W91QVN21R0162-0001.pdf

PDF 287 KB Posted

Attached to
Ladder Lift Truck 5Ton
Solicitation number
W91QVN21R0162
Issued by

View the file

Other files

File Type Posted
W91QVN21R0162.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011665748

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. The purpose of this amendment is to update the essential items in the Salient Characteristics.

B. The closing date is not extended.

C. All other terms and conditions of the RFP remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN21R0162

X 9B. DATED (SEE ITEM 11)

27-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Aug-2021

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

NAME: JUVON ALLGOOD

PHONE #: 315 730-4209

APO AP 96271

UNITED STATES

W91QVN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91QVN21R0162

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

DELIVERY /PAYMENT INFORMATION

1. SHIPPING INSTRUCTIONS:

Door-to-Door delivery to the following address between 150-180 calendar days or sooner after receipt of order of Modification, FOB: Destination.

BLDG 705, USAG Yongsan-Casey

APO AP 96224-15014

ATTN: Mr. Song Ki Po or Mr. Kim, Pyong Won

DSN: (0503) 322-2522/4156

2. INSPECTION AND ACCEPTANCE: Inspection for condition, quality count and final acceptance of the supplies delivered under this purchase/delivery order shall be conducted by Receiving Officer or his authorized representative at the final destination point in Korea. After final acceptance of all items, the payment will be made.

3. PAYMENT: All requests for payment, invoice, and payment status will be referred to address in block 18a on SF1449 or block 15 on DD1155. All problems with payment of accounts will be directed to the same office.

Telephone inquiries may be made between 8 am and 11 am, Monday through Friday. Phone: (011-822) 7913-4587.

Payment will be made NET 30 days from date of receipt of invoice in paying office or acceptance of materials/services by the Receiving Officer in Korea, whichever is later.

4. NOTICE TO RECEIVING OFFICER (KOREA); Upon receipt and acceptance of supplies, the receiving report shall be submitted electronically through Wide Area Work Flow – Receipt and Acceptance (WAWF) at the web site https://wawf.eb.mil

CAUTION: Failure to provide completed receiving report on a timely basis may result in a loss of discount, in which event the Receiving Officer is required to furnish reasons for delay so that proper documentation maybe made to explain the loss.

5. RECEIVING OFFICER’S NOTIFICATION TO PURCHASING ACTIVITY OF NON-RECEIPT,

DAMAGE OR NON-CONFORMANCE: The Receiving Officer shall notify the Purchasing Office promptly after date of delivery specifies in the order, of supplies not received, damaged in transit, or not conforming to specifications of the purchase order. Only under extenuating circumstances should such notification be made later than 15 days after specified date of delivery.

6. INVOICE SUBMITTAL:

The Contractor shall submit the invoice IAW DFARs 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Upon notification from the Receiving Officer, the invoice shall be submitted electronically through Wide Area Work Flow – Receipt and Acceptance (WAWF) at the web site https://wawf.eb.mil .

7. Partial delivery and partial payment are not authorized.

https://wawf.eb.mil/ https://wawf.eb.mil/

INSTUCTIONS TO THE OFFEROR

ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO THE OFFEROR(S)

1. The quotation with item description must be conforming to the requirement, and must be submitted via email to yongsuk.kim5.ln@mail.mil. The electronic proposal shall be submitted by 6 August 2021, 1300 hrs (Korea Standard Time) or 5 August 2021, 11:59 PM (Eastern time) on the closing date of RFQ. All questions should be e-mailed to yongsuk.kim5.ln@mail.mil within 2 days after the RFQ is issued.

2. Proposal Preparation Instructions. The offeror quotation must demonstrate a clear understanding of the solicitation requirement. Failure to provide a complete proposal may reflect lack of understanding of the requirements and may result in a determination that the offeror’s proposal is incomplete and ineligible for award.

3. The offeror(s) shall submit the following requirements IAW para. 1 above.

a. Technical Proposal: Must provide the specified salient characteristics of each item. "EQUAL" products must meet, or exceed, the salient physical, functional, or performance characteristic specified in the solicitation. Contractor shall clearly identify the descriptions of each item including manufacturer, model number, and drawings.

b. Price Schedule: The offeror shall submit prices and the length of warranty for all items in Section B of this solicitation.

4. Delivery Schedule: Offeror shall provide the delivery lead time to have all items arrive at the final delivery destination.

6. "In accordance with FAR 25.1002, solicitations for contracts to be entered into and performed in Korea, to ensure a fair evaluation of offers, the Government will use the Korea Exchange Bank conversion rate on the date specified for receipt of proposal."

BASIS OF AWARD

The Government will award a contract resulting from this solicitation to the responsible offeror having submitted the lowest-priced, technically acceptable offer that satisfies all terms and conditions of this solicitation. The following factors shall be used to evaluate quotations on an LPTA basis:

►Factor A : Technical (FAR 52.211-6 Brand Name or Equal) Item(s) shall meet the salient characteristics by stating the specifications of each item. To be determined technically acceptable, the submitted specification must meet salient characteristics stated in this solicitation.

►Factor B : Price Schedule – Price analysis will be performed in accordance with FAR 13.106-3. The lowest price for award purposes will be the total of all CLIN prices.

"In accordance with FAR 25.1002, solicitations for contracts to be entered into and performed in Korea, to ensure a fair evaluation of offers, the Government will use the Korea Exchange Bank conversion rate on the date specified for receipt of proposal."

Note: To be determined responsible, a prospective contractor must meet FAR 9.104-1 General standards.

A written notice of award or acceptance of an offer mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.

Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

mailto:yongsuk.kim5.ln@mail.mil

Failure to submit the above requirements may indicate that the offeror fails to understand the requirement, and may be grounds for determining the proposal to be non-responsive and ineligible for contract award in accordance with Basis of Award of this solicitation.

SALIENT CHARACTERISTICS

*All of capacity variance is minimum.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .