RFP_W91QVN19R0167.docx
DOCX document 301 KB Posted
- Solicitation number
- W91QVN19R0167
About this file
Solicitation W91QVN19R0167
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT_1.docx | DOCX document | |
| A2._ATTACHMENT_2,_COMMON_OUTPUT_LEVEL_STANDARDS_(COLS).docx | DOCX document | |
| A2._ATTACHMENT_1,_SITE_MAPS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91QVN19R0167
SEE ADDENDUM
(No Collect Calls)
W91QVN19R0167
18-Jun-2019
b. TELEPHONE NUMBER 315-755-0633
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 18 Jul 2019
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA
ARE
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 23.
CODE
10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QVN
9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. YI, HYE KYONG
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER 30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
PAGE 1 OF
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.
ADDENDA
ARE
ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:
SET ASIDE:
UNRESTRICTED OR
X
SMALL BUSINESS
17a.CONTRACTOR/
CODE
FACILITY
OFFEROR
CODE
411TH CSB, KOREA - SERVICE TEAM
POC: MS. YI, HYE KYONG
TEL:0503-355-0633
HYEKYONG.YI6.LN@MAIL.MIL
APO AP 96271
UNITED STATES
18a. PAYMENT WILL BE MADE BY
CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A 13b. RATING
CODE
15. DELIVER TO
CODE
N32778
16. ADMINISTERED BY
12. DISCOUNT TERMS
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
X
US NAVY, COMFLEACT CHINHAE
CHONG, YONG HUN
PSC 479
FPO AP 96269-1100
KOREA, SOUTH
TEL: 762-5012 FAX:
FAX:
TEL:
315-755-0633
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$7,500,000
NAICS:
561730 X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICES
ITEM NO.
QUANTITY
UNIT
UNIT PRICE
AMOUNT
24.
22.
21.
19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________ 32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED
INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINAL
PARTIAL
COMPLETE
36. PAYMENT
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER
39. S/R VOUCHER NUMBER
40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE 42a. RECEIVED BY (Print) 42b. RECEIVED AT (Location) 42c. DATE REC'D
(YY/MM/DD)
42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY
UNIT
22.
23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
NOTICE TO OFFERORS
All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative status to any offeror, for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea, must submit adequate verification in its initial proposal or quote, that it has the requisite authorization and capacity to compete for the requirement, and to perform the contract. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an offeror qualifies shall be determined by the Contracting Officer.
PERIOD OF PERFORMANCE
| Base Year | : | 15 AUG 2019 thru 14 FEB 2020 |
| Option Period I : | 15 FEB 2020 thru 14 FEB 2021 | |
| Option Period II : | 15 FEB 2021 thru 14 FEB 2022 | |
| Option Period III : | 15 FEB 2022 thru 14 FEB 2023 | |
| Option Period IV : | 15 FEB 2023 thru 14 FEB 2024 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3 |
| Months |
Mowing and Trimming (55,682 SM, COL3)
FFP
Total of 55,682 Square Meter (Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.1 of the PWS.
FOB: Destination
PSC CD: S208
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 300 |
| Linear Meter |
Edging (COL2)
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,113 |
| Linear Meter |
Edging(COL3)
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 500 |
| Square Meter |
Vegetation Control(COL2)
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,950 |
| Square Meter |
Vegetation Control(COL3)
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,400 |
| Square Meter |
Debris Removal(COL2)
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.3 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 50 |
| Each |
Shrub and Hedge Maintenance(COL2)
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.4 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 15 |
| Each |
Tree Maintenance(COL2)
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.5 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1,500 |
| Linear Meter |
Perimeter Fence Vegetation and Litter
Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.1 of the PWS.
ESTIMATED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1,000 |
| Linear Meter |
Covered Ditch
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.2 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 100 |
| Each |
Hedge Pruning and Shearing
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.3 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 100 |
| Each |
Shrub Pruning and Shearing
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.4 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 40,000 |
| Square Meter |
Installation After-storm Cleanup
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.5 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 130,000 |
| Square Meter |
Dedris Removal
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.6 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1 |
| Each |
Tree and Stump Removal Large 18.1" DBH and above Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.7 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1 |
| Each |
Tree and Stump Removal Medium 6.1" DBH up to 18" Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.8 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 3 |
| Each |
Tree and Stump Removal Small up to 6"
Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.9 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 800 |
| Linear Meter |
Roof Rain Gutters Cleaning
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.10 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 4,000 |
| Linear Meter |
Roof Rain Gutters Cleaning with screens
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.11 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 700 |
| Each |
Downspouts Cleaning Part Roof Rain
Gutters (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.12 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 4,800 |
| Square Meter |
Maintenance of Artificial Turf
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.13 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Family Housing Area
Total of 32,567 Square Meter (Firm Fixed Price Portion)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0022AA
| 3 |
| Months |
Mowing and Trimming (32,567 SM, COL3)
The contractor shall perform the service IAW Para. 5.2.7.1.1 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0022AB
| 1,676 |
| Linear Meter |
Edging(COL3)
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0022AC
| 1,050 |
| Square Meter |
Vegetation Control(COL3)
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0022AD
| 100 |
| Each |
Shrub and Hedge Maintenance(COL3)
The contractor shall perform the service IAW Para. 5.2.7.4 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0022AE
| 15 |
| Each |
Tree Maintenance(COL3)
The contractor shall perform the service IAW Para. 5.2.7.5 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
Accounting for Contract Services (CMR)
CMR requirement must be reported by 31 October of each calendar year during the life of the contract IAW Para. 5.4. of the PWS. NOTE: Not to exceed 20 Man hours for data collection and report.
(15 Aug 19 -14 Feb 20)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Estimated Cost for War Hazard Losses is zero (0).
(15 Aug 19 -14 Feb 20)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Months |
| OPTION |
| Mowing and Trimming (55,682 SM, COL3) |
FFP
Total of 55,682 Square Meter (Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.1 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 561 |
| Linear Meter |
| OPTION |
| Edging (COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6,226 |
| Linear Meter |
| OPTION |
| Edging(COL3) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,000 |
| Square Meter |
| OPTION |
| Vegetation Control(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,900 |
| Square Meter |
| OPTION |
| Vegetation Control(COL3) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2,800 |
| Square Meter |
| OPTION |
| Debris Removal(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.3 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 100 |
| Each |
| OPTION |
| Shrub and Hedge Maintenance(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.4 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| Tree Maintenance(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.5 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 3,000 |
| Linear Meter |
| OPTION |
| Perimeter Fence Vegetation and Litter |
FFP
Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.1 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 2,000 |
| Linear Meter |
| OPTION |
| Covered Ditch |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.2 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 100 |
| Each |
| OPTION |
| Hedge Pruning and Shearing |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.3 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 100 |
| Each |
| OPTION |
| Shrub Pruning and Shearing |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.4 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 80,000 |
| Square Meter |
| OPTION |
| Installation After-storm Cleanup |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.5 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 270,000 |
| Square Meter |
| OPTION |
| Dedris Removal |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.6 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1 |
| Each |
| OPTION |
| Tree and Stump Removal Large 18.1" DBH |
FFP
and above Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.7 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1 |
| Each |
| OPTION |
| Tree and Stump Removal Medium 6.1" DBH |
FFP
up to 18" Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.8 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 3 |
| Each |
| OPTION |
| Tree and Stump Removal Small up to 6" |
FFP
Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.9 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 800 |
| Linear Meter |
| OPTION |
| Roof Rain Gutters Cleaning |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.10 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 4,000 |
| Linear Meter |
| OPTION |
| Roof Rain Gutters Cleaning with screens |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.11 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 700 |
| Each |
| OPTION |
| Downspouts Cleaning Part Roof Rain |
FFP
Gutters (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.12 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 9,600 |
| Square Meter |
| OPTION |
| Maintenance of Artificial Turf |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.13 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Family Housing Area |
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1022AA
| 6 |
| Months |
| OPTION |
| Mowing and Trimming (32,567 SM, COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.1.1 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1022AB
| 3,353 |
| Linear Meter |
| OPTION |
| Edging(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1022AC
| 2,100 |
| Square Meter |
| OPTION |
| Vegetation Control(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1022AD
| 200 |
| Each |
| OPTION |
| Shrub and Hedge Maintenance(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.4 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1022AE
| 30 |
| Each |
| OPTION |
| Tree Maintenance(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.5 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| Accounting for Contract Services (CMR) |
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract IAW Para. 5.4. of the PWS. NOTE: Not to exceed 20 Man hours for data collection and report.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Estimated Cost for War Hazard Losses is |
FFP
zero (0).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Months |
| OPTION |
| Mowing and Trimming (55,682 SM, COL3) |
FFP
Total of 55,682 Square Meter (Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.1 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 561 |
| Linear Meter |
| OPTION |
| Edging (COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6,226 |
| Linear Meter |
| OPTION |
| Edging(COL3) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,000 |
| Square Meter |
| OPTION |
| Vegetation Control(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,900 |
| Square Meter |
| OPTION |
| Vegetation Control(COL3) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2,800 |
| Square Meter |
| OPTION |
| Debris Removal(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.3 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 100 |
| Each |
| OPTION |
| Shrub and Hedge Maintenance(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.4 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| Tree Maintenance(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.5 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 3,000 |
| Linear Meter |
| OPTION |
| Perimeter Fence Vegetation and Litter |
FFP
Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.1 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 2,000 |
| Linear Meter |
| OPTION |
| Covered Ditch |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.2 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 100 |
| Each |
| OPTION |
| Hedge Pruning and Shearing |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.3 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 100 |
| Each |
| OPTION |
| Shrub Pruning and Shearing |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.4 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 80,000 |
| Square Meter |
| OPTION |
| Installation After-storm Cleanup |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.5 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 270,000 |
| Square Meter |
| OPTION |
| Dedris Removal |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.6 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1 |
| Each |
| OPTION |
| Tree and Stump Removal Large 18.1" DBH |
FFP
and above Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.7 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1 |
| Each |
| OPTION |
| Tree and Stump Removal Medium 6.1" DBH |
FFP
up to 18" Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.8 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 3 |
| Each |
| OPTION |
| Tree and Stump Removal Small up to 6" |
FFP
Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.9 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 800 |
| Linear Meter |
| OPTION |
| Roof Rain Gutters Cleaning |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.10 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 4,000 |
| Linear Meter |
| OPTION |
| Roof Rain Gutters Cleaning with screens |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.11 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 700 |
| Each |
| OPTION |
| Downspouts Cleaning Part Roof Rain |
FFP
Gutters (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.12 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 9,600 |
| Square Meter |
| OPTION |
| Maintenance of Artificial Turf |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.13 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Family Housing Area |
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2022AA
| 6 |
| Months |
| OPTION |
| Mowing and Trimming (32,567 SM, COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.1.1 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2022AB
| 3,353 |
| Linear Meter |
| OPTION |
| Edging(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2022AC
| 2,100 |
| Square Meter |
| OPTION |
| Vegetation Control(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2022AD
| 200 |
| Each |
| OPTION |
| Shrub and Hedge Maintenance(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.4 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2022AE
| 30 |
| Each |
| OPTION |
| Tree Maintenance(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.5 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| Accounting for Contract Services (CMR) |
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract IAW Para. 5.4. of the PWS. NOTE: Not to exceed 20 Man hours for data collection and report.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Estimated Cost for War Hazard Losses is |
FFP
zero (0).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Months |
| OPTION |
| Mowing and Trimming (55,682 SM, COL3) |
FFP
Total of 55,682 Square Meter (Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.1 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 561 |
| Linear Meter |
| OPTION |
| Edging (COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6,226 |
| Linear Meter |
| OPTION |
| Edging(COL3) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,000 |
| Square Meter |
| OPTION |
| Vegetation Control(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,900 |
| Square Meter |
| OPTION |
| Vegetation Control(COL3) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2,800 |
| Square Meter |
| OPTION |
| Debris Removal(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.3 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 100 |
| Each |
| OPTION |
| Shrub and Hedge Maintenance(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.4 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| Tree Maintenance(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.5 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 3,000 |
| Linear Meter |
| OPTION |
| Perimeter Fence Vegetation and Litter |
FFP
Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.1 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 2,000 |
| Linear Meter |
| OPTION |
| Covered Ditch |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.2 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 100 |
| Each |
| OPTION |
| Hedge Pruning and Shearing |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.3 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 100 |
| Each |
| OPTION |
| Shrub Pruning and Shearing |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.4 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 80,000 |
| Square Meter |
| OPTION |
| Installation After-storm Cleanup |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.5 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 270,000 |
| Square Meter |
| OPTION |
| Dedris Removal |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.6 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1 |
| Each |
| OPTION |
| Tree and Stump Removal Large 18.1" DBH |
FFP
and above Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.7 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1 |
| Each |
| OPTION |
| Tree and Stump Removal Medium 6.1" DBH |
FFP
up to 18" Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.8 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 3 |
| Each |
| OPTION |
| Tree and Stump Removal Small up to 6" |
FFP
Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.9 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 800 |
| Linear Meter |
| OPTION |
| Roof Rain Gutters Cleaning |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.10 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 4,000 |
| Linear Meter |
| OPTION |
| Roof Rain Gutters Cleaning with screens |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.11 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 700 |
| Each |
| OPTION |
| Downspouts Cleaning Part Roof Rain |
FFP
Gutters (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.12 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 9,600 |
| Square Meter |
| OPTION |
| Maintenance of Artificial Turf |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.13 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Family Housing Area |
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3022AA
| 6 |
| Months |
| OPTION |
| Mowing and Trimming (32,567 SM, COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.1.1 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3022AB
| 3,353 |
| Linear Meter |
| OPTION |
| Edging(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3022AC
| 2,100 |
| Square Meter |
| OPTION |
| Vegetation Control(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3022AD
| 200 |
| Each |
| OPTION |
| Shrub and Hedge Maintenance(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.4 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3022AE
| 30 |
| Each |
| OPTION |
| Tree Maintenance(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.5 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| Accounting for Contract Services (CMR) |
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract IAW Para. 5.4. of the PWS. NOTE: Not to exceed 20 Man hours for data collection and report.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Estimated Cost for War Hazard Losses is |
FFP
zero (0).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Months |
| OPTION |
| Mowing and Trimming (55,682 SM, COL3) |
FFP
Total of 55,682 Square Meter (Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.1 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 561 |
| Linear Meter |
| OPTION |
| Edging (COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6,226 |
| Linear Meter |
| OPTION |
| Edging(COL3) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,000 |
| Square Meter |
| OPTION |
| Vegetation Control(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,900 |
| Square Meter |
| OPTION |
| Vegetation Control(COL3) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2,800 |
| Square Meter |
| OPTION |
| Debris Removal(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.3 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 100 |
| Each |
| OPTION |
| Shrub and Hedge Maintenance(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.4 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| Tree Maintenance(COL2) |
FFP
(Firm Fixed Price Portion)
The contractor shall perform the service IAW Para. 5.2.7.5 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 3,000 |
| Linear Meter |
| OPTION |
| Perimeter Fence Vegetation and Litter |
FFP
Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.1 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 2,000 |
| Linear Meter |
| OPTION |
| Covered Ditch |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.2 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 100 |
| Each |
| OPTION |
| Hedge Pruning and Shearing |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.3 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 100 |
| Each |
| OPTION |
| Shrub Pruning and Shearing |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.4 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 80,000 |
| Square Meter |
| OPTION |
| Installation After-storm Cleanup |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.5 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 270,000 |
| Square Meter |
| OPTION |
| Dedris Removal |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.6 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1 |
| Each |
| OPTION |
| Tree and Stump Removal Large 18.1" DBH |
FFP
and above Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.7 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1 |
| Each |
| OPTION |
| Tree and Stump Removal Medium 6.1" DBH |
FFP
up to 18" Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.8 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 3 |
| Each |
| OPTION |
| Tree and Stump Removal Small up to 6" |
FFP
Tree and Stump Removal (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.9 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 800 |
| Linear Meter |
| OPTION |
| Roof Rain Gutters Cleaning |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.10 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 4,000 |
| Linear Meter |
| OPTION |
| Roof Rain Gutters Cleaning with screens |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.11 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 700 |
| Each |
| OPTION |
| Downspouts Cleaning Part Roof Rain |
FFP
Gutters (Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.12 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 9,600 |
| Square Meter |
| OPTION |
| Maintenance of Artificial Turf |
FFP
(Requirements Portion)
The contractor shall perform the service IAW Para. 5.2.8.13 of the PWS.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Family Housing Area |
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
4022AA
| 6 |
| Months |
| OPTION |
| Mowing and Trimming (32,567 SM, COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.1.1 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
4022AB
| 3,353 |
| Linear Meter |
| OPTION |
| Edging(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.1.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
4022AC
| 2,100 |
| Square Meter |
| OPTION |
| Vegetation Control(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.2 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
4022AD
| 200 |
| Each |
| OPTION |
| Shrub and Hedge Maintenance(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.4 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
4022AE
| 30 |
| Each |
| OPTION |
| Tree Maintenance(COL3) |
FFP
The contractor shall perform the service IAW Para. 5.2.7.5 of the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| Accounting for Contract Services (CMR) |
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract IAW Para. 5.4. of the PWS. NOTE: Not to exceed 20 Man hours for data collection and report.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Estimated Cost for War Hazard Losses is |
FFP
zero (0).
NET AMT
PERFORMANCE WORK STATEMENT (PWS)
GROUND MAINTENANCE AND LANDSCAPING SERVICES FOR CFA AT CHINHAE, AREA IV
1. GENERAL: This is non-personal service contract to provide grounds maintenance and landscaping services located at Commander, Fleet Activities (CFA) at Chinhae, Area IV. The Government will not exercise any supervision or control over the Contractor’s performance of services herein.
1.1 DESCRIPTION OF SERVICES/INTRODUCTION: The Contractor shall provide all necessary labor, management, supervision, tools, materials, equipment, and transportation necessary to provide grounds maintenance and landscaping services in accordance with all other terms and conditions contained herein.
1.1.1 TYPE OF CONTRACT: The Government will award a Requirements contract inclusive of Firm Fixed Price (FFP) CLINs type of contract.
1.2 BACKGROUND See the website at http://www.cnic.navy.mil/Chinhae/index.htm for locality information.
1.2.1 This service will be performed at Commander, Fleet Activities (CFA) Chinhae, Commander Naval Forces Korea.
1.2.2 All services shall be provided in accordance with established standards, principles, and ethics of the profession and applicable professional specialty organizations, and current publications of NAVFAC P-307 Management of Weight Handling Equipment and Korea Environmental Governing Standards (KEGS).
1.3 OBJECTIVES: The Contractor shall provide GROUNDS MAINTENANCE AND LANDSCAPING services for sustainment, restoration and modernization of facilities, equipment, and related structures.
1.4 SCOPE: The Contractor shall furnish all the necessary labor, management, supervision, tools, materials, equipment, and transportation necessary for GROUNDS MAINTENANCE AND LANDSCAPING services in accordance with all other terms and conditions contained herein.
1.5 PERIOD OF PERFORMANCE: The period of performance shall be Base Year (6 Months) and four (4)-one year Option Years. The Period of Performance will be as follows:
| Base Year | : | 15 AUG 2019 thru 14 FEB 2020 |
| Option Period I : | 15 FEB 2020 thru 14 FEB 2021 | |
| Option Period II : | 15 FEB 2021 thru 14 FEB 2022 | |
| Option Period III : | 15 FEB 2022 thru 14 FEB 2023 | |
| Option Period IV : | 15 FEB 2023 thru 14 FEB 2024 |
1.6 GENERAL INFORMATION
1.6.1 HOURS OF OPERATION: The Contractor is responsible for conducting business, between the hours of 0800-1700 hours Monday through Friday except Korean holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must maintain an adequate workforce at all times for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the aforementioned reasons in this paragraph. Requests for work outside of regular hours must be made in writing five (5) working days in advance to the Contracting Officer Representative (COR).
1.6.2 RECOGNIZED HOLIDAYS:
ROK LEGAL HOLIDAYS:
(1) 1 and 2 January (New Year)
(2) Lunar New Year (31 December, 1 and 2 January on the Lunar Calendar)
(3) 1 March (Independence Movement Day)
(4) 1 May (Labor Day)
(5) 5 May (Children's Day)
(6) Buddha's Birthday (8 April on the lunar calendar)
(7) 6 June (Memorial Day)
(8) 17 July (Constitution Day)
(9) 15 August (Liberation Day)
(10) Chu-Suk (14, 15, and 16 August on the Lunar Calendar)
(11) 3 October (National Foundation Day)
(12) 9 October (Hangul Day)
(13) 25 December (Christmas Day)
NOTE: Any holidays that are declared by Presidential Executive Order shall be observed in the same manner as the holidays listed above. If the area in which the Contractor’s personnel are scheduled to work is closed due to the holiday declared by an Executive Order and the employee is not required to report in, payment will not be made for those hours. Closures of the installation due to inclement weather or other such acts of nature shall be handled in the same manner.
1.6.3 PLACE OF PERFORMANCE: The work to be performed under this contract will be performed at Commander, Fleet Activities Chinhae.
1.6.4 QUALIFTY CONTROL PLAN (QCP): Prior to contract award the Contractor shall provide a detailed QCP to the Contracting Officers Representative (COR) as listed in Para. 8, Deliverables that at a minimum covers procedures identified in the paragraph.
1.6.4.1 The QCP shall be used throughout the life of this contract and shall be updated by the Contractor when the changes impact the QCP.
1.6.4.2 The plan shall include, at a minimum, the following:
· Policy and objectives of Quality Control System (QCS)
· Quality organization
· List of personnel
· Responsibilities & lines of authority
· Training and qualifications
· Approach to assuring quality of services provided and conformance with performance objectives and standards
· Methods and procedures for effective planning, operation and control of processes and performance of work
· Procedures for inspection and surveillance of services
· Scheduling and performance of inspection and surveillance
· Measurement, data collection and analysis
· Corrective action, preventive action, and continuous improvement
· Oversight of subcontracted work
· Documentation and records management
· Communication with government (customers)
1.6.5 QUALIITY ASSURANCE (QA):
1.6.5.1 The Government will use the Quality Assurance Surveillance Plan (QASP) to evaluate the Contractor’s performance of tasks listed in Para. 7, Performance Requirements Summary (PRS) to ensure the contractor’s performance meets standards as specified in this PWS. The COR will follow the methods of surveillance in this contract. Government personnel will record all surveillance observations. When an observation indicates defective performance, the COR will require the Contract Manager (CM) to initial the form that annotates the defective performance that was observed. Initialing of the observation does not necessarily constitute concurrence with the observation, only acknowledgement that they have been made aware of defective performance. Government surveillance of tasks not listed in the PRS by methods other than those listed in the PRS may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the Contracting Officer (KO) as a result of surveillance will be in accordance with (IAW) the terms of this contract and FAR Part 46.
1.6.5.2 Performance Evaluation Meetings: The KO may require the CM to meet with the COR, and other Government personnel as deemed necessary. The Contractor may request a meeting with the KO when they believe such a meeting is necessary. Written minutes of any such meeting shall be recorded in the contract file and signed by the contract managers and the COR or contract administrator. If the Contractor does not concur with any portion of the minutes, such non-concurrence shall be provided in writing to the COR within 10 calendar days following receipt of the minutes.
1.6.6 SECURITY REQUIREMENTS: The Contractor and employees shall comply with all security requirements imposed by local installation commanders at all times while performing work under this contract.
1.6.6.1 Access to Installation: All Contractor employees shall obtain installation access by submitting USFK Form 82-E and USFK Form 195- EK-E as listed in Para 8, Deliverables for required employee and vehicle passes and badges. When an employee leaves the Contractor's service, the employee's Passes and Badges shall be returned within ten (10) calendar days.
1.6.6.2 Identification: Contractor personnel performing work under this contract shall obtain all required corporate and personnel security clearances prior to commencement of work, and shall maintain the level of security required for the life of the contract. All Contractor employees and representatives shall have in their possession Korean Citizen Identification Card during the performance of this contract.
1.6.6.3 Escort Privilege: Key personnel shall be authorized escort privileges for two (2) persons & 1 vehicle. This privilege is only for employees working on this contract or those providing supporting roles under emergency conditions and only during hours stated under this contract for GROUNDS MAINTENANCE AND LANDSCAPING related work. It is the escort’s responsibility to ensure he/she maintains full control of all escorted individuals at all times. The COR will not be responsible for providing escorts for the Contractor.
1.6.6.4 Military Restricted Areas: The Contractor shall have a military escort in all restricted areas. This escort will be arranged through the COR and provided by the tenant agency that occupies the space.
1.6.6.5 Employee Listing: The Contractor shall maintain a current Employee List and as listed in Para. 8, Deliverables.
1.6.6.6 Employee Status: The Contractor shall notify as listed in Para. 8, Deliverables for any changes to any employee’s status to include, but not limited to, termination, convictions, arrests, and adverse actions taken on the job for any reason or any other documented misbehavior that may affect, or pose potential threats to federal facilities or IT systems.
1.6.6.7 Vehicles: The Contractor shall maintain a current Vehicle List and submit as listed in Para. 8, Deliverables in accordance with USFK REG 190-1 Motor Vehicle Traffic Supervision. The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid license plate that complies with installation and ROK laws. Vehicles shall meet all other requirements of the Korean Vehicle Code, such as safety standards, and shall carry proof of insurance and registration, if applicable.
1.6.6.8 Physical Security: The Contractor shall be responsible for safeguarding all Government property provided for Contractor use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.
1.6.7 CONTRACTOR QUALIFICATION: The prime Contractor shall maintain all required ROK registration and qualifications for ground maintenance and landscaping service within the PWS of this contract. The Contractor shall maintain all required licenses throughout the contract period to perform the work specified hereinafter.
1.6.7.1 Prime Contractor’s License: The Prime contractor shall possess the Special Construction License for i) Landscaping and Planting (전문건설업 중 조경식재공사업) or ii) Comprehensive Landscaping Construction License (종합건설업중 조경공사업) issued by the Republic of Korea (ROK) Government.
1.6.7.2 Prime Contractor’s Prior Experience: The Prime Contractor shall have at least two (2) years of prior experiences in performing ground maintenance services.
1.6.7.3 The Government has the right to restrict employment under this contract of any Contractor employee, or prospective Contractor employee, who is identified as a potential threat to the health, safety, security, or general well- being of the installation and its population.
1.6.7.4 Contractor personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the Government installation shall abide by all the regulations of the installation.
1.6.7.5 The Contractor shall employ only personnel skilled and qualified in performing GROUNDS MAINTENANCE AND LANDSCAPING related work. The Contractor shall ensure that employees operate equipment only if they have been trained to do so safely.
1.6.7.6 The Contractor shall maintain full control over all employees at all times. The Contractor shall ensure that employees only enter base facilities for the performance of work under this contract. Employees found in unauthorized areas or facilities will be removed from the installation.
1.6.7.7 Contractor personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the Government installation are allowed to perform work only for this contract while on the Government installation. Contract personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the Government installation performing work not related to this contract on the Government installation shall be reported to the installation military police.
1.6.7.8 The Contractor shall be responsible for safeguarding all government furnished facilities and materials provided for Contractor use. At the close of each work period, government facilities and materials shall be secured.
1.6.8 KEY PERSONNEL: The Contractor shall provide a Contract Manager (CM) as key personnel.
1.6.8.1 Contract Manager (CM): The CM shall conduct overall management, coordination, and furnish liaison with the Government and shall be responsible for the overall performance for GROUNDS MAINTENANCE AND LANDSCAPING under this Contract. The CM shall have at least two (2) years of experience as a CM in managing GROUNDS MAINTENANCE AND LANDSCAPING projects. The CM shall have full authority to act or make decisions for the Contractor on all contract matters pertaining to the operations of GROUNDS MAINTENANCE AND LANDSCAPING.
1.6.8.2 The CM shall respond within two (2) hours to any requested meetings to discuss performance of this contract with the COR. After normal duty hours, the CM shall be available within four (4) hours of notice. The Contractor shall ensure that communications between the CM and Contractor employees are established within 30 minutes of any notification delivered to CM by the COR during normal working hours.
1.6.8.3 The CM shall be able to read, write, speak and understand English efficiently.
1.6.8.4 The CM shall fully understand the requirements of this contract and shall report to the COR any problems encountered in any of the facilities covered by this contract. The CM shall demonstrate adequate knowledge of equipment, tools and techniques, and shall be able to recognize situations or circumstances defined in this PWS that may be hazardous to the facilities or personnel. Immediately upon recognition of such situations and/or circumstances, the CM shall notify the KO and/or the COR.
1.6.8.5 Upon the request of the KO or COR, the CM shall make himself/herself present to discuss contract performance at a date and time specified in the request.
1.6.9 SAFETY
1.6.9.1 Safety Requirements: The contractor shall insure that safety precautions are taken during the performance of this contract to protect the lives of contractor personnel, the property of the U.S.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.