B08 W91QVN24R0054-0001..pdf
PDF 192 KB Posted
- Attached to
- Microwave Antenna & Equipment Decommission, FY24
- Solicitation number
- W91QVN-24-R-0054
About this file
This document is an amendment (Amendment #1) to Solicitation W91QVN-24-R-0054 for Microwave Antenna & Equipment Decommission, FY24 issued by the Department of the Army Materiel Command Army Contracting Command.
The amendment provides responses to questions received regarding the Performance Work Statement (PWS). Key details include:
- The contractor shall repair the 2.2 km access road to the CONCORD site only in the sections where vehicle access is not possible, using concrete.
- The contractor shall install a standard ANSI security fence with chain link type, rust-proof zinc coating, ground anchor installation, and a total estimated fence area of 20m x 50m with a front access door for the HUMP SSA BLDG S6961 temporary DRMO storage space.
- The contractor shall repair the communication facility floor tiles, which have a concrete base, after decommissioning the C4I equipment racks at the specified sites.
All other terms and conditions of the solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN24R0054 Attachment (PWS).pdf | ||
| W91QVN24R0054 (MW Antenna Decommission).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0012092288
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
1. The purpose of this amendment is to answ er the questions received.
2. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jun-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN24R0054
X 9B. DATED (SEE ITEM 11)
13-Jun-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jun-2024
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
HUMPHREYS CONTRACTING DIVISION
UNIT 15289
APO AP 96271-5584
UNITED STATES
W91QVN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91QVN24R0054
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT #1
QUESTIONS AND ANSWERS
W91QVN-24-R-0054
MW Antenna and Equipment Decommission
No Question Answer
PWS 5.9.1 Contractor shall repair the 2.2KM access road to CONCORD site.
I need a precise scope of work.
a. Please confirm whether we need to repair only the sections where vehicle access is not possible within the 2.2 km, or if the entire 2.2 km needs to be maintained.
b. Please also confirm the type of pavement (asphalt, cement, concrete)
a. The contractor shall repair the access road only the sections where vehicle access is not possible within the 2.2 km.
b. The contractor shall repair the access road using concrete.
PWS 5.9.3 Contractor shall install secure fence in HUMP SSA BLDG S6961 temporary DRMO storage space for physical security.
a. I need the fence installation drawings.
b. We need a PWS specifying the type and method of fence installation - Fence material, fence installation method (such as ground anchor installation), and scale.
a. The Requiring Activity (RA) will provide the fence installation after contract award based on DPW facility layout drawing.
b. Standard ANSI security fence with following fence specification.
Type: Chain link type with rust proofing zinc coat
Anchor: Ground anchor installation
Base size: 2000(W) X 1800(H) (unit: mm)
Origin: Made in Korea
Total Estimated Fence Area: 20(L) X 50(W)
(unit: meter) with front area access door
PWS 5.2.6 The contractor shall repair the communication facility floor tiles after decommissioning the C4I equipment racks.
Please provide the type of floor tiles for each area.
PAPYONGSAN (PAJU): Floor tiles with concrete base
CONCORD (YANGJU): Floor tiles with concrete base
W91QVN24R0054
CASEY TCF (DONGDUCHON): Floor tiles with concrete base
CASEY TVHILL (DONGDUCHON): Concrete base only
SALEM (KUMI GEUMOSAN): Floor tiles with concrete base
CAMP MORSE (SEOUL NAMSAN): Floor tiles with concrete base
(End of Summary of Changes)
File details come from the government source that posted it. Updated .