W91QVN20R0007_Amend0004.pdf

PDF 331 KB Posted

Attached to
MA IDIQ Contract General Building Repair and Construction, USAG Humphreys, Area III
Solicitation number
W91QVN20R0007_Amend0004
Issued by

About this file

This document is an amendment to a federal solicitation requesting proposals for an IDIQ contract for general building repair and construction services at USAG Humphreys Area III in Korea. The solicitation requires electronic submission of Volume III Price Proposals by 7 October 2020 and complete hard copy proposals including Volumes I through IV delivered by 10:00 AM on the same date. The amendment extends the response deadline and provides updated instructions for preparation of proposals, including requirements for contractor registration and licenses, key personnel qualifications, past performance references, and price and non-price proposal content and format. The Department of the Army Materiel Command Army Contracting Command is the issuing agency. Multiple awards may be made to up to five contractors.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

411TH CSB, KOREA - CONST & SUPPLY TEAM

POC: MS. KANG, SU-CHONG

TEL: 0503-355-3394/315-755-3394

SUCHONG.KANG.LN@MAIL.MIL

APO AP 96271

UNITED STATES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a. The purpose of this amendment is to provide changed Section L. Instruction to Offeror(s) and changed solicitation closing date and time.

b. As a result of change, the solicitation closing date and time is changed as below .

Email Submission: Volume III Price Proposal only, no later than 7:00 AM, 7 October 2020

Hand Carry of Hard copy (CD) Proposal Submission: Complete Proposal (including Volume I, II, III, and IV), 10:00 AM, 7 October 2020 at Dongchangri gate.

c. All other terms and conditions are unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN20R0007

X 9B. DATED (SEE ITEM 11)

24-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Sep-2020

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

CONSTRUCTION & SUPPLY DIV, UNIT #15289

APO AP 96271

UNITED STATES

W91QVN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W91QVN

FACILITY CODECODE

EMAIL:TEL:

W91QVN20R0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 21-Sep-2020 07:00 AM to 07-Oct-2020 07:00 AM.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

Proposals shall be prepared in accordance with the instructions in Section L. If a proposal is not prepared in accordance with the instructions in Section L, it will not be considered and will be excluded from consideration for award.

1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL:

1.1. Proposals shall adhere to the following instructions:

1.1.1. These instructions are designed to ensure the submission of information essential to understanding the proposal. Offerors are cautioned to follow the detailed instructions fully and carefully, as the Government reserves the right to make award based on initial offers received, without discussions of such offers.

1.1.2. Offerors are to submit enough information to enable the evaluation committee to fully ascertain each offeror’s capability to perform all of the requirements of this solicitation. All proposed elements shall become a part of the resultant contract. The offeror’s proposal is to represent his best effort to respond to the solicitation.

1.1.3. The proposals are intended to be evaluated, and award made, without discussions, with the offerors (other than clarification), unless discussions are determined to be necessary. However, if awards cannot be made on initial proposals, the Government will establish a competitive range which may consist of the most highly qualified proposals, considering technical, past performance and price evaluation factors and conduct the negotiation with all offers within the competitive range. The Government reserves the right to limit the number of offerors in the competitive range for the purpose of executing an efficient competition in accordance with FAR 15.306(c)(2) and the FAR Clause 52.215-1(f)(4).

1.1.4. Each offeror shall submit an ONLY VOLUME III. PRICE PROPOSAL via email to Ms. Kang, Su Chong, Contract Specialist, suchong.kang.ln@mail.mil and Ms. Jean K. Ross, Contracting Officer, jean.k.ross.civ@mail.mil via email no later than 0700 hours (KST) of closing date and time specified in the solicitation. Only Microsoft Excel Price Proposal is accepted. Do not link to any formula in other excel spreadsheet.

Government email only allows 15 MB per an email.

Each offeror shall submit COMPLETE PROPOSAL in English with Korean evidence document in CD. No USB or no other external hard drive type of hard copy proposal is accepted. The hard copies of the electronic submittal should be contained in a compact disk (CD) which should be identical to the electronic proposal, shall be submitted no later than 1000 hours (KST) on the closing date of the solicitation at Dongchangri Gate, parking lot. If the electronic price proposal is not identical to the CD, the offeror shall not be considered for award.

The CDs will be accepted only for the offerors who submitted the electronic price proposal on the closing date and time of solicitation. Both the electronic and CD hard copy price proposals shall be the same and timely. Offerors shall submit their proposal by the time and date specified above in order to be considered for contract award.

Late offer will not be acceptable.

1.2. Proposals shall be submitted in the following format:

1.2.1. Volumes shall be submitted in PDF file or MS Office compatible. All PDFs submitted must be text-searchable. Scanned PDF file and other program will not be accepted except license or certificate. Price Proposal shall be excel program file.

1.2.2. A table of contents shall be at the front of each volume identifying major sections by number, title, and page.

1.2.3. Page number shall be included at the bottom of each page.

1.2.4. The proposal text shall be portrait orientation and font size shall be no smaller than twelve (12) point black in Arial or Times New Roman fonts. Font requirements apply to bullets and other special text formatting, except for tables and graphic displays.

1.2.5. The use of hyperlinks in proposals is prohibited in all volumes and will not be reviewed. As a result, the offeror may not be considered for award.

1.2.6. Each offeror shall submit a complete offer package including:

Volume Volume Title No. Subject

I Technical Proposal 1 Technical Proposal Cover Letter

2 Table of Contents: List all sections of the technical proposal.

3 Company Registration/License

4 Key Personnel Resume

5 Contract Management Plan

6 Relevant Experience

II Past Performance Past Performance Information within the last three (3) years

III Price Proposal 1 Prices of each contract line item on the solicitation (CLIN 0001, 1001, 2001, 3001, 4001)

2 Attachment- Completed Pricing Schedule in Section J

3 Cost Breakdown for base plus all option periods

IV Section H&K 1 Signed first page of the solicitation and any subsequent solicitation amendments

2 52.203-2, Certificate of Independent Price Determination

3 52.204-3, Taxpayer Identification

4 52.209-5, Certification Regarding Responsibility Matters

252.247-7022, Representation of Extend of Transportation of Supplies by Sea

6 5152.204-4032, Representations and Certifications

252.209-7999, Representation by Corporation Regarding and Unpaid Delinquent Tax Liability

8 52.204-24(d)(1)&(2) Representation

9 52.204-26 (c) Representation

10 Business Registration in Korea

Essential Contractor Service Plan IAW 252.237-7023 Continuation of Essential Contractor Services and 252.237-7024 Notice of Continuation of Essential Contractor Services

1.2.6.1. Offeror shall provide the president information (name, e-mail, and phone number) and Point of Contact (name, position title, e-mail, and phone number) who has knowledge of the contractual and technical issues on the proposal. Offeror shall be prepared to have personnel available telephonically with all supporting data necessary to support/discuss the proposal within 24 hours after notification by the Contracting Officer.

1.2.6.2. Offeror shall provide complete proposals in CDs instructed below in response to this solicitation in the following principal element and copy.

Volume Volume Title CD Qty

CD Labeling Requirement

I Technical Proposal 4

2 each - Proposal INCLUDING company name, logo, information

Volume I Technical Proposal, Company

Name (회사이름)

2 each - Proposal WITHOUT company name, logo, information

Volume I Technical Proposal (Do Not include company name)

II

Past Performance 2

1 each - Proposal INCLUDING company name, logo, information

Volume II Past Performance, Company

Name (회사이름)

1 each – Proposal WITHOUT company name, logo, information

Volume II Past Performance (Do Not include company name)

III Price Proposal 2

1 each - Proposal INCLUDING company name, logo, information

Volume III Price Proposal, Company Name

(회사이름)

1 each - Proposal WITHOUT company name, logo, information

Volume III Price Proposal (Do Not include company name)

IV Section H&K 1 1 each - Proposal INCLUDING company name, logo, information

Volume IV Section H&K, Company Name

(회사이름)

TOTAL CD: 9 each

1.2.6.3. Offeror shall provide copies of required documents (registration, license, national pension payment record

(국민연금 납부기록) or medical insurance payment record (의료보험 납부기록) and the Certificate of

Engineering Career (건설기술자 경력증명서) issued by Korean Construction Engineers Association (KOCEA-

한국건설기술인협회) in Korean original version with English translated version.

1.2.7. Proposal must be submitted in the prescribed format and contain sufficient details to enable a thorough evaluation and sound conclusions as to the technical and management competence of offerors and their ability to perform the required contract performance. Proposals shall be precise, factual, complete, and describe in sufficient detail the proposed method(s) of accomplishing tasks set forth in the performance of work. Actual hard copy of licenses or other documents must be submitted within 24 hours after notification by the Contracting Officer, if requested.

1.2.8. Disposition of Proposals: After contract award, all proposals may be destroyed (no destruction certification will be provided).

2. DETAILED INSTRUCTIONS FOR PREPARATION OF PROPOSAL:

2.1. Technical Proposal (Volume I): The technical proposal shall include the following:

2.1.1. Prime Contractor’s Required Construction Registration:

In accordance with Korean Law, offeror(s) shall submit copies of Construction Registration for General works

(Civil & Architecture) (건설업등록증/토목 & 건축공사업 ), and Specialized work for Electrical (전기공사업).

The prime contractor shall have valid registrations/licenses during the entire performance period. (See Section C, Technical Provision II, Paragraph 2)

2.1.2. Prime Contractor’s Key Personnel Qualifications:

Offeror shall submit copies of Project Manager’s (PM) and Contractor Quality Control System Manager’s (CQCSM) valid engineer licenses. The Key Personnel Resumes shall include resumes for Project Manager (PM) for this contract, as well as Contract Quality Control System Manager (CQCSM), and Site Safety and Health Officer (SSHO) as provided below. (See Section C, Technical Provision II, Paragraph 3).

Name:

Education Years with the firm Experience of relevant projects: (Project title, location, dollar value, year worked on the project, and duties/functions on the project)

Offeror shall submit national pension payment record (국민연금 납부기록) or medical insurance payment record

(의료보험 납부기록) and the Certificate of Engineering Career (건설기술자 경력증명서) issued by Korean

Construction Engineers Association (KOCEA-한국건설기술인협회) for all key personnel to validate employment under prime contractor.

2.1.2.1. Project Manager: PM shall have a Bachelor’s degree in engineering, architecture, or construction management and have a licensed engineer (기사) for construction issued by Human Resources Development

Services of Korea(한국산업인력공단) with at least three (3) years relevant experience within the last five (5) years on construction similar to this contract as of the closing date of this solicitation. The offeror shall provide official

Certificate of Engineering Career (건설기술자 경력증명서) in a PM position issued by Korean Construction

Engineers Association (KOCEA-한국건설기술인협회) to validate at least three (3) years of relevant experience.

Relevant experience is defined as experience gained as a Project Manager for a Construction Contractor performing work similar in nature (repairs or minor construction) to the work that is required under this contract in the SOW.

The proposed PM may satisfy this requirement by working as PM for three (3) years for more than one company.

2.1.2.2. Contractor Quality Control System Manager: CQCSM shall have a licensed engineer(기사) for construction issued by Human Resources Development Services of Korea(한국산업인력공단) with at least five (5) years relevant experience within the last seven (7) years on construction similar to this contract as of the closing date of this solicitation. The offeror shall provide official Certificate of Engineering Career (건설기술자 경력증명서) in a CQCSM position issued by Korean Construction Engineers Association (KOCEA-한국건설기술인협회) to validate at least five (5) years’ experience. Relevant experience is defined as experience gained as a Contractor Quality Control System Manager for a Construction Contractor performing work similar in nature (repairs or minor construction) to the work that is required under this contract in the SOW. The proposed CQCSM may satisfy this requirement by working as CQCSM for five (5) years for more than one company.

2.1.2.3. Site Safety and Health Officer: SSHO shall have a safety engineer license for construction issued

(안전기사) by Human Resources Development Services of Korea (한국산업인력공단) with at least three (3) years relevant experience within the last seven (7) years as of the closing date of this solicitation. The offeror shall provide official Certificate of Engineering Career (건설기술자 경력증명서) in a SSHO position issued by Korean

Construction Engineers Association (KOCEA-한국건설기술인협회) to validate their experience. Relevant experience is defined as experience gained as a SSHO for a Construction Contractor performing work similar in nature (repairs or minor construction) to the work that is required under this contract in the SOW. Proposed SSHO may satisfy this requirement by working as a SSHO for three (3) years for more than one company.

<Summarized Key Personnel Qualification>

PM (Project Manager) Contractor Quality Control System Manager (CQCSM)

Site Safety and Health Officer

(SSHO)

Required Degree & Licenses and Certificates a Bachelor’s degree in engineering, architecture, or construction management and a Licensed engineer(기사) for construction issued by Human Resources Development Services of

Korea (한국산업인력공단) a Licensed engineer(기사) for construction issued by Human Resources Development Services of Korea

(한국산업인력공단) a Safety engineer license

(안전기사) for construction issued by Human Resources Development Services of

Korea (한국산업인력공단)

Certificate of Engineering

Career (건설기술자

경력증명서) in a PM position issued by Korean Construction Engineers Association (KOCEA-

한국건설기술인협회)

Certificate of Engineering

Career (건설기술자

경력증명서) in a CQCSM position issued by Korean Construction Engineers

Certificate of Engineering

Career (건설기술자

경력증명서) in a SSHO position issued by Korean Construction Engineers

Experience Requirement

Minimum of three (3) years relevant experience within the last five (5) years on construction similar to this contract.

Minimum of five (5) years last seven (7) years on construction similar to this contract.

Minimum of three (3) years last seven (7) years on construction similar to this contract.

Employment national pension payment record (국민연금 납부기록) or medical insurance payment record (의료보험 납부기록) national pension payment record (국민연금 납부기록) or medical insurance payment record (의료보험 납부기록) national pension payment record (국민연금 납부기록) or medical insurance payment record (의료보험 납부기록)

2.1.3. Prime Contractor’s Contract Management Plan: The Contract Management Plan shall include the contractor’s detailed processes that allow them to manage the contract IAW Statement of Work and drawings. (See Section C, Technical Provision II, Paragraph 4) As a minimum, the contract management plan shall include:

2.1.3.1. Contract Management tools to: 1) successfully plan, schedule and track the progress of individual task orders, 2) control project quality including tracking individual and overall contract discrepancy reports (CDR), 3) methods in evaluating and selecting subcontractor(s), and 4) resources to manage multiple task orders.

2.1.3.2. Organization chart for overall management showing the functional relationships and individual team members. As a minimum, chart shall include personnel listed in paragraph entitled “Key Personnel” and clearly show lines of authority.

2.1.4. Prime Contractor’s Relevant Experience: The offeror must possess and shall submit with their proposal evidence (copies of contract or Certificate of Performance (건설공사 시공 실적 증명서) of at least three (3) years prior experience within the last five (5) years in similar or same in scope, magnitude, and complexity as specified in the solicitation. Content listing for relevant experience as followings:

(a) Company Information

(b) Category of Business

(c) Company Name

(d) Licenses and Certificates

(e) The Registration Number of Contractor

(f) Company Achievements and Awards Recognition

The offeror shall provide a maximum of five (5) narrative descriptions of projects that describe your firm's relevant experience constructing projects that are the same or similar-in terms of size, complexity, scope of the completed project-to the project described in this solicitation.

To be considered, a project must either have been completed or turned over to the client within the last five (5) years before the date of this solicitation or currently be in progress towards completion, and be at least 75% physically completed. Any project narrative submitted in addition to the first five (5) will not be evaluated. Each project description may not exceed 5 letter - 8.5 x 11inch pages in length. Information on any pages that exceed this limitation will not be evaluated.

Each project narrative must include the following information in the order given below:

(a) Project title, contract number and location.

(b) Project contract type. For example: task order or stand-alone contract; firm-fixed-price; cost reimbursement; time and materials; etc.

(c) Total project award amount as amended at the time of completion, or current time. If awarded in Korean

Won or another non-dollar currency, give that amount and converted dollar amount as of the date of your proposal.

(d) Start and completion dates. Provide the official contract or task order start date and required completion date. Provide the actual date the owner considers the project (if completed) to have been substantially completed. If a project is in progress, provide the current date of expected substantial completion.

(e) Your firm's role in the project. In other words, as prime contractor, partner (including joint venture partner), subcontractor, or other. For other than "prime contractor," describe your firm's responsibilities (including trades) and percentage of physical work participation in the project. If a partner, state whether your firm was the managing partner.

(f) Role of proposed subcontractors in the project. If a subcontractor proposed to be utilized for the performance of the project described in this solicitation was utilized in the project, describe the role of the subcontractor's involvement, its responsibilities (including trades) and percentage of physical work participation in the project.

(g) Scope of the project. Describe the major systems or features of work involved in the project and significant construction considerations that had to be addressed during the project's execution in sufficient detail to enable the Government to ascertain the degree to which the project is the same or similar to the project described in this solicitation.

(h) Owner's identity and its point of contact. Provide the name/title of the agency that issued the task order, or contract (for example, Far East District, Ministry of National Defense, City of Seoul, Samsung Corporation, etc.), the name and title of the owner's representative who can best verify the above information your firm has presented about the project (for example, the Administrative Contracting Officer, project manager, etc.) with that person's current business address, telephone number and e-mail address. The Offeror must insure that the contact information for the owner's representative is current and valid.

(i) Any other relevant information about the project that will aid the Government's evaluation

(j) Copies of contract or Certificate of Performance (건설공사 시공실적증명서)

2.2. Past Performance (Volume II) – The past performance volume shall include the following:

2.2.1. The offeror shall provide a list of all contracts and subcontracts it has held within the last three (3) years which are similar or same construction to that which is detailed in the solicitation. Offerors shall present past performance for themselves, and for any proposed division, subcontractor, or teaming contractor whose effort on this contract will significantly influence performance of the proposed effort. For the purpose of this evaluation, the term "offeror" includes all team or joint venture members and subcontractors performing major project functions.

2.2.2. Each performance evaluation will consider the furnished or gathered data, significant achievement(s), the number and severity of problems, the effectiveness of corrective actions taken, and the overall work record. The overall evaluation will be the product of the subjective judgment of the evaluator after it considers all available, relevant, and recent information. Content listing of the past performance information as followings:

2.2.2.1. Company Information:

(a) Category of Business

(b) Company Name

(c) Licenses and Certificates

(d) The Registration Number of Contractor

(e) Company Achievements and Awards Recognition

2.2.2.2. Past Contracts

(a) Contract number

(b) Total dollar value

(c) Contract award date

(d) Procuring agency

(e) Title of contract

(f) Program Manager (name, address, and telephone number)

(g) Description of program/product

(h) Contracting Officer(name, address, e-mail address and telephone number)

(i) Period of performance

(j) Type of contract

(k) A synopsis of relevant performance, segregated by areas, which occurred under each copies of contract or

Certificate of Performance (건설공사 시공 실적 증명서)

2.2.3. Each offeror shall provide a copy of any cure notices or show-cause letters received on each contract listed and a description of any corrective action by the offeror or proposed subcontractor. The offeror shall also provide the information listed above on any contract that has been terminated, in whole or in part, for default during the past three (3) years, or any contracts which are currently in the process of such termination. This information is required for any contract, whether similar or not to the proposed effort.

2.2.4. If any offeror is a new entity and have any past performance data, the offeror must state that they do not possess any past performance data as part of the proposal.

2.2.5. The Government reserves the right to obtain past performance from any reasonable source available, including Government databases in order to evaluate past performance.

2.3. Price Proposal (Volume III):

Completed Pricing Schedule: The offeror shall complete the pricing information for each contract line item identified in the solicitation and shall complete Master Pricing Schedule, Attachment 1, under Section J of this solicitation. Offeror must use Government’s attached pricing schedule in excel, Attachment 1. Do not link to any formula in other excel spreadsheet. If offeror fails to comply with these instructions, the offeror will be considered non-compliant and will not be considered for award.

Offeror must explain any underlying assumption including proposed escalation rates between the 1st and subsequent periods shall be clearly explained.

2.3.1. Summary Sheet including total amounts covering all line items for each period.

2.3.2. Attachment 1 REV1 – Pricing Schedule

2.3.3. Cost breakdown for base plus all option periods including summary sheet.

: Summary sheet must include total cost of material, labor, transportation and equipment, and overhead and profit per period.

2.4. Section H Special Contract Requirement&Section K-Taxes and Continuation of Essential Contractor

Service (Volume IV): Offeror shall complete the following clauses in Section.

2.4.1. Signed first page of the solicitation and any subsequent solicitation amendments

2.4.2. 52.203-2, Certificate of Independent Price Determination

2.4.3. 52.204-3, Taxpayer Identification

2.4.4. 52.209-5, Certification Regarding Responsibility Matters

2.4.5. 252.247-7022, Representation of Extend of Transportation of Supplies by Sea

2.4.6. 5152.204-4032, Representations and Certifications

2.4.7. 252.209-7999, Representation by Corporation Regarding and Unpaid Delinquent Tax Liability

2.4.8. 52.204-24(d)(1)&(2) Representation

2.4.9. 52.204-26(c) Representation

2.4.10. Business Registration in Korea

2.4.11. Essential Contractor Service Plan: IAW 252.237-7023 Continuation of Essential Contractor

Services252.237-7024 Notice of Continuation of Essential Contractor Services: Offeror(s) shall submit an essential contractor service plan.

2.4.11.1. Essential Contractor Service Plan: In accordance with DFARS 252.237-7023(b), the

Government identifies all of the contractor services performed under this contract as Mission-Essential Contractor Services in support of mission essential functions. Offeror(s) shall submit an essential contractor services plan IAW 252.237-7024, Notice of Continuation of Essential Contractor Services. The following statement shall be included in essential contractor service plan.

“(fill in offeror name) acknowledged that the Government identifies all of the contractor services performed under this contract as Mission-Essential Contractor Services in support of mission essential functions.

(fill in offeror name) will continue to perform the services under this contract during periods of crisis.”

3. Eligibility for Award: All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative Status to any offeror, for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea, must submit adequate verification in its initial proposal or quote, that it has the requisite authorization and capacity to compete for the requirement, and to conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an offeror qualifies shall be determined by the Contracting Officer.

4. Failure to submit the above requirements may be grounds for determining the proposal to be noncompliant and not eligible to be considered for award.

5. Pre-Award Survey: A pre-award survey may be conducted on any offerors, to include joint venture partners and subcontractors indicating firm commitments to this acquisition, submitting proposals. The pre-award survey is to determine the prospective contractor’s responsibility in accordance with FAR Part 9.104-1. Information may be requested as required by the Contracting Officer and the information shall be submitted within three (3) working days of the request. Upon Contracting Officer’s request, offeror shall provide company’s financial related documents for determining the financial capability to perform this contract as below.

5.1. (주) 나이스디앤비에서 발행하는 공공기관제출용 "기업신용평가등급 확인서"

5.2. 세무서에 발행하는 표준재무제표증명 (Certificate of Standard Financial Statements, Standard Balance Sheet, Standard Income Statement, and Supplementary Statement)

6. Contractor Teaming Arrangements:

6.1. A contractor team arrangement (CTA) means an arrangement in which two or more companies form a partnership or joint venture to act as a potential prime contractor or a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. A CTA is not an arrangement in which two or more companies form a separate legal entity, such as a corporation or limited liability company, to act as a potential prime contractor.

6.2. The government will, when applicable, recognize the integrity and validity of CTAs when identified and fully disclosed to the Contracting Officer. Offerors proposing a CTA must identify and fully disclose contractor team arrangements relationships in their offer/proposal. A CTA must be in writing.

6.3. After award, the Contractor must notify the Contracting Officer of any CTA arrangement with subcontractor(s) within 30 days prior to any projected performance by the new subcontractor.

6.4. For offerors proposing a partnership/joint venture CTA: The CTA must do business under the CTA name, must register in SAM under the CTA name, must provide documents vesting an individual with the authority of the partners to bind the CTA, and must designate a single point of contact for the CTA.

6.5. The government will perform a responsibility determination on a CTA just as it would on any prospective contract awardee.

7. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. Any future amendments, additions and/or revisions to the proposal shall be included an updated table of contents for each set. Offerors may be requested to submit tracked changes version to the initial proposal if required by the government.

8. The offeror’s proposal shall contain all contractor’s costs including mobilization, demobilization, overhead, profit, insurance, and all other costs including but not limited to compliance with environmental laws, tax laws, protection of moving or government property, engineering services (to include survey work and drawings) and waste disposal inherent to accomplish the work requested. No allowance will be made for any other purpose whatsoever unless specifically allowed elsewhere in the contract.

9. Multiple awards. The Government reserves the right to make contract award up to 5 contract after considering the additional administrative costs and it is in the Government’s best interest to do so.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .