-0"

8' -0

TO

F

IN

IS

H F

LO

O

R

V A

R

IE

S

8' -0

TO

F

IN

IS

H F

LO

O

R

4"

1'-3 12"

SIZE VARIES

SEE SHEET A5

W

A L L S

E C

T

IO

N S

A N

D D

E T

A

IL

S

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-M

A Y

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

S o u th

P ar k A v e.

P .O

B o x

H er ri n

ID

P

R

-0

.9

.2

.9

.2 eg g em ey er -a rc h it ec ts .c o m

SHEET

IDENTIFICATION

SHEET OF

E J K

B H

B M

B D

-M

A Y

-2

WALL SECTION KEY NOTES ' '

STANDING SEAM METAL ROOF SYSTEM WITH CONCEALED FASTENERS.

6" METAL GUTTERS WITH DOWNSPOUTS TO GRADE. SEE ELEVATIONS FOR DOWNSPOUT

LOCATIONS.

METAL FRAMING - SEE STRUCTURAL SHEETS FOR SPACING. SEAL TO EXISTING ROOF

SYSTEM WITH LIQUID FLASHING TO MAINTAIN A WATERTIGHT SYSTEM DURING

CONSTRUCTION. SEE SPECIFICATION SECTION 07 56 00 AND DETAIL 7/ A7.

METAL FASCIA COVER - COLOR TO MATCH ROOF PANELS.

VENTED METAL SOFFIT SYSTEM.

MODIFY EXISTING INSULATED METAL WALL PANEL SYSTEM AS NECESSARY TO CONFORM

WITH NEW ROOFING SYSTEM. FURNISH AND INSTALL ALL NECESSARY TRIM FOR A

COMPLETE SYSTEM - COLOR TO MATCH EXISTING WALL PANELS.

METAL FLASHING/DRIP WITH HEMMED EDGE - COLOR TO MATCH ROOF PANELS.

EXISTING CONSTRUCTION TO REMAIN.

NEW SUSPENDED CEILING TILE AND GRID. SEE REFLECTED CEILING PLAN, SHEET A4.

METAL FRAMING - SEE STRUCTURAL SHEETS FOR ADDITIONAL INFORMATION AND DETAILS.

5" THK. POLY ISO INSULATION AT METAL FRAMING, VERIFY THICKNESS WITH EXISTING

CONSTRUCTION. INSTALL FLEXIBLE LIQUID FLASHING TO MAINTAIN A WATERTIGHT SYSTEM

DURING CONSTRUCTION. SEE SPECIFICATION SECTION 07 56 00 AND DETAIL 7, SHEET A7.

EXISTING BUILT-UP ROOF SYSTEM WITH 3"- 5" OF INSULATION BOARD, COVER BOARD, AND

BALLAST.

HEADWALL FLASHING AT EXISTING WALL PANEL

METAL RAKE TRIM - COLOR TO MATCH ROOF PANELS.

SNOW GUARDS - ENTIRE LENGTH OF ROOF. SEE SPECIFICATION SECTION 07 41 10

LOW PROFILE ATTIC EXHAUST VENTS. SEE ROOF PLAN, SHEET A5 FOR LOCATIONS.

STANDING SEAM METAL ROOF SYSTEM WITH CONCEALED FASTENERS AND THERMAL

INSULATION BLOCKS AT EXISTING FRAMING OVER SIMPLE SAVER INSULATION SYSTEM.

20 GA. x 3 5 8" GALV. METAL STUDS AT 16" O.C. WITH CONTINUOUS TOP AND BTM. TRACKS.

SECURE TO EXISTING AND NEW FRAMING.

ATTACH (3) THREE ROWS OF 20 GA. METAL HAT CHANNELS HORIZONTAL. ATTACH TO

EXISTING FRAMING FOR WALL PANEL CLIP INSTALLATION.

INSTALL CLOSURE STRIP AT SOFFIT AND WALL PANEL JUNCTURE.

METAL BUILDING INSULATION.

CONCEALED FASTENER METAL WALL PANEL SYSTEM.

REMOVE BALLAST AND CLEAN B.U.R. FOR ADHESION OF NEW LIQUID FLASHING

3 LAYERS LIQUID FLASHING SYSTEM: 1 LAYER LIQUID FLASHING, OVER 1 LAYER OF

REINFORCING, OVER 1 LAYER LIQUID FLASHING.

INSTALL METAL FRAMING AS NECESSARY TO SECURE WALL PANELS

NON-VENTED METAL SOFFIT AT RAKES

INSTALL SIMPLE SAVER ROOF LINER SYSTEM AND ROOF INSULATION SYSTEM R-30

WIRE BRUSH, CLEAN, PRIME AND PAINT EXISTING STEEL COLUMN. COLOR TO BE "AWARD

BLUE".

A7

GRAPHIC SCALES

SCALE: 1" = 1'-0"

A7

7 BUILT-UP ROOF PATCHING

SCALE: 1 1/2" = 1'-0"

D C

F T

-A

B -D

T L A

-7 .0

.D

W G

100% SUBMITTAL

11/MAY/2017

B-3

J:

\2

P ro je ct s\

A R

N G

S p ri n g fi e ld

\D W

G S \C

D \B

S u b m it ta l\

A _D e ta ils _D

FC

T -B

-F P

B ld g .d w g

, 5 /1

/2

:5 :3

A

M , B

ALUMINUM DOOR AND

FRAME - SEE SPEC

SECTION 08 41 00

5/8" GYP. BOARD

MTL. CORNER BEAD

6" METAL STUD BULKHEAD

FRAMING - ANCHOR TO

STRUCTURE ABOVE

SEALANT

SHIM AS NEEDED

DOOR AS

SCHEDULED

DOOR AS

SCHEDULED

SHIM AS NEEDED

SEALANT

DOOR AS

SCHEDULED

ACOUSTICAL CEILING TILE

A .F

.F

SEALANT AT DECK ABOVE

E N

L A

R G

E D

F L O

O R

P L A

N

S T

O R

E F

R O

N T

D C

F T

-A

-A .D

W G

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-M

A Y

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

S o u th

P ar k A v e.

P .O

B o x

H er ri n

ID

P

R

-0

.9

.2

.9

.2 eg g em ey er -a rc h it ec ts .c o m

SHEET

IDENTIFICATION

SHEET OF

E J K

B H

B M

B D

-M

A Y

-2

A8

E L E

V A

T

IO

N S

A

N D

D E

T A

IL

S

GRAPHIC SCALES

SCALE: 3/8" = 1'-0"

SCALE: 1 1/2" = 1'-0"

100% SUBMITTAL

11/MAY/2017

B-3

J:

\2

P ro je ct s\

A R

N G

S p ri n g fi e ld

\D W

G S \C

D \B

S u b m it ta l\

A _D o o r S ch e d u le a n d D e ta ils _D

FC

T -B

-F P

B ld g .d w g

, 5 /1

/2

:0 :5

A

M , B

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

M

-L G

-H .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O

IS

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

H0

G E

N E

R A

L N

O T

E S

A

B B

R E

V

IA

T

IO

N A

N D

S Y

M B

O L S

G W

W G

D G

G W

W

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

M

-S H

-H .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O

IS

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

H1

S C

H E

D U

L E

S

G W

W G

D G

G W

VAULT

VAULT

MECHANICAL

OFFICE

OFFICE

114 SERVER

OFFICE

OFFICE

OFFICE

OFFICE

CUSTOMER

SERVICE

OFFICE

MANAGEMENT

AND SYSTEMS

OFFICE

CORRIDOR

BREAK

ROOM

JAN.

MENS

RESTROOM

WOMENS

RESTROOM

INDIVIDUAL

EQUIPMENT

SHOWER

STORAGE

OFFICE

STORAGE

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

M

-X D

-H .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O I S

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

H2

H E

A T

IN

G

D E

M O

L

IT

IO

N

P L A

N

G W

W G

D G

G W

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

M

-X D

-H .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O I S

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

H3

H E

A T

IN

G

D E

M O

L

IT

IO

N

R O

O F

P L A

N

G W

W G

D G

G W

MECHANICAL

OFFICE

OFFICE

SERVER

OFFICE

OFFICE

OFFICE

OFFICE

CUSTOMER

SERVICE

OFFICE

MANAGEMENT

AND SYSTEMS

OFFICE

102 CORRIDOR

BREAK

ROOM

JAN.

MENS

RESTROOM

WOMENS

RESTROOM

INDIVIDUAL

EQUIPMENT

SHOWER

STORAGE

OFFICE

STORAGE

MECHANICAL

OFFICE

OFFICE

SERVER

OFFICE

OFFICE

OFFICE

OFFICE

CUSTOMER

SERVICE

OFFICE

MANAGEMENT

AND SYSTEMS

OFFICE

CORRIDOR

BREAK

ROOM

JAN.

104 MENS

RESTROOM

WOMENS

RESTROOM

INDIVIDUAL

EQUIPMENT

SHOWER

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

M

-H P

-H .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O I S

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

H4

H E

A T

IN

G

P L A

N

G W

W G

D G

G W

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

M

-H P

-H .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O

IS

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

H5

H E

A T

IN

G

R O

O F

P L A

N

G W

W G

D G

G W

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

M

-D T

-H .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O I S

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

H6

D E

T A

IL

S

G W

W G

D G

G W

HP-3

RXTQ36TAVJU

134.0ft

KHRP26A22T9

ヅ"×デ"

FCU-3-23

FXMQ18PBVJU

20.0ft

¼"×½"

FCU-3-24

FXMQ18PBVJU

30.0ft

¼"×½"

HP-1

REYQ360TTJU

REYQ120TTJU REYQ120TTJU REYQ120TTJU

½"×1ヂ"×¾" ½"×1ヂ"×¾" デ"x1ヅ"x1ヂ"

½"×1ヂ"×¾"

BHFP26P151U

28.0ft

KHRP25M73TU9

¾"×1デ"×1ヅ"

BS 1

BS8Q54TVJ

50.0ft

デ"×1ヂ"×1ヂ" *

50.0ft

KHRP26A22T9

ヅ"×デ"

FCU-1-1

FXFQ18TVJU

11.0ft

¼"×½"

FCU-1-2

FXFQ18TVJU

5.0ft

¼"×½"

14.0ft

KHRP26A22T9

ヅ"×デ"

FCU-1-3

FXFQ18TVJU

20.0ft

¼"×½"

FCU-1-4

FXFQ18TVJU

3.0ft

¼"×½"

28.0ft

KHRP26A22T9

ヅ"×デ"

FCU-1-14

FXAQ07PVJU

23.0ft

¼"×½"

FCU-1-15

FXAQ07PVJU

8.0ft

¼"×½"

FCU-1-13

FXFQ24TVJU

18.0ft

ヅ"×デ"

FCU-1-12

FXFQ36TVJU

28.0ft

ヅ"×デ"

FCU-1-5

FXFQ18TVJU

18.0ft

¼"×½" *

2.0ft

KHRP26A22T9

ヅ"×デ"

15.0ft

KHRP26A22T9

ヅ"×デ"

FCU-1-17

FXZQ07MVJU9

2.0ft

¼"×½"

FCU-1-18

FXZQ07MVJU9

28.0ft

¼"×½"

FCU-1-16

FXZQ07MVJU9

15.0ft

¼"×½"

FCU-1-6

FXZQ09MVJU9

42.0ft

¼"×½" *

BS 2

BS10Q54TVJ

3.0ft

½"×1ヂ"×¾" *

FCU-1-7

FXZQ12MVJU9

30.0ft

¼"×½" *

FCU-1-11

FXZQ18MVJU9

19.0ft

¼"×½" *

FCU-1-8

FXZQ15MVJU9

16.0ft

¼"×½" *

FCU-1-10

FXZQ07MVJU9

10.0ft

¼"×½" *

FCU-1-19

FXZQ07MVJU9

23.0ft

¼"×½" *

FCU-1-9

FXZQ12MVJU9

33.0ft

¼"×½" *

FCU-1-20

FXMQ12PBVJU

30.0ft

¼"×½" *

FCU-1-21

FXMQ72MFVJU

17.0ft ヅ"×デ"

ヅ"×デ"

KHRP26A250T

ヅ"×¾"

FCU-2-22

FTX15NMVJU

35.0ft

HP-2

RXL15QMVJU

¼"×ヅ"

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

M

-D G

-H .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O

IS

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

H7

P

IP

IN

G

S C

H E

M A

T

IC

S

G W

W G

D G

G W

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

M

-D G

-H .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O

IS

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

H8

P

IP

IN

G

S C

H E

M A

T

IC

S

G W

W G

D G

G W

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

E

-L G

-E .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O I S

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

E0

G E

N E

R A

L N

O T

E S

A

B B

R E

V

IA

T

IO

N A

N D

S Y

M B

O L S

G W

W G

D G

G W

VAULT

VAULT

MECHANICAL

OFFICE

OFFICE

SERVER

OFFICE

OFFICE

OFFICE

OFFICE

CUSTOMER

SERVICE

OFFICE

MANAGEMENT

AND SYSTEMS

OFFICE

102 CORRIDOR

BREAK

ROOM

JAN.

MENS

RESTROOM

WOMENS

RESTROOM

INDIVIDUAL

EQUIPMENT

SHOWER

STORAGE

OFFICE

STORAGE

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

E

-X D

-E .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O I S

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

E1

E L E

C T

R

IC

A L D

E M

O L

IT

IO

N

P L A

N

G W

W G

D G

G W

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

E

-X D

-E .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O I S

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

E2

E L E

C T

R

IC

A L D

E M

O L

IT

IO

N

R O

O F

P L A

N

G W

W G

D G

G W

VAULT

VAULT

MECHANICAL

OFFICE

OFFICE

SERVER

OFFICE

OFFICE

OFFICE

OFFICE

CUSTOMER

SERVICE

OFFICE

MANAGEMENT

AND SYSTEMS

OFFICE

CORRIDOR

BREAK

ROOM

JAN.

104 MENS

RESTROOM

WOMENS

RESTROOM

INDIVIDUAL

EQUIPMENT

SHOWER

STORAGE

OFFICE

STORAGE

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

E

-P P

-E .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O

IS

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

E3

E L E

C T

R

IC

A L P

L A

N

G W

W G

D G

G W

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

E

-P P

-E .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O

IS

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

E4

E L E

C T

R

IC

A L R

O O

F P

L A

N

G W

W G

D G

G W

HP-3

RXTQ36TAVJU

L1, L2 17A 1ph

F1,F2IN F1,F2

F1,F2

FCU-3-23

FXMQ18PBVJU

L1, L2 1.6A 1ph

BRC1E73

P1,P2

FCU-3-24

FXMQ18PBVJU

L1, L2 1.6A 1ph

BRC1E73

P1,P2

HP-1

REYQ360TTJU

REYQ120TTJU

REYQ120TTJU

REYQ120TTJU

Q1,Q2

Q1,Q2

Q1,Q2

L1, L2, L3

43A 3ph

L1, L2, L3

43A 3ph

L1, L2, L3

43A 3ph

BS 1

BS8Q54TVJ

L1, L2 0.8A 1ph

BS 2

BS10Q54TVJ

L1, L2 1A 1ph

OUT F1,F2

BS F1,F2

IN F1,F2

OUT F1,F2

F1,F2IN F1,F2

F1,F2

FCU-1-1

FXFQ18TVJU

L1, L2 0.6A 1ph

BRC1E73

P1,P2

FCU-1-2

FXFQ18TVJU

L1, L2 0.6A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

F1,F2

FCU-1-3

FXFQ18TVJU

L1, L2 0.6A 1ph

BRC1E73

P1,P2

FCU-1-4

FXFQ18TVJU

L1, L2 0.6A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

F1,F2

FCU-1-14

FXAQ07PVJU

L1, L2 0.3A 1ph

BRC1E73

P1,P2

FCU-1-15

FXAQ07PVJU

L1, L2 0.3A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

FCU-1-13

FXFQ24TVJU

L1, L2 0.7A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

FCU-1-12

FXFQ36TVJU

L1, L2 1.5A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

FCU-1-5

FXFQ18TVJU

L1, L2 0.6A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

F1,F2

F1,F2

FCU-1-17

FXZQ07MVJU9

L1, L2 0.8A 1ph

BRC1E73

P1,P2

FCU-1-18

FXZQ07MVJU9

L1, L2 0.8A 1ph

BRC1E73

P1,P2

FCU-1-16

FXZQ07MVJU9

L1, L2 0.8A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

FCU-1-6

FXZQ09MVJU9

L1, L2 0.8A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

FCU-1-7

FXZQ12MVJU9

L1, L2 0.8A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

FCU-1-11

FXZQ18MVJU9

L1, L2 0.9A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

FCU-1-8

FXZQ15MVJU9

L1, L2 0.8A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

FCU-1-10

FXZQ07MVJU9

L1, L2 0.8A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

FCU-1-19

FXZQ07MVJU9

L1, L2 0.8A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

FCU-1-9

FXZQ12MVJU9

L1, L2 0.8A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

FCU-1-20

FXMQ12PBVJU

L1, L2 1.4A 1ph

BRC1E73

P1,P2

F1,F2IN F1,F2

FCU-1-21

FXMQ72MFVJU

L1, L2 3.3A 1ph

BRC1E73

P1,P2

OUT F1,F2

to centralized controller

HP-2

RXL15QMVJU

L1, L2

IN F1,F2 F1,F2

FCU-2-22

FTX15NMVJU

L1, L2 3A 1ph

BRC1E72

P1,P2

OUT F1,F2

to centralized controller

5A 1ph

P R

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

E

-D G

-E .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O I S

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

E5

W

IR

IN

G

S C

H E

M A

T

IC

S

G W

W G

D G

G W

O J E

C T

N O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

P L O

T S

C A

L E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF 28

A R

C H

D

IS

S

U E

D A

T E d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

-1

-2

D C

F T

Air National Guard

IN

T

E G

R A

T E

D D

E S

IG

N

J .V

IL

L

IN

O

IS

A

IR

N A

T

IO

N A

L G

U A

R D

C o n su lti n g E n g in e e rs

L a n d S u rv e yo rs

M c

D o n o u g h -W h itl o w

, P .C

P h o n e

.5

.9

I lli n o is R o u te

Ta y lo r S p ri n g s, I L

P .O

B o x A

D C

F T

E

-D G

-E .d w g

-1

-2

IL

A

N G d C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

R E

P A

IR

S

U P

P L Y

R O

O F

A N

D H

V A

C

B U

IL

D

IN

G

IL

A

N G

P R

O J E

C T

N O

D

C F

T

W

LIH T

O

I N O

IS

G U Y

W

LL

I

062-05

REGIS

TERED

PROFE

SSION

AL

ENGIN

EER

OF

W

DATE: 5-11-2017

EXP. DATE: 11-30-2017

E6

W

IR

IN

G

S C

H E

M A

T

IC

S

G W

W G

D G

G W

Sheets and Views
DCFT162001M-LG-H0
DCFT162001M-SH-H1
DCFT162001M-XD-H2
DCFT162001M-XD-H3
DCFT162001M-HP-H4
DCFT162001M-HP-H5
DCFT162001M-DT-H6
DCFT162001M-DG-H7
DCFT162001M-DG-H8
DCFT162001E-LG-E0
DCFT162001E-XD-E1
DCFT162001E-XD-E2
DCFT162001E-PP-E3
DCFT162001E-PP-E4
DCFT162001E-DG-E5
DCFT162001E-DG-E6

File details come from the government source that posted it.