W91QVN23R0068 MPD AND Service TC DRAFT PWS.docx

DOCX document 617 KB Posted

Attached to
Military Personnel Division and Transition Center Service for IMCOM-P, Korea
Solicitation number
W91QVN23R0068
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE-BASED WORK STATEMENT (PWS)

FOR

Military Human Resources (HR), Military Personnel Division (MPD), Transition Center (TC), Retirement Services Office (RSO) and non- Personnel Services Delivery Redesign (PSDR) S1 services for US Army Installations in the Republic of Korea

IMCOM-Pacific

27 December 2022

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

INSTALLATION MANAGEMENT COMMAND PACIFIC (IMCOM-Pacific), REPUBLIC OF KOREA UNITED STATES ARMY MILITARY PERSONNEL DIVISION, TRANSITION CENTERS, RETIREMENT SERVICES OFFICE, AND NON -PERSONNEL SERVICES DELIVERY REDESIGN S1

PART 1

General Information

1. GENERAL: This is a non-personal services contract to provide Military Human Resources (HR), Military Personnel Division (MPD), Transition Center (TC), Retirement Services Office (RSO) and non- Personnel Services Delivery Redesign (PSDR) S1 services for Soldiers, Command Sponsored Dependents, DoD Civilians and Retiree’s assigned to US Army in the Republic of Korea (ROK). The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide military HR required for MPD, TC, RSO and non-PSDR S1 services for Soldiers, Command Sponsored Dependents, DoD Civilians and Retirees assigned to US Army in the ROK.

1.2 Background: The primary workload shall be performed at four ROK Garrisons for support at site organizations. The contractor shall provide all MPD, TC, RSO and non-PSDR S1 military HR services at four (4) Garrisons (Areas I, II, III, IV (see TAB C-Map of Areas I-IV)), and the non-PSDR units located across the Korean peninsula (see TAB D List of Organizations to include non-PSDR Units).

1.3 Type of Contract: The government will award a Firm-Fixed Price contract.

1.4 Objectives:

· Data Accuracy: Accuracy of information impacts not only on decisions made by Commanders, it affects readiness and the common operating picture, and impacts Soldiers and their Families. For Soldiers, accurate information impacts their careers, retention, compensation, promotions, and general well-being. For Family members, accuracy of information is critical for next of kin (NOK) notification if a Soldier becomes a casualty. HR providers must understand the dynamic nature of the Army’s HR Information System (HRIS) architecture and the fact that data input at the lowest level has direct impact on decisions being made at the highest level.

· Timeliness: Timeliness ensures decision makers have access to relevant HR information and analysis that supports current and future operations. It also supports a near real-time common operational picture across all echelons of HR support.

· Responsiveness: Responsiveness is providing the right support to the right place at the right time. It is the ability to meet ever-changing requirements on short notice and to apply HR support to meet changing circumstances during current and future operations. It involves identifying, accumulating, and maintaining sufficient resources, capabilities, and relevant information to enable commanders to make rapid decisions.

· Integration: Maximize effectiveness by joining all elements of HR support (tasks, functions systems, processes, and organizations) with operations ensuring unity of purpose and effort to accomplish the mission. Innovation and technology play a tremendous role in these objectives since only throughout innovation HR professional can keep remain relevant and provide the most effective ways for mission accomplishment.

· Anticipation: Foresee events and requirements in order to initiate the appropriate HR support.

1.5 Scope: The contractor shall conduct daily functions under the general guidance of an appropriate Government/Military Official from IMCOM-Pacific.

1.6 Period of Performance: The period of performance (PoP) will include a phase-in period (30 days), a base period (11 months), and two (2), 12-month option periods. The PoP reads as follows:

Base Period (Phase-In): 1 July 2023 – 14 August 2023 Base Period (Full Performance): 15 August 2023 – 30 June 2024 Option Period I: 1 July 2024 – 30 June 2025 Option Period II: 1 July 2024 – 30 June 2026

1.6.1 Phase-In Period: The contractor shall execute an effective phase-in period to address all requirements with minimal disruption to operations. The contractor shall assume full responsibility for work in each functional area by the end of the phase-in period. The contract awardee shall exercise their phase-in and phase-out plan, during the phase in and phase out period between contract award and termination.

1.6.2 Phase- Out Period: The services provided by this contract are vital to the Government’s overall effort and services must be maintained without interruption. Therefore, during the 45-calendar day period immediately prior to the end of the contract, the current contractor shall, if applicable, permit the successor contractor or the government MPD to observe and become familiar with all operations under this contract. The contractor shall not defer any needed services for the purpose of avoiding responsibility or transferring such responsibility to the successor contractor or the government MPD. The contractor shall provide a written phase-out due 30 days of award.

1.7 Performance: The contractor shall perform all military HR MPD, TC, RSO, and non-PSDR S1 military HR functions in accordance with Department of Defense and Army regulations, policies, directives, local regulations and directives, and the contract. The contractor shall perform the administrative tasks required for the daily operation of the MPD, TC, RSO and non-PSDR S1.

1.7.1 Administrative: The contractor shall perform these tasks at each MPD, TC, RSO and non-PSDR S1:

a. Coordinate with the designated Contracting Officer Representative (COR) and/or Assistant Contracting Officer Representative (ACOR) concerning daily work-flow requirements and priorities.

b. Perform general administrative tasks required for the daily operation of the MPD, TC, RSO and non-PSDR S1.

c. Maintain a customer service area to handle inquiries and refer clients to the appropriate MPD, TC, RSO and non-PSDR S1 sections. Customer service areas shall operate during the established business hours.

d. Perform administrative duties such as data entry, desktop publishing, word processing, general clerical duties, uploading documents to iPERMS, taking notes at meetings, filing, photocopying, correspondence, daily distribution of requirements, and answering MPD, TC, RSO and non-PSDR S1 telephone lines.

e. Maintain work areas in a safe, clean and orderly manner at all times.

f. Each specific task for MPD, TC, RSO and non-PSDR S1 are required to have a desk side Standard Operating Procedures (SOP). These SOPs will be kept current, pen and pencil updates as changes occur, then reprinted quarterly.

g. At Government’s request, the contractor may be required to assist third party agencies during official investigations and inquiries such as Military Law Enforcement Agencies and Army Career Counselors.

Assistance may include the following: provide Government’s copies of inventories/logs, reports, and Soldier’s personal files and generate memorandum for record. The contractor shall ensure all releases of information to third parties is in accordance with the Freedom of Information Act (FOIA).

1.8 Quality Control (QC). The contractor shall develop and implement procedures to identify, prevent, and ensure non- recurrence of defective services

1.8.1 Quality Control Plan (QCP). The contractor shall develop and maintain an effective QCP to ensure services are performed in accordance with this PWS. The QCP must be a comprehensive plan to execute and deliver quality services to the Government. The contractor’s QCP is the means by which he assures himself that his work complies with the requirement of the contract.

a. The contractor shall submit a QCP to the Government within 30 calendar days after the contract is awarded for review and acceptance.

b. The QCP shall be used by the contractor to collect data, evaluate and document performance against standards associated with each specific requirement. Performance is measured by assessing the required workload quantity in terms of quality and timeliness

c. Include the requirement to maintain documentation of all contractor quality control inspections and corrective actions to be maintained by the contractor throughout the term of this contract. Inspection documents and the corrective action taken shall be made available to the COR/ACOR and the KO or designated representative.

d. Must include a Quality Control Report (QCR).

e. After acceptance of the QCP the contractor will receive the COR’s acceptance in writing of any proposed change to his QC system.

1.8.2 Quality Control Report (QCR).

a. Shall meet the objectives of the QCP, shall cover and prioritize all services described in this contract, and mirror the requirements of the Performance Requirements Summary (PRS) table.

b. Contain specific quality control techniques and standards for contract services identified in the PRS and Inspection of Services Clause list. The quality control methods of following the deskside SOPs shall be comprehensive and adaptable to the reporting systems of the QCP. Control measures must be specified, and metrics developed to ensure accurate program monitoring.

c. Establishes a monthly inspection system covering all services required by this contract following the task performance guidance as outlined in the SOPs. This plan shall specify areas/tasks from the SOPs to be inspected on either a scheduled or an unscheduled basis and the title of the individual who will do the inspection.

d. Submitted to the government COR/ACOR by the 5th working day of every month.

e. The contractor shall use the format below to create the QCR and measure each line item in the PRS table. See example below.

Required Service PWS Paragraph

PERFORMANCE STANDARD

What level of performance is required to meet the Performance Objective or Task?

Acceptable Quality Level (AQL)
WHAT/DATA SOURCE

What are you going to inspect?

HOW/METHOD OF ASSESSMENT

How are you going to inspect? see drop down list

CALCULATION

How will you determine if the AQL and Standard are being achieved?

REMEDY

Contract
Para
100%
Contractor
Random
Contractor will
Corrected
Management
The contractor shall
submits based
Monitoring,
submit
within 24

develop and maintain

on PWS
100% Inspection,
(Pass/Fail)/AQL
hours

an effective Quality

requirement.
Periodic

Control Program

Inspection, (QCP) to ensure

Customer services are performed

Complaints, in accordance with

Periodic this PWS

Sampling

1.8.3 Performance Requirements Summary (PRS) table and Standard Operating Procedures (SOPs). Describes a method acceptable to the Government of identifying deficiencies in the quality of service performed under this contract before the level of performance becomes unacceptable and address processes for corrective actions without dependence upon Government direction.

1.8.4 Customer Complaint Feedback. Include a customer complaint feedback system that is monitored for correction of validated complaints and to inform the Government of corrections using Interactive Customer Evaluation (ICE), a web-based tool that collects feedback on services provided by various organizations throughout the Department of Defense (DoD). The ICE system allows customers to submit online comment cards to provide feedback to the service providers they have encountered at military installations and related facilities around the world. It is designed to improve customer service by allowing managers to monitor the satisfaction levels of services provided through reports and customer comments. The QCP shall describe how the Government may identify problem areas or situations to the contractor. The customer complaint program shall be compatible with the reporting and communication systems of the QCP.

1.8.5 Quality Assurance: The government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). The QASP is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the Acceptable Quality Levels (AQLs).

1.9 Hours of Operation: The contractor is responsible for conducting business between the hours of 0800-1700, Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor will maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential. Each MPD, TC, RSO and non-PSDR S1 shall be open and operational at least forty (40) hours per week. The hours of operation shall be established from 0800-1700 hours; not to exceed more than nine (9) consecutives hours per day, Monday – Friday except on legal holidays listed in this PWS 1.9.2. The COR/ACOR will establish each Garrison hours of operation in accordance with each Garrison Commander’s guidance. The hours of operation may vary during installation closing due to inclement weather, force protection exercises, and/or special operations in which the contractor may not be permitted in the work area. Each Area Site Manager, or afore designated alternate, shall be physically available at the MPD area government facility between 0800 to 1700, Monday thru Friday except Federal holidays or when the government facility is closed as mentioned above.

1.9.1 No proposed or directed change in working hours shall be effective until approved in writing by the KO.

1.9.2 The contractor shall observe the following as legal public holidays. As such, the MPD, TC, RSO and non-PSDR S1 shall not be required to conduct normal operations on these holidays:

US Government legal holidays are as follows:

· 1st January (New Year's Day)

· 3rd Monday, January (Dr. King’s Birthday)

· 3rd Monday, February (President's Day)

· Last Monday, May (Memorial Day)

· 19th June (Juneteenth)

· 4th July (Independence Day)

· 1st Monday, September (Labor Day)

· 2nd Monday, October (Columbus Day)

· 11th November (Veterans' Day)

· 4th Thursday, November (Thanksgiving Day)

· 25th December (Christmas Day)

1.10 Place of Performance: The work to be performed under this contract will be performed at Camp Casey, Yongsan (K-16), Camp Humphreys, and Camp Walker. Satellite sites might be established at other locations in order to support training exercises and the Korea Relocation Program. Contractor personnel may be required to visit other installation offices in the execution of their duties.

1.10.1 The Project Manager (PM), or afore designated alternate, shall be physically available at the Camp Humphreys MPD government facility between 0800 to 1700, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons or when conducting quarterly Quality Control Inspections at other Area MPDs.

1.10.2 Each Area Site Manager, Area Site Lead, Senor Transition Analyst, Retirement Services Officer, Personnel Automation Support (PAS) Chief, and Quality Assurance Specialist, or afore designated alternate, shall be physically available at their designated MPD area government facility between 0800 to 1700, Monday thru Friday except Federal holidays unless the government facility is closed for administrative reasons.

1.10.3 Place of performance is subject to change as personnel and resources shift from one garrison to another. The government reserves the right to direct/govern place of performance as required and necessary to support new mission requirements. No additional cost or price change will be made for relocations that may occur between the four MPD locations.

1.11 Special Qualifications: Contractor employees in key position shall have military HR automation experience, have knowledge of military HR doctrine, qualified, certified or licensed under the requirements specified in individual sections of the PWS prior to starting work. The contractor (PM) shall maintain records of all military HR automation training qualifications, certifications, and licenses on each employee for the duration of their employment. These records shall be available to the COR/ACOR or designated representative upon request. The contractor (PM) shall initiate all NIPRNET and military HR system(s) access requests and submit to COR for further processing within 30 days of employee receiving their CAC ID. The contractor shall provide internal military HR systems and technical training to ensure that employees remain qualified, certified, and licensed.

1.11.1 The government reserves the right to ask contractor to conduct and complete other required training. This training may include: Information Security/Assurance, Anti-Terrorism Training, Operations Security Training, Suicide Prevention Program, and Sexual Harassment Assault Response Prevention (SHARP) Program Training and any HR system(s) job specific training to gain access to the HRIS. IMCOM Operation Excellence (OPEX) Customer Service Training and Annual Refresher Training. New employees should complete OPEX within their first 30-90 days of employment. OPEX is a four-hour course for all employees. Key Position personnel shall attend the initial four-hour OPEX training to include OPEX for Leaders an additional four-hours of training. The cost of mandatory/required training is the full responsibility of the government.

1.11.2. Application for Status of Forces Agreement: Contractor shall submit the following documentation for each employee.

1.11.2.1 Complete USFK Form 700-19A-R-E, IAW USFK, FKAQ Contractor SOFA Designation Request Process Guide, regardless if employee is TDY, part time employee or full time employee

1.11.2.2 USFK Form 237-E, Provost Marshal Record Check

1.11.2.3 Certification of Ordinary Residence Memorandum

1.11.2.4 Copy of Passport Data Page for employee and/ or dependents.

1.11.2.5 Additional documentation shall be required in some cases at the request of USFK, FKAQ. These requirements are subject to change at any time and without notice. All documentation shall be submitted thirty (30) calendar days after contract award. New Arrival SOFA Designation request shall be submitted to Responsible Officer (RO) and/ or COR within two weeks before the contractor start date whenever a new contractor employee is hired IAW USFK Regulation 700-19. Change of Data SOFA Designation requests shall be submitted to RO and/ or COR within one week after change has occurred and within three weeks of current 700-19 expiration date.

1.11.3 All contractor employees in key position shall have knowledge of US Army military HR systems required to provide military HR services and support i.e. CITRIX, PERNET, EDAS, WebEdas, TOPMIS II, AIM2 and eMILPO, DAMPS-OCO-TCS, TRANSPROC, ISM (INPROC and OUTPROC) (not all inclusive) and any Korea specific military HR programs or programs required by the NEC. IPPS-A is a new Army military HR system that will subsume many of the current Army military HR systems addressed in this paragraph on or about mid-December 2022 and mid-January 2023. Upon implementation any references to legacy Army military HR systems subsumed will be replaced by IPPS-A.

1.11.4 Local National employees must have the ability to speak, comprehend, read and write English proficiently and have some knowledge of HR (US Army military) procedures and HR (US Army military) HR Systems.

1.12 Contracting Officer Representative (COR)/Assistant Contracting Officer Representative (ACOR): The COR/ACOR shall be designated in writing by the KO to act as his or her authorized representative to assist in administering this contract. The COR/ACOR is responsible for technical administration of this contract and ensures proper government surveillance of the contractor’s performance. The COR/ACOR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor contractor's performance and notifies both the KO and contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR/ACOR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR/ACOR, especially about changes in cost or price, estimates or changes in delivery dates. The COR/ACOR is not authorized to change any of the terms and conditions of the resulting order.

1.13 Key Positions: The contractor shall provide qualified personnel to fill each of the Key Positions and perform the Key Position duties stated in Technical Exhibit 3. A single person may not fill more than one (1) Key Position at the same time. The contractor shall designate in writing, a primary and alternate Key Position point of contact. The contractor shall provide the names, telephone numbers, fax numbers, and e-mail addresses, as well as the individuals' level of authority. The contractor shall submit the same information and criteria for any person acting as an alternate to the COR/ACOR. Key personnel shall not be replaced or relocated without prior approval of the COR/ACOR and KO.

1.13.1 The contractor shall provide resumes within 10 working days of start date for any new Key Position. Each resume shall detail each of the supporting qualifications that meet all of the requirements stated in Technical Exhibit 3 for each Key Position. If the contractor fails to meet this requirement for any of the individual Key Positions, this shall be a material breach of this contract by the contractor and may result in the government terminating this contract for cause. The KO and COR retains authority to approve and disapprove the persons to fill each Key Position based on the established criteria in Technical Exhibit 3.

1.13.1.1 The KO will notify the contractor after receipt of all required information of the KO’s decision to approve or disapprove each person for each Key Position. If the contractor fails to obtain the KO’s approval for any of the personnel who are to fill Key Positions in advance of the date of any required performance by the Key Position, this shall be a material breach of this contract by the contractor and may result in the government terminating this contract for cause.

1.13.2 Throughout the duration of this contract performance, the KO and COR retains authority to approve and disapprove the changing of any of the personnel in any of the Key Positions. Prior to substituting, removing, replacing, diverting, or otherwise changing any of the individuals in the Key Positions, the contractor shall notify the KO and COR no less than 10 working days in advance of the proposed change, and at the time of notice to the KO and COR/the contractor shall submit the resume of the person that the contractor proposes to fill the Key Position. At this same time (no less than ten (10) working days prior to the proposed start date for the personnel change to begin contract performance), the resume shall detail each of the supporting qualifications that meet all the Key Position requirements stated in Technical Exhibit 3. The KO and COR will notify the contractor after receipt of all required information of the KO and COR’s decision to approve or disapprove the personnel change for the Key Position. If the contractor fails to meet this requirement within the specified timeframe for any of the individual Key Positions, this shall be a material breach of this contract by the contractor and may result in the government terminating this contract. If the contractor fails to obtain the KO and COR/ACOR approval for any of the personnel who are to fill Key Positions in advance of the date of any required performance by the Key Position, this shall be a material breach of this contract by the contractor and may result in the government terminating this contract for cause.

1.14 Organizational Chart: The organizational chart shall include names, addresses (brick and mortar), and telephone numbers of the contractor’s point of contact, supervisory personnel, and key management personnel who shall serve as a focal point between the contractor and the Government to resolve problems and emergency situations. The contractor will ensure that the chart is current at all times and shall notify the KO/COR immediately, in writing, whenever changes are made.

1.15 Personnel: All contractor employees shall abide by pertinent regulations set forth in this PWS and all applicable Federal and local installation laws, policy or regulations. The contractor will develop, and update SOPs as required in the performance of this PWS to sustain operations and process customer products. This shall be done IAW applicable regulations and as directed by the COR.

1.15.1 The contractor shall provide a workforce possessing the skills, knowledge, and training to satisfactorily perform the requirements of services included in this PWS. Contractor employees shall have the ability to proficiently communicate in the English language. Personnel performing work under this PWS shall remain employees of the contractor and shall not be considered employees of the Government.

1.15.2 The contractor shall be responsible for its employees’ work performance, conduct, and behavior on duty and off duty. As this is a customer service-oriented requirement, the contractor shall train all employees in good customer service skills, techniques and etiquette. The contractor shall maintain provisions for the immediate removal of employees for misconduct or other causes prejudicial to the maintenance of health, welfare, morale or security. The contractor shall be aware of the Installation Commander's responsibility for the general security and well-being of personnel and shall ensure that personnel removal provisions support the Installation Commander in this regard.

1.15.3 The Government has an inherent right under law, practice and regulation, to control access to its facilities, property and data, including those that are the subject of this contract. Access control privileges will be tailored to individual contractor personnel responsibilities. The Government and/or KO will be the final authority in determining access privileges. The Government's exercise of its right to grant and revoke access by individual(s) to its facilities and automation systems and will not constitute a breach or change to this contract, regardless of whether said individual(s) are employed by the contractor, and regardless of whether said individuals are thereby precluded from performing work under this PWS.

1.16 Attire and Identification: The contractor shall develop dress code requirements subject to Government approval 14 calendar days after contract award. Contractor shall provide nametags and employees will always wear them. Nametags will be visible at all times.

1.17 Travel: The Contractor shall be required to travel in performance of this contract. The contractor may be required to travel between installations within the ROK. The contractor (Project Manager or Quality Control Specialist) shall be required to conduct one quality control visit monthly to the contractor operated MPDs, TCs, RSOs and non-PSDR S1s. RSO for Area II is responsible for traveling to Area I to provide RSO customer service not to exceed twice a month. RSO for Area III is responsible for traveling to Area IV to provide RSO customer service not to exceed twice a month. Contractors shall only be trained and funded by the Government in skills they are not required to bring to the job, such, command unique rules, practices, procedures and/ or systems that are essential for the contractor’s satisfactory contract performance. The cost of Government mandatory/required training is the full responsibility of IMCOM- Pacific. All travel shall be conducted in accordance with FAR 31.205-46, “Travel Costs,” and the Joint Travel Regulations (JTR) and shall be pre-approved by the COR/ACOR. For mission requirements the number of trips and personnel travelling shall be limited to the minimum number required to accomplish work requirements and shall be coordinated with the COR/ACOR. Travel may only be approved by the COR/ACOR if adequate funds are obligated and unexpended on the travel CLIN to cover the proposed travel costs.

1.18 Inspections and Acceptance: The monthly QCR must be approved by the COR.

1.19 Information Security and Government Systems Access: Contractor personnel shall require Common Access Cards (CAC), user accounts and system passwords for access to the Government’s personal computer networks. Contractor staff shall be required to initiate paperwork for a National Agency Check as applicable and apply for HRIS access within thirty (30) calendar days after contract award and effective date of newly hired employees. All systems access request forms shall be signed by COR/ACOR.

1.20 Security Requirements: Contractors are required to hold National Agency Check with Inquiry (NACI). Additionally, they are responsible for safeguarding official and sensitive information. Failure to safeguard any official and sensitive information which may involve the contractor or the contractor’s personnel or to which they may have access may subject the contractor and/or the contractor’s employees to criminal liability under Title 18, section 793 and 7908 of the United States Code. Provisions of the Privacy Act apply to all records and reports maintained by the contractor. All programs and materials developed at government expense during the contract are the property of the government. Contractor personnel shall be required to adhere to the security requirements of the Republic of Korea Theater of operation.

1.21 Key Control: The contractor shall appoint the Site Manager as the Key Control custodian, who will establish, implement and maintain records for ensuring that all keys issued to contractor employees by the Government are not lost or misplaced, and are not used by unauthorized persons by utilizing the Army’s Key Control Official Log IAW Army regulations. The COR/ACOR/DHR will initially furnish all keys required for access to offices and buildings. Keys issued to contractor personnel by the Government shall not be duplicated without the express written consent of the Government. The cost of any changes to locks as a result of keys lost by contractor employees shall be paid by the contractor. Prior to departing the ROK, all contract personnel will ensure if issued a key that the key is turned into the appointed Key Control custodian. Key Control custodians shall not be replaced or relocated without prior approval of the KO and COR/ACOR.

1.22 Common Access Card (CAC). The Government will issue a CAC to each contract employee. This card will be utilized for access to the installation, and for other identification purposes as required. Employees shall meet security background vetting requirements to be issued a CAC. This includes ensuring the employee has a valid NACI (Tier 1) or DoD-equivalent background investigation submitted to OPM and, the completion of an FBI fingerprint check with the return of favorable results before a CAC can be issued by the Trusted Agent. Upon employment termination or CAC Card expiration, whichever comes first, the Contractor Project Manager or

Contractor Site Manager shall collect and turn-in CAC Card to the local ID card section. Additionally, the Project Manager or Contract Site Manager shall provide applicable documentation to COR proving that CAC Card has been turn-in.

1.22.1 Reference Secretary of the Army Memorandum dated 28 Jun 06, Subject: Contractor Verification System (CVS) Implementation guidance and instructions for the implementation of the CVS Army-wide. IAW with this guidance, the authorizing official ((COR, the designated KO assigned to the installation contracting office, the installation’s designated representative, or other approving officials) will approve issuance of the CAC through the automated CVS system. The TASM will be the designated TASM as described in the Secretary of the Army guidance.

1.22.2 The contractor’s CVS applications under this contract should clearly cite the contract and contract numbers identified on the DD Form 1144 for this contract.

1.23 Safety Requirements. The contractor shall take safety precautions during the performance of this contract to protect the lives of contractor personnel, the property of the U.S. Government and the ROK, as well as the private individuals and firms who may be exposed to or endangered by the contractor’s actions to maintain minimal accidents/incidents, zero loss of life and minimal damage to property. The contractor shall provide a written safety plan with policies, procedures and safety checklist due 30 days of award of the contract. The safety plan will be confirmed by the COR then accepted by the KO within five (5) working days if there are any changes after award. The safety program shall comply with OSHA 2206, General Industry, Occupational Safety and Health Standards (29 CFR 1910) and Korean Occupational Safety and Health Act (KOSHA). The contractor agrees to comply with its written program for the life of the contract. Any changes or modification to its safety program shall be coordinated and reviewed by the COR, or his/her duly authorized representative.

1.24 Risk Management Process. The safety plan shall include detailed job related hazards and controls for each work activity. The plan shall include an Activity Hazard Analysis (AHA) for each work activity. The AHA shall include at a minimum the name of the activity/job, the job steps, the job hazards, the tools or equipment required to perform the job, control measures to eliminate or reduce the hazard(s), and a Risk Assessment Code (Risk Assessment Code is an assessment of the probability of the hazard occurring and its potential impact). The contractor shall assure that the safety control measures are implemented. The contractor may use the sample AHA forms in http://www.usace.army.mil/SafetyandOccupationalHealth/ActivityHazardAnalysis.aspx or develop their own.

1.24.1 Accident investigations, reports, and logs: The safety plan shall include a copy of the contractor’s accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than 4 hours of accident occurrence to the Contracting Officer/Representative (KO/COR). The contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the KO/COR in the accident investigation reporting format as soon as possible but no later than five (5) working days following the accident. Implement corrective actions as soon as reasonably possible. The accident investigation reporting format shall include at a minimum:

(1) Contract number and contract name/description.

(2) Name of contractor

(3) Date/time of accident

(4) Date report was completed

(5) Detail description of events that lead to the accident

(6) Root cause of accident

(7) Contributing factors

(8) Corrective action(s) to prevent recurrence

1.24.2 The following require immediate accident notification and written accident report:

(1) A fatality

(2) A permanent total or permanent partial disability;

(3) The hospitalization of three or more people resulting from a single occurrence;

(4) Property damage of $200 or more.

1.25 Performance Assessment: The Government reserves the right to evaluate all areas of contractor’s performance under this contract without any advance notice to the contractor.

1.26 DoDDS TUITION to Contractor. School allowances are applicable only to SOFA contractor personnel permanently assigned to locations supported under this PWS and must be allowable in accordance with FAR 31.205-44. These costs are directly reimbursable, and no fee or profit will be paid on the actual costs incurred. Enrollment is a logistic privilege subject to eligibility, availability, and approval. Approved contractor employees’ children are eligible to attend the DoD Dependent Schools (DoDDS) at established tuition rates per the Department of State Standardized Regulations (DSSR) at https://aoprals.state.gov/ . Contractors are authorized to enroll their children in an international or off-installation school. However, the Contractor will only be reimbursed at the established tuition rates per the Department of State Standardized Regulations (DSSR) at https://aoprals.state.gov/. Contractor shall provide Government with a copy of payment receipts for each employee.

1.27 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (example; cost or pricing information, budget information or analyses, specifications or work statements) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.28 Contractor’s Technical Proposal: The Contractor's technical proposal related to (e.g., personnel qualification, technical approach and staffing plan), in accordance with paragraph 1.6.20 of the PWS, shall be incorporated into the resultant contract as part of the PWS. The Contractor shall be obligated to perform in accordance with the incorporated proposal. Nothing contained in the incorporated proposal shall be interpreted as permitting the Contractor to perform less than required by the unincorporated portions of the PWS or other terms of the contract, or otherwise constituting a waiver of other requirements of the contract.

1.29 Housing Support to Contractor. Housing allowances are applicable only to Status of Forces Agreement (SOFA) Contractor personnel who are permanently assigned to locations supported under this PWS. These costs are directly reimbursable, and no profit will be paid on the actual costs incurred. Contractor employees are allowed up to 85% (all in group 3) of the amounts specified by the Department of State Standardized Regulations (DSSR) for Living Quarters Allowance (LQA) at http://aoprals.state.gov/Web920/default.asp?menu_id=95 and according to the number of eligible family members and location of duty assignment. This amount is provided to offset expenses associated with a residence (including utilities) in the overseas location.

1.29.1 Housing Allowances (HA) rates must be adjusted as of 1 January each contract option year. For the base year HA rates will be adjusted as of 1 February 2024. Each contract year will follow the same rules with HA amount determined at start of each option year based on 85% of the DSSR LQA rates. The contractor shall provide contract employees up to the full 85% of the DSSR LQA rates based on employee’s actual HA cost.

1.29.2 Contractor shall provide Government with a summary list of employees receiving HA, the rate authorized, the actual amount paid to the employee, a copy of the employee’s monthly HA payment receipt, and the total amount cost voucher NLT 60 days after the start of each month or “reimbursable period. Contractor shall recover unused HA within 60 days from employee(s) upon resignation or termination.

PART 2 DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1 DEFINITIONS:

2.1.1 CONTRACTOR. A supplier or vendor having a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR)/ASSISTANT CONTRACTING OFFICER

REPRESENTATIVE (ACOR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5 DELIVERABLE. Anything that can be physically delivered but may include non-physical things such as meeting minutes.

2.1.6 KEY POSITIONS. Those positions that are listed in Technical Exhibit 3

2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privacy of contract with the subcontractor.

2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.13 WORK WEEK. Is defined as Monday through Friday, unless specified otherwise.

2.2 ACRONYMS:

ACORAlternate Contracting Officer's Representative
AEIArmy Enterprise Infrastructure
AERArmy Emergency Relief
AFARSArmy Federal Acquisition Regulation Supplement
AKOArmy Knowledge Online
AHRSArmy Human Resources System
AIM2Assignment Interactive Module
AIPAssignment Incentive Pay
APOArmy Post Office
ARArmy Regulation
ASIAdditional Skill Identifier
AWOLAbsent Without Leave
CACCommon Access Card
CCEContracting Center of Excellence
CFCCombined Federal Campaign
CFRCode of Federal Regulations
CHCBPContinued Health Care Benefit Plan
CLSCommon Level of Support
CONUSContinental United States (excludes Alaska and Hawaii)
CORContracting Officer Representative
COTRContracting Officer's Technical Representative
COTSCommercial Off the Shelf
COTConsecutive Overseas Tour
CVSContractor Verification System
DADepartment of the Army
DCSDeployment Cycle Support
DEERSDefense Eligibility Enrollment Eligibility Reporting System
DFARSDefense Federal Acquisition Regulation Supplement
DHRDirector of Human Resources
DMDCDefense Manpower Data Center
DoDDepartment of Defense
EDASEnlisted Distribution & Assignment System
eMILPOElectronic Military Personnel Office
FARFederal Acquisition Regulation
FLAGFavorable Personnel Actions
FLPPForeign Language Proficiency Pay
FOIAFreedom of Information Act
FSTEForeign Service Tour Extension
FSTCForeign Service Tour Curtailment
HIPAAHealth Insurance Portability and Accountability Act of 1996
HQDAHeadquarters Department of the Army
HRCHuman Resources Command
IAWIn Accordance with
IDIdentification
IMCOM-PacificInstallation Management Command-Pacific
I/OPROCIn and Out Processing
IPCOTIn Place Consecutive Overseas Tour
iPERMSPersonnel Electronic Records Management System
IPPS-AIntegrated Personal & Pay System-Army
ISMInstallation Support Module
ITTIntra Theater Transfer
JTRJoint Travel Regulation
KOContracting Officer
MILPERMilitary Personnel
MOSMilitary Occupational Specialty
MPDMilitary Personnel Division
MSMMeritorious Service Medal
MTOEModification Table of Organization and Equipment
OCIOrganizational Conflict of Interest
OCSOfficer Candidate School
OCLLOffice of Chief Legislative Liaison
OCONUSOutside Continental United States (includes Alaska and Hawaii)
ODCOther Direct Costs
OHAOverseas Housing Allowance
PAMPamphlet
PASRPersonnel Accounting Strength Reporting
PERSTEMPOPersonnel Tempo
PDSRPersonnel Delivery Services Redesign
PIPOPhase In/Phase Out
POCPoint of Contact
PROCProcessing Control Station
PRSPerformance Requirements Summary
PTDYPermissive Temporary Duty
PWSPerformance Work Statement
QAQuality Assurance
QAPQuality Assurance Program
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Plan
RAPIDSReal-time Automated Personnel Identification System
ROKRepublic of Korea
RSORetirement Services Office
SBPSurvivor Benefit Plan
SGLIService members’ Group Life Insurance
SGLVService members’ Group Life Insurance Electronic and Certificate
SOESSGLI Online Enrollment System
SOPStandard Operating Procedures
SQISpecial Qualification Identifier
SRPSoldier Readiness Processing
TASMTrusted Agent Security Manager
TCTransition Center
TCSTemporary Change of Station
TETechnical Exhibit
TOPMISTotal Officer Personnel Management Information System
UCFRUnit Commander’s Financial Report
UICUnit Identification Code
USFKUnited States Force Korea
VAVoting Application
VAOVoting Assistance Officer
WIASWorld-wide Individual Augmentation System 411th CSB, Korea411th Contracting Support Brigade, Korea

PART 3

GOVERNMENT FURNISHED EQUIPMENT AND SERVICES

3. GOVERNMENT FURNISHED EQUIPMENT AND SERVICES:

The Government (each garrison within Installation Management Command Pacific in Korea) will provide all facilities, computers, fax, digital sender, printers, and Government cell phones for the Project Manager for the purpose of after hours on call for Emergency Leave processing and furniture to support training and set-up required for commencement of operation. All MPD, TC, RSO, and non-PSDR S1 automation equipment will be included on the Government automation life cycle plan. All Army Regulations, Department of the Army Pamphlets, Army Directives/Memorandums and Government forms are available on the internet at http://www.apd.army.mil/. All official mail sent from MPD, TC, RSO, and non-PSDR S1 will be processed for postage metering and certified/registered mail at Government expense. The Government (each respective garrison) will provide Information Management Office support. The Government (each respective garrison) will supply office furniture, i.e., desks, filing cabinets, chairs, office phones, copiers, etc., as needed or at the end-of-life cycle periods.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, and services required to perform work under this contract except those listed under Part 3 of this PWS.

4.2 Materials. All expendable supplies shall be provided by the contractor. The Department of Defense (DoD) defines expendable supplies as supplies which are consumed in use, such as ammunition, paint, fuel, cleaning and preserving materials, surgical dressings, drugs, medicines, etc., or which lose their identity, such as spare parts, etc. The Government will not reimburse any purchase of the equipment or supplies.

4.3 Equipment. The contractor shall furnish equipment as following:

4.3.1 Computer Software: Contractor-owned and operated Information Systems shall meet all security and configuration requirements for government-owned hardware and software when operating on the Army Enterprise Infrastructure (AEI) or when conducting official business.

4.3.2 Computer Software Installation: The contractor shall ensure that all the required software is installed in order to perform tasks described in the PWS. The contractor may install additional software as necessary to conduct business in support of the contract. The contractor shall verify with the COR/ACOR before installation of the software to ensure the data integrity of the Army Enterprise Infrastructure.

4.4 Temporary Duty (TDY): The Government will fund all TDY of contractor personnel as required by the COR/ACOR. The Government shall fund mandatory required travel to attend conferences and work-related events that are essential for the contractor’s satisfactory contract performance. The cost of Government mandatory required training is the full responsibility of the IMCOM-P.

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS. The contractor shall comply with the following requirements:

5.1 “Kick-off Meeting”: Coordinate and conduct a “kick-off” meeting within 14 calendar days of award

5.2 MPD Provides S1 Personnel Services Support (PSS) for non-PSDR units (see list at TAB D). S1 elements and/or tenant organizations not supported by a brigade/battalion S1 and geographically separated PSDR units without S1 support, i.e., parent unit is deployed may obtain limited support…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .