Base + Option year
| CLIN NO. | SUPPLIES/SERVICES | BASE YEAR QTY | UNIT | UNIT PRICE | MAX AMOUNT | 1ST OY QTY | UNIT | UNIT PRICE | MAX AMOUNT | 2ND OY QTY | UNIT | UNIT PRICE | MAX AMOUNT | 3RD OY QTY | UNIT | UNIT PRICE | MAX AMOUNT | 4TH OY QTY | UNIT | UNIT PRICE | MAX AMOUNT | |
| 0001 | COPPER CABLE Government Furnished Material (GFM) Install, Splice, Terminate and Test-Copper Cable in Duct (25 to 1200 PR) | |||||||||||||||||||||
| 0001AA | Government Furnished Materials (GFM) Install - Copper Cable | 40,000 | FT | |||||||||||||||||||
| (Linear Foot) | 40,000 | FT | ||||||||||||||||||||
| (Linear Foot) | 40,000 | FT | ||||||||||||||||||||
| (Linear Foot) | 40,000 | FT | ||||||||||||||||||||
| (Linear Foot) | 40,000 | FT |
(Linear Foot)
| 0001AB | Government Furnished Materials (GFM) Splice and Test - Copper Cable EA = 1 EA | 4,000 | EA | 4,000 | EA | 4,000 | EA | 4,000 | EA | 4,000 | EA | |
| 0001AC | Government Furnished Materials (GFM) Terminate and Test - Copper Cable EA = 1 EA Pair | 4,000 | EA | 4,000 | EA | 4,000 | EA | 4,000 | EA | 4,000 | EA | |
| 0002 | Contractor Furnished Materials (CFM) Install Ground Rod to Include Grounding of Cable / Terminal. | 100 | EA | 100 | EA | 100 | EA | 100 | EA | 100 | EA | |
| 0003 | Government Furnished Materials (GFM) Install Protected Entrance Terminal (PET) Housing for Copper Cable. | 50 | EA | 50 | EA | 50 | EA | 50 | EA | 50 | EA | |
| 0004 | Government Furnished Materials (GFM) Install Splice Case for Copper Cable. | 50 | EA | 50 | EA | 50 | EA | 50 | EA | 50 | EA | |
| 0005 | Contractor Furnished Material (CFM) Install ¾ Inch, Fire-Retardant Plywood Backboard. | 40 | EA | 40 | EA | 40 | EA | 40 | EA | 40 | EA | |
| 0006 | Government Furnished Materials (GFM) Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores). | |||||||||||
| 0006AA | Government Furnished Materials (GFM) Install - Optic Cable | 160,000 | FT | |||||||||
| (Linear Foot) | 160,000 | FT | ||||||||||
| (Linear Foot) | 160,000 | FT | ||||||||||
| (Linear Foot) | 160,000 | FT | ||||||||||
| (Linear Foot) | 160,000 | FT |
(Linear Foot)
| 0006AB | Government Furnished Materials (GFM) Splice and Test - Optic Cable EA = 1 EA Core | 1,500 | EA | 1,500 | EA | 1,500 | EA | 1,500 | EA | 1,500 | EA | |
| 0006AC | Government Furnished Materials (GFM) Terminate and Test - Optic Cable EA = 1 EA Core | 1,500 | EA | 1,500 | EA | 1,500 | EA | 1,500 | EA | 1,500 | EA | |
| 0007 | Government Furnished Materials (GFM) Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores). | |||||||||||
| 0007AA | Government Furnished Materials (GFM) Install - Leaf Fiber Optic Cable | 800,000 | FT | |||||||||
| (Linear Foot) | 800,000 | FT | ||||||||||
| (Linear Foot) | 800,000 | FT | ||||||||||
| (Linear Foot) | 800,000 | FT | ||||||||||
| (Linear Foot) | 800,000 | FT |
(Linear Foot)
| 0007AB | Government Furnished Materials (GFM) Splice and Test - Leaf Fiber Optic Cable EA = 1 EA Core | 1,000 | EA | 1,000 | EA | 1,000 | EA | 1,000 | EA | 1,000 | EA | |
| 0007AC | Government Furnished Materials (GFM) Terminate and Test - Leaf Fiber Optic Cable EA = 1 EA Core | 1,000 | EA | 1,000 | EA | 1,000 | EA | 1,000 | EA | 1,000 | EA | |
| 0008 | Government Furnished Materials (GFM) Install Fiber Optic - Termination Panel (Wall Mount or Rack). | 100 | EA | 100 | EA | 100 | EA | 100 | EA | 100 | EA | |
| 0009 | Government Furnished Materials (GFM) Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores). | 100 | EA | 100 | EA | 100 | EA | 100 | EA | 100 | EA | |
| 0010 | Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | |||||||||||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | ||||||||||||
| 0010AA | Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | |||||||||||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | ||||||||||||
| Tape(Paved Area). | 4,000 | FT | ||||||||||
| (Linear Foot) | 4,000 | FT | ||||||||||
| (Linear Foot) | 4,000 | FT | ||||||||||
| (Linear Foot) | 4,000 | FT | ||||||||||
| (Linear Foot) | 4,000 | FT |
(Linear Foot)
| 0010AB | Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | |||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | ||||
| Tape(Paved Area). | 4,000 | FT | ||
| (Linear Foot) | 4,000 | FT | ||
| (Linear Foot) | 4,000 | FT | ||
| (Linear Foot) | 4,000 | FT | ||
| (Linear Foot) | 4,000 | FT |
(Linear Foot)
| 0010AC | Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | |||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | ||||
| Tape(Paved Area). | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT |
(Linear Foot)
| 0010AD | Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | |||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | ||||
| Tape(Paved Area). | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT |
(Linear Foot)
| 0011 | Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | |||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | ||||
| 0011AA | Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | |||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT | ||
| (Linear Foot) | 20,000 | FT | ||
| (Linear Foot) | 20,000 | FT | ||
| (Linear Foot) | 20,000 | FT | ||
| (Linear Foot) | 20,000 | FT |
(Linear Foot)
| 0011AB | Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | |||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT | ||
| (Linear Foot) | 20,000 | FT | ||
| (Linear Foot) | 20,000 | FT | ||
| (Linear Foot) | 20,000 | FT | ||
| (Linear Foot) | 20,000 | FT |
(Linear Foot)
| 0011AC | Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | |||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT |
(Linear Foot)
| 0011AD | Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | |||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT | ||
| (Linear Foot) | 1,000 | FT |
(Linear Foot)
| 0012 | Government Furnished Materials (GFM) Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct. | 10,000 | FT | |||||||||
| (Linear Foot) | 10,000 | FT | 10,000 | FT | 10,000 | FT | 10,000 | FT | ||||
| 0013 | Labor Only Core Drill ½ to 4 Inch Hole. | 1,000 | EA | 1,000 | EA | 1,000 | EA | 1,000 | EA | 1,000 | EA | |
| 0014 | Contractor Furnished Material (CFM) Install 4 Inch Building Entrance Conduit. | 50 | EA | 50 | EA | 50 | EA | 50 | EA | 50 | EA | |
| 0015 | Contractor Furnished Material (CFM) Install Multidirectional 1000 x 1000 x 1000 Millimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, | |||||||||||
| All Hardware and Grounding Installation. | 25 | EA | 25 | EA | 25 | EA | 25 | EA | 25 | EA | ||
| 0016 | Contractor Furnished Material (CFM) Install Multidirectional W1500 by L2400 x H2100 Millimeter Maintenance Hole to Include Excavation, Restoration, Backfill, | |||||||||||
| Pulugging Ducts, Istallation. All Hardware and Grounding. | 5 | EA | 5 | EA | 5 | EA | 5 | EA | 5 | EA | ||
| 0017 | Contractor Furnished Material (CFM) Install Strand and Guy Wires for Aerial Cable. | 50,000 | FT | |||||||||
| (Linear Foot) | 50,000 | FT | ||||||||||
| (Linear Foot) | 50,000 | FT | ||||||||||
| (Linear Foot) | 50,000 | FT | ||||||||||
| (Linear Foot) | 50,000 | FT |
(Linear Foot)
| 0018 | Government Furnished Materials (GFM) Install Cable on Guy Wires for Aerial to Include Splicing, Termination, and Testing of Cable. | |||
| 0018AA | Government Furnished Materials (GFM) Install - Fiber Cable | 65,000 | FT | |
| (Linear Foot) | 65,000 | FT | ||
| (Linear Foot) | 65,000 | FT | ||
| (Linear Foot) | 65,000 | FT | ||
| (Linear Foot) | 65,000 | FT |
(Linear Foot)
| 0018AB | Government Furnished Materials (GFM) Splice and Test - Fiber Cable EA = 1 EA Pair | 500 | EA | 500 | EA | 500 | EA | 500 | EA | 500 | EA | |
| 0018AC | Government Furnished Materials (GFM) Terminate and Test - Fiber Cable EA = 1 EA Pair | 500 | EA | 500 | EA | 500 | EA | 500 | EA | 500 | EA | |
| 0018AD | Government Furnished Materials (GFM) Install Splice Case on Strand. | 20 | EA | 20 | EA | 20 | EA | 20 | EA | 20 | EA | |
| 0019 | Contractor Furnished Material (CFM) Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of Building. | 25,000 | FT | |||||||||
| (Linear Foot) | 25,000 | FT | ||||||||||
| (Linear Foot) | 25,000 | FT | ||||||||||
| (Linear Foot) | 25,000 | FT | ||||||||||
| (Linear Foot) | 25,000 | FT |
(Linear Foot)
| 0020 | Government Furnished Materials (GFM) Install Pull or Drop Box for Protected Distribution System (PDS). | 200 | EA | 200 | EA | 200 | EA | 200 | EA | 200 | EA | |
| 0021 | Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Inside of Building. | 100 | FT | |||||||||
| (Linear Foot) | 100 | FT | ||||||||||
| (Linear Foot) | 100 | FT | ||||||||||
| (Linear Foot) | 100 | FT | ||||||||||
| (Linear Foot) | 100 | FT |
(Linear Foot)
| 0022 | Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, | |||
| Encased Within a Minimum of 20 Centimeters of Concrete On All Sides. | 200 | FT | ||
| (Linear Foot) | 200 | FT | ||
| (Linear Foot) | 200 | FT | ||
| (Linear Foot) | 200 | FT | ||
| (Linear Foot) | 200 | FT |
(Linear Foot)
| 0023 | Labor Only Deinstall Cable in Conduits. | 1,000,000 | FT | |
| (Linear Foot) | 1,000,000 | FT | ||
| (Linear Foot) | 1,000,000 | FT | ||
| (Linear Foot) | 1,000,000 | FT | ||
| (Linear Foot) | 1,000,000 | FT |
(Linear Foot)
| 0024 | Contractor Furnished Material (CFM) Install Combined Innerduct System (CIS) | |||
| Type 25 Millimeter X 4 Each (Black, Yellow, Red, Green). | 6,000 | FT | ||
| (Linear Foot) | 6,000 | FT | ||
| (Linear Foot) | 6,000 | FT | ||
| (Linear Foot) | 6,000 | FT | ||
| (Linear Foot) | 6,000 | FT |
(Linear Foot)
| 0025 | Government Furnished Materials (GFM) Install Outside Pull-Box (Various Sizes). Average 40cm x 40cm x 20cm | 40 | EA | 40 | EA | 40 | EA | 40 | EA | 40 | EA | |
| 0026 | Contractor Furnished Material (CFM) Install Pulling Wire in Ducts. | 1,000,000 | FT | |||||||||
| (Linear Foot) | 1,000,000 | FT | ||||||||||
| (Linear Foot) | 1,000,000 | FT | ||||||||||
| (Linear Foot) | 1,000,000 | FT | ||||||||||
| (Linear Foot) | 1,000,000 | FT |
(Linear Foot)
Base Period
| CLIN NO. | SUPPLIES/SERVICES | BASE YEAR QTY | UNIT | UNIT PRICE | MAX AMOUNT |
| 0001 | COPPER CABLE Government Furnished Material (GFM) Install, Splice, Terminate and Test-Copper Cable in Duct (25 to 1200 PR) | ||||
| 0001AA | Government Furnished Materials (GFM) Install - Copper Cable | 40,000 | FT |
(Linear Foot)
| 0001AB | Government Furnished Materials (GFM) Splice and Test - Copper Cable EA = 1 EA | 4,000 | EA |
| 0001AC | Government Furnished Materials (GFM) Terminate and Test - Copper Cable EA = 1 EA Pair | 4,000 | EA |
| 0002 | Contractor Furnished Materials (CFM) Install Ground Rod to Include Grounding of Cable / Terminal. | 100 | EA |
| 0003 | Government Furnished Materials (GFM) Install Protected Entrance Terminal (PET) Housing for Copper Cable. | 50 | EA |
| 0004 | Government Furnished Materials (GFM) Install Splice Case for Copper Cable. | 50 | EA |
| 0005 | Contractor Furnished Material (CFM) Install ¾ Inch, Fire-Retardant Plywood Backboard. | 40 | EA |
| 0006 | Government Furnished Materials (GFM) Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores). | ||
| 0006AA | Government Furnished Materials (GFM) Install - Optic Cable | 160,000 | FT |
(Linear Foot)
| 0006AB | Government Furnished Materials (GFM) Splice and Test - Optic Cable EA = 1 EA Core | 1,500 | EA |
| 0006AC | Government Furnished Materials (GFM) Terminate and Test - Optic Cable EA = 1 EA Core | 1,500 | EA |
| 0007 | Government Furnished Materials (GFM) Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores). | ||
| 0007AA | Government Furnished Materials (GFM) Install - Leaf Fiber Optic Cable | 800,000 | FT |
(Linear Foot)
| 0007AB | Government Furnished Materials (GFM) Splice and Test - Leaf Fiber Optic Cable EA = 1 EA Core | 1,000 | EA |
| 0007AC | Government Furnished Materials (GFM) Terminate and Test - Leaf Fiber Optic Cable EA = 1 EA Core | 1,000 | EA |
| 0008 | Government Furnished Materials (GFM) Install Fiber Optic - Termination Panel (Wall Mount or Rack). | 100 | EA |
| 0009 | Government Furnished Materials (GFM) Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores). | 100 | EA |
| 0010 | Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | |||
| 0010AA | Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 4,000 | FT |
(Linear Foot)
| 0010AB | Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 4,000 | FT |
(Linear Foot)
| 0010AC | Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 1,000 | FT |
(Linear Foot)
| 0010AD | Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 1,000 | FT |
(Linear Foot)
| 0011 | Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | |||
| 0011AA | Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT |
(Linear Foot)
| 0011AB | Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT |
(Linear Foot)
| 0011AC | Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT |
(Linear Foot)
| 0011AD | Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT |
(Linear Foot) 0012 Government Furnished Materials (GFM) Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct. 10,000 FT (Linear Foot)
| 0013 | Labor Only Core Drill ½ to 4 Inch Hole. | 1,000 | EA |
| 0014 | Contractor Furnished Material (CFM) Install 4 Inch Building Entrance Conduit. | 50 | EA |
| 0015 | Contractor Furnished Material (CFM) Install Multidirectional 1000 x 1000 x 1000 Millimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, | ||
| All Hardware and Grounding Installation. | 25 | EA | |
| 0016 | Contractor Furnished Material (CFM) Install Multidirectional W1500 by L2400 x H2100 Millimeter Maintenance Hole to Include Excavation, Restoration, Backfill, | ||
| Pulugging Ducts, Istallation. All Hardware and Grounding. | 5 | EA | |
| 0017 | Contractor Furnished Material (CFM) Install Strand and Guy Wires for Aerial Cable. | 50,000 | FT |
(Linear Foot)
| 0018 | Government Furnished Materials (GFM) Install Cable on Guy Wires for Aerial to Include Splicing, Termination, and Testing of Cable. | ||
| 0018AA | Government Furnished Materials (GFM) Install - Fiber Cable | 65,000 | FT |
(Linear Foot)
| 0018AB | Government Furnished Materials (GFM) Splice and Test - Fiber Cable EA = 1 EA Pair | 500 | EA |
| 0018AC | Government Furnished Materials (GFM) Terminate and Test - Fiber Cable EA = 1 EA Pair | 500 | EA |
| 0018AD | Government Furnished Materials (GFM) Install Splice Case on Strand. | 20 | EA |
| 0019 | Contractor Furnished Material (CFM) Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of Building. | 25,000 | FT |
(Linear Foot)
| 0020 | Government Furnished Materials (GFM) Install Pull or Drop Box for Protected Distribution System (PDS). | 200 | EA |
| 0021 | Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Inside of Building. | 100 | FT |
(Linear Foot)
| 0022 | Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, | ||
| Encased Within a Minimum of 20 Centimeters of Concrete On All Sides. | 200 | FT |
(Linear Foot) 0023 Labor Only Deinstall Cable in Conduits. 1,000,000 FT (Linear Foot)
| 0024 | Contractor Furnished Material (CFM) Install Combined Innerduct System (CIS) | ||
| Type 25 Millimeter X 4 Each (Black, Yellow, Red, Green). | 6,000 | FT |
(Linear Foot)
| 0025 | Government Furnished Materials (GFM) Install Outside Pull-Box (Various Sizes). Average 40cm x 40cm x 20cm | 40 | EA |
| 0026 | Contractor Furnished Material (CFM) Install Pulling Wire in Ducts. | 1,000,000 | FT |
1st Option Period
| CLIN NO. | SUPPLIES/SERVICES | 1ST OY QTY | UNIT | UNIT PRICE | MAX AMOUNT |
| 0001 | COPPER CABLE Government Furnished Material (GFM) Install, Splice, Terminate and Test-Copper Cable in Duct (25 to 1200 PR) | ||||
| 0001AA | Government Furnished Materials (GFM) Install - Copper Cable | 40,000 | FT |
(Linear Foot)
| 0001AB | Government Furnished Materials (GFM) Splice and Test - Copper Cable EA = 1 EA | 4,000 | EA |
| 0001AC | Government Furnished Materials (GFM) Terminate and Test - Copper Cable EA = 1 EA Pair | 4,000 | EA |
| 0002 | Contractor Furnished Materials (CFM) Install Ground Rod to Include Grounding of Cable / Terminal. | 100 | EA |
| 0003 | Government Furnished Materials (GFM) Install Protected Entrance Terminal (PET) Housing for Copper Cable. | 50 | EA |
| 0004 | Government Furnished Materials (GFM) Install Splice Case for Copper Cable. | 50 | EA |
| 0005 | Contractor Furnished Material (CFM) Install ¾ Inch, Fire-Retardant Plywood Backboard. | 40 | EA |
| 0006 | Government Furnished Materials (GFM) Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores). | ||
| 0006AA | Government Furnished Materials (GFM) Install - Optic Cable | 160,000 | FT |
(Linear Foot)
| 0006AB | Government Furnished Materials (GFM) Splice and Test - Optic Cable EA = 1 EA Core | 1,500 | EA |
| 0006AC | Government Furnished Materials (GFM) Terminate and Test - Optic Cable EA = 1 EA Core | 1,500 | EA |
| 0007 | Government Furnished Materials (GFM) Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores). | ||
| 0007AA | Government Furnished Materials (GFM) Install - Leaf Fiber Optic Cable | 800,000 | FT |
(Linear Foot)
| 0007AB | Government Furnished Materials (GFM) Splice and Test - Leaf Fiber Optic Cable EA = 1 EA Core | 1,000 | EA |
| 0007AC | Government Furnished Materials (GFM) Terminate and Test - Leaf Fiber Optic Cable EA = 1 EA Core | 1,000 | EA |
| 0008 | Government Furnished Materials (GFM) Install Fiber Optic - Termination Panel (Wall Mount or Rack). | 100 | EA |
| 0009 | Government Furnished Materials (GFM) Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores). | 100 | EA |
| 0010 | Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | |||
| 0010AA | Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 4,000 | FT |
(Linear Foot)
| 0010AB | Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 4,000 | FT |
(Linear Foot)
| 0010AC | Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 1,000 | FT |
(Linear Foot)
| 0010AD | Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 1,000 | FT |
(Linear Foot)
| 0011 | Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | |||
| 0011AA | Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT |
(Linear Foot)
| 0011AB | Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT |
(Linear Foot)
| 0011AC | Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT |
(Linear Foot)
| 0011AD | Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT |
(Linear Foot)
| 0012 | Government Furnished Materials (GFM) Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct. | 10,000 | FT |
| 0013 | Labor Only Core Drill ½ to 4 Inch Hole. | 1,000 | EA |
| 0014 | Contractor Furnished Material (CFM) Install 4 Inch Building Entrance Conduit. | 50 | EA |
| 0015 | Contractor Furnished Material (CFM) Install Multidirectional 1000 x 1000 x 1000 Millimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, | ||
| All Hardware and Grounding Installation. | 25 | EA | |
| 0016 | Contractor Furnished Material (CFM) Install Multidirectional W1500 by L2400 x H2100 Millimeter Maintenance Hole to Include Excavation, Restoration, Backfill, | ||
| Pulugging Ducts, Istallation. All Hardware and Grounding. | 5 | EA | |
| 0017 | Contractor Furnished Material (CFM) Install Strand and Guy Wires for Aerial Cable. | 50,000 | FT |
(Linear Foot)
| 0018 | Government Furnished Materials (GFM) Install Cable on Guy Wires for Aerial to Include Splicing, Termination, and Testing of Cable. | ||
| 0018AA | Government Furnished Materials (GFM) Install - Fiber Cable | 65,000 | FT |
(Linear Foot)
| 0018AB | Government Furnished Materials (GFM) Splice and Test - Fiber Cable EA = 1 EA Pair | 500 | EA |
| 0018AC | Government Furnished Materials (GFM) Terminate and Test - Fiber Cable EA = 1 EA Pair | 500 | EA |
| 0018AD | Government Furnished Materials (GFM) Install Splice Case on Strand. | 20 | EA |
| 0019 | Contractor Furnished Material (CFM) Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of Building. | 25,000 | FT |
(Linear Foot)
| 0020 | Government Furnished Materials (GFM) Install Pull or Drop Box for Protected Distribution System (PDS). | 200 | EA |
| 0021 | Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Inside of Building. | 100 | FT |
(Linear Foot)
| 0022 | Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, | ||
| Encased Within a Minimum of 20 Centimeters of Concrete On All Sides. | 200 | FT |
(Linear Foot) 0023 Labor Only Deinstall Cable in Conduits. 1,000,000 FT (Linear Foot)
| 0024 | Contractor Furnished Material (CFM) Install Combined Innerduct System (CIS) | ||
| Type 25 Millimeter X 4 Each (Black, Yellow, Red, Green). | 6,000 | FT |
(Linear Foot)
| 0025 | Government Furnished Materials (GFM) Install Outside Pull-Box (Various Sizes). Average 40cm x 40cm x 20cm | 40 | EA |
| 0026 | Contractor Furnished Material (CFM) Install Pulling Wire in Ducts. | 1,000,000 | FT |
2nd Option Period
| CLIN NO. | SUPPLIES/SERVICES | 2ND OY QTY | UNIT | UNIT PRICE | MAX AMOUNT |
| 0001 | COPPER CABLE Government Furnished Material (GFM) Install, Splice, Terminate and Test-Copper Cable in Duct (25 to 1200 PR) | ||||
| 0001AA | Government Furnished Materials (GFM) Install - Copper Cable | 40,000 | FT |
(Linear Foot)
| 0001AB | Government Furnished Materials (GFM) Splice and Test - Copper Cable EA = 1 EA | 4,000 | EA |
| 0001AC | Government Furnished Materials (GFM) Terminate and Test - Copper Cable EA = 1 EA Pair | 4,000 | EA |
| 0002 | Contractor Furnished Materials (CFM) Install Ground Rod to Include Grounding of Cable / Terminal. | 100 | EA |
| 0003 | Government Furnished Materials (GFM) Install Protected Entrance Terminal (PET) Housing for Copper Cable. | 50 | EA |
| 0004 | Government Furnished Materials (GFM) Install Splice Case for Copper Cable. | 50 | EA |
| 0005 | Contractor Furnished Material (CFM) Install ¾ Inch, Fire-Retardant Plywood Backboard. | 40 | EA |
| 0006 | Government Furnished Materials (GFM) Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores). | ||
| 0006AA | Government Furnished Materials (GFM) Install - Optic Cable | 160,000 | FT |
(Linear Foot)
| 0006AB | Government Furnished Materials (GFM) Splice and Test - Optic Cable EA = 1 EA Core | 1,500 | EA |
| 0006AC | Government Furnished Materials (GFM) Terminate and Test - Optic Cable EA = 1 EA Core | 1,500 | EA |
| 0007 | Government Furnished Materials (GFM) Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores). | ||
| 0007AA | Government Furnished Materials (GFM) Install - Leaf Fiber Optic Cable | 800,000 | FT |
(Linear Foot)
| 0007AB | Government Furnished Materials (GFM) Splice and Test - Leaf Fiber Optic Cable EA = 1 EA Core | 1,000 | EA |
| 0007AC | Government Furnished Materials (GFM) Terminate and Test - Leaf Fiber Optic Cable EA = 1 EA Core | 1,000 | EA |
| 0008 | Government Furnished Materials (GFM) Install Fiber Optic - Termination Panel (Wall Mount or Rack). | 100 | EA |
| 0009 | Government Furnished Materials (GFM) Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores). | 100 | EA |
| 0010 | Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | |||
| 0010AA | Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 4,000 | FT |
(Linear Foot)
| 0010AB | Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 4,000 | FT |
(Linear Foot)
| 0010AC | Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 1,000 | FT |
(Linear Foot)
| 0010AD | Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 1,000 | FT |
(Linear Foot)
| 0011 | Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | |||
| 0011AA | Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT |
(Linear Foot)
| 0011AB | Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT |
(Linear Foot)
| 0011AC | Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT |
(Linear Foot)
| 0011AD | Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT |
(Linear Foot)
| 0012 | Government Furnished Materials (GFM) Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct. | 10,000 | FT |
| 0013 | Labor Only Core Drill ½ to 4 Inch Hole. | 1,000 | EA |
| 0014 | Contractor Furnished Material (CFM) Install 4 Inch Building Entrance Conduit. | 50 | EA |
| 0015 | Contractor Furnished Material (CFM) Install Multidirectional 1000 x 1000 x 1000 Millimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, | ||
| All Hardware and Grounding Installation. | 25 | EA | |
| 0016 | Contractor Furnished Material (CFM) Install Multidirectional W1500 by L2400 x H2100 Millimeter Maintenance Hole to Include Excavation, Restoration, Backfill, | ||
| Pulugging Ducts, Istallation. All Hardware and Grounding. | 5 | EA | |
| 0017 | Contractor Furnished Material (CFM) Install Strand and Guy Wires for Aerial Cable. | 50,000 | FT |
(Linear Foot)
| 0018 | Government Furnished Materials (GFM) Install Cable on Guy Wires for Aerial to Include Splicing, Termination, and Testing of Cable. | ||
| 0018AA | Government Furnished Materials (GFM) Install - Fiber Cable | 65,000 | FT |
(Linear Foot)
| 0018AB | Government Furnished Materials (GFM) Splice and Test - Fiber Cable EA = 1 EA Pair | 500 | EA |
| 0018AC | Government Furnished Materials (GFM) Terminate and Test - Fiber Cable EA = 1 EA Pair | 500 | EA |
| 0018AD | Government Furnished Materials (GFM) Install Splice Case on Strand. | 20 | EA |
| 0019 | Contractor Furnished Material (CFM) Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of Building. | 25,000 | FT |
(Linear Foot)
| 0020 | Government Furnished Materials (GFM) Install Pull or Drop Box for Protected Distribution System (PDS). | 200 | EA |
| 0021 | Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Inside of Building. | 100 | FT |
(Linear Foot)
| 0022 | Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, | ||
| Encased Within a Minimum of 20 Centimeters of Concrete On All Sides. | 200 | FT |
(Linear Foot) 0023 Labor Only Deinstall Cable in Conduits. 1,000,000 FT (Linear Foot)
| 0024 | Contractor Furnished Material (CFM) Install Combined Innerduct System (CIS) | ||
| Type 25 Millimeter X 4 Each (Black, Yellow, Red, Green). | 6,000 | FT |
(Linear Foot)
| 0025 | Government Furnished Materials (GFM) Install Outside Pull-Box (Various Sizes). Average 40cm x 40cm x 20cm | 40 | EA |
| 0026 | Contractor Furnished Material (CFM) Install Pulling Wire in Ducts. | 1,000,000 | FT |
3rd Option Period
| CLIN NO. | SUPPLIES/SERVICES | 3RD OY QTY | UNIT | UNIT PRICE | MAX AMOUNT |
| 0001 | COPPER CABLE Government Furnished Material (GFM) Install, Splice, Terminate and Test-Copper Cable in Duct (25 to 1200 PR) | ||||
| 0001AA | Government Furnished Materials (GFM) Install - Copper Cable | 40,000 | FT |
(Linear Foot)
| 0001AB | Government Furnished Materials (GFM) Splice and Test - Copper Cable EA = 1 EA | 4,000 | EA |
| 0001AC | Government Furnished Materials (GFM) Terminate and Test - Copper Cable EA = 1 EA Pair | 4,000 | EA |
| 0002 | Contractor Furnished Materials (CFM) Install Ground Rod to Include Grounding of Cable / Terminal. | 100 | EA |
| 0003 | Government Furnished Materials (GFM) Install Protected Entrance Terminal (PET) Housing for Copper Cable. | 50 | EA |
| 0004 | Government Furnished Materials (GFM) Install Splice Case for Copper Cable. | 50 | EA |
| 0005 | Contractor Furnished Material (CFM) Install ¾ Inch, Fire-Retardant Plywood Backboard. | 40 | EA |
| 0006 | Government Furnished Materials (GFM) Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores). | ||
| 0006AA | Government Furnished Materials (GFM) Install - Optic Cable | 160,000 | FT |
(Linear Foot)
| 0006AB | Government Furnished Materials (GFM) Splice and Test - Optic Cable EA = 1 EA Core | 1,500 | EA |
| 0006AC | Government Furnished Materials (GFM) Terminate and Test - Optic Cable EA = 1 EA Core | 1,500 | EA |
| 0007 | Government Furnished Materials (GFM) Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores). | ||
| 0007AA | Government Furnished Materials (GFM) Install - Leaf Fiber Optic Cable | 800,000 | FT |
(Linear Foot)
| 0007AB | Government Furnished Materials (GFM) Splice and Test - Leaf Fiber Optic Cable EA = 1 EA Core | 1,000 | EA |
| 0007AC | Government Furnished Materials (GFM) Terminate and Test - Leaf Fiber Optic Cable EA = 1 EA Core | 1,000 | EA |
| 0008 | Government Furnished Materials (GFM) Install Fiber Optic - Termination Panel (Wall Mount or Rack). | 100 | EA |
| 0009 | Government Furnished Materials (GFM) Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores). | 100 | EA |
| 0010 | Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | |||
| 0010AA | Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 4,000 | FT |
(Linear Foot)
| 0010AB | Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 4,000 | FT |
(Linear Foot)
| 0010AC | Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 1,000 | FT |
(Linear Foot)
| 0010AD | Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 1,000 | FT |
(Linear Foot)
| 0011 | Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | |||
| 0011AA | Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT |
(Linear Foot)
| 0011AB | Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT |
(Linear Foot)
| 0011AC | Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT |
(Linear Foot)
| 0011AD | Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT |
(Linear Foot)
| 0012 | Government Furnished Materials (GFM) Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct. | 10,000 | FT |
| 0013 | Labor Only Core Drill ½ to 4 Inch Hole. | 1,000 | EA |
| 0014 | Contractor Furnished Material (CFM) Install 4 Inch Building Entrance Conduit. | 50 | EA |
| 0015 | Contractor Furnished Material (CFM) Install Multidirectional 1000 x 1000 x 1000 Millimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, | ||
| All Hardware and Grounding Installation. | 25 | EA | |
| 0016 | Contractor Furnished Material (CFM) Install Multidirectional W1500 by L2400 x H2100 Millimeter Maintenance Hole to Include Excavation, Restoration, Backfill, | ||
| Pulugging Ducts, Istallation. All Hardware and Grounding. | 5 | EA | |
| 0017 | Contractor Furnished Material (CFM) Install Strand and Guy Wires for Aerial Cable. | 50,000 | FT |
(Linear Foot)
| 0018 | Government Furnished Materials (GFM) Install Cable on Guy Wires for Aerial to Include Splicing, Termination, and Testing of Cable. | ||
| 0018AA | Government Furnished Materials (GFM) Install - Fiber Cable | 65,000 | FT |
(Linear Foot)
| 0018AB | Government Furnished Materials (GFM) Splice and Test - Fiber Cable EA = 1 EA Pair | 500 | EA |
| 0018AC | Government Furnished Materials (GFM) Terminate and Test - Fiber Cable EA = 1 EA Pair | 500 | EA |
| 0018AD | Government Furnished Materials (GFM) Install Splice Case on Strand. | 20 | EA |
| 0019 | Contractor Furnished Material (CFM) Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of Building. | 25,000 | FT |
(Linear Foot)
| 0020 | Government Furnished Materials (GFM) Install Pull or Drop Box for Protected Distribution System (PDS). | 200 | EA |
| 0021 | Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Inside of Building. | 100 | FT |
(Linear Foot)
| 0022 | Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, | ||
| Encased Within a Minimum of 20 Centimeters of Concrete On All Sides. | 200 | FT |
(Linear Foot) 0023 Labor Only Deinstall Cable in Conduits. 1,000,000 FT (Linear Foot)
| 0024 | Contractor Furnished Material (CFM) Install Combined Innerduct System (CIS) | ||
| Type 25 Millimeter X 4 Each (Black, Yellow, Red, Green). | 6,000 | FT |
(Linear Foot)
| 0025 | Government Furnished Materials (GFM) Install Outside Pull-Box (Various Sizes). Average 40cm x 40cm x 20cm | 40 | EA |
| 0026 | Contractor Furnished Material (CFM) Install Pulling Wire in Ducts. | 1,000,000 | FT |
4th Option Period
| CLIN NO. | SUPPLIES/SERVICES | 4TH OY QTY | UNIT | UNIT PRICE | MAX AMOUNT |
| 0001 | COPPER CABLE Government Furnished Material (GFM) Install, Splice, Terminate and Test-Copper Cable in Duct (25 to 1200 PR) | ||||
| 0001AA | Government Furnished Materials (GFM) Install - Copper Cable | 40,000 | FT |
(Linear Foot)
| 0001AB | Government Furnished Materials (GFM) Splice and Test - Copper Cable EA = 1 EA | 4,000 | EA |
| 0001AC | Government Furnished Materials (GFM) Terminate and Test - Copper Cable EA = 1 EA Pair | 4,000 | EA |
| 0002 | Contractor Furnished Materials (CFM) Install Ground Rod to Include Grounding of Cable / Terminal. | 100 | EA |
| 0003 | Government Furnished Materials (GFM) Install Protected Entrance Terminal (PET) Housing for Copper Cable. | 50 | EA |
| 0004 | Government Furnished Materials (GFM) Install Splice Case for Copper Cable. | 50 | EA |
| 0005 | Contractor Furnished Material (CFM) Install ¾ Inch, Fire-Retardant Plywood Backboard. | 40 | EA |
| 0006 | Government Furnished Materials (GFM) Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores). | ||
| 0006AA | Government Furnished Materials (GFM) Install - Optic Cable | 160,000 | FT |
(Linear Foot)
| 0006AB | Government Furnished Materials (GFM) Splice and Test - Optic Cable EA = 1 EA Core | 1,500 | EA |
| 0006AC | Government Furnished Materials (GFM) Terminate and Test - Optic Cable EA = 1 EA Core | 1,500 | EA |
| 0007 | Government Furnished Materials (GFM) Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores). | ||
| 0007AA | Government Furnished Materials (GFM) Install - Leaf Fiber Optic Cable | 800,000 | FT |
(Linear Foot)
| 0007AB | Government Furnished Materials (GFM) Splice and Test - Leaf Fiber Optic Cable EA = 1 EA Core | 1,000 | EA |
| 0007AC | Government Furnished Materials (GFM) Terminate and Test - Leaf Fiber Optic Cable EA = 1 EA Core | 1,000 | EA |
| 0008 | Government Furnished Materials (GFM) Install Fiber Optic - Termination Panel (Wall Mount or Rack). | 100 | EA |
| 0009 | Government Furnished Materials (GFM) Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores). | 100 | EA |
| 0010 | Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | |||
| 0010AA | Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 4,000 | FT |
(Linear Foot)
| 0010AB | Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 4,000 | FT |
(Linear Foot)
| 0010AC | Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 1,000 | FT |
(Linear Foot)
| 0010AD | Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present. | ||
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning | |||
| Tape(Paved Area). | 1,000 | FT |
(Linear Foot)
| 0011 | Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | |||
| 0011AA | Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT |
(Linear Foot)
| 0011AB | Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT |
(Linear Foot)
| 0011AC | Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT |
(Linear Foot)
| 0011AD | Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit. | ||
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT |
(Linear Foot)
| 0012 | Government Furnished Materials (GFM) Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct. | 10,000 | FT |
| 0013 | Labor Only Core Drill ½ to 4 Inch Hole. | 1,000 | EA |
| 0014 | Contractor Furnished Material (CFM) Install 4 Inch Building Entrance Conduit. | 50 | EA |
| 0015 | Contractor Furnished Material (CFM) Install Multidirectional 1000 x 1000 x 1000 Millimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, | ||
| All Hardware and Grounding Installation. | 25 | EA | |
| 0016 | Contractor Furnished Material (CFM) Install Multidirectional W1500 by L2400 x H2100 Millimeter Maintenance Hole to Include Excavation, Restoration, Backfill, | ||
| Pulugging Ducts, Istallation. All Hardware and Grounding. | 5 | EA | |
| 0017 | Contractor Furnished Material (CFM) Install Strand and Guy Wires for Aerial Cable. | 50,000 | FT |
(Linear Foot)
| 0018 | Government Furnished Materials (GFM) Install Cable on Guy Wires for Aerial to Include Splicing, Termination, and Testing of Cable. | ||
| 0018AA | Government Furnished Materials (GFM) Install - Fiber Cable | 65,000 | FT |
(Linear Foot)
| 0018AB | Government Furnished Materials (GFM) Splice and Test - Fiber Cable EA = 1 EA Pair | 500 | EA |
| 0018AC | Government Furnished Materials (GFM) Terminate and Test - Fiber Cable EA = 1 EA Pair | 500 | EA |
| 0018AD | Government Furnished Materials (GFM) Install Splice Case on Strand. | 20 | EA |
| 0019 | Contractor Furnished Material (CFM) Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of Building. | 25,000 | FT |
(Linear Foot)
| 0020 | Government Furnished Materials (GFM) Install Pull or Drop Box for Protected Distribution System (PDS). | 200 | EA |
| 0021 | Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Inside of Building. | 100 | FT |
(Linear Foot)
| 0022 | Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, | ||
| Encased Within a Minimum of 20 Centimeters of Concrete On All Sides. | 200 | FT |
(Linear Foot) 0023 Labor Only Deinstall Cable in Conduits. 1,000,000 FT (Linear Foot)
| 0024 | Contractor Furnished Material (CFM) Install Combined Innerduct System (CIS) | ||
| Type 25 Millimeter X 4 Each (Black, Yellow, Red, Green). | 6,000 | FT |
(Linear Foot)
| 0025 | Government Furnished Materials (GFM) Install Outside Pull-Box (Various Sizes). Average 40cm x 40cm x 20cm | 40 | EA |
| 0026 | Contractor Furnished Material (CFM) Install Pulling Wire in Ducts. | 1,000,000 | FT |
File details come from the government source that posted it. Updated .