Project No: SMYU18-1002 Title: Repair Airf ield Obstructions at TWY A, F & E, Osan Air Base (AB)

a. This is Work Plan Task Order for the follow ing MATOC Contractors only. Work Plan Task Order requests for proposal under the MATOC #W91QVN-18-D-0053, 0054, 0055, 0056, 0060, 0061, 0062, 0063, 0064, 0072, 0095, 0096, 0097, 0098 and 0099

b. Site Visit: All MATOC offerors w ho intend to propose on this solicitation are strongly recommended to attend the site visit. See site visit clause in Section L for Scheduel

c. If the Contractor is unable to submit the proposal in response to this RFP, the Contractor shall submit the 'No-Offer Letter' by date and time

MS. KIM, NAM SUN 02-7914-3339

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

01-Jun-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________360 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________14 Jun 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCC YONGSAN, UNIT #15289

APO AP 96205-5289

UNITED STATES

W91QVN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 755-0638 TEL: FAX:

W91QVN18R0106 19

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W91QVN18R0106

Section A - Solicitation/Contract Form

SUBJECT TO AVAILABLITY OF FUND

“Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Repair Airfield Obstructions

FFP

Project No: SMYU18-1002 Title: Repair Airfield Obstructions at TWY A, F & E, Osan Air Base (AB) (see detailed statement of work and attached drawings)

Contractor shall provide all personnel, labor, tools, equipment materials, supervision, and transportation.

FOB: Destination

PURCHASE REQUEST NUMBER: F3J3CE8081AW01

NET AMT

Section C - Descriptions and Specifications

SOW

TECHNICAL PROVISIONS – I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

SMYU 18-1002 REPAIR AIRFIELD OBSTRUCTIONS Osan Air Base (AB)

AT TAXIWAY ALPHA, ECHO & FOXTROT

1. DESCRIPTION: The work to be performed for completion of this project shall be as described in general below.

1.1. The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications.

1.2. All work shall be completed IAW drawings and specifications.

2. PRINCIPLE FEATURES: This project is K-work (repair) and also includes the following principle features:

SCHEDULE #I, REPAIR (K): All work shall be in accordance with the attached drawings and specifications

2.1. CIVIL WORK:

2.1.1. Provide earth fill on the entire area of parcel ‘B’ with satisfactory materials from off-base earth borrow site. (Approx. 1.5 meter (M) high, 62,010 cubic meter (CM))

- Off-base barrowed soil shall be tested and reported for Total Petroleum Hydrocarbons (TPH) and Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and the soil shall contain less than 100 parts per million (ppm) TPH, less than 1 ppm Benzene, less than 20 ppm Toluene, less than 50 ppm Ethyl Benzene, and less than 15 ppm Xylene. Test frequency shall be complied with Section 31 00 00, O&MA Specification 2015.

2.1.2. Dispose mixed debris and industrial waste disposal from parcel ‘B’ and contractor village in airfield clear zone to appropriately licensed off-base disposal site. Debris consist of concrete debris, industrial waste debris, and general construction debris and all debris are piled with mixed. (Approx. 3,520 CM)

2.1.3. Provide grading and compaction on earth filled area at parcel ‘B’ and submit density report specified per OMA specification Section 31 00 00. (Approx. 62,010 CM)

2.1.4. Replace existing open swale with concrete flume drainage with 40M interval catch basins as indicated in the site plan. (Approx. 400 linear meter (LM))

2.1.5. Provide hydro-seeding on entire graded area of parcel ‘B’, and watering to seeded area. (Approx. 41,340 square meter (SM)

2.1.6. Remove existing roads, concrete pads, and storm ditches in parcel ‘B’. (Approx. 650SM)

2.1.7. Remove existing vertical structures of airfield obstructions in accordance with UFC 3-260-01 and provide seeding in flight line. (Approx. 670SM and 10M height)

2.1.8. Remove existing horizontal structures of airfield obstructions in accordance with UFC 3-260-01.

(Approx. 1,390CM)

2.1.9. Dispose debris and industrial waste from removal of existing vertical/horizontal structures to appropriately licensed off-base disposal site. (Approx. 1,390 CM)

2.1.10 Remove trees in north of runway lateral clearance zone as indicated in the site plan. (Approx. 75ea)

2.1.11. Replace existing concrete open ditch with concrete box culvert near west site of parcel ‘A’ & ‘B’.

Replaced reinforced concrete box culvert shall be connected from existing box culvert end point adjacent parcel ‘A’ gate and be terminated at the base property boundary at north access road of parcel ‘B’ gate. (Approx. 200LM, Section 3.6M X 2.6M @ 3ea at downstream structure dimension.)

- Note: Pyongtaek city’s existing sewage water box culvert (1.0M X 1.0M) currently runs underneath the route of existing concrete open ditch. Replaced concrete box culvert installation work shall require close coordination with Pyongtaek city Sewage Management Official and shall not any damage to Pyongtaek city property by this contract. And main fuel supply pipe managed by Daehan Oil Pipeline Corporation (대한송유관공사) currently runs underneath the existing concrete open ditch that is also required to close coordination.

2.1.12. Provide earth shoring for concrete box culvert work. (Approx. 400LM)

2.1.13. Provide surface inlets on reinforced concrete box culvert with aircraft graded (90,000 pound (lb)) inlet covers and appropriate intervals.

2.1.14. Remove swamp soil from existing natural swale where reinforced concrete box culvert will be replaced.

(Approx. 2,640 CM)

2.1.15. Provide 1.0 M thickness aggregate base course for reinforced concrete box culvert. (Approx. 2,640 CM)

2.1.16. Compact replaced aggregate base course and perform density test in accordance with Section 31 00 00, OMA specification 2015. (Approx. 2,640 CM)

2.1.17. Provide perforated pipe drainage system adjacent to new concrete box culvert. (Approx. 400 LM)

2.1.18. Provide man-proof barriers on new installed reinforced concrete box culvert.

2.1.19. Provide temporary storm drainage and pumping equipment during new box culvert construction.

(Approx. 200LM)

SCHEDULE #II, NEW CONSTRUCTION (L): All work shall be in accordance with the attached drawings and specifications.

None

TECHNICAL PROVISIONS - II

SPECIAL INSTRUCTIONS

PROJECT NO TITLE LOCATION

SMYU 18-1002 REPAIR AIRFIELD OBSTRUCTIONS Osan Air Base (AB)

AT TAXIWAY ALPHA, ECHO & FOXTROT

1. GENERAL: This project shall comply with the “Standard Technical Specifications and Standard Detail Drawings for OMA Projects, Korea” dated 30 November 2015 issued by the Department of the Army, Installation Management Agency, Korea Region Office. The most current specifications (OMA Specification

2015, Revision-1) and standard drawings are available at the Engineering Flight, 51st Civil Engineer Squadron, Osan AB, Unit 2129, APO AP 96278-2129 and also are located on the Web Page http://www.usfk.mil/Resources/ContractingwithUSFK.aspx

2. SPECIAL REQUIREMENTS:

2.1. Government provides 30% of concept design for the contract and contractor shall accomplish and submit “Design Data” with 100% design completion (MATOC WORK PLAN). Following design documents shall be submitted for technical evaluation with the proposal.

2.1.1. Design Data to be submitted

2.1.1.1. Required Design Data

i. Civil:

- Site plan for overall works

- Plan and section for reinforced concrete box culvert

- Profiles of concrete box culvert

- Details for reinforced concrete box culvert

- Demolition site plan for abandon batch plant

- Grading and earth fill plan with ground slope for parcel ‘B’

- Plan and detail for storm drainage for parcel ‘B’

- Temporary storm drainage and pumping plan

2.1.1.2 Offer Breakdown

2.1. All construction equipment and earth transporting vehicles shall be passed and checked through Doolittle gate and new Morin gate. Freezone access to Parcel A and B will not be permitted.

2.2. Military exercises (one week period) are anticipated to occur four (4) times at minimum during construction period. During the exercise, contractor will not be allowed to access the project site. Contractor shall consider these conditions in their proposal.

2.4 The Contractor shall restore to its original or better condition all items or infrastructure damaged as a result of the construction, unless otherwise noted. These items include, but are not limited to pavements, concrete sidewalks and curbs, trees, grass, electrical poles, transformers, and utilities.

2.5 The contractor shall be responsible for verifying the location, size and inverts of all existing utilities and shall protect all such utilities at all times, unless otherwise indicated. Existing utilities whether shown on the drawings or not which have been damaged as a result of the construction work, shall be restored immediately to their original or better condition and shall be paid for by the contractor.

2.6. Whenever connections to existing utilities or where new utilities cross existing utilities are shown, the contractor shall carefully expose the utility by hand excavation to verify their locations and depths prior to excavating trenches for the new utility lines.

2.7. Whenever any change in alignment or conditions for the contract works due to unforeseen conflict, the contractor shall inform the contracting officer immediately for remedial action.

2.8. Site Orientation will be strongly recommended. The contractor acknowledges that it has taken steps necessary to ascertain the nature and location of the works, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost IAW FAR 52.236-3.

3. SECURITY REQUIRMENTS:

3.1 Contractor’s personnel or any representative of the contractor entering installation/base shall abide by all security regulations imposed by Installation Commander or Base Commander at all times and shall be subject to security checks. Contractor’s personnel and property shall be subject to search and seizure upon entering the confines of the installation/base, while on, and upon leaving confines of the installation/base.

3.2 Escort Privileges: The contractor shall be responsible for adhering to the escorting privileges on base passes for the Program Manager, Contract Manager (CM), CQC System Manager, SSHO with a limitation of three (3) persons and one (1) vehicle access per base pass. It is the contractor’s responsibility to ensure that the escorting official has full control over all escorted individuals at all times. Any individual found on the installations unescorted will be removed from the installation or base and the escort officials escorting privileges will be immediately withdrawn. Any individual removed from these installations/bases will not be authorized further access to these installations/bases and may further be subject to other Government actions.

3.3 Return Post/Base Passes: On the contract completion date, the contractor shall turn in all passes to the sponsor that were issued for the contract and final payment will not be made until such items are returned.

APPENDIX “A”

LIST OF DRAWINGS

PROJECT NO TITLE LOCATION

SMYU 18-1002 REPAIR AIRFIELD OBSTRUCTIONS Osan Air Base (AB)

AT TAXIWAY ALPHA, ECHO & FOXTROT

1. GENERAL: The work shall conform to the following contract drawings, all of which form a part of the specifications. Additional sets will be furnished to the contractor. Drawings are available at the 51 Civil Engineer Squadron, Osan AB.

2. Note: See the uploaded Project Drawing in FBO

DWG NO. SHT NO. REF NO. DESCRIPTION

1 OF 3 T-1 COVER SHEET

2 OF 3 C-1 SITE PLAN - 1

3 OF 3 C-2 SITE PLAN – 2

CONTRACT SUBMITTAL REQUIREMENT

MATERIAL APPROVAL SUBMITTALS: Contractor shall have an approved AF Form 3000 for all material which are on the lists in provided “SUBMITTAL REGISTER” that is to be used on this contract.

Note: See the uploaded Submittal Register in FBO

ATOPSEC

1. AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 20 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

2. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

2a. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

2b. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

3. AT Awareness Training for Contractor Personnel Traveling Overseas. This standard language required US based contractor employees and associated sub-contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact.

4. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 calendar days of contract award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 10 calendar days after contract award.

6. For contracts that require a formal OPSEC program. The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer. This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The contractor shall implement OPSEC measures as ordered by the commander. In addition, the contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1.

7. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter. OPSEC training is available at the following website:

http://cdsetrain.dtic.mil/opsec/

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 360 calendar days after Notice of Proceed (NTP). The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section G - Contract Administration Data

Section K - Representations, Certifications and Other Statements of Offerors

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

(a) The offeror certifies that --

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –

(i) Those prices,

(ii) The intention to submit an offer, or

(iii) The methods of factors used to calculate the prices offered:

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --

(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or

(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.

(End of Provision)

5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS

(a) SUBCONTRACTING:

If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.

(b) AFFILIATED OFFERORS:

(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.

(2) Each offeror shall furnish, below, the following information:

(i) Whether the offeror has any affiliates;

(ii) The names and addresses of all affiliates of the offeror; and

(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.

AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)

(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):

Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.

(d) STANDARDS OF CONDUCT CERTIFICATION:

This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.

(i) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(ii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(iii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

Firm ____________________________________________________ Name _____________________________________________________ Signature __________________________________________________

Title _____________________________________________________ Date of Execution ____________________________________________

(e) TAXES:

(1) References:

(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."

(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.

(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.

(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.

(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

This item will be imported specifically for this contract? Yes _____ No _____

(ii) Special Excise Tax:

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

Name of item manufacturer

(iii) Value Added Tax (VAT):

Input VAT on materials purchased for this contract. 10% _____ Input VAT on transportation leased/rented for this contract.10% _____ Input VAT on equipment leased/rented for this contract. 10% _____ Input VAT on services purchased for this contract. 10% _____ Output VAT on total contract amount. 10% _____

(iv) Special Excise (Petroleum) Tax:

No. of U/P

Liters w/o Tax Tax/Unit Total Tax Amount Regular Gasoline ________ (L) ________ w________ w_____________ Premium Gasoline ________ (L) ________ w________ w_____________ Diesel ________ (L) ________ w________ w_____________ Other ________ (L) ________ w________ w_____________

(v) Education Tax.

(3) Name of the oil company from which POL products will be purchased:

Oil Company: _________________________________________ (Name only)

(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.

Signed (Chop)

(f) CERTIFICATIONS AND REPRESENTATIONS

By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation.

The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.

Section L - Instructions, Conditions and Notices to Bidders

INSTRUCTION TO OFFEROR

INSTRUCTIONS: The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215- 1(f)(4).

Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.

SUBMISSION OF PROPOSAL:

FBO SUBMISSION REQUIRED: Offers shall be submitted to Federal Business Opportunities (https://fbo.gov), or if FBO is not available, email to namsun.kim3.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to only FBO server problem not individual failure/problem. All questions should be emailed to namsun.kim3.ln@mail.mil within five (5) days after the solicitation is issued.

CLOSING DATE: The electric offer shall be submitted by 1300 hours on the closing date of RFP.

SUBMISSION REQUIREMENT:

TECHNICAL PROPOSAL: Offeror's Design Data Submittal shall have the drawing(s) which meet “Minimum Requirement for Work Plan”, design data, and other documents indicating offeror’s ability to satisfactorily accomplish the Government design intent and achieves the desired quality end-products. As part of the Design Data Submittal, offeror shall provide drawings and data analysis in accordance with Work Plan SOW.

PRICING PROPOSAL: The pricing proposal must clearly indicate prices for each Contract Line Item Number in Section B - Supplies or Services and Prices.

DETAILED OFFER BREAKDOWN: The detailed offer breakdown must clearly identify all costs that can materially impact the statement of work.

Section K-TAXES: Offerors must complete all tax portions of Section K. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, any proposed exemption of a specific ROK tax shall be legitimate, attributable to the contract, and authorized by the applicable stated references.

Section K-OTHER: Offerors must complete all Non-Tax related portions of SECTION K.

COMPLIANCE WITH SOLICITATION: Failure to submit the above requirements under SECTION L may be grounds for determining the proposal to be non-compliant. For example, if a detailed offer breakdown is not submitted, the contracting officer will be unable to find the offeror's pricing proposal acceptable and the offeror's proposal will be ineligible for award. Non-compliance will only be cured if the government holds discussions as detailed in SECTION L.

No-Offer Letter: If MATOC Contractor is unable to submit the proposal in response to this RFP, the Contractor shall submit a 'No-Offer Letter' by date and time specified in this solicitation.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Date/Time: 7 June 2018/ 0930 hours Place: Doolittle Gate, Osan AFB Point of Contact: Mr. Nam, Sung Nam, (DSN) 784-5227, (Commercial) 0503-384- 5227, (E-mail) sung_nam.nam.kr@us.af.mil

Escort : Any MATOC contractor who needs escort shall be at front of "Doolittle Gate, Osan AFB" on 7 June 2018 by 0920 hrs with Korea identification card, passport or driver license

(주민등록증, 여권 혹은 운전면허증).

Note: Any MATOC contractor who needs escort shall contact with Mr. Nam, Sung Nam, Construction Inspector

(End of provision)

5152.236-4011 CONSTRUCTION PRICE RANGE

Pursuant to FAR 36.204 the estimated price range is between $1,000,000.00 and $5,000,000.

Section M - Evaluation Factors for Award

Electronic offers submitted by 1300 hours on the closing date of RFP shall be considered timely.

EVALUATION CRITERIA

Offeror’s Design Data Submittal shall be evaluated to determine whether an offeror’s proposal demonstrates a clear and adequate understanding of the work to be performed under the contract and to identify any performance risks associated with an offeror’s proposal. Design Data Submittal shall have the drawing(s) which meet “Minimum Requirement for Work Plan”, design data, and other documents indicating offeror’s ability to satisfactorily accomplish the Government design intent and achieves the desired quality end-products. As part of the Design Data Submittal, Offeror shall provide drawings and data analysis in accordance with Work Plan SOW.

The pricing proposal shall be evaluated to determine whether it is complete and reasonable. A complete and reasonable pricing proposal will be deemed acceptable.

The detailed offer breakdown will be used by the contracting officer to determine whether proposed prices are complete and reasonable. A detailed offer breakdown may be used by the contracting officer to determine whether an offeror is able to complete the requirements under the contract, and/or whether discussions will be conducted pursuant to instructions to the offerors.

SECTION K - Representations, Certifications and Other Statements of Offerors

SECTION K-TAXES will be evaluated to determine whether it is complete. In addition, propose exemptions of specific ROK taxes will be evaluated to determine whether they are legitimate, attributable to the contract, authorized, and reasonable. A complete SECTION-K that only proposes exemptions of specific ROK taxes that are legitimate, attributable to the contract, necessary to complete the Task Order, do not improperly overstate any proposed tax exemption, authorized, and reasonable will be deemed acceptable.

SECTION K-OTHER will be evaluated to determine whether it is complete. A complete SECTION K-OTHER will be deemed acceptable.

BASIS FOR AWARD: Award shall be made to the responsible offeror submitting the lowest priced offer that is evaluated as acceptable for all evaluation criteria.