This document contains questions and answers regarding solicitation number W91QVP-21-Q-3650 for port operations and inland transportation services on the islands of Saipan and Tinian. The U.S. Army requires vessels to arrive between July 15 and August 4 for uploading and downloading of equipment at the sea ports, with specific arrival dates of July 15 and 20 for Saipan and July 28 for download and August 2 for upload on Tinian. Services will be needed at the Marpi Training Area and sea ports, with C Dock at the port designated for military equipment. Quotes are due by July 1, 2021 and the selected contractor must provide an EFT form and DBA insurance after award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers for W91QVP-21-Q-3650
1. What dates are the vessels arriving?
Currently, expect two arrival dates and one departure date for Saipan. 15 July should be primarily containers and 20 July should be primarily rolling stock. Please provide one total upload and one download cost. Additional port cost due to multiple visits will be coordinated and modified as needed after award. Coordination will occur prior to vessel arrival date to ensure adequate preparation on any given date between 15 July and 04 August.
For Tinian, we expect 28 July download and 2 Aug for upload.
2. What is the period of performance?
Currently, we expect vessels to arrive between 15 July and 04 August for upload and downloading of equipment. Specifics on equipment or changes in timelines will be coordinated as changes occur especially in delays, weather, or maintenance issues.
3. What are the locations for the exercise?
Currently, we expect Marpi Training Area and the Sea Port to be available. COW TOWN has been denied. Cow Town is beside Marpi Training Area so there should not be any additional cost.
4. Is the roads passable for trucks?
There are some branches and trees, which may be potentially an obstruction to the road, which may need to be removed. Coordination will occur with local government. Please quote based on direct access without obstruction.
5. Telecommunications Clause
The telecommunication clauses are only to ensure that your company is not using banned telecommunication equipment from unauthorized sources. The U.S. Army does not need telecommunication equipment for this requirement.
6. What is the plan for Tinian offload?
Current plan is to use the RO/RO ramp between the two piers; however, after recent assessment of the ramps capabilities it is more than likely that LO/LO operations will be needed. This is already a CLIN in the solicitation.
7. Where is the location in the port?
Port Authority has allowed us to use C Dock for all military equipment.
8. What documents are required for quote submission?
The RFQ document must be returned completed NLT 1700 ChST on 1 July 2021. All yellow fields must be filled in. After award, an EFT form and DBA insurance must be provided.