Camp Walker: Bldg #223, Child Development Center 32,274 SF Bldg #252, Youth Center 15,405 SF Bldg #257, Child Care Center 4,476 SF
Total: 52,155 SF
Legend & Work Description A/R: As Required/Requested D: Daily W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months Y: Yearly 4Y: 4 Times a Year
High Traffic
Corridor & Lobby
Other Corridor &
Lobby Office Area
Classroom & Reading Room
Lounge Restroom & Locker Room
Remove Trash 6W 5W 5W 6W 6W 6W
Sweep Floor 6W 5W 5W 6W 6W 6W
Vacuum Carpet 6W 5W 5W 6W 6W
Clean & Supply Restroom 6W Disinfect Toilet/Urinal & Descaling
6W
Apply Wax M M M M M
Wet Mop 6W 6W 5W 6W 6W 6W
Regular Dusting W W W W W W
Spot Clean A/R A/R A/R A/R A/R A/R
Clean Drinking Fountain 6W 6W 5W 5W 6W
Clean Interior Window W W W W W W
Clean Exterior Window 4Y 4Y 4Y 4Y 4Y 4Y
Service Area
APPENDIX
SCHEDULE OF CUSTODIAL WORK
SCHEDULE #1
Applicable Buildings: All Child Care & Youth Service Centers (See Enclosed Bldg List)
Legend & Work Description A/R: As Required/Requested D: Daily W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly Y: Yearly 2Y: 2 Times a Year
Corridor, Lobby, Lounge
Office, Classroom, Reading Room
Restroom, Locker Room, Shower Room
Remove Trash 2W 2W 5W
Sweep Floor 5W 5W 5W
Vacuum Carpet 1W 1W
Clean & Supply Restroom 5W Disinfect Toilet/Urinal & Descaling
5W
Apply Wax M M
Wet Mop 5W 5W
Regular Dusting 2Y 2Y
Spot Clean A/R A/R A/R
Dry Buff (Wooden Floor) M
Clean Drinking Fountain 5W 5W
Camp Henry:
Bldg #1121, 1107
Camp Walker:
Bldg #261, 265
Camp Carroll:
Bldg #135, 151, 163
APPENDIX
SCHEDULE OF CUSTODIAL WORK
SCHEDULE #2
Service Area
Applicable Bldgs:
Non-Reimbursable Customers;
Gymnasium Facilities (See Enclosed Bldg List)
D: Daily W: Weekly 2W: 2 times a week 3W: 3 times a week 5W: 5 times a week W2: Every 2 weeks M: Monthly M3: Every 3 months Y: Yearly
Corridor, Lobby, Lounge
Office, Classroom, Reading Room
Restroom, Locker Room, Shower Room
Remove Trash W 2W 3W
Sweep Floor W2 W2 3W
Vacuum Carpet M M
Clean & Supply Restroom 3W
(Supplies: 2W) Disinfect Toilet/Urinal & Descaling
3W
Apply Wax M3 M3
Wet Mop M M
Regular Dusting W W
Spot Clean W W W
Dry Buff (Wooden Floor) M3 M3
Clean Drinking Fountain 3W 3W
Camp Henry:
Bldg #1211, 1501
Camp Walker:
Bldg #330
APPENDIX
SCHEDULE OF CUSTODIAL WORK
SCHEDULE #3
Service Area
Applicable Bldgs:
Non-Reimbursable Customers;
Senior Level Admin Facilities & High Use Community Facilities
A/R: As Required/Requested D: Daily W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M3: Every 3 months Y: Yearly 2Y: 2 Times a Year
Corridor, Lobby, Lounge
Office, Classroom, Reading Room
Restroom, Locker Room, Shower Room
Remove Trash W W 2W
Sweep Floor W W W
Vacuum Carpet M M
Clean & Supply Restroom 2W
(Supplies: 2W) Disinfect Toilet/Urinal & Descaling
2W
Apply Wax M3 M3
Wet Mop W W
Regular Dusting 2Y 2Y
Spot Clean A/R A/R A/R
Dry Buff (Wooden Floor) M3 M3
Clean Drinking Fountain W W
APPENDIX
SCHEDULE OF CUSTODIAL WORK
SCHEDULE #4
Camp Henry: 42 Bldgs
Camp Walker: 28 Bldgs
Camp George: 1 Bldg
Camp Carroll: 70 Bldgs
Busan: 13 Bldgs
* The "Medical Unit" in this building schedule does NOT mean actual medical facility.
Therefore, it doesn't require special treatment of this facility.
(Medical Admin Bldg)
Service Area
Applicable Bldgs:
Non-Reimbursable Customers;
Other Admin Facilities
W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M6: Every 6 months Y: Yearly
Corridor, Lobby, Lounge
Office, Classroom, Reading Room
Restroom, Locker Room, Shower Room
Remove Trash 5W 5W 5W
Sweep Floor 3W 2W
Vacuum Carpet 3W 2W
Clean & Supply Restroom 5W Disinfect Toilet/Urinal & Descaling
5W
Apply Wax M M
Wet Mop 3W 2W
Regular Dusting W W
Spot Clean 5W 5W 5W
Clean Chalk Board W
Dry Buff (Wooden Floor) M
Clean Drinking Fountain 5W 5W
* Project Work: Below works could be done as customer requirement basis with separate funds.
1. Strip & Rewax Resilient Tile Floor As Requirement Basis
2. Carpet Shampoo As Requirement Basis
3. Machine Scrub Grouted Tile Floor As Requirement Basis
4. Wash Interior/Exterior Window As Requirement Basis
5. High Dusting As Requirement Basis
6. Clean Venetian Blind As Requirement Basis
Camp Henry: 9 Bldgs
Camp Walker: 7 Bldgs
Camp Carroll: 14 Bldgs
Busan: 5 Bldgs
* The "Medical Unit" in this building schedule does NOT mean actual medical facility.
Therefore, it doesn't require special treatment of this facility.
(Medical Admin Bldg)
APPENDIX
SCHEDULE OF CUSTODIAL WORK
SCHEDULE #5-1
Service Area
Applicable Bldgs:
Reimbursable Customers;
Applicable Buildings: Reimbursable Customer. This schedule may be used for buildings except from the standard schedule and open 5 days per week. (DoD School)
Camp George: Bldg #3000, 3008 & 3019 (Total 93,771 SF) Camp Walker: Bldg #170 (Total 142,266 SF)
Legend & Work Description D: Daily W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M6: Every 6 months Y: Yearly
Corridor, Lobby & Stairway
Office Area Classroom, Lounge &
Library
Restroom & Locker Room
Gym
Multi- Purpose Room &
Stage
Remove Trash D D D D D D
Sweep Floor D D D D D D Vacuum Carpet (Kindergarden)
D D D
(2D) Sink D D
Clean & Supply Restroom D
Apply Wax M M
Damp Mop D D D D D
Regular Dusting W W W W W W
Spot Clean D D D D D D
Clean Chalk Board D D
Dry Buff (Wooden Floor) M
Clean Drinking Fountain D D D D
Folding Tables W D
Classroom Desk/Chair W
Entrance Glass Door & Showcase D
Time Schedule:
Camp George: 07:00 ~ 16:00 hours
08:00 ~ 17:00 hours
Camp Walker: 08:00 ~ 17:00 hours
Summer Vacation: 1 July thru 15 August
* Applicable Service Period: Base Year (1 July 2019 through 30 Jun 2020)
APPENDIX
SCHEDULE OF CUSTODIAL WORK
SCHEDULE #5-2
Service Area
Applicable Buildings: Reimbursable Customer. This schedule may be used for buildings except from the standard schedule and open 5 days per week. (DoD School)
Camp George: Bldg #3000 (School Cafeteria) - Total 3,840 SF
Legend & Work Description D: Daily W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M6: Every 6 months Y: Yearly
Cafeteria, Lobby, Lounge
Office, Classroom, Reading Room
Restroom, Locker Room, Shower Room
Remove Trash 5W
Sweep Floor 5W
Vacuum Carpet 5W
Clean Table/Chair 5W
Apply Wax M
Wet Mop 5W
Regular Dusting W
Spot Clean 2W
Dry Buff (Wooden Floor) M
Clean Drinking Fountain 5W 5W
* Applicable Service Period: Base Year (1 July 2019 through 30 Jun 2020)
Camp George:
Bldg #3000
APPENDIX
SCHEDULE OF CUSTODIAL WORK
SCHEDULE #5-2a
Service Area
Applicable Bldgs:
Reimbursable Customers;
DoD School Cafeteria
D: Daily, 3D: 3 times a day W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M6: Every 6 months Y: Yearly
High Traffic
Corridor & Lobby
Other Corridor &
Lobby
Office Area
Break Room
Lounge & Sales Area
Restroom & Locker Room
Meat Department
Remove Trash 3D 3D D D 3D 3D 3D
Sweep Floor 6W 6W 6W 6W 6W 6W 6W
Clean & Supply Restroom 3D
(Supplies: 6W)
Disinfect Toilet/Urinal & Descaling 6W
Spray Cleaning 5W 5W 5W
Apply Wax W W W
Damp Mop 6W 6W 6W 6W 6W 6W
Regular Dusting W W W W W W W
Clean Drinking Fountain and Sink (Meat Department)
6W 6W 6W 6W 6W 6W 6W
Clean Interior Window Glass & Interior Surface (Meat Department)
W W W W W W 6W
Clean Window Glass (Entrance Door & Outdoor Glass)
6W 6W 6W 6W 6W
Spot Clean 6W 6W 6W 6W 6W 6W 6W
Machine Scrubbing M M M
Entrance Mat Shampoo M4
Stripping & Refinishing M M M M
Clean Venetian Blind M4 M4 M4 M4 M4 M4 M4
Time Schedule: Sales Area 06:30 ~ 10:00 hours
Restroom 06:30 hours, 11:00 hours, 15:00 hours
Other Area 06:30 ~ 16:00 hours
Meat Department 15:00 ~ 17:00 hours
Machine Scrubbing 15:00 hours on Monday
* Tuesday through Sunday: 06:00 ~ 15:00 hours (1 Janitor/Janitress)
08:00 ~ 17:00 hours (2 Janitor/Janitress)
APPENDIX A
SCHEDULE OF CUSTODIAL WORK
SCHEDULE 5-3
Applicable Building (Reimbursable Customer): Camp Walker Commissary Bldg #357 (Total 22,495 SF)
D: Daily, 2D: 2 times a day W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M4: Every 4 months Y: Yearly
High Traffic
Corridor & Lobby
Other Corridor &
Lobby
Office Area
Break Room
Lounge & Sales Area
Restroom & Locker Room
Meat Department
Remove Trash 2D 2D D D 2D 2D D
Sweep Floor 6W 6W 6W 6W 6W 6W 6W
Clean & Supply Restroom 2D
(Supplies: 6W)
Disinfect Toilet/Urinal & Descaling 6W
Spray Cleaning 2W 2W 2W
Apply Wax M M M
Damp Mop 6W 6W 6W 6W 6W 6W
Regular Dusting W W W W W W W
Clean Drinking Fountain 6W 6W 6W 6W 6W 6W 6W
Clean Interior Window Glass W W W W W W W
Spot Clean 6W 6W 6W 6W 6W 6W 6W
Machine Scrubbing M4 M4 M4
Stripping & Refinishing M4 M4 M4 M4
Clean Venetian Blind M4 M4 M4 M4 M4 M4 M4
Time Schedule: Sales Area 08:00 ~ 10:00 hours
Restroom 08:00 hours, 14:00 hours
Other Area 08:00 ~ 17:00 hours
Thursday thru Tuesday 08:00 ~ 17:00 hours (1 Janitor/Janitress)
APPENDIX A
SCHEDULE OF CUSTODIAL WORK
SCHEDULE 5-3a
Applicable Building (Reimbursable Customer): Camp Carroll Commissary Bldg #136 (Total 8,103 SF)
W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M4: Every 4 months Y: Yearly
High Traffic Corridor &
Lobby
Other Corridor &
Lobby Office Area
Classroom & Reading
Room Lounge
Restroom & Locker Room
Patient Care
Remove Trash 5W 5W 5W 5W 5W 5W 5W
Sweep Floor 3W 3W 3W 3W 3W 3W 5W
Vacuum Carpet 3W 3W 3W 3W 3W 3W 5W
Clean & Supply Restroom 5W
(Supplies: 6W) Apply Wax M M M M M M
Wet Mop 3W 3W 3W 3W 3W 3W 3W
Regular Dusting W W W W W W W
Sopt Clean 5W 5W 5W 5W 5W 5W 5W
Clean Chalk Board 2W 2W
Clean Drinking Fountain 5W 5W
* Project Work: Below works could be done as customer requirement basis with separate funds.
1. Strip & Rewax Resilient Tile Floor As Requirement Basis
2. Carpet Shampoo As Requirement Basis
3. Machine Scrub Grouted Tile Floor As Requirement Basis
4. Wash Interior/Exterior Window As Requirement Basis
5. High Dusting As Requirement Basis
6. Clean Venetian Blind As Requirement Basis
Time Schedule: 08:00 ~ 17:00 hours
APPENDIX A
SCHEDULE OF CUSTODIAL WORK
SCHEDULE 5-4
Service Area
Applicable Building: Reimbursable Customer - All health, dental and veterinary clinics in USAG Daegu. All schedule service is 5 days per week, Monday thru Friday. (See Enclosed Bldg List) The "Medical Unit" in this building schedule does NOT mean actual medical facility. Therefore, it doesn't require special treatment of this facility. (Medical Admin Bldg)
W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M6: Every 6 months Y: Yearly
Corridor, Lobby, Lounge
Office Area Restroom, Locker Room, Shower Room
Remove Trash 3W 3W 5W
Sweep Floor 3W 3W 5W
Vacuum Carpet 3W 2W
Clean & Supply Restroom 5W Disinfect Toilet/Urinal & Descaling
5W
Apply Wax M2 M2
Wet Mop 2W 2W
Regular Dusting W W
Complete Dusting 2W 2W 2W
Spot Clean 1W 1W 1W
Clean Drinking Fountain M M Clean Interior/Exterior Window Glass
M M
Carpet Shampoo Y Y
Stripping & Refinishing Y
A-PO:
Bldg #2300, 2302, 2307, 2308
APPENDIX A
SCHEDULE OF CUSTODIAL WORK
SCHEDULE 5-5
Service Area
Applicable Bldgs:
Reimbursable Customer;
DRMO (DLA) at A-PO
W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly Qtrly: Quarterly M6: Every 6 months Y: Yearly
Corridor, Lobby, Lounge
Office, Classroom &
Reading Room
Restroom, Locker Room, Shower Room
Remove Trash 5W 5W 5W
Sweep Floor 5W 5W 5W
Clean & Supply Restroom 5W Disinfect Toilet/Urinal & Descaling
5W
Wet Mop 5W 5W 5W
Regular Dusting W W W
Spot Clean 5W 5W 5W
Clean Entrance Mats 5W 5W 5W
Clean Drinking Fountain 5W 5W 5W Strip & Rewax Resilient Tile Floor
Qtrly
Machine Scrub Grouted Tile Floor
Qtrly
High Dusting Qtrly Wash Interior/Exterior Window Glass
M6
Clean Venetian Blind M6
Carpet Shampoo Y
Camp Carroll:
Bldg #605A, 605B, 606, 620, 580
APPENDIX A
SCHEDULE OF CUSTODIAL WORK
SCHEDULE 5-6
Service Area
Applicable Bldgs:
Reimbursable Customer;
DDD-K
W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M4: Every 4 months Y: Yearly
Corridor, Lobby, Lounge
Office, Classroom &
Reading Room
Restroom, Locker Room, Shower Room
Remove Trash 2W 2W 5W
Sweep Floor 2W 2W
Vacuum Carpet 2W 2W
Clean & Supply Restroom 5W Disinfect Toilet/Urinal & Descaling
5W
Apply Wax M
Wet Mop 2W 2W
Regular Dusting W W
Spot Clean 5W 5W 5W
Clean Drinking Fountain 5W
* Project Work: Below works could be done as customer requirement basis with separate funds.
1. Strip & Rewax Resilient Tile Floor As Requirement Basis
2. Carpet Shampoo As Requirement Basis
3. Machine Scrub Grouted Tile Floor As Requirement Basis
4. Wash Interior/Exterior Window As Requirement Basis
5. High Dusting As Requirement Basis
6. Clean Venetian Blind As Requirement Basis
Busan: 2 Bldgs US NFK-Busan & Chong Hae Kwan
APPENDIX
SCHEDULE OF CUSTODIAL WORK
SCHEDULE 5-7
Service Area
Applicable Bldgs:
Reimbursable Customer;
CNFK (Busan)
W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M4: Every 4 months Y: Yearly
Corridor, Lobby, Lounge
Office, Classroom &
Reading Room
Restroom, Locker Room, Shower Room
Remove Trash 2W 2W
Sweep Floor 2W 2W
Vacuum Carpet 2W 2W
Apply Wax M3
Wet Mop 2W 2W
Regular Dusting W W
Spot Clean 2W 2W 2W
Clean Drinking Fountain 2W
* Project Work: Below works could be done as customer requirement basis with separate funds.
1. Strip & Rewax Resilient Tile Floor As Requirement Basis
2. Carpet Shampoo As Requirement Basis
3. Machine Scrub Grouted Tile Floor As Requirement Basis
4. Wash Interior/Exterior Window As Requirement Basis
5. High Dusting As Requirement Basis
6. Clean Venetian Blind As Requirement Basis
Busan: 1 Bldg Sky Centum Family Support Office, Bldg
#97, Room #501 & 503 (Haeundae)
APPENDIX A
SCHEDULE OF CUSTODIAL WORK
SCHEDULE 5-8
Service Area
Applicable Bldgs:
Reimbursable Customer;
CNFK (Busan)
| Schedule 1 |
| Schedule 2 |
| Schedule 3 |
| Schedule 4 |
| Schedule 5-1 |
| Schedule 5-2 |
| Schedule 5-2a |
| Schedule 5-3 |
| Schedule 5-3a |
| Schedule 5-4 |
| Schedule 5-5 |
| Schedule 5-6 |
| Schedule 5-7 |
| Schedule 5-8 |
File details come from the government source that posted it.