SOLICITATION W91QVN21R0028.docx

DOCX document 254 KB Posted

Attached to
Pick-Up and Disposal Construction Debris at Yongsan, K-16 and Camp Casey
Solicitation number
W91QVN21R0028
Issued by

View the file

Other files

File Type Posted
PHOTO 4.jpg JPG image
PHOTO 2.jpg JPG image
PHOTO 3.jpg JPG image
PHOTO 1.jpg JPG image
AMENDMENT 1 W91QVN21R0028.docx DOCX document
SOLICITATION W91QVN21R0028.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91QVN21R0028

SEE ADDENDUM

(No Collect Calls)

W91QVN21R0028

25-Feb-2021

b. TELEPHONE NUMBER 315-755-0633

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 25 Mar 2021

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA

ARE

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 23.

CODE

10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W91QVN

9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MS. YI, HYE KYONG

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER 30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

PAGE 1 OF

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.

ADDENDA

ARE

ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:

SET ASIDE:

UNRESTRICTED OR

X

SMALL BUSINESS

17a.CONTRACTOR/

CODE

FACILITY

OFFEROR

CODE

411TH CSB, KOREA - SERVICE TEAM

POC: MS. YI, HYE KYONG

TEL:0503-355-0633

HYEKYONG.YI6.LN@MAIL.MIL

APO AP 96271

UNITED STATES

18a. PAYMENT WILL BE MADE BY

CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A 13b. RATING

CODE

15. DELIVER TO

CODE

W582LG

16. ADMINISTERED BY

12. DISCOUNT TERMS

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

X

DPW, USAG YONGSAN

SO, CHONG OK

UNIT #15333

APO AP 96205-5333

UNITED STATES

TEL: 724-4477 FAX:

FAX:

TEL:

315-755-0633

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$41,500,000

NAICS:

562219 X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICES

ITEM NO.

QUANTITY

UNIT

UNIT PRICE

AMOUNT

24.

22.

21.

19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________ 32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED

INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINAL

PARTIAL

COMPLETE

36. PAYMENT

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER

39. S/R VOUCHER NUMBER

40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE 42a. RECEIVED BY (Print) 42b. RECEIVED AT (Location) 42c. DATE REC'D

(YY/MM/DD)

42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY

UNIT

22.

23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

NOTICE TO OFFERORS

All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative status to any offeror, for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any Contractor not already doing business in Korea, must submit adequate verification in its initial proposal or quote, that it has the requisite authorization and capacity to compete for the requirement, and to perform the contract. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an offeror qualifies shall be determined by the Contracting Officer.

Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
3,000
Actual Tons

Pickup & Disposal of Construction Debris

FFP

at DPW Collection Points for Yongsan, K-16 and Camp Casey.

FOB: Destination

PSC CD: S205

ESTIMATED

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

Accounting for Contract Services (CMR)

CMR requirement must be reported by 31 October of each calendar year during the life of the contract in accordance with Para. 5.2. of the PWS.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Estimated Cost for War Hazard Losses is

Zero (0).

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
3,000
Actual Tons
OPTION
Pickup & Disposal of Construction Debris

FFP

at DPW Collection Points for Yongsan, K-16 and Camp Casey.

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
Accounting for Contract Services (CMR)

FFP

CMR requirement must be reported by 31 October of each calendar year during the life of the contract in accordance with Para. 5.2. of the PWS.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Estimated Cost for War Hazard Losses is

FFP

Zero (0).

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
3,000
Actual Tons
OPTION
Pickup & Disposal of Construction Debris

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
Accounting for Contract Services (CMR)

FFP

CMR requirement must be reported by 31 October of each calendar year during the life of the contract in accordance with Para. 5.2. of the PWS.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Estimated Cost for War Hazard Losses is

FFP

Zero (0).

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
3,000
Actual Tons
OPTION
Pickup & Disposal of Construction Debris

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
Accounting for Contract Services (CMR)

FFP

CMR requirement must be reported by 31 October of each calendar year during the life of the contract in accordance with Para. 5.2. of the PWS.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Estimated Cost for War Hazard Losses is

FFP

Zero (0).

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
3,000
Actual Tons
OPTION
Pickup & Disposal of Construction Debris

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
Accounting for Contract Services (CMR)

FFP

CMR requirement must be reported by 31 October of each calendar year during the life of the contract in accordance with Para. 5.2. of the PWS.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Estimated Cost for War Hazard Losses is

FFP

Zero (0).

NET AMT

PERFORMANCE WORK STATEMENT (PWS)

PICK UP AND DISPOSAL OF CONSTRUCTION DEBRIS

FOR

YONGSAN, K-16 AND CAMP CASEY

1. GENERAL: This is a non-personal service contract to provide Pick-up and Disposal of Construction Debris such as bricks, concrete blocks, asphalt, tile, mixed construction debris from repair, and/or renovation of buildings and civil works at DPW collection points at Yongsan, K-16 and Camp Casey.

1.1. DESCRIPTION OF SERVICES/INTRODUCTION: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, material, supervision, and other items and non-personal services necessary to perform pick-up and disposal of construction debris service as defined in Para. 5. of the Performance Work Statement (PWS). The Contractor shall perform this service in accordance with applicable local regulations and standards, and in strict compliance with the attached specifications and all other terms and conditions contained here.

1.1.1. BACKGROUND: The Contractor shall dispose of Construction Debris at off-base facility in accordance with Act on the Promotion of Construction Waste Recycling (건설폐기물의 재활용촉진에관한 법률) and all applicable ROK environment laws and regulations.

1.2. OBJECTIVES: The objective of this contract is to provide the service of collection, transportation and disposal of construction debris from the collection points at Yongsan, K-16, and Camp Casey. The Contractor shall leave collection stations in a neat and orderly manner. The Contractor shall ensure that all work accomplished in the performance of this PWS meets all applicable Federal, local laws, regulations, and directives including listed publications in Para. 7, Related Documents.

1.3. SCOPE: The Contractor shall furnish all the necessary labor, management, supervision, tools, material, equipment, and transportation necessary for and Pick-up and Disposal of Construction Debris services in accordance with all other terms and conditions contained herein. The Contractor shall prepare required reports, and submit all information as specified by the Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract.

1.4. TYPE OF CONTRACT: A Requirements type of contract. The quantity of CLIN X001 is estimate and the total quantity of task orders during the life of the contract may be unexpectedly lower the contracted quantity due to the Yongsan Relocation Program (YRP) and Base closure.

1.5. PERIOD OF PERFORMANCE (POP): The POP shall be Base Period plus Four (4) Option Years.

Base Period01 July 2021 – 30 June 2022
Option Period I01 July 2022 – 30 June 2023
Option Period II01 July 2023 – 30 June 2024
Option Period III01 July 2024 – 30 June 2025
Option Period IV01 July 2025 – 30 June 2026

1.6. GENERAL INFORMATION:

1.6.1. HOURS OF OPERATION: The Government's regular (normal) hours are from 0800 – 1700 hours Monday through Friday, except ROK legal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall conduct business during regular hours.

1.6.2. ROK LEGAL HOLIDAYS:

(1) 1 and 2 January (New Year)

(2) Lunar New Year (31 December, 1 and 2 January on the Lunar Calendar)

(3) 1 March (Independence Movement Day)

(4) 1 May (Labor Day)

(5) 5 May (Children's Day)

(6) Buddha's Birthday (8 April on the Lunar calendar)

(7) 6 June (Memorial Day)

(8) 15 August (Liberation Day)

(9) Chu-Suk (14, l5 and 16 August on the Lunar Calendar)

(10) 3 October (National Foundation Day)

(11) 9 October (Hangul Day)

(12) 25 December (Christmas Day)

1.6.3. PLACE OF PERFORMANCE: Each DPW Collection Point at Yongsan, K16 and Camp Casey.

1.6.4. INSTALLATION CLOSURES. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:

a. Reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a legal public holiday, and when routine work is not scheduled for that day; or

b. Reschedule the work on any day mutually satisfactory.

1.6.5. INCLEMENT WEATHER DELAY. If the Contractor determines unsafe weather conditions for continued operations, then the Contractor shall notify the COR if inclement weather suspends operations within (2) hours. The Contractor shall resume operations with COR approval

1.6.6. QUALITY CONTROL PLAN (QCP): Quality control is the responsibility of the Contractor. The Contractor shall develop, implement, and maintain an effective quality control program which shall be documented in a QCP to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify and prevent the recurrence of defective services. The Contractor’s QCP is the means by which they assure themselves that the work conforms to contract requirements. The basic principle of the plan is that the Contractor is responsible for quality control. The QCP shall be constructed in such a manner that each CLS service can be extracted and used for that function only and not contain extraneous information. The Contractor's QCP shall include a separate section, which addresses the Contractor's method of managing quality of work. The QCP shall include a description of the inspection system to address services listed in this PWS, and a description of the methods to be used for identifying and preventing defects in the quality of services performed. The plan shall include a description of the Contractor’s inspection system to include specifics as to areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the Contractor’s inspectors. No lead person or first line supervisor shall be considered a Quality Control Inspector. The Contractor shall develop, maintain, and submit a QCP to the COR for acceptance within fourteen (14) calendar days after the contract is awarded. The Contractor shall submit any proposed changes in the QCP to the COR for written approval five (5) working days prior to implementation.

1.6.6.1. COMMON LEVEL OF SERVICE (CLS):

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions of the Base Operations specified below. This shall be done IAW all the terms, conditions, general and special provisions, specifications, drawings, attachments, and exhibits contained herein or incorporated by reference.

The Contractor shall ensure that all work meets or exceeds the specifications for the listed CLS.

CLS
Service Title
Specific Tasks
403
Solid Waste Management
Paragraph 5

1.6.7. QUALITY ASSURANCE (QA):

1.6.7.1. The Government will use the Quality Assurance Surveillance Plan (QASP) to evaluate the Contractor’s performance of tasks listed in the performance requirements summary (PRS) in Part 8. Deliverables to ensure the contractor’s performance meets standards as specified in this PWS. For those tasks listed on the PRS, the COR will follow the methods of surveillance in this contract. Government personnel will record all surveillance observations. When an observation indicates defective performance, the COR will require the Contract Manager (CM) to initial the form that annotates the defective performance that was observed. Initialing of the observation does not necessarily constitute concurrence with the observation, only acknowledgement that they have been made aware of defective performance. Government surveillance of tasks not listed in the PRS by methods other than those listed in the PRS may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the COR as a result of surveillance will be in accordance with (IAW) the terms of this contract.

1.6.8. SECURITY:

1.6.8.1 Access and General Protection/Security Policy and Procedures. The Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by Department of Defense (DOD), Headquarters Department of the Army (HQDA), and local policy. The COR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.

1.6.8.2. Motor Vehicle Operators. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid driver’s license, certificates, and permits applicable for the type and class of vehicle being operated.

1.6.8.3. Contractor Vehicle Registration

. The Contractor shall register all Contractor-owned or operated vehicles and trailers operating on the installation within 10 working days of contract start date. The Contractor shall complete all applications with the Provost Marshal Vehicle Registration section located in Building S-2533 at Camp Casey. Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.

1.6.8.4. The Contractor shall provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost Marshall Office, Director of Emergency Services.

1.6.8.5 Physical Security. The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured. Contractor employees shall not allow any individuals entry into the facilities before or after operational hours.

1.7. SPECIAL QUALIFICATIONS:

1.7.1. PRIME CONTRACTOR’S QUALIFICATION: The prime Contractor shall have current and valid Intermediate or Final Waste Disposal Business Permit in construction debris for pick-up, transporting, and disposal (건설폐기물 중간처리업 허가증 또는 최종처리업 허가증) issued by the ROK Government.

1.7.2. PRIME CONTRACTOR’S PRIOR EXPERIENCE: The Prime Contractor shall have at least two (2) years of experience in performing Pick-up and Disposal of construction Debris services.

1.7.3. KEY PERSONNEL: The following personnel are considered key personnel by the Government:

1.7.3.1. Contract Manager (CM): The Contractor shall provide a qualified CM who shall be responsible for the overall performance of the work and be given authority to make on-site decisions on behalf of the Contractor on contract matters.

1.7.3.1.1. The CM shall possess at least two (2) years of experience in performing Pick-up and Disposal of construction Debris services.

1.7.3.1.2. The CM or designated representative shall be available during normal duty hours (0800 – 1700) to respond within three (3) hours for Yongsan, K16 and Camp Casey to meet on the installation with COR to discuss problem areas. After duty hours and including weekends and ROK holidays, the CM shall respond within four (4) hours from the time notified by the COR to meet on the installation at the location specified by the COR.

1.7.3.1.3. The CM shall be able to communicate in the English language at the intermediate level as exemplified in his written and verbal skills in the performance of CM duties under this contract. Government will assess language skills of CM who are required by terms of this PWS to be proficient at speaking English through performance of services. If the Government, at its sole discretion, determines that the language skills of CM does not meet the language proficiency skills required of the position, the Government reserves the right to require the Contractor to provide a new Contract employee that does possess the required language proficiency skills required of the position, at no additional cost to the Government.

1.7.3.2. Contractor Identification. The Contractor shall ensure all personnel be identified as a Contractor to distinguish themselves by wearing appropriate uniforms or badges that contain the company name and employee’s name. Such uniform or badges shall be furnished and controlled by the contractor. All of the contractor’s employees shall be required to display identification uniforms or badges at all times during the performance of work under this contract.

1.7.3.3. Standards of Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.

1.7.3.4. Contractor Hiring Restrictions. The Contractor shall not hire or sub-contract with off duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.

1.7.3.5. Organizational Conflict of Interest (OCI). Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the COR immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the COR, and in the event the COR unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the COR may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.7.3.6. Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the COR/ACOR corrective action plans, timely identification of issues, and effective management of subcontractors within 2 days or at a mutually agreed upon date. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.

1.8. WORK MANAGEMENT: The Contractor shall schedule and coordinate with the COR to minimize disruptions to the facility mission.

1.9. ANTITERRISM AND OPERATIONS SECURITY:

1.9.1 AT LEVEL I TRAINING: The contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil

1.9.2. ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES: The Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.9.2.1. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

1.9.3. iWATCH TRAINING: The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 14 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

1.9.3.1. Requirement for OPSEC Training: Per AR 530-1, Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

1.9.4. SAFETY: The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program and AK REG 385-10, which is the local supplement of AR 385-10.

1.9.4.1. Safety Plan: The Contractor shall develop and implement a safety program for its employees. The Contractor shall submit the Safety Plan to the COR for review and acceptance within thirty (30) days after award of contract. Revisions shall be submitted five (5) calendar days prior to the effective date of change.

1.9.4.2. Occupational Safety and Health. The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards. The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.

1.9.4.3. Accident investigations, reports, and logs: The safety plan shall include a copy of the contractor’s accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than 30 minutes of accident occurrence to the COR. The contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the COR in the accident investigation reporting format as soon as possible but no later than five (5) working days following the accident. Implement corrective actions as soon as reasonably possible. The accident investigation reporting format shall include at a minimum.

(1) Contract number and contract name/description

(2) Name of contractor

(3) Date/Time of accident

(4) Date report was completed.

(5) Detail description of events that lead to the accident

(6) Root cause of accident

(7) Corrective action(s) to prevent recurrence.

1.9.4.4. The following require immediate accident notification and written accident report

(1) A fatality

(2) A permanent total or permanent partial disability

(3) The hospitalization of three or more people resulting from a single occurrence.

(4) Property damage of $200 or more

1.9.4.5. The Contractor shall immediately correct all safety deficiencies upon notification of the deficiencies by the COR/ Quality Assurance Representative (QAR), and shall notify the COR of the corrective action to be taken.

1.9.5. The Contractor shall ensure all Contractor’s employees and associated subcontractors are certified or licensed, as appropriate in South Korea, in the specific areas required by the South Korean National, Provincial, Municipal, or local governmental organizations. The Contractor shall ensure employees are certified or licensed in the appropriate areas required. The Contractor shall ensure all required documentation of certification or licensure for Contractor personnel are filed with the COR within twenty‐four (24) hours prior to employees commencing performance.

1.9.5.1. Environmental Compliance. The Contractor shall comply with all Federal, State, local, and installation environmental laws, rules, plans, and policies. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation IAW industry standards, local, State and Federal laws, and according to manufactures' recommendations. The Contractor shall be financially responsible for all fines and associated costs for hazardous waste management, transportation, and disposal of waste due to the Contractor's non-compliance. The Contractor shall submit Safety Data Sheets (SDS) for approval on all materials, five (5) days before delivery of the material, to the COR. The Contractor shall provide upon request from the COR all required data to meet environmental-mandated reporting requirements (e.g., air emission data, hazardous material storage/usage, herbicide/pesticide usage, solid/hazardous waste generation). The Contractor shall provide data to meet reporting deadlines and during compliance inspections upon request from the COR.

1.9.6. Damage Caused by Contractor. Damages caused by Contractor employees shall be repaired at no cost to the Government. The Contractor shall notify the COR and return the damaged area to its previous condition. The Contractor shall furnish all labor, materials, and equipment to perform the repair work.

1.9.6.1. Damage Report. The Contractor shall submit damage report to the COR within thirty (30) calendar days that annotates the damage, corrective action, and date corrected.

1.10. EMERGENCY SERVICES: The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the COR immediately, not later than (NLT) two (2) hours from the incident. The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.

1.11. POST AWARD CONFERENCE/PERIODIC PROGRESS MEETINGS: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The COR will meet periodically with the contractor to review the contractor's performance. At these meetings the COR will apprise the Contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.12. Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.

1.13. The following provides the roles and their respective authority during the performance of the contract:

1.13.1.1.13.1. Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change at the direction of any person other than the KO authorizing such changes. The KO will approve all submittals and plans required in this PWS.

1.13.2. Contracting Officer’s Representative (COR). The KO will appoint a COR during the performance of this contract. Additional Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR or ACOR, and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer’s Representative (COR) Certification and DFARS 201.602-2. The ACOR will serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR. The COR/ACOR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR/ACOR will perform IAW the responsibilities and duties identified in the appointment letter.

1.13.2.1. COR Authority. A letter of designation will be issued to the COR/ACOR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR/ACOR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR/ACOR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.

1.13.3. The Contractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).

1.13.4. COR/ACOR FUNCTIONS: The COR/ACOR monitors all technical aspects of the contract and assists in contract administration. The COR/ACOR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and coordinate site entry of Contractor personnel.

2. DEFINITIONS, ACRONYMS, AND ABBREVIATIONS

2.1. DEFINITIONS:

2.1.1. Acceptable Quality Level (AQL). The AQL is the maximum percent defective (or the number of defects per hundred units) for the purposes of sampling inspection can be considered satisfactory.

2.1.2. Alternate Contracting Officer’s Representative (ACOR). An employee of the U.S. Government provided by the A and appointed by the KO to provide support to CORs in monitoring and documenting the Contractor’s performance. These alternate surveillance support personnel will serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR.

2.1.3. Contract Administrator (CA). The official Government representative delegated authority by the KO to administer a contract. This individual, normally working in an appropriate contracting or procurement career field, advises on all technical contractual matters.

2.1.4. Contract Discrepancy. A failure of the Contractor to perform IAW contract requirements and specifications, e.g., a failure of the Contractor to provide, or provide on time, the required contract products or services; or it may result because delivered products or services do not meet specific contract requirements.

2.1.5. Contract Discrepancy Report (CDR). A report used to document other than satisfactory Contractor performance. The CDR requires the Contractor to explain, in writing, why performance is other than satisfactory; how performance shall be returned to satisfactory levels; and how recurrence of the problem shall be prevented in the future.

2.1.6. Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.7. Contractor Acquired Property (CAP). Property acquired, fabricated, or otherwise provided by the Contractor for performing a contract. Contractor retains title.

2.1.8. Contracting Officer (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

2.1.9. Contracting Officer’s Representative (COR). An employee of the U.S. Government appointed by the KO to help administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.10. Collection Point. The location designated on the drawings or maps or described in this performance work statement where solid waste, including bulky materials, will be temporarily stored for collection by the Contractor.

2.1.11. Construction Debris. The waste construction/demolition of materials such as bricks, concrete blocks, asphalt, tile, mixed construction debris from repair, and/or renovation of buildings and civil works from DPW, In-house work.

2.1.12. Defective Service. A service output that does not meet the standard of performance associated with the PWS.

2.1.13. Deliverable. Anything that can be delivered; can include non-manufactured things, such as meeting minutes or reports.

2.1.14. Equipment. A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article, when put into use. Equipment does not include material, real property, special test equipment or special tooling.

2.1.15. Government-Furnished Property (GFP). Property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

2.1.16. Government Property. All property owned or leased by the Government. Government property includes both Government-furnished property and Government purchased Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

2.1.17. Hazardous Material. Any item or chemical, which is a “health hazard”, or “physical hazard”, as reflected in Federal Standard (FED-STD) 313 Material Safety Data and Disposal Data for Hazardous Materials Furnished to Government Activities, defined in OSHA 29 CFR 1910, and pursuant to FAR 23.301 (Hazardous Materials) Definition. It also includes any other material designated by a Government COR/technical representative as potentially hazardous and requiring safety controls (e.g., pesticides, fertilizers).

2.1.18. Key Personnel. Contractor personnel evaluated in a source selection process and are used in the performance of a contract. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons who are listed in the proposal. The prime Contractor is responsible for performance of all subcontractors.

2.1.19. Loss of Government Property. Unintended, unforeseen or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property. Loss of Government property does not include occurrences such as purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to:

a. Items that cannot be found after a reasonable search,

b. Theft,

c. Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition, or

d. Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair.

2.1.20. Material. Property that is consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include equipment, special tooling, and special test equipment or real property.

2.1.21. Non-Personal Services. The personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government IAW FAR 37.104, under general contracting authority, and do not require specific statutory authorization.

2.1.22. Performance Requirements Summary (PRS). Identifies the key service outputs of the contract that will be evaluated by the Government to ensure contract performance standards are met by the Contractor (other services may also be inspected under the authority of the Inspection of Service Clause).

2.1.23. Physical Security. Actions that prevent the loss or damage of Government property.

2.1.24. Property Records. Records created and maintained by the Contractor in support of its stewardship responsibilities for the management of Government property.

2.1.25. Quality Assurance (QA). Verification that services being performed by the Contractor are IAW acceptable standards.

2.1.26. Quality Assurance Evaluator (QAE). A Government representative responsible for performing surveillance and inspection of Contractor performance.

2.1.27. Quality Assurance Surveillance Plan (QASP). An organized document written by the Government specifying the surveillance methodology used for surveillance of Contractor performance.

2.1.28. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.29. Random Sample. A sampling method whereby each service output in a lot has an equal chance of being selected.

2.1.30. Random Sampling. A method for looking at a few individual items in a lot to measure the quality of that lot against a standard.

2.1.31. Real Property. DOD Lands, buildings, structures, utility systems, improvements, and appurtenances, thereto that includes equipment attached to and made part of buildings and structures, but not movable equipment. See Federal Management Regulation 102-71.20 (41 CFR 102-71.20).

2.1.32. Recycling. The act of recovering materials from the solid waste stream, separating them by commodity, and returned to the economic mainstream as raw material.

2.1.33. Recycling Materials. Commodities include corrugated cardboard, wood, and plastic pallets.

2.1.34. Refuse. All garbage, ashes, debris, trash, rubbish and items intended for disposal that are generated in conjunction with the activities in the areas covered in this contract. Items excluded are explosives, incendiary waste, hazardous waste, and pathological waste resulting from medical and radiological processes.

2.1.35. Sensitive Property. Property potentially dangerous to the public safety or security if stolen, lost, or misplaced, or that shall be subject to exceptional physical security, protection, control, and accountability. Examples include weapons, ammunition, explosives, controlled substances, radioactive materials, hazardous materials or wastes, or precious metals.

2.1.36. Standard. A measure of comparison; an acceptability criterion; a benchmark or yardstick against which a service will be measured.

2.1.37. Subcontractor. One that enters into a contract with a prime Contractor. The Government does not have private of contract with the subcontractor.

2.1.38. Wide Area Work Flow (WAWF). A secure web based system for electronic invoicing, receipt, and acceptance. WAWF allows Government vendors to submit and track invoices and receipt or acceptance documents over the web allowing Government personnel to process those invoices in a real-time, paperless environment.

2.1.39. Work Day. The number of hours per day the Contractor provides services IAW the contract.

2.1.40. Work Week. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACORAlternate Contracting Officer's Representative
AFARSArmy Federal Acquisition Regulation Supplement
AQLAcceptable Quality Level
ARArmy Regulation

CAP Contractor Acquired Property

CDCChild Development Center
CDRLContract Data Requirements List
CFMContractor Furnished Material
CFRCode of Federal Regulations
CLINContract Line Item Number
CMRAContractor Manpower Reporting Application
CONUSContinental United States (excludes Alaska and Hawaii)
CORContracting Officer’s Representative
CPARSContractor Performance Assessment Reporting System
DADepartment of the Army
DESDirectorate of Emergency Services
DFARSDefense Federal Acquisition Regulation Supplement
DODDepartment of Defense
DPWDirectorate of Public Works
FARFederal Acquisition Regulation
FPCONForce Protection Condition
GFEBSGeneral Fund Enterprise Business System
GFMGovernment-Furnished Material

GFP Government-Furnished Property

HQDAHeadquarters Department of the Army
IAWIn Accordance With
IMCOMInstallation Management Command
KOContracting Officer
N/ANot Applicable
NLTNot Later Than
OCONUSOutside Continental United States (includes Alaska and Hawaii)
OSHAOccupational Safety and Health Administration
PAMPamphlet
PMPreventive Maintenance
POCPoint of Contact
PoPPeriod of Performance
PRSPerformance Requirements Summary
PWSPerformance Work Statement
QAQuality Assurance
QAPQuality Assurance Program
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Plan
TETechnical Exhibit
WAWFWide Area Work Flow

3. GOVERNMENT FURNISHED ITEMS AND SERVICES: None

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1.1. Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE). All Contractor furnished, material, property and equipment shall meet applicable Federal, State, local, DOD and Army laws, codes, and regulations. Examples are provided below:

4.1.1.1. Contractor-Furnished Material and Responsibilities. The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract.

4.1.1.2. Contractor-Furnished Items

. The Contractor shall provide all vehicles, equipment, parts, tools, fuel, oil, materials and any other items required to perform all Contract requirements. The Contractor's property shall be operational as intended by the manufacturer, and be safe, clean, and suitable for use at a military installation. All Contractor furnished property and equipment are subject to COR inspection at all times.

4.1.2. Identification of Contractor Vehicles and Trailers. The company name shall be displayed on each of the Contractor’s vehicles and trailers in a manner and size that is clearly visible. All vehicles and trailers shall display a valid State license plate and meet current local and State vehicle registration requirements.

4.1.2.1. The Contractor shall remove all vehicles, trailers and equipment from the installation at the end of each workday, unless otherwise directed by the COR.

4.1.2.2. The Contractor's equipment and other slow moving equipment shall be equipped with the slow moving vehicle sign.

4.1.3. Contractor Facilities. The Contractor shall secure the necessary office space and other facilities required for the performance of this contract, off the military installation.

5. SPECIFIC TASKS:

5.1. DESCRIPTION OF SERVICE: The Contractor shall provide the service of collection, transportation and disposal of construction debris such as bricks, concrete blocks, asphalt, tile, mixed construction debris from repair, and/or renovation of buildings and civil works from the DPW collection points at Yongsan, K-16, and Camp Casey upon schedule of a task order. The Contractor shall dispose of Construction Debris at off-base facility in accordance with all applicable ROK environment laws and regulations. The Contractor shall leave collection stations in a neat and orderly manner.

5.1.1. WORK RESPONSE. Upon receipt of task order, the contractor shall pick up and dispose construction debris from the collection points within 3 weeks after COR’s notification.

5.1.2. DISPOSAL REQUIREMENTS. The Contractor shall dispose of construction debris at off-base facility in accordance with all…