1 T - 1 1 OF 1 TITLE SHEET
CIVIL
T-1
TITLE SHEET
A
B C D
E F G H
SCHEDULE OF DRAWINGS
RING NO. RING NO.DWG. NO. DWG. NO.SHT. NO. SHT. NO.DESCRIPTION OF DRAWINGS DESCRIPTION OF DRAWINGSREF. NO. REF. NO.REVISION STATUS REVISION STATUS
SYMBOL BY
DESIGNED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENERGY MANAGER
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
ENVIRONMENT
FORCE PROTECTION
CHOE, S M.
REPLACE FLOOD DAMAGED FLOOD GATE
LOCATION PLAN-1 AND GENERAL NOTES
REPLACE FLOOD DAMAGED FLOOD GATE
CAMP CASEY, HOVEY
SCREENED FLOOD GATE DETAIL
FLOOD GATE #1
LOCATION PLAN - 2
SITE LAYOUT PLAN-FLOOD GATE #1, NOTES AND SCOPE OF WORK
SITE LAYOUT PLAN-FLOOD GATE #2, NOTES AND SCOPE OF WORK
SITE LAYOUT PLAN-FLOOD GATE #3, NOTES AND SCOPE OF WORK
SITE LAYOUT PLAN-FLOOD GATE #4, NOTES AND SCOPE OF WORK
FLOOD GATE #2
FLOOD GATE #3
FLOOD GATE #4
200735
11 OF 13C - 11
C - 10
C - 9
C - 8
C - 7
C - 6
C - 5
C - 4
C - 3
C - 2
C - 1
CAMP CASEY, HOVEY
FEWR NO. 200735
- 1 SCALE = 1 : 6,000
CIVIL
C-1
GENERAL NOTES :
PRIOR TO COMMENCING WORK ON THE PROJECT.
INDICATED BY THE COR AND SHALL BE APPROVED BY THE COR
UNDETAILED PORTION OF THE JOB INCLUDING OTHER AREAS
2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ANY
EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
DISMANTLING, DEMOLISHING, OR REMOVING AT THE CONTRACTOR'S
TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR/RESTORATION
TO THE PROJECT CONTRACT.
TO ACCOMPLISH THE CIVIL SCOPE OF WORK AT NO ADDITIONAL COST
FORM ARE A PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED
OF THE REPLACEATION MANAGEMENT AGENCY, KOREA REGION OFFICE"
DRAWINGS, FOR OM&A PROJECTS, KOREA, OCTOBER 2003, DEPARTMENT
6. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL
REPRESENTATIVE.
A CLEAN CONDITION ACCEPTABLE TO THE OWNER OR OWNER'S
MATERIALS, EQUIPMENT AND DEBRIS AND LEAVE THE PREMISES IN
ALL TIMES AND AT COMPLETION OF WORK, REMOVE ALL SURPLUS
8. THE CONTRACTOR SHALL KEEP THE REPLACEION AREA CLEAN AT
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
COVERED WITH TOP SOIL AND SOLID SODDED.
4. ALL UNPAVED AREAS WITHIN THE GRADING LIMIT LINES SHALL BE
N
CAMP CASEY
REPLACE FLOOD DAMAGED FLOOD GATE
65-A
12 CM
ST
STREAM
ST
S T
P V C
227.5
J-4
ST
36 CM
.5
.9
W A
L L
W A
L L
W A
L L
WALL
W A
L L
WALL
228.4
ST
GAL275
LAUNDRY
KSC
PEST
647667
WH-1
WH-2
DPW HQ
A
B
651A
833T
808 811
715 726
A B
A
B
1149 1151
A
B
A
B
A
B
A
B
2372A
2373T
A
C
A
B
A
B
2609T
2514 2540
8008T
2540T
1991 1963
A B
456A
463Z
549 546
8114T
560G
A
B
86M
48T
A
B
39 55
134 133
202A
258252
1785 235
FOOT BR
VEH BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
VEH BR 1821
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
1158A
1158B
.8
.5
S T
R C
6 PVC
ST
C M
S T
268.6
STREAM
DISCHARGE TO
65-A
12 CM
ST
STREAM
447A
F
F
497A
497B
458Z
A
B
A B
VEH BR
VEH BR
472?
455?
BARRIER
635A
2002B
A B
48A
A
B
A B
A
B
A
B
A
B
A
B
GRAVES
GRAVES
B A
S K
E T
B A
L
O
U R
T
706(707A)
(2298)
1071?
A B
1760?
VEH BR?
VEH BR?
BARRIER
FLAG
FO
TBALL
FIELD
(SYN
TH
ETIC
TU
R F
AR
EA)
1919LIFT STATION
VEH BR
BARRIER
B
UTILITY
BLDG
O.S.
O.S.
PARKING
TT
DPW
SCALE: 1:6000
0 60 120 240
REAR GATE
MAIN GATE
FIRE STATION
FLOOD GATE #1
FLOOD GATE #2
DURING THE SITE ORIENTATION.CONTRACTING OFFICER
SHALL BE DETERMINED, DESIGNATED AND COORDINATED WITH THE
THE CONTRACTOR'S HAUL ROUTE, STORAGE AND OPERATIONS AREA
NOTE:
LOCATION PLAN - 1
LOCATION PLAN-1 AND GENERAL NOTES
SUBMISSION OF CONTRACT PROPOSAL.
DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO
1. THE CONTRACTOR SHALL VERIFY ALL EXSTING CONDITIONS AND
ADDITIONAL COST.
EXSTING SITE CONDITIONS PRIOR TO START OF WORK AT NO
CHECK THE OTHER REPLACEION REQUIREMENTS IN MEETING THE
FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO
7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY
ITEMS WHICH WILL INTERFERE WITH THE REPLACEION OPERATIONS.
UNDER GROUND ROCK BASE, EXSTING UTILITY LINES, AND OTHER
CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS
5. THE SITE INDICATED ON THE DRAWINGS SHALL BE GRADED AND
ADDITIONAL COST.
EXSTING SITE CONDITIONS PRIOR TO START OF WORK AT NO
CHECK THE OTHER REPLACEION REQUIREMENTS IN MEETING THE
FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO
7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY
200735
REPLACE FLOOD DAMAGED FLOOD GATE, CASEY
FEWR 200735,
THIS PROJECT
MAIN GATE
AREA
AM
M
O STORAGE3
STREAM
37533710B3717B3717B
FY
F Y
R C
W R
POOL
SWIMMING
M A
IN
T
TA
C T
3709B
3709B
FY-
BEQ
9 3
TANK
WATE
R
3524 3532 3
A
B
B
A
B
A
A
A
B
A
B
B
S T
R E
A M
A
B
A
B
3717B
3717B
3717B
3717B
3711B
3710B 3754
3711B
3648B
3648B
B
3646B
3646B
B
3844B
A
3847B
3847A
3854A
3888A
3888B
B
3854B
3845B
3845A
3844A
A
B
B
A
F Y
B O
Q
B
A
A
B
A
A
B
A
B
A
8 3
2 3695
3693 3696
DOSING TANK
CAHMBER
3482 3
3415 3442
FILTER
TRICKING
MAIN GATE
CHLORINE
12S
O C C E R
FI
E
LD
3443 TANK
IMHOFF
A
S E
Y
S T
R E
A M
1 4
STATION
SENTRY
7 4
A
D
A
T R
O O
P
F Y
4037 4
T E
N N
IS
U R
T
FAC FY-83
TACT MAINT
MTR
FY-83
MAINT
FAC.
4120 4320
S H
E D
AMMO STORAGE
S O
F T
B A
F
IE
L D
7 4099
S T
R E
A M
K O
R E
V
IL
L A
G E
M A
R
E
A D
9 T E
N
IS
U R
T
H E
L
IP
A D
F
IR
IN
G
R
A N
G
E
A
S H E
D
S O
U
TH
G
A
TE
A S
P H
A L T
SOUTH GATE
DURING THE SITE ORIENTATION.CONTRACTING OFFICER
SHALL BE VERIFIED AND COORDINATED WITH THE
THE CONTRACTOR'S HAUL ROUTE, STORAGE AND OPERATIONS AREA
NOTE:
SCALE: 1:3000
0 30 60 120
FLOOD GATE #3
FLOOD GATE #4
CIVIL
C-2
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
CAMP CASEY
REPLACE FLOOD DAMAGED FLOOD GATE
N
- 2 SCALE = 1 : 3,000
LOCATION PLAN - 2
LOCATION PLAN - 2
200735
REPLACE FLOOD DAMAGED FLOOD GATE, CASEY
FEWR 200735,
THIS PROJECT
F/T
N 4,199,135.394
E 329,212.429
Elev. 59.958
T5
N
W
TEE
GUARD
TOWER
TANKOUT EL:55.708
(LIFT STATION)
TOP EL:60.222
CP 300
IN EL:58.356
CP 300
OUT EL:268
CP 300
OUT EL:58.235
CP 1000
IN EL:58.074
CP 1000
OUT EL:57.947
S
S
TOWER
GUARD
TOWER
GUARD
SCALE: 1:300
0 3 6 12
N
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
C-3
AS SHOWN
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
- 3
SCALE: 1 / 300
REPLACE FLOOD DAMAGED FLOOD GATE
CAMP CASEYSITE LAYOUT PLAN-FLOOD GATE #1
NOTES AND SCOPE OF WORK
SITE LAYOUT PLAN-FLOOD GATE #1,
COORDINATE WITH DES.
APPROX. 38.0 LM
DURING THE CONSTRUCTION,
PROVIDE TEMPORARY CHAIN LINK FENCE
DURING THE CONSTRUCTION.
2. PROVIDE TEMPORARY CHAIN LINK FENCE
4. MARK WATER LEVEL HEIGHT EVERY 50 CM ON THE CONCRETE WALL.
3. FOR DETAIL OF FLOOD GATE, SEE REF NO. C-3 & 4.
NO ADDITIONAL AMOUNT WILL BE PAID TO THE CONTRACTOR FOR THIS WORK.
AND SHOP DRAWINGS AS REQUIRED TO MAKE ADJUSTMENTS TO FIELD CONDITIONS.
DESIGN OF FLOOD GATE BASED ON FIELD VERIFIED CONDITIONS,
THE CONTRACTOR'S PROPOSAL SHALL INCLUDE VERIFICATION OF EXSTING SITE CONDITIONS,
AND UTILITIES WAS NOT AVAILABLE FOR DESIGN DEVELOPMENT.
2. A DETAILED TOPOGRAPHIC SURVEY INDICATING ACCURATE EXSTING FLOOD GATE STRUCTURE
1. THE CONTRACTOR MUST VISIT THE JOB SITE PRIOR TO SUBMITTING HIS PROPOSAL.
NOTES:
GATES W/ NEW SET.
1. REPLACE EIGHT(8) FLOOD DAMAGED SCREENED
200735
SWITCHES AND HOUSING.
3. CLEAN AND TEST EXISTING WATER LEVEL
SEE REF NO. C-3 & 4
SCREENED GATES W/ NEW SET,
REPLACE EIGHT(8) FLOOD DAMAGED
L
W
P
V C
D300
D200
D200 D400
P P
S P
E C L
E C L
E C L
E C L
P P
S P
P P
S P
S P
S P
#1
N:4199565.682
E:332788.915
EL:107.207
CP
CP
CP
CP
CP
CP
CP
N4199500
E
N4199550
E 0 N4199550
E
N4199500
E
N4199550
E 0 N4199550
E
SCALE: 1:300
0 3 6 12
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
C-4
AS SHOWN
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
REPLACE FLOOD DAMAGED FLOOD GATE
CAMP CASEY
N
- 4
SCALE: 1 / 300
SITE LAYOUT PLAN-FLOOD GATE #2
NOTES AND SCOPE OF WORK
SITE LAYOUT PLAN-FLOOD GATE #2,
4. MARK WATER LEVEL HEIGHT EVERY 50 CM ON THE CONCRETE WALL.
3. FOR DETAIL OF FLOOD GATE, SEE REF NO. C-3 & 4.
NO ADDITIONAL AMOUNT WILL BE PAID TO THE CONTRACTOR FOR THIS WORK.
AND SHOP DRAWINGS AS REQUIRED TO MAKE ADJUSTMENTS TO FIELD CONDITIONS.
DESIGN OF FLOOD GATE BASED ON FIELD VERIFIED CONDITIONS,
THE CONTRACTOR'S PROPOSAL SHALL INCLUDE VERIFICATION OF EXSTING SITE CONDITIONS,
AND UTILITIES WAS NOT AVAILABLE FOR DESIGN DEVELOPMENT.
2. A DETAILED TOPOGRAPHIC SURVEY INDICATING ACCURATE EXSTING FLOOD GATE STRUCTURE
1. THE CONTRACTOR MUST VISIT THE JOB SITE PRIOR TO SUBMITTING HIS PROPOSAL.
NOTES:
GATES W/ NEW SET.
1. REPLACE ONE(1) FLOOD DAMAGED SCREENED
200735
SWITCHES AND HOUSING.
2. CLEAN AND TEST EXISTING WATER LEVEL
SEE REF NO. C-3 & 4
REPLACE ONE(1) FLOOD DAMAGED
T
O/H
A.C.
N
T
PILE
PILE
PILE
PARKING
N
W P
K V
P
V
SCALE: 1:300
0 3 6 12
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
C-5
AS SHOWN
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
REPLACE FLOOD DAMAGED FLOOD GATE
CAMP HOVEY
NOTES AND SCOPE OF WORK
SITE LAYOUT PLAN-FLOOD GATE #3,
- 5
SCALE: 1 / 300
SITE LAYOUT PLAN-FLOOD GATE #3
N
COORDINATE WITH DES.
APPROX. 15.0 LM
DURING THE CONSTRUCTION,
PROVIDE TEMPORARY CHAIN LINK FENCE
DURING THE CONSTRUCTION.
2. PROVIDE TEMPORARY CHAIN LINK FENCE
4. MARK WATER LEVEL HEIGHT EVERY 50 CM ON THE CONCRETE WALL.
3. FOR DETAIL OF FLOOD GATE, SEE REF NO. C-3 & 4.
NO ADDITIONAL AMOUNT WILL BE PAID TO THE CONTRACTOR FOR THIS WORK.
AND SHOP DRAWINGS AS REQUIRED TO MAKE ADJUSTMENTS TO FIELD CONDITIONS.
DESIGN OF FLOOD GATE BASED ON FIELD VERIFIED CONDITIONS,
THE CONTRACTOR'S PROPOSAL SHALL INCLUDE VERIFICATION OF EXSTING SITE CONDITIONS,
AND UTILITIES WAS NOT AVAILABLE FOR DESIGN DEVELOPMENT.
2. A DETAILED TOPOGRAPHIC SURVEY INDICATING ACCURATE EXSTING FLOOD GATE STRUCTURE
1. THE CONTRACTOR MUST VISIT THE JOB SITE PRIOR TO SUBMITTING HIS PROPOSAL.
NOTES:
GATES W/ NEW SET.
1. REPLACE THREE(3) FLOOD DAMAGED SCREENED
200735
SWITCHES AND HOUSING.
3. CLEAN AND TEST EXISTING WATER LEVEL
SEE REF NO. C-3 & 4
REPLACE THREE(3) FLOOD DAMAGED
TOWER
V
C
6 PVC
U N
K
SCALE: 1:300
0 3 6 12
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
C-6
AS SHOWN
NOTES AND SCOPE OF WORK
SITE LAYOUT PLAN-FLOOD GATE #4,
CHOE, S M.
CIVIL
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
REPLACE FLOOD DAMAGED FLOOD GATE
CAMP HOVEY
DURING THE CONSTRUCTION.
2. PROVIDE TEMPORARY CHAIN LINK FENCE
- 6
SCALE: 1 / 300
SITE LAYOUT PLAN-FLOOD GATE #4
N
COORDINATE WITH DES.
APPROX. 32.0 LM
DURING THE CONSTRUCTION,
PROVIDE TEMPORARY CHAIN LINK FENCE
4. MARK WATER LEVEL HEIGHT EVERY 50 CM ON THE CONCRETE WALL.
3. FOR DETAIL OF FLOOD GATE, SEE REF NO. C-3 & 4.
NO ADDITIONAL AMOUNT WILL BE PAID TO THE CONTRACTOR FOR THIS WORK.
AND SHOP DRAWINGS AS REQUIRED TO MAKE ADJUSTMENTS TO FIELD CONDITIONS.
DESIGN OF FLOOD GATE BASED ON FIELD VERIFIED CONDITIONS,
THE CONTRACTOR'S PROPOSAL SHALL INCLUDE VERIFICATION OF EXSTING SITE CONDITIONS,
AND UTILITIES WAS NOT AVAILABLE FOR DESIGN DEVELOPMENT.
2. A DETAILED TOPOGRAPHIC SURVEY INDICATING ACCURATE EXSTING FLOOD GATE STRUCTURE
1. THE CONTRACTOR MUST VISIT THE JOB SITE PRIOR TO SUBMITTING HIS PROPOSAL.
NOTES:
GATES W/ NEW SET.
1. REPLACE EIGHT(8) FLOOD DAMAGED SCREENED
200735
SWITCHES AND HOUSING.
3. CLEAN AND TEST EXISTING WATER LEVEL
SEE REF NO. C-3 & 4
REPLACE EIGHT(8) FLOOD DAMAGED
4275 (L) 4255 (L)4325 (L) 4225 (L) 4255 (L) 4215 (L) h
4245 (L) 4325 (L)
B
300 300
ELEVATION
NOT TO SCALE
1B
P L A N
NOT TO SCALE
1A
C O
X
F
N C
E
H
H
H
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
C-7
AS SHOWN
REPLACE FLOOD DAMAGED FLOOD GATE
- 7
SCALE: NONE
CAMP CASEYFLOOD GATE #1-CAMP CASEY
FLOOD GATE #1
ON TOP OF FLOOD GATE
EXST CONC WALKWAY W/HANDRAIL
EXST FLOOD GATE LIFTING MOTOR
2. FOR DETAIL OF NEW FLOOD GATE, SEE REF NO. C-11.
1. CONTRACTOR MUST VERIFY REAL GATE SIZE ON FIELD.
NOTE:
EXST CONC SIDEWALK
EXST CONC STRUCTURE
EXST CONC BOTTOM SLAB
EXST CONC STRUCTURE
EXST CMU PERIMETER FENCE
REPAIR DAMAGED GEAR
SPINDLE
REPLACE DAMAGED
REPLACE SCREENED FLOOD GATE
REPLACE SCREENED FLOOD GATE
EXST CHAIN-LINK FENCE
200735 h
RESET
LOC
REM
RESET
LOC
REM
RESET
LOC
REM
RESET
LOC
REM
RESET
LOC
REM
RESET
LOC
REM
3400 (L) 3600 (L) 3400 (L) 3700 (L) 3400 (L) 3600 (L)
B
300 300 300
ELEVATION
NOT TO SCALE
1B
P L A N
NOT TO SCALE
1A
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
C-8
AS SHOWN
REPLACE FLOOD DAMAGED FLOOD GATE
- 8
SCALE: NONE
CAMP CASEYFLOOD GATE #2-CAMP CASEY
FLOOD GATE #2
H
H
H
EXST CONC SIDEWALK
EXST CONC STRUCTURE
EXST CONC STRUCTURE
EXST CONC BOTTOM SLAB
ON TOP OF FLOOD GATE
EXST CONC WALKWAY W/HANDRAIL
EXST FLOOD GATE LIFTING MOTOR
REPLACE SCREENED FLOOD GATE EXST CHAIN LINK FENCE
REPAIR DAMAGED GEAR
REPLACE DAMAGED SPINDLE
REPLACE SCREENED FLOOD GATE
h
RESET
LOC
REM
RESET
LOC
REM
RESET
LOC
REM
4300 (L) 4300 (L) 4300 (L)
B
ELEVATION
NOT TO SCALE
1B
P L A N
NOT TO SCALE
1A
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
- 9
SCALE: NONE
FLOOD GATE #3-CAMP HOVEY
CHOE, S M.
CIVIL
C-9
AS SHOWN
REPLACE FLOOD DAMAGED FLOOD GATE
CAMP HOVEY
FLOOD GATE #3
H
H
H
EXST CONC STRUCTURE
EXST CONC STRUCTURE
EXST CONC BOTTOM SLAB
EXST CONC SIDEWALK
EXST CHAIN LINK FENCE
ON TOP OF FLOOD GATE
EXST CONC WALKWAY W/HANDRAIL
REPLACE SCREENED FLOOD GATE
REPAIR DAMAGED GEAR
EXST FLOOD GATE LIFTING MOTOR
REPLACE DAMAGED SPINDLE
REPLACE SCREENED FLOOD GATE
h
3600 (L) 3700 (L) 3500 (L) 3600 (L) 3500 (L) 3500 (L) 3600 (L) 3600 (L)
B
300 300 300 300
ELEVATION
NOT TO SCALE
1B
P L A N
NOT TO SCALE
1A
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CHOE, S M.
CIVIL
C-10
AS SHOWN
REPLACE FLOOD DAMAGED FLOOD GATE
CAMP HOVEY
FLOOD GATE #4
-10
SCALE: NONE
FLOOD GATE #4-CAMP HOVEY
EXST CONC STRUCTURE
EXST CONC STRUCTURE
EXST CONC BOTTOM SLAB
EXST CONC SIDEWALK
EXST CHAIN LINK FENCE
REPLACE SCREENED FLOOD GATE
ON TOP OF FLOOD GATE
EXST CONC WALKWAY W/HANDRAIL
REPLACE SCREENED FLOOD GATE
200735
EXST FLOOD GATE LIFTING MOTOR
REPAIR DAMAGED GEAR
19t, 25t
M24x120L
6t
GALVANIZED STEEL
NO DESCRIPTION DIMENSION MATERIAL
UPPER BEAM
SIDE BEAM
ROUND BAR
BOTTOM BEAM
BRACKET
BOLT NUT
FRAME
PLATE
SHAFT (SPINDLE)
75x75x9�
75x75x9�
D50
GALVANIZED STEEL
GALVANIZED STEEL
GALVANIZED STEEL
GALVANIZED STEEL
GALVANIZED STEEL
GALVANIZED STEEL
GALVANIZED STEEL
GALVANIZED STEEL
STS304
FRAME 75x75x9� GALVANIZED STEEL
6x100x70
- 11
SCALE: NONE
SCREENED FLOOD GATE
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CHOE, S M.
CIVIL
C-11
AS SHOWN
REPLACE FLOOD DAMAGED FLOOD GATE
CAMP HOVEY
SCREENED FLOOD GATE DETAIL
REMARK
300MM L, @600MM O.C
2. SEE DETAILS REF NO. C-3 FOR DIMENSION L & H.
1. CONTRACTOR MUST VERIFY REAL GATE SIZE.
NOTES:
SECTION A-A
B
SECTION B-B
EXST FLOOD GATE (CONC SIDEWALK ON TOP OF CONC STRUCTURE)
EXIST OR NEW FLOOD GATE CONC WALL
SST ANCHOR BOLT 13mm DIA 125mm LONG @350mm
H
L
L
H
H m m
IN
V A
R
200(180mm MIN)
VAR
(180mm MIN)
VAR
L-40
200 200
65b x 9t3 FLAT BAR
@250mm O.C
16mm DIA 125mm LONG
SST ANCHOR BOLT
�215x80x6
D19
| T1 |
| C1 |
| C2 |
| C3 |
| C4 |
| C5 |
| C6 |
| C7 |
| C8 |
| C9 |
| C10 |
| C11 |
File details come from the government source that posted it.