This document contains Questions and Answers related to RFQ W91QVP-24-Q-5014 for a non-personal services contract to provide power generation and tent light sets on Training Site Area X-Ray, Schofield Barracks, Hawaii from 9 September 2024 to 25 October 2024. The key details are:
The contract requires 25 tents (36'L x 18'W) and 26 tents (18'L x 25'W), with power needed only for lighting string sets, not for computers or fans. The government will provide JP-8 fuel for the generators, and the contractor will be responsible for the initial fuel fill but not subsequent refueling during the contract period. The power supply may be shared among the tents for lighting. A tent layout diagram was provided. The contracting agency is the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08 RFQ Tent Lighting and Power 23 AUG 2024.pdf | ||
| B08 Pricing Sheet Power Generator and String Light Sets.xlsx | XLSX spreadsheet | |
| A02 PWS - Power Generator and String Light SetsV2 23 AUG 2024 V1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for RFQ W91QVP-24-Q-5014
1. What are the power requirements for the 25 (36’L x 18’W) tents? (e.g.
Computers? Fans?)
The only power needed for the tents will be to provide power for the string light sets that is also being requested.
2. Will the 26 (18'L x 25’W) tents need power for anything other than lighting? (e.g.
Computers? Fans?)
No, lighting is the only source that will require power from the generators.
3. Can you provide a layout of the tents?
See diagram below. Be sure to take into consideration where there will be duct/ portable AC units when planning placement of generators.
4. Can the power supply be shared amongst the tents or does each tent need independent power sources?
Power supply may be shared amongst other tents for lighting.
5. We understand that the generators must be fueled by JP-8 and the fuel will be provided by the government. Will we be responsible for topping up the fuel?
You will be responsible for the initial fill of fuel once the generators are initially setup.
After that, the government will be responsible for topping the generators off with fuel until the end of the performance period of the contract.