H01._Revised_Drawing_files___172322.pdf
PDF 171 KB Posted
- Attached to
- Repair Pavement near Bldg #504, Cp Casey
- Solicitation number
- W91QVN18R0100
About this file
Revised Drawing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21._Amendment__01_W91QVN-18-R-0100-0001.docx | DOCX document | |
| A21._W91QVN-18-R-0100.docx | DOCX document | |
| H03._Submittal_Register___172322.xlsx | XLSX spreadsheet | |
| H01._Drawing_files___172322.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B C D E F
REPAIR BY REPLACEMENT EXISTING BROKEN
PCC PAVEMENT WITH REINFORCED PCC PAVEMENT
APPROX. 480 SM.
MILL EXISTING AC PAVEMENT AND 75MM THICK AC OVERLAY SEE NOTE ON THIS SHEET
AND DETAIL ON SHEET C-3 APPROX. 1,360 SM. SEE NOTE ON THIS SHEET ---�
--------------------------____ J
I
I I
MILL EXISTING AC SURFACE COURSE 50MM THICK MINIMUM
AND OVERLAY 75 MM THICK AC OVERLAY
TACK COAT WHERE REQUIRED
PRIME COAT
CHECK THE EXISTING BASE COURSE CONDITION
AND CULTIVATE, ADD MORE MATERIAL AND COMPACT
TO KEEP MINIMUM 150MM THICK.
AT LEAST TWO TEST CORES SHOULD BE DRILLED
BEFORE THE WORK BEGINE AT THE CONTRACTOR'S
EXPENSE
EXISTING SUBBASE COURSE
SUBGRADE
TYPICAL SECTION
OPEN CONC DITCH
REPAIR EXISTING BROKEN STONE CURB AND ---�
1.2 M WIDE CONCRETE SIDEWALK.
SCOPE OF WORK
X I
X
OPEN CONc DITCH
O 0
OPEN CONC DITCH
I
I X ·•,, I
L ·..
I
.r=-. ··-...... I
I
1!
I
APPROX. 25 LM.
I \
I I
I ·-----
L--���\
··························--········· .... ·-'Zl . .. . ............. �·-··· ·····-.. , \......... ········-..,.••············--········ . --r: ·-- ··• ........ ······· ........... ,.-··
SITE PLAN
SCHEDULE #1 (MAINTENANCE AND REPAIR : K)
1. PERFORM DENSITY TESTS TO DETERMINED THE LOCATION WHERE NEED TO DO DEEP PATCHING, ESPECIALY FOR THE AREAWHERE DEPRESSED, HEAVILY DEPRESSED,HEAVILY CRACKED OR SUBLAYERS ARE POSSIBILY FAILED IT'S FUNCTION.
2. DEEP PATCHING WORK SHALL BE DONE FOR THE LOCATIONS WHERE REQUIRED BY TEST OR DESIGNATED BY THE COR BEFORE
AC SURFACE COURSE WORK.
3. MILL EXISTING FAILED AC SURFACE COURSE AND OVERLAY AC SURFACE COURSE, MIN. 75 MM THICK AC
OVERLAY. SMOOTH RIDE CONNECTION SHOULD BE APPLIED FOR THE EXISTING STRUCTURES.
4. TACK COAT SHOULD BE APPLIED ON THE EXISTING STRUCTURE SURFACE WHERE MEET THE NEW AC PAVEMENT.
5. RESTORE ALL EXISTING PAVEMENT MARKINGS.
6. REPLACE FAILED PCC PAVEMENT
7. REPLACE DAMAGED CONCRETE SIDEWALK AND GRANITE STONE CURB
NOTE,
THE CONTRACTOR SHALL CONDUC T JOINT INSPECTION
FOR POT HOLES AND PAVEMENT MARKINGS WITH ROAD
AND GROUND BRANCH, OMA DIVISION, DPW AND REPAIR
THE POT HOLE AND OTHER AREAS NEEDS TO BE DEEP
PATCHED PRIOR TO THE AC OVERL AY WORKS BEGINE.
C: I
G
', -.l ;;I . .
\�I•
' _ 11 't, · • _ 4 't, ·
. . ' "'. t,. . .
. t, . • -� . t, " 4 ' 4 ·
. t, ·t,. . t, ·4 .
H
\... . . --i---._ ________ .---�--- ---
SCALE IN METERS
GENERAL NOTES
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AS SHOWN ON THE
DRAWINGS PRIOR TO THE START OF CONSTRUCTION. ANY
DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION
OF THE CONTRACTING OFFICER.
2. THE EXISTING TOPOGRAPHIC INFORMATION SHOWN ON THE DRAWINGS
IS FROM VARIOUS AS-BUil T DRAWINGS FOR FACILITIES AT CAMP CASEY
WHICH WERE CONSTRUCTED OVER THE LAST 20YEARS. THE DATUMS
FOR THESE AS-BUil TS MAY NOT MATCH. THEREFORE THE CONTRACTOR
SHALL PERFORM A COMPLETE SURVEY OF THE WATER LINE ROUTE TO
VERIFY EXISTING CONDITIONS AND ELEVATIONS. MAJOR DISCREPANCIES
SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER.
3. THE CONTRACTOR SHALL RESTORE ALL IMPROVEMENTS, DAMAGED OR
REMOVED AS A RESULT OF CONSTRUCTION TO ITS ORIGINAL OR BETTER
CONDITION, UNLESS OTHERWISE NOTED. THESE ITEMS INCLUDE, BUT
ARE NOT LIMITED TO PAVEMENTS, CONCRETE SIDEWALKS AND CURBS,
AND UTILITIES.
4. THE CONTRACTOR SHALL COORDINATE ALL PHASES OF WORK WITH THE
CONTRACTING OFFICER.
SYMBOL ZONE DESCRIPTION DATE BY CHK'D APVD.
REV ISIONS
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
REVIEWED BY
BLDGS & GROUNDS DESIGNED BY
YICH
UTILJTIES SUBMITTED BY
FIRE & EMERGENCY SVC APPROVED BY
SAFETY CHIEF, ENGR'G DIV
FORCE PROTECTION USING AGENCY
ENVIRONMENT ENERGY MANAGER
UNrT #15707, APO AP 9625a---5707
REPAIR PAVEMENTS, SIDEWALK AND
CURB, NEAR BUILDING S-504
CAMP CASEY
CIVIL
SITE PLAN, NOTE, DETAIL AND
SCOPE OF WORK
PROJECT NO. DRAWING NO.
58477
SCALE
AS SHOWN
SHEET OF
REF NO.
C-2
| C-1 |
| C-2 |
| C-3 |