A21_W91QVN-19-R-0217-A0001.pdf
PDF 257 KB Posted
- Solicitation number
- W91QVN-19-R-0217
About this file
AMENDMENT TO CHANGE THE DESCRIPTION OF CLIN 0002 ALONG WITH OPTION YEARS AND CHANGE THE QUANTITY OF CLINS 1001AA THRU 1001AP ALONG WITH OPTION YEARS.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE NEXT PAGES
1. CONTRACT ID CODE PAGE OF PAGES
1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN19R0217
X 9B. DATED (SEE ITEM 11)
14-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Sep-2019
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
SERVICES DIV, UNIT #15289
APO AP 96271
UNITED STATES
W91QVN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91QVN19R0217
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
A00001
a. The purpose of this amendment is to change the description of CLIN 0002 along with option years, and change the quantity of CLINs 1001AA thru 1001AP along with option years as follows:
FROM TO
CLIN DESCRIPTIOIN DESCRIPTION
0002 thru 4002 SURVEY:
Survey of Interior Building Mass Notification System Inspection, Test, and Preventive maintenance (ITM) and Minor Repair of Interior Broadcast System, IAW PWS Paragraph. 5.2 See Technical Exhibit 1 and 2.
INTERIOR BUILDING MASS NOTIFICATION:
Inspection, Test and Preventive Maintenance (ITM) and Minor Repair of Interior Broadcast System, IAW Para 5.2 of the PWS (See Technical Exhibit 1 and 2)
FROM TO
CLIN Q’TY UNIT Q’TY UNIT
1001AA thru 1001AP 11 month 12 month 2001AA thru 2001AP 11 month 12 month 3001AA thru 3001AP 11 month 12 month 4001AA thru 4001AP 11 month 12 month
b. All other terms and conditions of the solicitation remain the same.
SUMMARY OF CHANGES
SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The CLIN description has changed from SURVEY to INTERIOR BUILDING MASS NOTIFICATION
SYST.
The CLIN extended description has changed from:
Survey of Interior Building Mass Notification System Inspection, Test, and Preventive maintenance (ITM) and Minor Repair of Interior Broadcast System, IAW PWS Paragraph. 5.2 See Technical Exhibit 1 and 2.
(REQUIREMENT PORTION)
To:
Inspection, Test and Preventive Maintenance (ITM) and Minor Repair ofInterior Broadcast System, IAW Para 5.2 of the PWS (See Technical Exhibit 1 and 2)
SUBCLIN 1001AA
The pricing detail quantity has increased by 1.00 from 11.00 to 12.00.
SUBCLIN 1001AB
SUBCLIN 1001AC
SUBCLIN 1001AD
SUBCLIN 1001AE
SUBCLIN 1001AF
SUBCLIN 1001AG
SUBCLIN 1001AH
SUBCLIN 1001AJ
SUBCLIN 1001AK
SUBCLIN 1001AL
SUBCLIN 1001AM
SUBCLIN 1001AN
SUBCLIN 1001AP
CLIN 1002
SYST.
The CLIN extended description has changed from:
Survey of Interior Building Mass Notification System Inspection, Test, and Preventive maintenance (ITM)
SUBCLIN 2001AA
SUBCLIN 2001AB
SUBCLIN 2001AC
SUBCLIN 2001AD
SUBCLIN 2001AE
SUBCLIN 2001AF
SUBCLIN 2001AG
SUBCLIN 2001AH
SUBCLIN 2001AJ
SUBCLIN 2001AK
SUBCLIN 2001AL
SUBCLIN 2001AM
SUBCLIN 2001AN
SUBCLIN 2001AP
CLIN 2002
SYST.
The CLIN extended description has changed from:
Survey of Interior Building Mass Notification System Inspection, Test, and Preventive maintenance (ITM)
SUBCLIN 3001AA
SUBCLIN 3001AB
SUBCLIN 3001AC
SUBCLIN 3001AD
SUBCLIN 3001AE
SUBCLIN 3001AF
SUBCLIN 3001AG
SUBCLIN 3001AH
SUBCLIN 3001AJ
SUBCLIN 3001AK
SUBCLIN 3001AL
SUBCLIN 3001AM
SUBCLIN 3001AN
SUBCLIN 3001AP
CLIN 3002
SYST.
The CLIN extended description has changed from:
Survey of Interior Building Mass Notification System Inspection, Test, and Preventive maintenance (ITM)
SUBCLIN 4001AA
SUBCLIN 4001AB
SUBCLIN 4001AC
SUBCLIN 4001AD
SUBCLIN 4001AE
SUBCLIN 4001AF
SUBCLIN 4001AG
SUBCLIN 4001AH
SUBCLIN 4001AJ
SUBCLIN 4001AK
SUBCLIN 4001AL
SUBCLIN 4001AM
SUBCLIN 4001AN
SUBCLIN 4001AP
CLIN 4002
SYST.
The CLIN extended description has changed from:
Survey of Interior Building Mass Notification System Inspection, Test, and Preventive maintenance (ITM)
Para 5.2 of the PWS (See Technical Exhibit 1 and 2)
(End of Summary of Changes)