RevisedDrawingW91QVN24R00430001.PDF
PDF 11 MB Posted
- Solicitation number
- W91QVN24R0043
About this file
This document appears to be a set of revised drawings related to solicitation number W91QVN24R0043 for the replacement of the HVAC system with a VRF unit for buildings S-424, 1078, and 2072 at USAG Humphreys. The solicitation was issued by the Department of the Army Materiel Command Army Contracting Command. The project involves replacing the existing HVAC system with a new VRF (Variable Refrigerant Flow) unit for the specified buildings at the USAG Humphreys military installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN24R00430001.pdf | ||
| W91QVN24R0043.pdf | ||
| Drawings W91QVN24R0043.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24-019
1 2
CZUMAK.JAMES.CHRISTOPHER.1531075907
Digitally signed by
CZUMAK.JAMES.CHRISTOPHER.1531075907
Date: 2024.01.24 07:54:01 +09'00'
2 2
1 38
2 38
3 38
4 38
5 38
6 38
7 38
8 38
A I B I
SCOPE OF WORK FOR B-424
HVAC WORK (REPAIR / MAINTENANCE)
1. REPLACE EXISTING FAN COIL UNIT SYSTEM WITH NEW VRF SYSTEM.
2. REPLACE EXISTING CEILING DIFFUSERS WITH NEW (TYP).
3. REMOVE EXISTING INDOOR AND OUTDOOR HEAT PUMP SYSTEM WITH ALL ASSOCIATED PIPING
AND ELECTRICAL WIRING.
4. CONNECT NEW VRF SYSTEM TO EXISTING DDC CONTROL SYSTEM (LON COMMUNICATION)
AND UPDATE DIRECT DIGITAL CONTROL SYSTEM AND GRAPHICS.
5. INSTALL CASING FOR REFRIGERANT AND DRAIN PIPING AND PAINT WITH CURRENT SAME EXTERIOR
COLOR.
6. REPAIR ALL DAMAGES OR BLOCK UP OPENINGS IN EXISTING AREA CAUSED BY THIS PROJECT
AND MATCH TO EXISTING ADJACENT AREA.
GENERAL NOTES
1. ANY PIPES THAT PENETRATE FIRE RATED WALL (EXISTING/ NEW) SHALL BE SEALED
PER THE O&MA SPECIFICATIONS AND THE O&MA STANDARD DETAIL DRAWINGS.
2. ANY CONNECT TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT
DAMAGE THE EXISTING EQUIPMENT, DUCT WORK, PIPING ETC. DAMAGED DUE TO
THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR
REPLACED BY THIS CONTRACTOR.
3. ALL MANUFACTURERS INSTRUCTION SHOP DRAWINGS SHALL BE SUBMITTED TO
THE CONTRACTING OFFICER FOR APPROVAL PRIOR TO COMMENCING ANY
INSTALLATION.
4. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP
DRAWINGS.
5. ALL WALUFLOOR/ROOF OPENINGS RESULTED FROM THE REMOVAL OF PIPING AND
DUCTWORK THAT IS NOT TO BE RE-USED SHALL BE PATCHED OR RESTORED TO
MATCH ADJACENT SURFACE OR AREAS.
6. ALL HVAC PIPING/DUCTWORK TO BE REMOVED SHALL INCLUDE ALL IT'S
ACCESSORIES SUCH AS ANCHORS, HANGERS/SUPPORT, ETC.
7. ALL SUPPLY, RETURN, AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED
ACCORDING TO SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS METAL AND
FLEXIBLE, LATEST VISION, AS TO REINFORCING RECTANGULAR DUCT OVER ITS
ASPECT RATIO.
8. ALL MECHANICAL SYSTEMS SHALL BE TESTED, ADJUSTED, AND BALANCED BY THE
CONTRACTOR IN STRICT ACCORDANCE WITH APPICABLE SECTIONS OF DIVISION 15
- MECHANICAL, O&MA STANDARD TECHNICAL SPECIFICATIONS, KOREA.
9. THE CONTRACTOR SHALL SUBMIT DESIGN DRAWINGS INCLUDING SIZING FOR
REFRIGERANT PIPING AS SHOP DRAWING SUBMITTALS.
10. CONTRACTOR SHALL VERIFY THE EXISTING CONTROL SYSTEM AND SOLAR HEATING
SYSTEM AND COORDINATE WITH JCI PRIOR TO COSTRUCTION WORK COMMENCE
TO SATISFY THE OPERATION OF THOSE SYSTEM IN ORIGINAL INTENTED SQUENCE
BEFORE REMOVAL WORKING.
11. THE CONTRACTOR SHALL INSTALL VRF SYSTEM & VENTILATOR IN ACCORDANCE WITH
MANUFACTURER'S GUIDANCE.
12. THE CONTRACTOR SHALL SUBMIT COMMISSIONING & TAB (TESTING, ADJUSTING, &
BALANCING) REPORTS TO THE ENGINEER THROUGH C.O.R.
I I
C
ITEM NO
A
NOTE:
ITEM NO
I D I E
SCOPE OF WORK FOR B-1078
HVAC WORK (REPAIR / MAINTENANCE)
1. REPLACE EXISTING FAN COIL UNIT SYSTEM WITH NEW VRF SYSTEM.
2. REPLACE EXISTING CEILING DIFFUSERS WITH NEW (TYP).
3. REMOVE EXISTING INDOOR AND OUTDOOR HEAT PUMP SYSTEM WITH ALL ASSOCIATED PIPING
AND ELECTRICAL WIRING.
4. INSTALL CASING FOR REFRIGERANT AND DRAIN PIPING AND PAINT WITH CURRENT SAME EXTERIOR
COLOR.
5. REPAIR ALL DAMAGES OR BLOCK UP OPENINGS IN EXISTING AREA CAUSED BY THIS PROJECT
AND MATCH TO EXISTING ADJACENT AREA.
I F I G I H
SCOPE OF WORK FOR B-2072
HVAC WORK (REPAIR / MAINTENANCE)
1. REPLACE EXISTING FAN COIL UNIT SYSTEM WITH NEW VRF SYSTEM.
2. REMOVE EXISTING INDOOR AND OUTDOOR HEAT PUMP SYSTEM WITH ALL ASSOCIATED PIPING
AND ELECTRICAL WIRING.
3. REMOVE EXISTING CHILLER AND CHILLED WATER PUMP SYSTEM WITH ALL ASSOCIATED PIPING.
4. REMAIN EXISTING CHILLER PAD.
5. PROVIDE CASING FOR REFRIGERANT AND DRAIN PIPING AND PAINT WITH CURRENT SAME EXTERIOR
COLOR.
6. PROVIDE ONE (1) EA DOAS AND LOW LEAKAGE DAMPER.
7. PROVIDE OUTDOOR AIR SUPPLY DUCT AND CEILING DIFFUSER SYSTEM.
8. REPLACE EXISTING VENTILATOR FOR TOILETS WITH NEW.
9. PROVIDE ONE (1) EMERGENCY SHUT OFF SWITCH.
10. REPAIR ALL DAMAGES OR BLOCK UP OPENINGS IN EXISTING AREA CAUSED BY THIS PROJECT
AND MATCH TO EXISTING ADJACENT AREA.
EQUIPMENTS SCHEDULE - I
Q'TY
1.
2.
3.
4.
Q'TY
SERVICE T Y P E
SUPPLY FAN
FLOW ESP
CFM Pa
DEDICATED OUTDOOR AIR SYSTEM (DOAS)
COOLING COIL
CAP. EAT (
F) LAT (°F)
BTUH DB/WB DB/WB
HEATING COIL
CAP. EAT (
F) LAT (
F)
BTUH DB/WB DB/WB
RE-HTG
CAP.
BTUH
REF. FILTER
REF. PIPE SIZE
(INCH)
POWER
1--�--�---+-�-�--�-�------, RL RG(H) RG(L) FLA MCA MOP V PH/HZ
REMARK
B-2072 VRF SPLIT COMPACT TYPE 670 250 70,000 82 / 75 55 / 53 40,000 42.8 /30.1 68 / 44.6 13,000 R410A 2"FLAT 1/2 3/4 1-1/8 5.8 7.3 1 5 230 1 /60 G)@@@
DISCHARGE AIR TEMP CONTROL WITH FACTORY MTD SENSOR.
INTEGRATED DE-HUMIDIFICATION CONTROL WITH HOT GAS RE-HEATING
UNIT INTEGRATED CONDENSATE DRAIN PUMP, DISCONNECTING SWITCH AND SUPPLY DUCT AIR TEMP & HUMIDITY SENSOR.
LG ARND093DCR4 OR APPROVED EQUAL.
VRF OUTDOOR UNIT
SERVICE T Y P E
GROSS OUTPUT
COMPRESSOR POWER (BTUH) REF.TYPE
COOLING HEATING TYPE RLA MCA MOCP
IDU - 1, 2, 4, 5, 8,
9, 1 0, AND 11
IDU -3, 6, 7, 12,
AND 13
IDU - 14, 16, 17, 19,
21, 24, AND 25
IDU - 15, 18, 20, 22,
AND 23
IDU -32-37
IDU - 26 -31 AND
38-40
DOAS-1
HEAT PUMP TYPE 96,000
HEAT PUMP TYPE 72,000
HEAT PUMP TYPE 119,700
HEAT PUMP TYPE 72,000
HEAT PUMP TYPE 72,000
HEAT PUMP TYPE 96,000
HEAT PUMP TYPE 72,000
108,000 R-410A
81,000 R-410A
135,000 R-410A
81,000 R-410A
81,000 R-410A
108,000 R-410A
81,000 R-410A
DC SCROLL 16.4 28.5 40
DC SCROLL 14.1 22.6 35
DC SCROLL 18.3 30.9 40
DC SCROLL 14.1 22.6 35
DC SCROLL 14.1 22.6 35
DC SCROLL 16.4 28.5 40
DC SCROLL 14.1 22.6 35
REMARK
V/PH/HZ
200 /3 /60 G)®@@
200 / 3 / 60 G)®@@
200 / 3 / 60 G)®@@
200 /3 /60 G)®@@
200 /3 /60 G)®@@
200 /3 /60 G)®@@
200 /3 /60 G)®@@
NOTE: 1. MFR'S STANDARD ADJUSTIBLE OUTDOOR UNIT MOUNT KIT W/NEOPRENE RUBBER PAD VIBRATION ISOLATOR.
I
2. INTERGRATED VRF SYSTEM CENTRAL CONTROL PANEL (AC SMART5 OR EQUAL) W/LON GATEWAY.
3. LOW AMBIENT KIT FOR LOW OA TEMP. OPERATION IN WINTER
4. LG ARUM072BTE5 OR APPROVED EQUAL (OPERATING RANGE FOR COOLING 5 - 122F (DB), HEATING -22 -61 F (WB)).
5. LG ARUM096BTE5 OR APPROVED EQUAL (OPERATING RANGE FOR COOLING 5 - 122F (DB), HEATING -22 -61 F (WB)).
6. LG ARUM121BTE5 OR APPROVED EQUAL (OPERATING RANGE FOR COOLING 5- 122F (DB), HEATING -22-61F (WB)).
I I I
SYMBOL ZONE DESCRIPTION
R E V IS I O NS
DEPARTMENT OF THE ARMY
DA TE BY CHK. A PVD.
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT# 15228, APO AP 96271-5228
REVIEWED BY ;�:::���I
REV
BY
REPLACE HVAC SYSTEM WITH
O&M DIV SUBMITTED BY VRF UNIT FOR S-424, 1078, 2072
SECU RITY DIV. CM BR.
FIRE SERV. DIV. DESIGN BR.
SA FETY OFC. CHIEF, ENGR. DIV.
MASTER PLAN DIV. USING A GENCY
I
USAG HUMPHREYS
MECHANICAL
SCOPE OF WORK AND
EQUIPMENTS SCHEDULE-I
PROJECT NO.
�-300000273686
SCALE :
AS SHOWN
DRAWING NO.
SHEET OF
REF NO.
M-2
1459168822.LN
Polygon
1459168822.LN
Polygon
1289988820.LN
Typewritten Text 24-019
1289988820.LN
Typewritten Text 9 38
10 38
11 38
12 38
13 38
14 38
15 38
16 38
17 38
18 38
19 38
20 38
21 38
22 38
23 38
24 38
25 38
26 38
27 38
28 38
29 38
30 38
31 38
32 38
33 38
34 38
35 38
36 38
37 38
38 38
| VT3B84~1 |
| VT-300000273686-m2 |
| Untitled |
File details come from the government source that posted it. Updated .