W91QVN25R0003ReeferandDryVanTruckingSvcsDeCA.pdf

PDF 933 KB Posted

Attached to
Reefer & Dry Van Trucking Services DeCA & 35th ADA
Solicitation number
W91QVN25R0003
Issued by

About this file

This document is a Performance Work Statement (PWS) for a contract to provide reefer (refrigerated) and dry van trucking services for the United States Forces Korea (USFK) Defense Commissary Agency (DeCA) and 35th Air Defense Artillery (ADA) in the Republic of Korea.

The contract has a 2-month phase-in period, a 10-month base period, and up to four 1-year option periods. The contractor shall provide all personnel, equipment, and resources to transport refrigerated and dry cargo for DeCA and 35th ADA locations. Key requirements include maintaining proper temperature controls, adhering to delivery schedules, and complying with all applicable transportation regulations. The contractor must have at least 10 reefer and 10 dry trucks, and drivers must possess the required licenses and certifications. The contract will be awarded on a fixed-price basis, with pricing based on the Exhibit Line Item List. Contract administration will be handled by the 411th Contracting Support Brigade.

View the file

Other files

File Type Posted
Attachment 1 ELIN List_W91QVN25R0003.xlsx XLSX spreadsheet
Attachment 2 Technical Exhibit_Est POL Qty_W91QVN25R0003.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W91QVN25R0003 17-Oct-2024

b. TELEPHONE NUMBER

315-755-0636

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 18 Nov 2024

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W91QVN9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MS. PAK, NAM-YE

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

HUMPHREYS CONTRACTING DIVISION

UNIT 15289

APO AP 96271-5584

UNITED STATES

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W582MZ 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

0019 CS HHC HHC EXPEDITIONA

MS. SON, YORUM

DMC,

HQ 19TH ESC BLDG 1650

CAMP HENRY

APO AP 96218-5015

UNITED STATES

TEL: 315-763-4268 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$34,000,000

NAICS:

484110

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF85

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W91QVN25R0003

Section SF 1449 - CONTINUATION SHEET

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

REEFER AND DRYVAN TRUCKING SERVICES

For USFK Wide Defense Commissary Agency (DeCA) and 35th ADA

PART 1

GENERAL INFORMATION

1. GENERAL:

The Contractor shall transport refrigerated items utilizing refrigerated vans or trucks, which employs a reefer container and dry items utilizing dry vans or trucks for United States Forces Korea (USFK) DeCA and 35 th ADA specified by the US Government in accordance with the technical specifications identified in the Performance Work

Statement (PWS).

1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, tools, supervision and all other necessary resources needed to perform the services identified in paragraph 1. This shall include, but is not limited to trucks, lubricants, fuels, tires, tubes, spare parts, canvas covers, blocking and bracing materials, tie-down material, and such other material, equipment, or supplies necessary for the performance of services.

Deliveries shall be completed within 12 hours of loading. Trucks tasked to support this contract will only transport cargo as detailed on their transportation documentation. There will be no consolidated loads between US

Government shipments and commercial shipments.

1.2. Background: This contract shall be designed to transport the US Government property in accordance with all terms and condition of this contract.

1.3. Period of Performance: The effective period of this contract is two (2) months Phase-In period and ten (10) months base performance period with four (4) one-year Option performance periods for up to five (5) years, from the date of award.

Phase-In Period: 1 Jan 25 – 28 Feb 25

Base Period: 1 Mar 25 – 31 Dec 25

1st Option Period: 1 Jan 26 – 31 Dec 26

2nd Option Period: 1 Jan 27 – 31 Dec 27

3rd Option Period: 1 Jan 28 – 31 Dec 28

4th Option Period: 1 Jan 29 – 31 Dec 29

1.4. Quality Control:

The contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS. The plan shall clearly describe the offeror’s quality control methods and practices such as standardized procedures to monitor performance, identify discrepancies, and take corrective action to prevent re-occurrences. As part of the QC Plan, the contractor shall identify what items the contractor will inspect under its comprehensive QC for each task listed in the PRS table. The Government will make review and acceptance of the QCP and any subsequent changes within 10 days after receipt of the revised QCP. After acceptance of the QCP the contractor will receive the Contracting Officer's acceptance in writing of any proposed change to his QC system.

1.5. Quality Assurance:

The government will evaluate the contractor’s performance under this contract in accordance with the Quality

Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6. General Information:

1.6.1. Types of Equipment Required: All contractor vehicles in the performance of this contract shall be in good and safe working condition, be suitable for transporting the requested cargo, and have insurance coverage for cargo.

Trucks that do not comply with the stated minimum cargo capacity are not authorized for use in the execution of the contract.

1.6.1.1. Refrigeration Trucks or Vans.

1.6.1.1.1. Operational refrigerator trucks with automatic thermostat and temperature reading device capable of controlling the temperature inside the cargo compartment and recording the temperature therein. The contractor shall provide trucks with capacity specified in each Exhibit Line-Item Description in Exhibit #1. (Attachment #1)

1.6.1.1.2. The cargo compartment and container shall be equipped with an automatic temperature-controlled device, which is capable of maintaining the following temperatures: freeze (0 degrees Fahrenheit or lower or -17.78 degrees

Celsius or lower), chill (34 F - 45 F or 1.11 - 7.22 degree Celsius). These temperatures shall be maintained throughout the transport of these items, or as determined by the shipping officer.

1.6.1.1.3. The space of the refrigerator truck or trailers shall be divided into two compartments: one for Freeze

(50% at nose) and the other for Chill (50% at tail-gate).

1.6.1.1.4. A tolerance not to exceed 2 F, + or -, from the temperature specified shall be maintained.

1.6.1.1.5. Equipment: The Contractor shall provide dry and refrigerated vans or trucks with locking capability and the capacity to haul the loads tasked. The dry and refrigerated vans or trucks shall have locking capability on all doors that the seals furnished by U.S. Government can be placed and inserted.

Alteration: Alteration, modifications, or rehabilitation of the dry and refrigerated vans or trucks shall be indicated in the vehicle registration document (자동차등록증) issued by ROK Government. The dry and refrigerated vans or trucks that are illegally altered, modified, or rehabilitated shall not be accepted. Alteration, Modifications, or rehabilitation of the dry and refrigerated vans or trucks shall be verified in the vehicle registration document (자동차등록증) issued by ROK Government.

Tonnage of vehicles: The size of the dry and refrigerated vans or trucks shall be verified by vehicle registration document (자동차등록증) issued by ROK Government. The contractor shall provide dry and refrigerated vans or trucks with correct tonnage as specified in each Exhibit Line-Item Description in Exhibit #1. (Attachment #1 ELINs

List) and capacity that can load the number of pallets as specified in PWS Part 9. Number of pallet load capacity per truck and pallet size.

1.6.2. Holidays: The Contractor shall provide services below listed all US Government and ROK holidays except four (4) holidays as shown below:

(1) US Government Holiday: 25 December (Christmas) and 4th Thursday, November (Thanksgiving Day)

(2) ROK Holiday: Lunar New Year (1 Jan on the Lunar Calendar) and Chu-Suk (15 Aug on the Lunar Calendar)

U.S. Government legal holidays

(1) 1 January (New Year's Day)

(2) 3rd Monday, January (Dr. King’s Birthday)

(3) 3rd Monday, February (President's Day)

(4) Last Monday, May (Memorial Day)

(5) 19 June (Juneteenth National Independence Day)

(6) 4 July (Independence Day)

(7) 1st Monday, September (Labor Day)

(8) 2nd Monday, October (Columbus Day)

(9) 11 November (Veterans' Day)

(10) 4th Thursday, November (Thanksgiving Day)

(11) 25 December (Christmas Day)

ROK legal holidays

(1) 1 January (New Year)

(2) Lunar New Year (31 December, 1 and 2 January on the Lunar Calendar)

(3) 1 March (Independence Movement Day)

(4) 1 May (Labor Day)

(5) 5 May (Children's Day)

(6) Buddha's Birthday (8 April on the lunar calendar)

(7) 6 June (Memorial Day)

(8) 17 July (Constitution Day)

(9) 15 August (Liberation Day)

(10) Chu-Suk (14, 15, and 16 August on the Lunar Calendar)

(11) 3 October (National Foundation Day)

(12) 9 October (Hangul Proclamation Day)

(13) 25 December (Christmas Day)

NOTE 1: Any holidays that are declared by Presidential Executive Order shall be observed in the same manner as the holidays listed above. If the area in which contract personnel is scheduled to work is closed due to the holiday declared by an Executive Order and the employee is not required to report in, payment will not be made for those hours. Closures of the installation due to inclement weather or other such acts of nature shall be handled in the same manner.

NOTE 2. Hours of Operation: The contractor is responsible for conducting business, between the hours of 0600 to

1700, Monday thru Sunday except Korean National holidays and US Government holidays as listed above Para

1.6.2 and when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.3. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal

Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other

Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.4. Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration, The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:

perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.5. Data Rights: The Government has unlimited rights to all documents/material produced under this contract.

All documents and materials, to include the source codes of any software, produced under this contract shall be

Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other

Government rights.

1.6.6. Base Passes: The contractor shall be responsible to arrange for base passes and necessary vehicle permits required for entry onto the installation prior to performing any work under this contract. The Government will issue passes/decals to only personnel and vehicles of the Prime Contractor.

Submission Requirement: During Phase-in period, the Contractor shall submit the list of Post Pass &

DECAL Request document within one (1) week from the contract award date.

1.7. Qualification:

1.7.1. Prior Experience as Prime Contractor: The prime contractor shall have at least (2) years’ experience within the last seven (7) years in Reefer and Dry Van Trucking Service.

1.7.2. Certification: The contractor shall maintain below required certifications.

1.7.2.1. Certification of Food and Transportation Business Permission (식품운반업 허가증).

1.7.2.2. Certification of Freight Transportation Business Permission (화물자동차 운송사업허가증)

1.7.2.3. Certification of Freight Transportation Forwarder Business Permission (화물자동차운송주선사업허가증)

1.7.3. Personnel Qualification:

1.7.3.1. Contract Manager (CM): The CM shall have minimum two (2) years’ experience as a CM within the last seven (7) years in Reefer and Dry Van Trucking Service. Any new changes to the Contract Manager (CM) position shall be notified in writing to the Contracting Officer Representative (COR) and Contracting Officer (KO).

1.7.3.2. Driver:

1.7.3.2.1. The Contractor drivers shall be licensed for the vehicles he/she is operating, know vehicle’s capabilities and safety procedures that are required for operation. The Movement Control Team (MCT) will inform the driver of any specific safety requirements. The drivers shall possess the 1st Large Driver License. (1종 대형 면허증) that were issued/approved by ROK government. All drivers shall have license and required documentation physically in their possession when required to enter all U.S. Military Installations. No cell phone photo copies shall be accepted.

1.7.3.2.2. The Contractor drivers shall have communication assets and points of contact information to conduct urgent reporting procedures in case of traffic accident or specific circumstances on the road.

1.7.3.2. Company Identification Badges. The contractor shall provide each employee an identification (ID) badge on contract starts date or employment start date. The ID badge shall be made of nonmetallic material, easily readable and include employee’s name, contractor’s name, functional area of assignment, and color photograph.

The Contracting Officer Representative (COR) will approve the ID badge before contract start date.

1.8. Contractor Insurance and Replacement Coverage:

1.8.1. The Contractor shall have adequate commercial insurance as prescribed by Korea law to cover any accidents or cover any damage and loss of cargo. This insurance will remain current or be renewed so as to ensure a valid insurance policy is in effect at all times covered by the contract. If damages or a loss of goods does occur, the penalty paid by the contractor shall equal the cost of the goods being shipped. The insurance must specify the amounts and types of coverage and all limitations of the policy. The Contractor shall submit the copies of insurances to the Contracting Officer within ten (10) days after award of the Contract.

1.8.2. The contractor shall assume the cost for any associated testing, calibration, maintenance or technical inspection necessary to verify the serviceability of any damaged cargo.

1.9. Phase-In/Phase-Out Transition Period:

1.9.1. Phase-In: Phase-in is a one-time performance that allows the new Contractor to work with the incumbent

Contractor to take over operations. The period between contract award date and contract start date, or the 60 days prior to the contract start date, will constitute the phase-in period, whichever is shorter. During the phase-in period, the new Contractor shall prepare to assume full responsibility for all areas of operation IAW the terms and conditions of this contract. The new Contractor shall take all actions necessary for a smooth transition of the contracted operations. The Government will make all facilities and equipment accessible to the new Contractor during the phase-in period. During this time, the new Contractor's management personnel shall be permitted to observe any on-going operations, as coordinated by the COR and the contractor shall prepare required reefer/dry van trucks and its vehicle DECALs and Post Passes for all drivers, as coordinated by the Requiring Activity (RA) and

COR.

1.9.2. Phase-Out/Transition: The incumbent Contractor shall provide supervision, control, personnel, resources, and work task responsibility for all functions described in this PWS during the transition period. If the same

Contract is awarded the new contract, Contracting Officer (KO) will determine the phase-out/transition/phase-in requirements.

1.10. Management Approach

1.10.1 Staffing Plan: The contractor shall have a staffing plan that clearly demonstrates how they plan to perform day to day operations of transportation services. At a minimum the staffing plan shall include a chart that clearly identifies the drivers and quantities by major task listed in paragraph 5 “Specific Task” of the PWS. In addition, the plan shall include a written replacement strategy, backup policy, retention policy and any other information pertinent to the execution of this requirement.

1.10.2. Key Personnel: The plan shall take special care to clearly identify Key Personnel and each of their responsibilities in the management of the operations of the transportation services. Furthermore, the contractor shall discuss each of the Key Personnel including detailing responsibilities of each position and how each of the key persons will support the operation of transportation services.

1.10.3. Other Personnel: The plan shall also address any other personnel assigned to work on this requirement and their roles in the operations of the transportation services. The contractor shall discuss the proposed “other personnel”, both full time and part-time staff, detailing responsibilities of each position supporting the operation of transportation services.

1.10.4. Equipment Plan: The contractor shall have an equipment plan that clearly demonstrates how they plan to perform day to day operations of transportation services. The equipment plan shall include a list of all refrigerated and dry van trucks by area listed in Attachment 1, Exhibit Line Item List Number (ELIN List) quantities by major task listed in paragraph 5 “Specific Tasks” of the PWS. The equipment plan shall correspond with the staffing plan.

The Government shall be able to clearly see the relationship between the number of trucks shown and the staff proposed.

1.10.5. The contractor shall provide estimated manpower (drivers) to perform delivery service IAW Attachment #1

ELIN List.

1.10.6. The contractor shall provide estimated number of trucks to perform delivery service IAW Attachment #1

ELIN List.

PART 2

DEFINITIONS & ACRONYMS

2.1. DEFINITIONS: As used throughout this contract, the following terms shall have the meanings set forth below.

2.1.1. Commitment. Action by MCT’s requiring the Contractor to arrange and prepare transportation service for the

US Government. Commitment will be made orally by the ordering officer to the contractor’s designated representative.

2.1.2. Freight. Property ordered by the US Government to be transported, pursuant to this contract.

2.1.3. Freight Loading Point. A platform, warehouse, or location designated by the consignor as a location where the committed freight will be loaded into the Contractor’s vehicle(s).

2.1.4. General Cargo. Freight of all types other than bulk POL, water, perishable items, non-perishable items, non-perishable commissary items and baggage.

2.1.5. Installation Transportation Officer (ITO). An individual who is a military officer, warrant officer, or

American civil service employee and is authorized to execute transportation documents such as GBL’s for services rendered by the Contractor. The ITO has no authority to issue commitment documents or to place orders with the

Contractor directly.

2.1.6. Loading. Physical movement of freight from a general location into or onto a mode of transportation.

2.1.7. Reefer Van. Operational refrigerator trucks with automatic thermostat and temperature reading device capable of controlling the temperature inside the cargo compartment and recording the temperature therein.

2.1.8. Refrigerated Items. Those subsistence items that are received, stored, and sold in a chill or frozen state.

2.1.9. Movement Control Team (MCT). A sub-element of the 25th Transportation Battalion (25th TB) which acts as a field movement control team and is responsible for commitment, coordination, monitoring and supervision of all transportation services committed within its assigned area.

2.1.10. Spotting of Vehicles. The placement of a vehicle at a freight deck, platform or warehouse for loading of freight after inspection of the vehicle by the Government has been satisfactorily completed.

2.1.11. Transportation Movement Release Number (TMR). Authorization issued by the 25th TB for movement of freight by transportation committed by that organization, which consists of numbers and letters: This number is issued on each shipment and is entered on all transportation documents (GBL and TCMD) to substantiate that the shipment obligating US Government funds is properly authorized.

2.1.12. Transportation Control and Movement Document (TCMD). DD Form 1384 is used as documentation for shipments and is the basis for issuance of a GBL or BAS (Bill for Accessorial Service) when contractual transportation is used. Issuance of this document is required by Defense Transportation Regulation (DTR).

2.1.13. Weight of Shipment. Will be provided in TCMD or GBL.

2.1.14. US Government Bill of Lading. USFK Form 79-3EK, a serially numbered, bilingual, and accountable document. This document is required for procurement of transportation services from the Contractor pursuant to this contract.

2.1.15. Veterinary Inspection Personnel. Individuals of the US Government who are responsible for inspection of trucks furnished by the Contractor in accordance with para 2.9 thru 2.10. These inspectors are normally available at all Commissaries where perishable food items are handled.

2.1.16. Wing Span Vans. Cargo vans that doors open from both sides allowing cargo to be up or downloaded by forklift.

2.1.17. Consignee. The recipient (unit, depot, or person) to whom cargo is addressed or consigned for final delivery. Activity that receives the shipment.

2.1.18. Consignor. The individual, unit, or activity that is the supplier or shipper of the product.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative

AFARS Army Federal Acquisition Regulation Supplement

AR Army Regulation

CCE Contracting Center of Excellence

CFR Code of Federal Regulations

CONUS Continental United States (excludes Alaska and Hawaii)

COR Contracting Officer Representative

COTR Contracting Officer's Technical Representative

COTS Commercial Off the Shelf

DA Department of the Army

DD250 Department of Defense Form 250 (Receiving Report)

DD254 Department of Defense Contract Security Requirement List

DFARS Defense Federal Acquisition Regulation Supplement

DMDC Defense Manpower Data Center

DOD Department of Defense

FAR Federal Acquisition Regulation

HIPAA Health Insurance Portability and Accountability Act of 1996

KO Contracting Officer

OCI Organizational Conflict of Interest

OCONUS Outside Continental United States (includes Alaska and Hawaii)

ODC Other Direct Costs

PIPO Phase In/Phase Out

POC Point of Contact

PRS Performance Requirements Summary

SOW Performance Work Statement

QA Quality Assurance

QAP Quality Assurance Program

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Plan

TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED PROPERTY, EQUIPMENT AND SERVICES: None.

PART 4

CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work as specified in the PWS.

4.2. Secret Facility Clearance: N/A.

4.3. Materials: The Contractor shall provide materials to include but not limited to lubricants, fuels, tires, tubes, spare parts, canvas covers, blocking and bracing materials, tie-down material, and such other material, equipment, or supplies necessary for the performance of services to meet the requirements under this PWS.

4.4. Equipment: The Contractor shall provide all transportation modes including trucks and other vehicles/methods of transportation for the performance of services to meet the requirements under this PWS. The Contractor shall have organic reefer and dry van trucks belong to the prime company with a minimum of ten (10) reefer trucks and, a minimum of ten (10) dry trucks.

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS:

5.1. Performance Requirements:

5.1.1. Tasking Procedure:

5.1.1.1. Tasking of the Contractor’s services shall be made no later than (NLT) 1500 hours of the day prior to the operation. A duly appointed Ordering Officer shall task the Contractor’s vehicle services. It is the responsibility of the Contractor to ensure that a tasking is only made by an appointed Ordering Officer. The tasking order will be initially issued orally by the appointed Ordering Officer. This order will be followed by a written notification. The notification can be submitted for weekly missions. Delegation of ordering assets by the ordering officer is not authorized. The Contracting Officer will officially notify the contractor in writing to any changes to the authorized ordering officer list.

5.1.1.2 Upon receipt of tasking, the Contractor shall confirm the tasking with the Ordering Officer in writing the number and type of vehicles to be utilized on each shipment NLT 1700 every working day.

5.1.1.3. DeCA/MCT will provide the following information when tasking assets: Transportation Movement Release

(TMR) numbers and consignee, locations where freight is to be picked up and unloaded; truck reporting time at loading point, shipment completion time, short-tons and cubes to be transported; number and type of vehicle(s);

payable mileage and the following cargo information: cargo nomenclature, dimensions and any special handling requirements if material handling equipment is required.

5.1.1.4. Tasked trucks shall report to the consignor at the time specified in the request or in the tasking sheet to receive detailed instruction as to location of freight (warehouse, loading dock, etc.) and precautionary measures for handling the freight. At this time, using Eight Army Transportation Center (EATC) Form 114 (Inspection of

Commercial Vehicle, Attachment 3), the consignor may conduct an inspection of the contractor’s trucks to determine suitability and acceptability thereof for movement of the intended freight. Any of the trucks failing to meet the inspection criteria shall be replaced within two (2) hours by the contractor with assets that meets inspection criteria and can support the transportation mission.

5.1.1.5. In the event the freight offered for shipment by the consignor at the freight loading point differs from the freight tasked by the DeCA/MCT in terms of commodity, weight, cube, or consignee (destination), the Contractor shall immediately contact the nearest DeCA/MCT for 25th TB’s instructions prior to loading the offered freight.

5.1.2. TCMD DD Form 1384 (Transportation Control and Movement Document, Attachment 3)

5.1.2.1. When the truck reports to the consignor, the Contractor shall verify and tally the freight to be picked up against the list on the TCMD presented by the consignor. The Contractor shall affix its signature and time/date on all copies of the TCMD and return one copy to the consignor and carry the remaining copies to the consignee along with the freight.

5.1.2.2. When the delivery is completed, the Contractor shall present the TCMD to the consignee, and the consignee will sign over the typed or printed name in block 28 of all copies of the TCMD presented after verifying and tallying the freight and receipt for it. Two copies of the TCMD shall be given to the Contractor. The Contractor shall retain one of these copies and the other copy shall be submitted to the MCT, which is designated to issue a Government

Bill of Lading (GBL).

5.1.2.3. The contractor shall affix his signature and date to all copies of transportation documents verifying the amount of the commodity loaded and condition thereof against that listed on the transportation documents. For the purpose of this verification, the contractor shall tally the load during the loading process. The contractor’s signature shall constitute evidence of receipt for the commodity from the consignor as indicated on the documents.

5.1.3. Government Bill of Lading USFK Form 79-3EK (Attachment 3):

5.1.3.1. Contractor shall receive an order for line haul transportation service for movement of freight under this contract by means of a properly executed U.S. Government Bill of Lading, USFK Form 79-3EK. In the event the original Bill of Lading is lost or destroyed, a Certificate in Lieu of Lost U.S. Government Bill of Lading, USFK

Form 79-6EK, shall be used to document the shipment.

5.1.3.2. When ready for departure, the contractor shall report to the transportation office of the consignor to receive necessary transportation documents Government Bill of Lading (GBL) and Transportation Control and Movement

Document (TCMD).

5.1.3.3. Contractor shall always attach the US Government Bill of Lading with TCMD (Transportation Control and

Movement Document), DD Form 1384. Contractor shall use the TCMD as documentation for shipment and is the basis of issue of the GBL when commercial transportation is used.

5.1.3.4. Contractor shall distribute the US Government Bill of Lading and Bill for Accessorial Services as described below.

US Government Bill of Lading Distribution:

COPY NUMBERFROM ISSUING OFFICE TO

1. Original Carrier for proof of delivery and payment.

2. Audit Thru 25th TB, 19th RM

3. Carrier Carrier file-main office.

4. Shipper Shipper’s file.

5. Consignee Thru carrier to consignee for file.

6. Carrier Carrier file (Local Office).

7. Carrier Carrier file, or submission for POL Tax Exemption.

8. Management 19TH DMC

9. Fiscal 175TH Finance.

5.1.4. Pick-up and Delivery Schedule. The contractor shall coordinate the pick-up and delivery schedule by the tasking DeCA/MCT. Vehicles shall be provided for loading and unloading during normal duty hours. The US

Government reserves right to refuse any vehicle for unloading after 1700 hours, Monday through Sunday.

5.1.5. Adherence to Delivery Schedule. The contract trucks shall maintain a schedule as detailed in each Exhibit

Line-Item Description in Exhibit#1(Attachment #1). The dry and refrigerated vans or truck shall be no later than 30 minutes late as requested in Ordering Officer’s call order IAW Exhibit Line-Item Description in

Exhibit#1(Attachment #1 ELINs List). The Camp Humphreys Central Distribution Center (CDC) and Osan Central

Distribution Center (CDC) have different gate access times. The Osan Air Force base truck gate opens at 0600. The contract truck shall be at Osan Central Distribution Center (CDC) dock no later than (NLT) 0700. The Camp

Humphreys gate opens at 0500. The contract truck shall be at Camp Humphreys Central Distribution Center (CDC) dock no later than (NLT) 0600.

If Defense Commissary Agency (DeCA) personnel are not on hand when the truck arrives, the driver shall not wait more than 30 minutes. The driver shall note this on his trip ticket, call the origin DeCA/MCT and proceed to his next delivery/pick-up point. If a truck cannot arrive prior to the normal duty hours as described in the pick-up and delivery schedule, the driver shall immediately notify the origin DeCA/MCT and provide the following information:

Reason for delay, when cargo will be delivered, which safe haven the truck driver will utilize. If coordination can be made by the MCT, the late delivery may be completed after normal duty hours. The DeCA/MCT shall provide guidance to the truck driver as to where to transport the cargo.

When DeCA Central Distribution Center (CDC) and commissary stores locate on the same installation, one (1) truck shall make two (2) trips. If there are special requests for three (3) to four (4) trucks, then the one (1) or two (2) additional vans or trucks shall be call in advance to the Contractor for the additional coverage. This coverage shall be available for all stores which Camp Humphreys CDC/ Osan CDC support. When there are special requests for additional trucks, the contractor shall be notified no later than (NLT) 1300 hours the day prior to the operation.

5.1.6, Surveillance Requirements. The Contractor shall provide constant surveillance service on controlled substances while in-transit. The Contractor shall ensure that a carrier representative remains with the vehicle, (awake and not in a sleeper berth) or remains within 100 feet of the vehicle with the vehicle in full, unobstructed view.

5.2. Conditions of Loading and Unloading:

5.2.1. All freight will be loaded and unloaded by the US Government; however, tarpaulins or other covers and such blocking, bracing or tie-down material as may be required to ensure maximum protection of the freight from damage or pilferage, shall be provided by the contractor.

5.2.2. During the period of loading/unloading, the Contractor shall ensure that the doors of the cargo compartment are closed at all times except when supplies are actually being carried into or out of the cargo compartment and shall ensure that the refrigeration unit is running and required temperature ranges are established prior to transporting cargo. However, if it is necessary to keep the pre-cooled atmosphere in the truck and to prevent the refrigeration unit from frosting, the refrigeration may be suspended on agreement between the shipping officer and the

Contractor.

5.2.3. A temperature recording device shall be operated to record temperature for temperature sensitive items. The shipping officer of the Central Distribution Center (CDC) shall seal the recording device with Government furnished seals and enter the seal number on the GBL and TCMD. The device shall be so secured that it cannot be tampered with by unauthorized personnel, including driver and helper aboard the truck. The Contractor shall be responsible to establish the reliability of the temperature records. Upon completion of unloading, the Contractor shall present the record of temperature to the consignee attaching it to the TCMD covering the shipment.

5.2.4. Upon completion of the Government’s placing of freight into the truck, the contractor shall furnish and apply blocking and tie-down material to ensure that the freight is properly loaded, blocked, and braced. All shipment preparation shall include canvas covers to protect cargo from rain and pilferage.

5.2.5. Upon arrival at the destination, the contractor shall report to the consignee to inform them of the shipment arrival and receive instructions as to where the truck(s) are to be spotted for unloading.

5.2.6. It is the contractor’s responsibility to ensure that the receipt for freight delivered is made only by properly designated representatives of the consignee, properly designated by the commander of an activity on DA Form 1687

“Notice of Delegation of Authority to Receipt for Supplies” (Attachment 3). The Contractor has the right to request the presentation of the form listing the persons who are authorized to receipt for the freight delivered.

5.2.7. Prior to the Government unloading of freight, a joint inspection shall be conducted to ascertain whether any damage or loss has occurred to the freight. Representatives of the consignee and the contractor shall conduct this inspection. The freight shall then be unloaded using a joint tally.

5.2.8. If shipment damage or loss is discovered, a statement of the facts shall be entered on the TCMD and GBL covering the shipment. Both the consignee and the Contractor shall sign the statement. The Contractor may not alter information on GBL’s or TCMD’s. All documents shall be prepared jointly by the customer and the 25th

Transportation Battalion. The MCT will notify the COR who will initiate a Discrepancy Report. If there are discrepancies in the transportation documents, the Contractor shall contact the requesting MCT.

5.2.9. When delivery is completed, the Contractor shall present the TCMD to the consignee. The consignee will sign above the typed or printed name in block 28 of all copies of the TCMD presented after verifying, tallying, and receipting the freight. The Contractor shall ensure that the consignee signs and dates the TCMD. Two copies of the

TCMD shall be given to the Contractor. The Contractor shall retain one of these copies and the other copy shall be submitted to the MCT who submitted the request within one week.

5.2.10. Freight Not Delivered Due to Incapability of the US Government or Contractor:

5.2.10.1. The Contractor shall be responsible for conducting a road survey and informing the DeCA/MCT of any consignment that cannot be delivered because of unacceptable road conditions prior to acceptance of a tasking.

5.2.10.2. If the Contractor’s loaded vehicle arrives at a destination and is unable to reach the designated discharge point within the installation, the vehicle’s load must be returned to the originating DeCA CDC within 12 hours for

Reefer and 24 hours for Day Van.

5.3. GBL Ordering.

5.3.1. Any services to be furnished under this contract will be ordered by the Ordering Officer. A copy of each ordering officer appointment will be provided to the Contractor by the Administrative Contracting Officer (ACO).

5.3.2. All GBL's are subject to the terms and conditions of this contract. In the event of conflict between a GBL and this contract, the contract will prevail.

5.3.3. If mailed, a GBL is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods.

5.3.4. The Contractor shall submit invoices on a monthly basis, providing original GBLs in support of their billing.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE TRANSPORATION PUBLICATIONS (CURRENT EDITIONS):

6.1. Transportation References: The following documents are referenced herein and shall be applicable to this

PWS. The most current regulation will be used.

6.1.1. USFK Reg. 55-37, dated 12 Aug 2013.

http://8tharmy.korea.army.mil/g1_AG/Programs_Policy/Publication_Records_Reg_USFK.htm

6.1.2. Mileage Distance Table, published by the 25th Transportation Battalion (25th Trans Bn), Unit #15264, APO

AP 96205-0037, dated February 2009, and http://www.roadplus.com/.

6.1.3. AR 735-11, w/EA Supplement, Accounting for Lost, Damaged and Destroyed Property, Section 5, dated 1

May 85.

6.1.4. USFK Reg 190-1 (Motor Vehicle Traffic Supervision) Section 4, Appendices C-G.

6.1.5. AR 385-55 (Prevention of Motor Vehicle Accidents) dated 12 Mar 1987. Chapter 2-7.

http://www.calguard.ca.gov/gs/Documents/AR385-55.pdf

PART 7

CONTRACT DATA REQUIREMENTS LIST (CDRL)

7. CONTRACT DATA REQUIREMENTS LIST (CDRL):

DELIVERABLE FREQUENCY

# OF COPIES

MEDIUM/FORMAT SUBMIT TO

CDRL #1.

The signed copy of the valid

Auto Insurance

PWS, Para 1.6.1.

Within 10 days after the contract award and prior to the start date of full performance

1 copy Contractor

Format

COR

CDRL #2.

EATC Form 114

PWS, 5.1.1.4.

Twice per month 1 original Government

Format

COR

CDRL#3

DD Form 1384 (TCMD)

PWS, 5.1.2.

Issue per shipment 1 Original and 3 copies

Government

Format

Shipper, Receiver, Origin and destination

MCTs

CDRL #4

USFK Form 79-3 EK (GBL)

PWS, para 5.1.3.

Once Per Week 1 copy Government

Format

COR

CDRL #5

List of Post Pass & DECAL

Request

PWS, Para 1.6.6.

Within one (1) week from the contract award date

1 copy Contractor

Format

COR

PART 8

PERFORMANCE REQUIREMENTS SUMMARY

8. PERFORMANCE REQUIREMENT SUMMARY (PRS):

http://www.roadplus.com/ http://www.calguard.ca.gov/gs/Documents/AR385-55.pdf

8.1. The contract performance requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement.

8.2. The PRS and the contractor’s QCP provide information on contract requirements, the expected level of contractor performance and the expected method of government validation and confirmation of services provided.

These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. The COR or designated representative will conduct the inspections, and any deficiencies are to be provided to the contractor in writing.

Performance

Objective

Standard Performance

Threshold

Method of Surveillance

Remedy

PRS # 1.

All vehicles that the

Contractor provides shall meet the operational and safety standards for both

ROK and US Government as specified in this contract, be in good working condition, be suitable for transporting US

Government cargo/equipment and have insurance coverage of any damage and loss of cargo.

(IAW PWS para 1.6.1)

The contractor shall provide certificates of all vehicles showing those vehicles meet the operational and safety standards for both ROK and US

Government and shall provide insurance coverage.

2 defects Random CAR will be written to show poor performance.

The contractor will contact the

COR within 2 hours and perform re-work at no cost to the government within 12 hours.

PRS#2

All dispatched drivers must possess the driver's license that were issued/approved by ROK Government and comply safety training that was mandated by the ROK

Government.

(IAW PWS Para 1.7.3.2.1) provide all dispatched drivers' license that were issued/approved by

ROK Government and comply safety training that was marked by the ROK

Government.

All drivers will have license and other documentation physically in their possession when required to enter all

U.S. Military

Installations.

No Cell Phone Photo

Copies shall be accepted.

O defects Random

Inspection

CAR will be written to show poor performance.

The contractor will contact the COR within 2 hours and perform replace at no cost to the

Government within

4 hours. If the driver doesn’t have license should not be driving

PRS#3

The Contractor shall provide each employee an identification (ID) badge on contract starts date or employment start date.

(IAW PWS para 1.7.3.2)

The contractor shall report and receive approval for the ID badge from the KO before contract start date.

0 defects Inspection

Random

Sampling

COR will be written to show poor performance. The contractor will contact the COR within 2 hours and perform re-work at no cost to the government within 24 hours.

PRS#4

The contractor shall ensure temperature-controlled device O degrees (Freeze) and 34 degrees(chill).

(IAW PWS para 1.6.1.1.1.

-4)

Trucking Device

(Temp Tail) with+ and -2 degrees

2 degrees +/- Random

Sampling

The contractor shall contact the COR within 2 hours and correct at no cost to the Government within 6 hours.

Reduce up to 5% of monthly payment.

PRS#5

Truck on time

CP Humphreys CDC and

Osan CDC have different

Gate access times. Osan

Truck Gate opens 0600, should be at Osan CDC dock NLT 0700.

Humphreys Truck Gate opens 0500, should be at

Humphreys CDC dock

NLT 0600.

(IAW PWS para 5.1.5)

Truck shall be no later than 30 minutes late as specified in the requested

Ordering Officer's call order IAW

Exhibit Line-Item

Description in

Exhibit#1(Attachmen t #1 ELINs List)

97% Random, Periodic, Customer

Complaint

Get truck back on schedules and reduce up to 5% of monthly payment

PRS#6

Vehicle Maintain

(IAW PWS para

1.6.1)

IAW vehicle manufacture standards

1 truck for every 50 inspected

Random, Periodic

Replace truck within

4 hours

PRS#7

Truck Driver follows the quality control measures given to them by their manager

(IAW PWS para 1.4.)

The quality control plan's checklist be completed

2 defects Random, Periodic

Driver should stop travel and completed

QCP checklist prior to moving again.

PRS#8

TCMD (Transportation

Control and Movement

Document, DD Form

1384)

(IAW PWS Para 5.1.3.3.)

The contractor shall always attach the US

Government Bill of

Lading with TCMD

(Transportation

Control and

Movement

Document), DD Form

97% Random TCMD

Recovered and presented. Failure to present results no pay for the day.

PRS#9

Locking capability and the capacity to haul the load tasked.

(PWS Para 1.6.1.1.5.)

The contractor shall provide dry and refrigerated vans or trucks with locking capability on all doors that the seal by DeCA can be inserted and the capacity to haul the loads tasked

97% Random

Inspection

Fix locking capability on all doors and the capacity. CAR will be written to show poor performance.

The contractor will contact the COR within 2 hours and perform re-work at no cost to the

Government within

8 hours. If and when a contractor fails to provide vans or trucks with locking capability on all doors that seal by DeCA can be inserted and the capacity to haul the loads tasked for three (3) times per month, reduce up to 5% of monthly payment.

PRS#10

The contractor shall be responsible to arrange for base passes and necessary vehicle permits required for entry onto this installation prior to performing any work under this contract.

The Government will issue passes/decals to only personnel and vehicles of the

Prime Contractor. (PWS

Para 1.6.6.)

submit the application for passes and vehicle permits for drivers at least 60 days prior for initial passes and 30 days prior for renewal passes from the date the delivery services start.

95% Random

Inspection

CAR will be written to show poor performance.

The Contractors who have escort privilege on their base pass shall escort the drivers to the military installation immediately.

PRS#11

Truck Tonnage

The contractor shall provide correct tonnage and capacity of vehicles IAW attachment

1, Exhibit Line-Item

Numbers (ELINs) list and

PWS Part 9. Number of pallet load capacity per truck and pallet size which is suitable for transporting the requested cargo.

(PWS para 1.6.1./1.6.1.1.5, Part 9)

All contractor vehicles in the performance contract shall be correct tonnage and suitable capacity for transporting the requested cargo IAW attachment 1, Exhibit

Line-Item Numbers

(ELINs) and PWS Part

9. Number of pallet load capacity per truck and size.

The size of the dry and refrigerated vans or trucks shall be verified by vehicle registration document

(자동차등록증) issued by ROK government.

97% Random

CAR will be written to show poor performance. If and when a contractor fails to provide correct tonnage of vehicles IAW attachment 1, Exhibit Line-Item

Numbers (ELINs) for three (3) times per month, reduce up to 5% of monthly

PRS#12

Alteration

Alteration, modifications, or rehabilitation of the dry and refrigerated vans or trucks shall be indicated in the vehicle registration document (자동차등록증) issued by ROK

Government.

The dry and refrigerated vans or trucks that are illegally altered, modified, or rehabilitated shall not be accepted.

Alteration, modifications, or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .