Questions_regarding_the_Dugway_Proving_Grounds_FY17_Land_Mobile_Radio_Maintenance_(003).pdf
PDF 303 KB Posted
- Attached to
- Land Mobile Radio (LMR) Maintenance
- Solicitation number
- W91RUS-17-T-0093
About this file
Questions and answers
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions regarding the Dugway Proving Grounds FY17 Land Mobile Radio Maintenance Solicitation #: W91RUS-17-T-0093
General Questions:
1. Could a site visit be coordinated to collect vital information on all sites, environmental and equipment?
VENDORS CAN DO A SITE VISIT SO THEY CAN GET THE LAY OF THE LAND,
MOUNTAINOUS TERRAIN AND VASTNESS OF DPG. BUT SINCE IT’S WINTER TIME
VENDORS NEED TO PROVIDE THEIR OWN METHOD OF TRANSPORTATION TO THE
MOUNTAIN TOPS AS THE ROADS ARE SNOWED AND POSSIBLY DRIFT COVERED.
Antenna Site and Non-Antenna Site Management
1. Please provide detail on what minor building maintenance needs are required. i.e. light bulbs, HVAC maintenance, etc.
a. ONLY ONE REPEATER SITE WOULD REQUIRE MINOR BUILDING
MAINTENANCE. THAT WOULD BE THE SAPPHIRE SITE. BUILDING
IS A CONCRETE BLOCK BUILDING WITH SOLAR POWER AND
PROPANE GENERATOR AS THE ONLY SOURCE OF POWER.
EXAMPLES OF MAINTENANCE WOULD BE LIGHT BULBS, 2 SMALL
48 V DC AC UNITS (.5 TON & 1.5 TON), 1 PROPANE GENERATOR
WITH TANK, AND PROPANE FUEL (DETAILS ON THE GENERATOR
ARE LISTED BELOW IN APPENDIX A).
2. Please confirm only one (1-annual) Preventive Maintenance is required per year.
a. CORRECT. WITHIN THE FIRST 30 DAYS OF THE CONTRACT BEING
AWARDED
RF Site Specific Information
1. UPS systems located at the given RF sites are aging. Would the government request a full replacement of aging batteries for those UPS’s as part of its annual Preventive Maintenance Inspection?
a. NEW BATTERIES ARE NOT REQUIRED AT TIME OF PM, BUT SHOULD
A UPS FAIL THE REPAIR OF THE UPS SYSTEM WOULD BE REQUIRED,
TO INCLUDE NEW BATTERIES IF DETERMINED THAT IS THE CAUSE
OF THE FAILURE.
2. Is it the government’s request to have the contractor perform a complete tower inspection to include coaxial cables, antennas, clips, connectors, grounding, and lighting as part of its annual Preventive Maintenance Inspection?
a. NOT AT THIS TIME
3. Please confirm all components “after the repeater output connectors”, to include TX combiners and RX multi-couplers will be covered for Infrastructure Repair during the period of performance.
a. CORRECT COMBINER, MULTI-COUPLERS, CABLING, ANTENNA, ETC.
4. Please clarify what specific services the government is requesting for RF site generators, and provide type, models, and any relevant information for those generators.
a. ONLY THE SAPPHIRE GENERATOR WOULD BE CONSIDERED UNDER
THIS CONTRACT.
5. Please describe existing fire suppression systems to include models, type, quantities, etc; and what coverage for services the government is requesting.
a. FIRE SUPPRESSION SYSTEMS ARE NOT COVERED UNDER THIS
CONTRACT.
Subscriber Equipment
1. Does the government wish to procure maintenance coverage for all handheld and mobile subscribers provided in the equipment list? If so, refer to an option below. (Accessory repairs are not available, and typically are replaced through warranty or procurement after failure).
a. MAINTENANCE COVERAGE FOR ALL HANDHELDS AND MOBILE
SUBSCRIBER UNITS ARE NOT COVERED UNDER THIS CONTRACT.
THE EQUIPMENT LIST BELOW WAS PROVIDED FOR GENERAL
KNOWLEDGE OF THE SYSTEM AND SUBSCRIBER UNITS OPERATING
ON THE SYSTEM.
a. Service from the Start Lite (SFS)- Includes:
i. Normal wear and tear repair coverage
ii. Five day repair turnaround time
iii. Expert technical support (8x5)
iv. 2-way shipping included
b. Service from the Start (SFS) Comprehensive- Includes:
i. Chemical, liquid and physical damage coverage
ii. Three day repair turnaround time
iii. Expert technical support (24x7x365)
iv. Battery Refresh program is available as an option at time of product purchase, providing fixed price battery replacements over a four year period.
v. 2-way shipping included
Over The Air Rekeying (OTAR) & Programming Over P25 (POP25) Does the government wish to procure subscriber upgrades for OTAR and POP25 for subscribers as listed in the equipment list? Or is the equipment list simply identifying equipment capable of OTAR and POP25?
1. OTAR/POP25 FOR ALL SUBSCRIBER UNITS ARE NOT COVERED
UNDER THIS CONTRACT. THE EQUIPMENT LIST BELOW WAS PROVIDED
FOR GENERAL KNOWLEDGE OF THE SYSTEM AND SUBSCRIBER UNITS
OPERATING ON THE SYSTEM.
APPENDIX A
File details come from the government source that posted it. Updated .