Amd 01.pdf

PDF 153 KB Posted

Attached to
Excavator
Solicitation number
W91QVN21R0173
Issued by

View the file

Other files

File Type Posted
B.08.02 Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

J

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

Amd 01

3. EFFECTIVE DATE

18-Aug-2021

4. REQUISITION/PURCHASE REQ. NO.

0011665746

5. PROJECT NO.(If applicable)

6. ISSUED BY CODE W91QVN 7. ADMINISTERED BY (If other than item 6) CODE W91QVN

411TH CONTRACTING SUPPORT BRIGADE, KOREA

411TH CSB, KOREA - CONST & SUPPLY TEAM

POC: MS. OK, SUN-HUI

CONSTRUCTION & SUPPLY DIV, UNIT #15289 TEL: 05033-55-3393

APO AP 96271 SUN.H.OK.LN@MAIL.MIL

UNITED STATES APO AP 96271-5228

UNITED STATES

8. NAME AND ADDRESS OF CONTRACT OR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W91QVN21R0173

X 9B. DATED (SEE ITEM 11)

05-Aug-2021

10A. MOD. OF CONTRACT /ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. T HIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICIT ATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNT ING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT S/ORDERS.

IT MODIFIES THE CONTRACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. T HE ABOVE NUMBERED CONTRACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO THE AUT HORIT Y OF FAR 43.103(B).

C. T HIS SUPPLEMENT AL AGREEMENT IS ENTERED INTO PURSUANT TO AUT HORIT Y OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT : Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPT ION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

A. The purpose of this amendment is to revise the Salient Characteristics as follow s:

SEE NEXT PAGE.

B. All other terms and conditions are remain unchanged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONT RACT OR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNIT ED STATES OF AMERICA

B Y (Signature of Contracting Officer)

16C. DATE SIGNED

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

mailto:SUN.H.OK.LN@MAIL.MIL

W91QVN21R0173

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

Salient Characteristics

Equipment weight min5930 max6280kg Bucket capacity min0.175 max0.18 m³ Engine output min57.8/2,300 max67.8/2,400ps/rpm Max torque min20.9/1560 max24/1800kg.m/rpm Hydraulic pump discharge rate min2x57.5+37.3 max2x60+38.9 l/min Discharge pressure min220 max240 kg/cm² Fuel tank min118 max125 l Maximum turning speed min8.7 max9.3rpm Maximum driving speed min30 max40 km/h Maximum traction min3042 max3300kgf Gradeability min30° max31° Maximum bucket digging force min4200 max4290kgf Maximum arm digging force min2500 max2890kgf Length min5930 max6100mm Height min2855 max3185mm Width min1920 max1925mm Rear turning radius min1650 max1667mm Minimum ground clearance min285 max290mm Maximum digging radius min6150 max6445mm Maximum digging depth min3450 max3830mm Maximum digging height min6085 max6285mm Maximum dumping height min3925 max4325mm

Shall be euipped with Air conditioner, Heater, Quick coupler and Breaker. 3 each Grab, Bucket: Small, Medium, Large

Essentiality items: Operating Manual Book, Maintenance Service Manual Book & Repair Parts Manual Book(English & Hangul), OEM tool boxs, Equipment manufacturing certificate, Delivery 60-90 days (Flexible) and Warranty is 2 years

To:

Salient Characteristics

Equipment weight min5930 max6280kg Bucket capacity min0.175 max0.18 m³ Engine output min57.8/2,300 max67.8/2,400ps/rpm Max torque min20.9/1560 max24/1800kg.m/rpm Hydraulic pump discharge rate min2x57.5+37.3 max2x60+38.9 l/min Discharge pressure min220 max240 kg/cm² Fuel tank min118 max125 l Maximum turning speed min8.7 max9.3rpm Maximum driving speed min30 max40 km/h

Maximum traction min3042 max3300kgfGradeability min30° max31° Maximum bucket digging force min4200 max4290kgf Maximum arm digging force min2500 max2890kgf Length min5930 max6100mm Height min2855 max3185mm Width min1920 max1925mm Rear turning radius min1650 max1667mm Minimum ground clearance min285 max290mm Maximum digging radius min6150 max6445mm Maximum digging depth min3450 max3830mm Maximum digging height min6085 max6285mm Maximum dumping height min3925 max4325mm

Shall be euipped with Air conditioner, Heater, Quick coupler, Breaker and Grab. 3 each bucket (Small, Medium, Large)

Essentiality items: Operating Manual Book, Maintenance Service Manual Book & Repair Parts Manual Book(English & Hangul), OEM tool boxs, Equipment manufacturing certificate, Delivery 60-90 days (Flexible) and Warranty is 2 years

(End of Summary of Changes)

File details come from the government source that posted it. Updated .