W91QVN22R0032-0001_Final.pdf

PDF 209 KB Posted

Attached to
Asphalt concrete hot mixed
Solicitation number
W91QVN22R0032
Issued by

View the file

Other files

File Type Posted
W91QVN22R0032_Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

411TH CSB, KOREA - HUMP CONTRACTING DIV

POC: MRS. YUN, SU-OK

TEL: 0503-355-3349

SUOK.YUN.LN@ARMY.MIL

APO AP 96271

UNITED STATES

0011731482

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See next page for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jan-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN22R0032

X 9B. DATED (SEE ITEM 11)

20-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jan-2022

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

NAME: JUVON ALLGOOD

PHONE #: 315 730-4209

APO AP 96271

W91QVN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W91QVN

FACILITY CODECODE

EMAIL:TEL:

W91QVN22R0032

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CONTINUATION

a. The purpose of this amendment is to answer vendor’s question as below:

i) Question #1) I found delivery point is UIJEONGBU on cover page (block # 15). However, delivery point indicated as YONGSAN on 14 page. Which one is correct?

Answer #1) Here is the detailed delivery points.

Camp Warrior Base: Daesungdong-kil, Kunnae-Myon, Paju-city and Camp Casey: Bosan-dong, Dongduchon-city, Kyonggi-do

ii) Question #2) Should I deliver asphalt and concrete at separate places and separate time? Can we supply them at one time or not?

Answer #2) As stated in the solicitation, the contractor shall deliver it separate places and separate time upon RA request from 15 March 2022 to 31 October 2022.

iii) Question #3) If we supply them several times and different place, how about minimum quantity and maximum quantity per delivery.

Answer #3) Minimum quantity- Asphalt: 6 Ton, Concrete ready mixed: 6 cz. Maximum quantity- Asphalt: 50 Ton, Concrete ready mixed: 80 cz.

b. All other terms conditions remain unchanged.

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

LOCAL DELIVERY INFORMATION

ADDENDUM TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS

1. DELIVERY INSTRUCTIONS:

The Contractor shall contact below point of contact (POC) at least five (5) working days prior to delivery to coordinate the delivery schedule.

a. DELIVERY TO: The purchase order number (TBD) must be included.

Camp Warrior Base: Daesungdong-kil, Kunnae-Myon, Paju-city

Camp Casey: Bosan-dong, Dongduchon-city, Kyonggi-do.

b. Receiving Officer: Ms. Yi, Hye Yong DSN 722-4737 / COMM 050-3322-4237 / E-mail:

Hyeyong.yi2@army.mil.

mailto:Hyeyong.yi2@army.mil

W91QVN22R0032

c. TIME OF DELIVERY (Door-to-Door): should be delivered to the designated location From

15 March 2022 to 31 October 2022.

2. INSPECTION AND ACCEPTANCE: Inspection for condition, quality count and final acceptance of the supplies delivered under this purchase/delivery order shall be conducted by Receiving Officer or his authorized representative at the final destination point in Korea.

3. PARTIAL DELIVERY IS AUATHORIZED.

4. INVOICE SUBMITTAL: IAW FAR 52.232-33, Payment by Electronic Funds Transfer and DFARS 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports, invoices shall be submitted to the DoDAAC identified in Block #15 of the resultant order through Wide Area Work Flow (WAWF) at https://wawf.eb.mil.

5. PAYMENT: All request for payment, invoicing, and payment status will be referred to addressee in Block # 18a. All problems on payment of accounts will be directed to the same office. Payment inquiries should be sent to payment office via the e-mail, 175TH FINANCIAL MANAGEMENT SUPPORT (usarmy.humphreys.8-army.mbx.175-fmsc-drowawf1@mail.mil).

Payment will be made NET 30 days from date of receipt of invoice in paying office or acceptance of material/services, whichever is later.

6. NOTICE TO RECEIVING OFFICER (KOREA): Upon receipt and acceptance of supplies, the receiving report shall be submitted electronically through Wide Area Work Flow – Receipt and Acceptance (WAWF) at the web site https://wawf.eb.mil.

7. RECEIVING OFFICER’S NOTIFICATION TO PURCHASING ACTIVITY OF NON-RECEIPT,

DAMAGE OR NON-CONFORMANCE: The Receiving Officer shall notify the Purchasing Office promptly after date of delivery specified in the purchase order, of supplies not received, damaged in transit, or not conforming to specifications of the purchase order.

8. NOTE: Contractor shall ensure that a copy of Government Purchase/Delivery Order (SF 1449 or DD 1155) is included in Packing List/Invoice ATTACHED to the outside of the delivery item.

(End of Summary of Changes) https://wawf.eb.mil/ https://wawf.eb.mil/

File details come from the government source that posted it. Updated .