W91QVN19R0249-00001.docx
DOCX document 32 KB Posted
- Attached to
- Fire Station Pumper Truck
- Solicitation number
- w91qvn19r0249
About this file
Amendment_W91QVN19R02490001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A2_OALS-Ladder-Angled-Group1-1_19R0249.jpg | JPG image | |
| W91QVN19R0249.docx | DOCX document | |
| A2_BGFD_E26-0200P-600x400_19R0249.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91QVN19R0249
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
INSTRUCTIONS TO THE OFFEROR
ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO THE OFFEROR(S)
1. The quotation with item description must be conforming to the requirement, and must be submitted to Federal Business Opportunities (FBO) (https://www.fbo.gov/). The electronic proposal shall be submitted by 05 August 2019, 1300 hrs (Korea Standard Time) or 04 August 2019, 11:59 PM (Eastern time) on the closing date of RFQ. All questions should be e-mailed to yongsuk.kim5.ln@mail.mil.
a. The quotation submitted other than FBO will not be considered for award.
2. Proposal Preparation Instructions. The offeror quotation must demonstrate a clear understanding of the solicitation requirement. Failure to provide a complete proposal may reflect lack of understanding of the requirements and may result in a determination that the offeror’s proposal is incomplete and ineligible for award.
a. If FBO is not available, email to yongsuk.kim5.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to ONLY FBO server problem not individual failure/problem.
3. The offeror(s) shall submit the following requirements IAW para. 1 above.
a. Technical Proposal: Must provide the specified saliant characteristics of each item. "EQUAL" products must meet, or exceed, the salient physical, functional, or performance characteristic specified in the solicitation.
b. Price Schedule: The offeror shall submit prices and the length of warranty for all items in Section B of this solicitation.
4. Delivery Schedule: Offeror shall provide the delivery lead time to have all items arrive at the final delivery destination.
5. Clause 5152.204-4032, FAR 52.212-1, 2 and 3: The terms “Quotation” and “Quoter” shall be substituted for “Offer” and “Offeror.”
6. "In accordance with FAR 25.1002, solicitations for contracts to be entered into and performed in Korea, to ensure a fair evaluation of offers, the Government will use the Korea Exchange Bank conversion rate on the date specified for receipt of proposal."
BASIS OF AWARD
The Government will award a contract resulting from this solicitation to the responsible offeror having submitted the lowest-priced, technically acceptable offer that satisfies all terms and conditions of this solicitation. The following factors shall be used to evaluate quotations on an LPTA basis:
►Factor A : Technical (FAR 52.211-6 Brand Name or Equal) Item(s) shall meet the salient characteristics by stating the specifications of each item. To be determined technically acceptable, the submitted specification must meet salient characteristics stated in this solicitation.
►Factor B : Price Schedule – Price analysis will be performed in accordance with FAR 13.106-3. The lowest price for award purposes will be the total of all CLIN prices.
►Factor C : Domestic Manufacturer – Item(s) shall be made in Korea. Only Korean sources are eligible for award of LCS funded contract.
"In accordance with FAR 25.1002, solicitations for contracts to be entered into and performed in Korea, to ensure a fair evaluation of offers, the Government will use the Korea Exchange Bank conversion rate on the date specified for receipt of proposal."
Note: To be determined responsible, a prospective contractor must meet FAR 9.104-1 General standards.
A written notice of award or acceptance of an offer mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
Failure to submit the above requirements may indicate that the offeror fails to understand the requirement, and may be grounds for determining the proposal to be non-responsive and ineligible for contract award in accordance with Basis of Award of this solicitation.
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it.