Text version

Camp Walker: Bldg #223, Child Development Center 32,274 SF Bldg #252, Youth Center 15,405 SF Bldg #257, Child Care Center 4,476 SF

Total: 52,155 SF

Legend & Work Description A/R: As Required/Requested D: Daily W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months Y: Yearly 4Y: 4 Times a Year

High Traffic

Corridor & Lobby

Other Corridor &

Lobby Office Area

Classroom & Reading Room

Lounge Restroom & Locker Room

Remove Trash 6W 5W 5W 6W 6W 6W

Sweep Floor 6W 5W 5W 6W 6W 6W

Vacuum Carpet 6W 5W 5W 6W 6W

Clean & Supply Restroom 6W Disinfect Toilet/Urinal & Descaling

6W

Apply Wax M M M M M

Wet Mop 6W 6W 5W 6W 6W 6W

Regular Dusting W W W W W W

Spot Clean A/R A/R A/R A/R A/R A/R

Clean Drinking Fountain 6W 6W 5W 5W 6W

Clean Interior Window W W W W W W

Clean Exterior Window 4Y 4Y 4Y 4Y 4Y 4Y

Service Area

APPENDIX

SCHEDULE OF CUSTODIAL WORK

SCHEDULE #1

Applicable Buildings: All Child Care & Youth Service Centers (See Enclosed Bldg List)

Legend & Work Description A/R: As Required/Requested D: Daily W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly Y: Yearly 2Y: 2 Times a Year

Corridor, Lobby, Lounge

Office, Classroom, Reading Room

Restroom, Locker Room, Shower Room

Remove Trash 2W 2W 5W

Sweep Floor 5W 5W 5W

Vacuum Carpet 1W 1W

Clean & Supply Restroom 5W Disinfect Toilet/Urinal & Descaling

5W

Apply Wax M M

Wet Mop 5W 5W

Regular Dusting 2Y 2Y

Spot Clean A/R A/R A/R

Dry Buff (Wooden Floor) M

Clean Drinking Fountain 5W 5W

Camp Henry:

Bldg #1121, 1107

Camp Walker:

Bldg #261, 265

Camp Carroll:

Bldg #135, 151, 163

APPENDIX

SCHEDULE OF CUSTODIAL WORK

SCHEDULE #2

Service Area

Applicable Bldgs:

Non-Reimbursable Customers;

Gymnasium Facilities (See Enclosed Bldg List)

D: Daily W: Weekly 2W: 2 times a week 3W: 3 times a week 5W: 5 times a week W2: Every 2 weeks M: Monthly M3: Every 3 months Y: Yearly

Corridor, Lobby, Lounge

Office, Classroom, Reading Room

Restroom, Locker Room, Shower Room

Remove Trash W 2W 3W

Sweep Floor W2 W2 3W

Vacuum Carpet M M

Clean & Supply Restroom 3W

(Supplies: 2W) Disinfect Toilet/Urinal & Descaling

3W

Apply Wax M3 M3

Wet Mop M M

Regular Dusting W W

Spot Clean W W W

Dry Buff (Wooden Floor) M3 M3

Clean Drinking Fountain 3W 3W

Camp Henry:

Bldg #1211, 1501

Camp Walker:

Bldg #330

APPENDIX

SCHEDULE OF CUSTODIAL WORK

SCHEDULE #3

Service Area

Applicable Bldgs:

Non-Reimbursable Customers;

Senior Level Admin Facilities & High Use Community Facilities

A/R: As Required/Requested D: Daily W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M3: Every 3 months Y: Yearly 2Y: 2 Times a Year

Corridor, Lobby, Lounge

Office, Classroom, Reading Room

Restroom, Locker Room, Shower Room

Remove Trash W W 2W

Sweep Floor W W W

Vacuum Carpet M M

Clean & Supply Restroom 2W

(Supplies: 2W) Disinfect Toilet/Urinal & Descaling

2W

Apply Wax M3 M3

Wet Mop W W

Regular Dusting 2Y 2Y

Spot Clean A/R A/R A/R

Dry Buff (Wooden Floor) M3 M3

Clean Drinking Fountain W W

APPENDIX

SCHEDULE OF CUSTODIAL WORK

SCHEDULE #4

Camp Henry: 42 Bldgs

Camp Walker: 28 Bldgs

Camp George: 1 Bldg

Camp Carroll: 70 Bldgs

Busan: 13 Bldgs

* The "Medical Unit" in this building schedule does NOT mean actual medical facility.

Therefore, it doesn't require special treatment of this facility.

(Medical Admin Bldg)

Service Area

Applicable Bldgs:

Non-Reimbursable Customers;

Other Admin Facilities

W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M6: Every 6 months Y: Yearly

Corridor, Lobby, Lounge

Office, Classroom, Reading Room

Restroom, Locker Room, Shower Room

Remove Trash 5W 5W 5W

Sweep Floor 3W 2W

Vacuum Carpet 3W 2W

Clean & Supply Restroom 5W Disinfect Toilet/Urinal & Descaling

5W

Apply Wax M M

Wet Mop 3W 2W

Regular Dusting W W

Spot Clean 5W 5W 5W

Clean Chalk Board W

Dry Buff (Wooden Floor) M

Clean Drinking Fountain 5W 5W

* Project Work: Below works could be done as customer requirement basis with separate funds.

1. Strip & Rewax Resilient Tile Floor As Requirement Basis

2. Carpet Shampoo As Requirement Basis

3. Machine Scrub Grouted Tile Floor As Requirement Basis

4. Wash Interior/Exterior Window As Requirement Basis

5. High Dusting As Requirement Basis

6. Clean Venetian Blind As Requirement Basis

Camp Henry: 9 Bldgs

Camp Walker: 7 Bldgs

Camp Carroll: 14 Bldgs

Busan: 5 Bldgs

* The "Medical Unit" in this building schedule does NOT mean actual medical facility.

Therefore, it doesn't require special treatment of this facility.

(Medical Admin Bldg)

APPENDIX

SCHEDULE OF CUSTODIAL WORK

SCHEDULE #5-1

Service Area

Applicable Bldgs:

Reimbursable Customers;

Applicable Buildings: Reimbursable Customer. This schedule may be used for buildings except from the standard schedule and open 5 days per week. (DoD School)

Camp George: Bldg #3000, 3008 & 3019 (Total 93,771 SF) Camp Walker: Bldg #170 (Total 142,266 SF)

Legend & Work Description D: Daily W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M6: Every 6 months Y: Yearly

Corridor, Lobby & Stairway

Office Area Classroom, Lounge &

Library

Restroom & Locker Room

Gym

Multi- Purpose Room &

Stage

Remove Trash D D D D D D

Sweep Floor D D D D D D Vacuum Carpet (Kindergarden)

D D D

(2D) Sink D D

Clean & Supply Restroom D

Apply Wax M M

Damp Mop D D D D D

Regular Dusting W W W W W W

Spot Clean D D D D D D

Clean Chalk Board D D

Dry Buff (Wooden Floor) M

Clean Drinking Fountain D D D D

Folding Tables W D

Classroom Desk/Chair W

Entrance Glass Door & Showcase D

Time Schedule:

Camp George: 07:00 ~ 16:00 hours

08:00 ~ 17:00 hours

Camp Walker: 08:00 ~ 17:00 hours

Summer Vacation: 1 July thru 15 August

* Applicable Service Period: Base Year (1 July 2019 through 30 Jun 2020)

APPENDIX

SCHEDULE OF CUSTODIAL WORK

SCHEDULE #5-2

Service Area

Applicable Buildings: Reimbursable Customer. This schedule may be used for buildings except from the standard schedule and open 5 days per week. (DoD School)

Camp George: Bldg #3000 (School Cafeteria) - Total 3,840 SF

Legend & Work Description D: Daily W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M6: Every 6 months Y: Yearly

Cafeteria, Lobby, Lounge

Office, Classroom, Reading Room

Restroom, Locker Room, Shower Room

Remove Trash 5W

Sweep Floor 5W

Vacuum Carpet 5W

Clean Table/Chair 5W

Apply Wax M

Wet Mop 5W

Regular Dusting W

Spot Clean 2W

Dry Buff (Wooden Floor) M

Clean Drinking Fountain 5W 5W

* Applicable Service Period: Base Year (1 July 2019 through 30 Jun 2020)

Camp George:

Bldg #3000

APPENDIX

SCHEDULE OF CUSTODIAL WORK

SCHEDULE #5-2a

Service Area

Applicable Bldgs:

Reimbursable Customers;

DoD School Cafeteria

D: Daily, 3D: 3 times a day W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M6: Every 6 months Y: Yearly

High Traffic

Corridor & Lobby

Other Corridor &

Lobby

Office Area

Break Room

Lounge & Sales Area

Restroom & Locker Room

Meat Department

Remove Trash 3D 3D D D 3D 3D 3D

Sweep Floor 6W 6W 6W 6W 6W 6W 6W

Clean & Supply Restroom 3D

(Supplies: 6W)

Disinfect Toilet/Urinal & Descaling 6W

Spray Cleaning 5W 5W 5W

Apply Wax W W W

Damp Mop 6W 6W 6W 6W 6W 6W

Regular Dusting W W W W W W W

Clean Drinking Fountain and Sink (Meat Department)

6W 6W 6W 6W 6W 6W 6W

Clean Interior Window Glass & Interior Surface (Meat Department)

W W W W W W 6W

Clean Window Glass (Entrance Door & Outdoor Glass)

6W 6W 6W 6W 6W

Spot Clean 6W 6W 6W 6W 6W 6W 6W

Machine Scrubbing M M M

Entrance Mat Shampoo M4

Stripping & Refinishing M M M M

Clean Venetian Blind M4 M4 M4 M4 M4 M4 M4

Time Schedule: Sales Area 06:30 ~ 10:00 hours

Restroom 06:30 hours, 11:00 hours, 15:00 hours

Other Area 06:30 ~ 16:00 hours

Meat Department 15:00 ~ 17:00 hours

Machine Scrubbing 15:00 hours on Monday

* Tuesday through Sunday: 06:00 ~ 15:00 hours (1 Janitor/Janitress)

08:00 ~ 17:00 hours (2 Janitor/Janitress)

APPENDIX A

SCHEDULE OF CUSTODIAL WORK

SCHEDULE 5-3

Applicable Building (Reimbursable Customer): Camp Walker Commissary Bldg #357 (Total 22,495 SF)

D: Daily, 2D: 2 times a day W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M4: Every 4 months Y: Yearly

High Traffic

Corridor & Lobby

Other Corridor &

Lobby

Office Area

Break Room

Lounge & Sales Area

Restroom & Locker Room

Meat Department

Remove Trash 2D 2D D D 2D 2D D

Sweep Floor 6W 6W 6W 6W 6W 6W 6W

Clean & Supply Restroom 2D

(Supplies: 6W)

Disinfect Toilet/Urinal & Descaling 6W

Spray Cleaning 2W 2W 2W

Apply Wax M M M

Damp Mop 6W 6W 6W 6W 6W 6W

Regular Dusting W W W W W W W

Clean Drinking Fountain 6W 6W 6W 6W 6W 6W 6W

Clean Interior Window Glass W W W W W W W

Spot Clean 6W 6W 6W 6W 6W 6W 6W

Machine Scrubbing M4 M4 M4

Stripping & Refinishing M4 M4 M4 M4

Clean Venetian Blind M4 M4 M4 M4 M4 M4 M4

Time Schedule: Sales Area 08:00 ~ 10:00 hours

Restroom 08:00 hours, 14:00 hours

Other Area 08:00 ~ 17:00 hours

Thursday thru Tuesday 08:00 ~ 17:00 hours (1 Janitor/Janitress)

APPENDIX A

SCHEDULE OF CUSTODIAL WORK

SCHEDULE 5-3a

Applicable Building (Reimbursable Customer): Camp Carroll Commissary Bldg #136 (Total 8,103 SF)

W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M4: Every 4 months Y: Yearly

High Traffic Corridor &

Lobby

Other Corridor &

Lobby Office Area

Classroom & Reading

Room Lounge

Restroom & Locker Room

Patient Care

Remove Trash 5W 5W 5W 5W 5W 5W 5W

Sweep Floor 3W 3W 3W 3W 3W 3W 5W

Vacuum Carpet 3W 3W 3W 3W 3W 3W 5W

Clean & Supply Restroom 5W

(Supplies: 6W) Apply Wax M M M M M M

Wet Mop 3W 3W 3W 3W 3W 3W 3W

Regular Dusting W W W W W W W

Sopt Clean 5W 5W 5W 5W 5W 5W 5W

Clean Chalk Board 2W 2W

Clean Drinking Fountain 5W 5W

* Project Work: Below works could be done as customer requirement basis with separate funds.

1. Strip & Rewax Resilient Tile Floor As Requirement Basis

2. Carpet Shampoo As Requirement Basis

3. Machine Scrub Grouted Tile Floor As Requirement Basis

4. Wash Interior/Exterior Window As Requirement Basis

5. High Dusting As Requirement Basis

6. Clean Venetian Blind As Requirement Basis

Time Schedule: 08:00 ~ 17:00 hours

APPENDIX A

SCHEDULE OF CUSTODIAL WORK

SCHEDULE 5-4

Service Area

Applicable Building: Reimbursable Customer - All health, dental and veterinary clinics in USAG Daegu. All schedule service is 5 days per week, Monday thru Friday. (See Enclosed Bldg List) The "Medical Unit" in this building schedule does NOT mean actual medical facility. Therefore, it doesn't require special treatment of this facility. (Medical Admin Bldg)

W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M6: Every 6 months Y: Yearly

Corridor, Lobby, Lounge

Office Area Restroom, Locker Room, Shower Room

Remove Trash 3W 3W 5W

Sweep Floor 3W 3W 5W

Vacuum Carpet 3W 2W

Clean & Supply Restroom 5W Disinfect Toilet/Urinal & Descaling

5W

Apply Wax M2 M2

Wet Mop 2W 2W

Regular Dusting W W

Complete Dusting 2W 2W 2W

Spot Clean 1W 1W 1W

Clean Drinking Fountain M M Clean Interior/Exterior Window Glass

M M

Carpet Shampoo Y Y

Stripping & Refinishing Y

A-PO:

Bldg #2300, 2302, 2307, 2308

APPENDIX A

SCHEDULE OF CUSTODIAL WORK

SCHEDULE 5-5

Service Area

Applicable Bldgs:

Reimbursable Customer;

DRMO (DLA) at A-PO

W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly Qtrly: Quarterly M6: Every 6 months Y: Yearly

Corridor, Lobby, Lounge

Office, Classroom &

Reading Room

Restroom, Locker Room, Shower Room

Remove Trash 5W 5W 5W

Sweep Floor 5W 5W 5W

Clean & Supply Restroom 5W Disinfect Toilet/Urinal & Descaling

5W

Wet Mop 5W 5W 5W

Regular Dusting W W W

Spot Clean 5W 5W 5W

Clean Entrance Mats 5W 5W 5W

Clean Drinking Fountain 5W 5W 5W Strip & Rewax Resilient Tile Floor

Qtrly

Machine Scrub Grouted Tile Floor

Qtrly

High Dusting Qtrly Wash Interior/Exterior Window Glass

M6

Clean Venetian Blind M6

Carpet Shampoo Y

Camp Carroll:

Bldg #605A, 605B, 606, 620, 580

APPENDIX A

SCHEDULE OF CUSTODIAL WORK

SCHEDULE 5-6

Service Area

Applicable Bldgs:

Reimbursable Customer;

DDD-K

W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M4: Every 4 months Y: Yearly

Corridor, Lobby, Lounge

Office, Classroom &

Reading Room

Restroom, Locker Room, Shower Room

Remove Trash 2W 2W 5W

Sweep Floor 2W 2W

Vacuum Carpet 2W 2W

Clean & Supply Restroom 5W Disinfect Toilet/Urinal & Descaling

5W

Apply Wax M

Wet Mop 2W 2W

Regular Dusting W W

Spot Clean 5W 5W 5W

Clean Drinking Fountain 5W

* Project Work: Below works could be done as customer requirement basis with separate funds.

1. Strip & Rewax Resilient Tile Floor As Requirement Basis

2. Carpet Shampoo As Requirement Basis

3. Machine Scrub Grouted Tile Floor As Requirement Basis

4. Wash Interior/Exterior Window As Requirement Basis

5. High Dusting As Requirement Basis

6. Clean Venetian Blind As Requirement Basis

Busan: 2 Bldgs US NFK-Busan & Chong Hae Kwan

APPENDIX

SCHEDULE OF CUSTODIAL WORK

SCHEDULE 5-7

Service Area

Applicable Bldgs:

Reimbursable Customer;

CNFK (Busan)

W: Weekly 2W: 2 times a week 5W: 5 times a week 6W: 6 times a week W2: Every 2 weeks M: Monthly M2: Every 2 months M4: Every 4 months Y: Yearly

Corridor, Lobby, Lounge

Office, Classroom &

Reading Room

Restroom, Locker Room, Shower Room

Remove Trash 2W 2W

Sweep Floor 2W 2W

Vacuum Carpet 2W 2W

Apply Wax M3

Wet Mop 2W 2W

Regular Dusting W W

Spot Clean 2W 2W 2W

Clean Drinking Fountain 2W

* Project Work: Below works could be done as customer requirement basis with separate funds.

1. Strip & Rewax Resilient Tile Floor As Requirement Basis

2. Carpet Shampoo As Requirement Basis

3. Machine Scrub Grouted Tile Floor As Requirement Basis

4. Wash Interior/Exterior Window As Requirement Basis

5. High Dusting As Requirement Basis

6. Clean Venetian Blind As Requirement Basis

Busan: 1 Bldg Sky Centum Family Support Office, Bldg

#97, Room #501 & 503 (Haeundae)

APPENDIX A

SCHEDULE OF CUSTODIAL WORK

SCHEDULE 5-8

Service Area

Applicable Bldgs:

Reimbursable Customer;

CNFK (Busan)

Schedule 1
Schedule 2
Schedule 3
Schedule 4
Schedule 5-1
Schedule 5-2
Schedule 5-2a
Schedule 5-3
Schedule 5-3a
Schedule 5-4
Schedule 5-5
Schedule 5-6
Schedule 5-7
Schedule 5-8

File details come from the government source that posted it.