This performance work statement outlines the requirements for base maintenance services at multiple co-located operating bases for the Department of the Army Materiel Command under solicitation number W91QVN-18-R-0010. Key services include facility maintenance, infrastructure maintenance, environmental protection services, custodial services, grounds maintenance, and non-design engineering support. Acceptable performance standards are defined for over 100 specific tasks covering areas such as storm water management, pavement repair, utility meter tracking, HVAC system maintenance, pest control, and environmental compliance inspections. The contractor must appoint environmental managers and maintain material safety data sheets for all chemicals used.

Attachment 2 - PRS

View the file

Other files

File Type Posted
A21_W91QVN-18-R-0010-0001.pdf PDF
Attachment_4_APPENDIX_I-2_PUBLICATIONS.doc DOC document
Attachment_1_-_ELINs_4th_Option.xls XLS spreadsheet
Attachment_7_APPENDIX_II-5_FACILITY_LISTING_-_GWANGJU.xls XLS spreadsheet
Attachment_11_APPENDIX-VI-HIGH-PRESSURE-VESSEL.xls XLS spreadsheet
Attachment_3_APPENDIX_I-1_DEFINITIONS-ACRONYMS.doc DOC document
Attachment_7_APPENDIX_II-1_FACILITY_LISTING_-_DAEGU.xls XLS spreadsheet
Attachment_15_Contingency_Services.docx DOCX document
Attachment_7_APPENDIX_II-4_FACILITY_LISTING_-_CHONGJU.xls XLS spreadsheet
Attachment_7_APPENDIX_II-2_FACILITY_LISTING_-_GIMHAE.xls XLS spreadsheet
Attachment_9_APPENDIX-IV-CDRL.doc DOC document
Attachment_10_APPENDIX-V-GIS-CONTRACT-DELIVERABLES.doc DOC document
Attachment_7_APPENDIX_II-3_FACILITY_LISTING_-_SUWON.xls XLS spreadsheet
Attachment_14_APPENDIX_IX-IMR.docx DOCX document
Attachment_1__-_ELINs_1st_Option.xls XLS spreadsheet
Attachment_13_APPENDIX_VIII-POL-Breakdown.xls XLS spreadsheet
Attachment_6_APPENDIX_I-4_PACAF_SERVICE_CONTRACT_STANDARDS.PDF PDF
Attachment_12_APPENDIX_VII_Contractor_Funished_equipment,_tools_and_materials_list.xls XLS spreadsheet
Attachment_1__-_ELINs_2nd_Option.xls XLS spreadsheet
A21_W91QVN-18-R-0010.pdf PDF
Attachment_8_APPENDIX_III_GOVT-FURNISHED-PROPERTY.xlsx XLSX spreadsheet
Attachment_1_-_ELINs_Base_Period.xls XLS spreadsheet
Attachment_1_-_ELINs_3rd_Option.xls XLS spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex - Performance Requirements Summary (PRS)

Specific Requirements
Production Control (FO)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.1.1.1.
Recurring Work Program (RWP)
The contractor shall provide a schedule for all required recurring work and preventive maintenance.
· A complete RWP plan and schedule shall be submitted to the BCE for approval within thirty (30) days of the first operational performance date. (1 time / year)

· A monthly schedule of recurring work and preventive maintenance shall be made available to the COR. (1 time / month)

· The contractor shall prepare work/maintenance job plans for existing functions, and equipment and when new equipment is installed, or existing equipment is replaced. The job plans shall be IAW best practices, maintenance specifications detailed in equipment O&M manuals, RS Means Facilities and Maintenance Manual, or equivalent ROK industry standards. (1 time / month)

· All completed recurring work or preventive maintenance including the dates performed and resources consumed shall be documented in the work management systems. (Daily)

· 100% of recurring work and preventive maintenance is placed on a schedule which is available to the COR.

· 100% of recurring work and preventive maintenance job plans shall accurately reflect work requirements for the individual function, equipment, system, or facility.

5.1.2.1.
Real Property Surveys
The contractor shall evaluate the current condition of all assets and identify maintenance, repair, and upgrade requirements.
· The contractor shall conduct facility surveys on all facilities as identified in Appendix II, Facility Listing. (Annual)

· The contractor shall identify and correct all work considered routine direct scheduled work (DSW); submit an AF Form 332 for all other items identified. (Routine)

· 90% of all facilities identified in Appendix II are updated after conducting annual facility surveys

· 90% of identified work during facility surveys is input in ADP system for execution or planning.

Specific Requirements
Customer Support Service (FO)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.1.2.2.
Customer Service
The work reception and customer service shall be provided during normal operations to receive, process, and provide information regarding verbal and written requests for services
The contractor shall during all standard work hours:

· Help customer with work request process in accordance with Air Force Pamphlet 32-1004, Volume 3, 1 Sep 1998 Working in the Operations Flight-Facility Maintenance. (50 times per month)

· Provide a single point of contact for customers to request services and request information. (Maintain POC current)

· Receive work requests for routine, emergency, and urgent facilities repair requests, or other services specified in this solicitation. (7,200/Year)

· Update customers on the status of their work requests. (50 times per month)

· Respond to other customer questions. Requests for customer service may be received via telephone, electronically, in writing, or in person. (50 times per month)

· No more than 2 incorrectly submitted AF Form 332 per month.

· The work reception shall be operated and attended during standard working hours.

· Customers shall receive the service/work order number or a response to questions within 15 minutes of receipt.

· No more than 2 customer complaints per month about work reception.

· All unscheduled work completed IAW 5.1.2.5. Work Categories.

5.1.2.3.
Work Request Management
The contractor shall maintain status of work requests, direct scheduled work, and associated cost data on an ADP system. The contractor shall maintain Maintenance and Repair (M&R) records and summary workload data for all requests.
· The contractor shall input, maintain, and update data in the ADP system approved by COR. If the contractor chooses to use a different system it must be approved by the COR. The government shall be provided full access to the data in the system and the data contained in the system and at contract close out shall be provided to the Government.

· The contractor shall input and update status of all work requests with associated cost data (Daily)

· The contractor shall track all material costs to include where material was used/installed (1 time / month)

· The contractor shall record and document in the ADP system the status of all project work performed by in-house personnel and contract. (Daily)

· 90% of work requests, scheduled work, and work orders shall accurately reflect current status.

· Summary report of in progress and completed work provided by 1st work day of the following week.

· Actual expenditures of resources shall be recorded and reported by 1st work day of the following month.

Specific Requirements
Customer Support Service (FO)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.1.2.5
Work Categories
The contractor shall properly classify all work requests and provide adequate services
· The contractor shall categorize the requirement based on urgency (emergency, urgent, and routine) and classify the requirements either a Direct Scheduled Work (DSW) Job Order or Maintenance and Repair (M&R) Work Order based on the table in PWS 5.1.2.5. (Daily)

· The contractor shall submit AF Form 3000, Material Approval Submittal, with all AF Form 332, Base Civil Engineer Work Request, prior to obtaining approval from the COR and/or Base Civil Engineer (BCE)

· 100% of work requests shall be validated by the Quality Assurance Inspector (QAI)

· 90% of all AF Form 3000s are submitted for review and approval prior to execution of work orders.

· All unscheduled work completed IAW 5.1.2.5. Work Categories.

5.1.2.5.1.
Emergency Work
The contractor shall provide emergency work as required.
· The contractor shall provide on-site response within one (1) hours during normal hours and within two (2) hours during other than normal duty hours. (As required)

· The contractor shall mitigate the emergency as quickly as possible, not to exceed 24 hours. (As required)

· The contractor shall notify the BCE and/or COR promptly upon discovery of significant emergencies and provide periodic updates. (As required)

· Zero (0) discrepancy is allowed for on-site response time specified in the PWS

· Zero (0) discrepancy is allowed for mitigation period.

· BCE and/or COR is notified of the emergency within 1 hour during normal duty hours and within 2 hours during other than normal duty hours.

5.1.2.5.2.
Urgent Work
The contractor shall provide urgent work as required.
· The contractor shall respond to and complete urgent work requests within seven (7) days of receipt. (As required)

· The contractor shall immediately notify QAI, COR, or BCE for work evaluation and approval to proceed. (As required)

· 100% of all urgent work requests shall be completed within 7 days of receipt.

· 100% of all urgent work requests shall be evaluated by QAI, COR, or BCE for approval prior to execution

Specific Requirements
Customer Support Service (FO)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.1.2.5.3.
Routine Work
Coordinate and perform routine direct scheduled work.
· The contractor shall accomplish routine work within thirty (30) days after identification of the requirement. (routine)

· If non-stock material is required, the contractor shall order materials within fourteen (14) days after identification of the requirement and shall complete the work within thirty (30) days of receipt of the material. (As required)

· 90% of all scheduled routine works are completed within thirty (30) days of the work request.

· 90% of all scheduled routine works that were awaiting parts are completed within thirty (30) days of the receipt of the materials.

5.1.3.
Coordinate disruption of services
The contractor shall coordinate all scheduled service disruptions with customers and Quality Assurance Inspector (QAI)
· Scheduled service disruptions shall be coordinated with customers and QAI at least seven (7) calendar days prior to any scheduled outage. (Continuous)
· Failure to coordinate scheduled service disruption is not acceptable at all times.
5.1.4.
Customer Coordination
The contractor shall coordinate routine work and facility inspections with the facility manager, occupant, and/or Republic of Korea (ROK) personnel.
· Coordination with appropriate requesting activity and/or facility manager shall be accomplished no later than 48 hours before work is scheduled. (Daily)

· Any M&R request that cannot be executed within the specified timeframe established in the PWS shall be notified to facility managers and QAI. (Daily)

· All coordination action shall be accomplished no later than 48 hours prior to work execution.

· Delay in 90% of scheduled M&R work without prior notification is not acceptable.

5.1.5.
Work Clearance Permits
The contractor shall develop, implement, and train customers on obtaining base permit procedures. The contractor shall coordinate with ROKAF Civil Engineering for all work request and issue and maintain permits for all excavation and digging requests.
· The contractor shall train customers on AF Form 103, Base Civil Engineer Work Clearance Request, procedures. (As requested)

· All clearance requests in ROKAF-owned area shall be coordinated with ROKAF Civil Engineering personnel. (As requested)

· The contractor shall identify any and all areas scheduled for work that have USAF-owned utility lines/systems present or near the site using standard color-coded marking system. (As requested)

· The contractor shall suspend operations if hazards and/or deficiencies are identified and immediately notify the QAI or Base Civil Engineer (BCE). (As required)

· All AF Form 103 submitted by requestors shall be 100% error-free.

· All clearance requests for ROKAF-owned area shall be coordinated with ROKAF Civil Engineering prior to scheduled work start date.

· All markings of USAF utility line/systems shall be clearly marked on the drawings and shall be error-free.

Specific Requirements
Customer Support Service (FO)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.1.6.
Work History
Maintain a work history and warranty/guarantee information for each facility.
· The contractor shall maintain all facility work history data and warranty/guarantee information in the ADP system. (Daily)

· The contractor shall submit DD Form 1343, Transfer and Acceptance of Military Real Property, to the COR for capitalization for all M&R work exceeding W20,000,000. (As required)

· 90% of all facility work history data (facility status, inspections, M&R, and warranty/guarantee) shall be current in ADP system.

· 100% of DD Form 1354 shall be submitted to the COR for capitalization.

Specific Requirements
Infrastructure (RPM)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.2.1.
Storm Water Systems
The contractor shall maintain USAF-owned storm drainage systems in a proper condition
1. The contractor shall keep storm drainage system free of debris and vegetation overgrowth IAW 607 MMS Storm Water Pollution Prevention Plan. (1 time / week)

1. The contractor shall ensure open drainage ditches and swales shall not impede storm water flow or foster pest breeding habitats. (1 time / week)

1. 90% of the inspected storm drainage system shall be free of debris and vegetation.

1. 90% of inspected open drainage ditched and swales shall not impede storm water flow or foster pest breeding habitats.

5.2.2.
Pavement Management Program
The contractor shall maintain and repair USAF-owned pavements IAW specified regulations and standards in the PWS
1. The contractor shall keep airfield pavement surfaces free of debris to avoid Foreign Object Damage (FOD). (Daily)

1. The contractor shall prevent any form of vegetation from growing in cracks and joints of the pavement. (1 time / semi-annual)

1. The contractor shall repair damaged cracks, spalls, and joints of pavement. (1 time / semi-annual)

1. The contractor shall repair broken sidewalks. (1 time / semi-annual)

1. Airfield pavement shall be free of FOD 100% of the time.

1. 100% of the damaged pavement joint, cracks, and spalls on airfield shall be repaired.

1. 80% of the pavement shall be free of vegetation growing in cracks and joints of pavement.

1. 80% of the damaged pavement joint, cracks, and spalls shall be repaired.

1. 80% of broken sidewalks shall be repaired.

Specific Requirements
Infrastructure (RPM)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.2.4.
Petroleum, Oil, and Lubricant (POL) System
The contractor shall perform all POL Systems operations and maintenance IAW applicable regulations and standards in the PWS
1. The contractor shall wear appropriate Personal Protection Equipment (PPE) during fuel maintenance work. (Daily)

1. The contractor shall perform inspection and testing for all above ground and underground piping and fuel system, and its components. (Annual, semi-annual, quarterly, and monthly)

1. The contractor shall coordinate with COR, QAI, and base fuels office/facility manager at least five (5) calendar days prior to starting any work on petroleum systems. (As required) 1.

1. 100% of the contractor personnel during fuel maintenance work shall wear appropriate PPE.

1. 90% of scheduled periodic testing and inspection.

1. 100% of all petroleum system maintenance and repair work is coordinated 5 calendar days prior to starting the work.

5.2.5.
Cathodic Protection Management Program
The contractor shall inspect, repair, and maintain cathodic protection systems
1. The contractor shall prevent stress corrosion cracking, document equipment status, operations, inspections, maintenance and repair on equipment logs

1. The contractor shall submit work request to repair cathodic protection system if the system requires repair. (As required)

1. 90% of cathodic protection system shall operate at normal condition.

1. Work requests are planned and submitted for review and approval by the COR on time.

5.2.6.
Fuel Recovery System
The contractor shall ensure all fuel recovery functions, systems, and components are inspected, tested, operated, maintained, and repaired
1. The contractor shall operate and maintain recovery wells, inspect associated system components and adjust accordingly. (Daily)

1. The contractor shall operate and maintain observation wells. Take water/fuel level probe readings weekly and flush out of well screens when water is present or as required.

1. The contractor shall inspect, maintain, and repair vapor detectors to ensure proper operation. The contractor shall respond to the affected site after being notified by the ROKAF fire department.

1. Tanks do not overflow and system operates properly

1. 90% of well screens are flushed out when water is present or as required

1. Respond within one (1) hour during duty hours and two (2) hours during non-duty hours.

5.2.7.
Utility Meters
The contractor shall track, document, and report utility consumption
1. The contractor shall submit utility consumption data report for all USAF facilities and tenant units. (Monthly)

1. The contractor shall develop plans to install required new meters. (As required)

1. The contractor shall provide as-required updates and analysis if unusual utility consumption data is detected. (As required)

1. The consumption report is submitted to the 607 MMS energy manager and the COR on time

1. The installation plan shall include at least 90% of facilities at COBs

1. Monthly utility consumption report shall include special analysis report if required.

5.2.8.
Generators
The contractor shall operate, maintain, repair, and overhaul generators.
1. Load test emergency/back-up generators under actual/simulated load for a period identified by Technical Order (TO) standards. (Monthly)

1. The contractor shall submit inventory of emergency generators. (1 time / Annual)

1. Applicable TOs shall be available on site 100% during load test.

1. Annual inventory shall be 100% accurate.

5.2.10
Water Distribution System
The contractor shall assign a Backflow Prevention Manager at each Co-located Operating Bases (COB)
1. The contractor shall provide proper training for assigned backflow prevention manager. (As required)

1. The certified backflow prevention manager shall identify, isolate, survey, record, and correct cross-connections and other potential sources of distribution system contamination. (1 time / semi-annual)

1. All documentation of training and certification is available.

1. Semi-annual program review results are documented and kept on file.

5.2.11.
Oil and Gas Systems
The contractor shall maintain and repair all oil and gas systems
1. The contractor shall maintain and repair oil systems, gas supply, and compressed gas supplying distribution systems.
1. 90% of piping, valves, regulators, and meters shall properly operate.
5.2.12
Exterior Electrical Distribution System
The contractor shall maintain electrical distribution system
1. The contractor shall maintain and repair overhead and underground electrical distribution systems, substations, switching stations, electrical vaults, exterior lights, meters, low voltage electrical wiring, devices, and electrical equipment.
1. No NEC violations.

1. All work performed in accordance with best commercial practices.

5.2.13.
Fencing
The contractor shall maintain and repair fencing on USAF area
1. The contractor shall maintain and repair all existing fencing and any future installation of chain-link, barb wire, metal, block, and word permanent, security, and containment fencing on 607 MMS COBs.

1. The contractor shall perform corrosion control on all existing fencing to prevent further damage.

1. The contractor shall inspect fence line, remove weeds, and accumulation of tumble weeds and debris in all fence areas of the installation

1. Zero (0) security incident due to poor maintenance of fencing.

1. 90% of all fencing shall be rust-free.

1. 90% of all fenced areas are free of weeds and debris.

Specific Requirements
Facility Maintenance (RPM)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.3.1.
Preventive Maintenance Inspection (PMI)
The contractor shall maintain a PMI Recurring Work Program (RWP) for facilities, infrastructure systems, and fire and intrusion detection/alarm systems.
1. The contractor shall perform PMI for facilities, Real Property Installed Equipment (RPIE), and infrastructure systems. (As required)

1. The contractor shall perform PMI for fire and intrusion detection/alarm systems. (As required)

1. 95% completion rates for facilities, RPIE, and infrastructure system.

1. 100% completion rates for fire and intrusion detection/alarm systems.

5.3.2.
Facility Finishes
The contractor shall perform facility finishes for facilities interior and exterior.
1. The contractor shall paint interior and exterior colors IAW Air Force paint and finish schedule defined by Federal Standard 595B.
1. No violation of Federal Standard 595B.
5.3.3.
Plumbing System
The contractor shall inspect, maintain, and repair building plumbing systems
1. The contractor shall inspect, maintain, and repair building plumbing systems and submit work requests to QAI and/or COR for review and approval if repair is needed.

1. NFPA Standards 17 and 17A shall be adhered to when performing this task

1. The contractor shall perform preventive maintenance and inspections of fire suppression systems. If, during performance of the preventive maintenance, a repair is required, the contractor shall request an urgent job order to BCE and/or COR and perform the repair IAW the priority of the job order.

1. 90% of repair work requests are validated and submitted to COR within required 5.1.2.5. Work Categories timeframes.

1. All preventive maintenance is scheduled and performed as scheduled within 30 days from the scheduled start date.

5.3.4.
Heating, Ventilation, and Air Conditioning, and Refrigeration (HVAC/R) Systems
The contractor shall maintain all HVAC systems IAW AFI 32-1069 and applicable manufacturer’s O&M manuals.
1. The contractor shall maintain M&R logs on all operating equipment which will note operator checks and adjustments, and a record file noting normal or abnormal operating conditions, deficiencies or malfunctions, and corrective action taken. All recording charts and required logs shall be filed chronologically and kept in the location(s) as designated by the Government. This information shall be readily available for inspection at all times. (1 time / day)

1. The contractor shall identify any required repair and shall establish appropriate service orders to accomplish and document the repair.

1. Place all systems into operation within 3 workdays of notification from the Government that the heating/cooling season has begun. Notification of cooling/heating season shall be notified by the Government. (2 times / year)

1. The contractor shall inspect and monitor the steam distribution system and check for steam or condensate leaks. The contractor shall open job orders or work orders (as applicable) to identify and control the repair of the steam or condensate lines.

1. 100% of scheduled/unscheduled maintenance and repair records are maintained.

1. All repair requirements are identified and work orders established to complete the repair IAW5.1.2.5. Work Categories .

1. All heating/cooling equipment is operational or shut down by the specified date.

1. The steam distribution system and condensate return system have no leaks.

1. The contractor shall perform an inspection and overhaul of all boilers and heating system equipment during the summer months when the equipment is not in operations. All required repairs shall be identified to the COR. (1 time / year)

1. The contractor shall respond to work that requires planned work orders to perform the repair.

1. The inspection of all boilers are scheduled and completed as scheduled but within 30 days.

1. Requests for work orders shall be reviewed and accepted by the Government.

Specific Requirements
Infrastructure (RPM)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.3.6.
Interior Electric Systems
The contractor shall maintain and repair interior building electrical systems IAW applicable instructions and regulations.
1. The contractor shall maintain and repair cooking appliances, exhaust hoods, and kitchen fire extinguishing systems in base dining facilities IAW NED Code 96.
1. No NEC violations.

1. All work performed in accordance with best commercial practices.

5.3.7.
Roof Systems
The contractor shall provide all services to maintain and repair roofs
1. The types of roofs which shall be maintained include, but is not limited to: Metal, wood, built-up, and EPDM.

1. The contractor shall respond to roof repair service orders.

1. All job/work orders are responded to and completed IAW the priority.

5.3.8.
Fire Protection and Detection Systems
The contractor shall maintain fire protection and detection systems including testing, inspections, and repairs
1. NFPA standards 17 and 17A shall be adhered to when performing this task.

1. The contractor shall perform the fire alarm systems test and inspection IAW RWP approved by the Government. If, during performance of the preventive maintenance, a repair is required, the contractor shall open an urgent job order request for approval and perform the repair IAW the priority of the job order.

1. All preventive maintenance is scheduled and performed as scheduled but within 30 days.

5.3.9.
Hardened Aircraft Shelters (HAS)
The contractor shall maintain and repair HAS/hangar/overhead doors
1. The contractor shall inspect, test, and maintain and repair HAS/hangar/overhead doors.

1. The contractor shall document equipment status operations, inspections, maintenance and repairs on equipment logs.

1. 90% of systems and components in HAS/hangar/overhead doors are operational.

1. 90% of records on equipment logs are accurate and updated.

5.3.10
Revetment and Force Protection Devices
The contractor shall maintain and repair revetments and force protection devices.
1. The contractor shall maintain and repair force protection devices IAW manufacturer’s recommendations.

1. The contractor shall maintain and repair revetments.

1. 90% of all force protection devices are operational.

1. 90% of revetments shall be free of corrosion and show no structural failure.

5.3.11
Locksmith Services
The contractor shall provide all locksmith services.
1. Provide a locksmith (1 time / Annual)

1. Implement and maintain a key control program and perform inventory of the key control log (1 time)

1. Duplicate keys IAW key control program

1. Replace or create keys for padlocks under the contractor’s control.

1. Maintain doors, containers, and vault equipment in a serviceable condition.

1. Change combinations of classified containers and vaults. (As required)

1. Provide emergency service for all lock systems, safes, and vaults 24 hours per day, 7 days per week.

1. Maintain summary workload data regarding non-BMC combination changes, key control, and locksmith service.

1. Repaired lock works and provides same level of security.

1. All job orders are responded to and completed IAW the priority.

1. Key control is maintained IAW key control program.

Specific Requirements
Physical Plant Operations (FO)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.4.1.
Boiler and Unfired Pressure Vessels
The contractor shall provide the necessary services, reports, supplies, and equipment to perform inspection of boilers and High Pressure Vessels (HPV)
1. AFI 32-1068 shall be adhered to when performing this task.

1. The contractor shall perform boiler inspections including types A-E and types VA-VD. Perform type VE inspections at the discretion of the Government and/or the inspector. (48 HPVs / year)

1. The contractor shall perform inventory of all HPVs at COBs (1 time / year)

1. Annual HPV inspection shall be conducted and inspection reports shall be submitted to the COR.

1. 100% annual HPV inventory shall be conducted

5.4.2.
Water Treatment Plant
The contractor shall operate and maintain water treatment plants and distribution equipment
1. The contractor shall respond to work requests to repair the water distribution system. (As required)

1. The contractor shall inspect and clean the interior of water tanks bi-annually. (2 times / year)

1. The contractor shall remove foreign materials and sludge from septic tanks and manholes. (66 hours / month)

1. The contractor shall drain water from oil/water separators, skim oil, and remove sludge. (1 time / month)

1. The contractor shall check oil/water separator for damage, cracks, seepage, or leakage and initiate job order to repair the problem. (As required)

1. The contractor shall clean grease traps quarterly. (4 times / year)

1. Repair requirements are responded to and completed IAW the priority requirements. Repairs completed to meet work standards.

1. Work is scheduled and performed as scheduled within 30 days

1. 90% of septic tanks and manholes are free of foreign materials and sludge.

1. 90% of oil/water separators are operational and free of oil and sludge.

1. Repair requirements are responded to and completed IAW the priority requirements. Repairs completed to meet work standards.

1. Grease traps are cleaned as specified.

Specific Requirements
Civil Engineering Support (FO)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.5.1.
Custodial Services
The contractor shall provide all cleaning tasks for all facilities (except dorm units) owned by USAF
1. The contractor shall perform all custodial services IAW Appendix I-4 PACAF Service Contract Standards.

1. No visible dirt

1. Supplies for restrooms must be stocked at all times

1. Trash receptacles shall never appear full or dirty

1. Mirrors and glass surfaces shall appear clean and streak-free

1. No more than one (1) complaints from occupants of each facility per month

5.5.2.
Grounds Maintenance
The contractor shall provide grounds maintenance services
The contractor shall maintain and repair the installation grounds as indicated in the workload factors of Appendix I-4 and the grounds maintenance maps in Appendix I-3.

1. The contractor shall provide the Grounds Management Plan to the BCE no later than thirty (30) days after the start of the first performance period.

1. The contractor shall inspect and fill pot holes quarterly on all USAF roads. Repair material shall match the surface being repaired. (4 times / year)

1. The contractor shall provide traffic control during road repair projects to maintain safety. (As required)

1. The contractor shall repair and overlay road surfaces with asphalt as directed by work orders

1. Complete plan is submitted on time.

1. No more than 1 customer complaint per quarter

1. No more than 1 customer complaint during each road repair project

1. Requests for work order is responded to on a timely basis, completed IAW the work order, reviewed and accepted by the Government

5.5.2.1.

The contractor shall maintain grass and vegetation
1. The contractor shall maintain grass including seedpods on semi-improved grounds. (1 time / month)

1. The contractor shall provide semi-improved grounds maintenance as indicated in Appendix I-4. (As required)

1. The contractor shall provide unimproved grounds maintenance as indicated in Appendix I-4. (1 time / year)

1. The contractor shall edge sidewalks, driveways, street edges, curbs, and other hard surfaced areas located within the improved grounds

1. The contractor shall trim grass and weeds around trees, shrubs, buildings, fences, poles, fire hydrants, parking lots, bumper blocks, boulders, and other fixed obstacles and temporary obstacles/objects on improved grounds.

1. The contractor shall police up all streets, gates, pads, playgrounds, parks, parking lots, temporary lodging facilities, and common areas.

1. 90% of improved grounds shall be maintained at a height between two (2) and four (4) inches and be uniform in appearance

1. 90% of semi-improved grounds shall be maintained at a height between four (4) and Ten (10) inches and be uniform in appearance

1. 90% of unimproved grounds shall not exceed fourteen (14) inches.

1. 90% of edge grass and vegetation on improved grounds shall be cut back no more than a half (1/2) inch from the surface edge, maintaining an even contour with the edged surface and uniform in appearance.

1. 90% trimmed area shall match surrounding area grass height.

1. 90% of natural debris and man-made debris are removed.

5.5.3.
Snow and Ice Control
The contractor shall provide snow and ice removal services to ensure all paved surfaces are safe and passable
1. The contractor shall implement a Snow and Ice Control Plan to include established routes and priorities and submit plan to 607 MMS/CE for review and approval. (1 time / year)

1. The contractor shall use snow removal equipment on airfield surfaces but shall not allow any metal contact with airfield surfaces.

1. The contractor shall ensure all priority 1 and 2 areas are clear of snow within four (4) hours after the snowfall stops.

1. The contractor shall have priority 3 areas cleared within forty-eight (48) hours after the snowfall stops.

1. Removal of snow and ice plan is accepted by the Government

1. Zero (0) discrepancy of snow removal equipment’s metal contact with airfield surfaces

1. No more than 2 customer complaints on snow removal per month

1. No more than two (2) inches of snow accumulation for priority 1 area

1. No more than five (5) inches of snow accumulation for priority 2 area

Specific Requirements
Civil Engineering Support (FO)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.5.4.
Pest and Animal Control
The contractor shall provide pest control services
1. The contractor shall keep animals from occupying buildings

1. The contractor shall properly dispose of dead/dying animals found in USAF occupied facilities

1. The contractor shall perform periodic rodent, insects (arthropods) inspections in facilities.

1. The contractor shall treat areas with infestations or entrap in areas of infestations

1. The contractor shall respond to work requests generated by facility managers on pest infestations treatment

1. The contractor shall maintain a treatment log, to include type of treatment, number of treatments, and description of the area treated. (1 time /day)

1. The contractor shall provide all chemicals and use only chemicals approved by regulation or an authorized government agency.

1. Animals are kept within 25 feet from buildings

1. Dead/dying animals are properly disposed of within one (1) duty day.

1. No pest infestations are left untreated

1. Work requests are responded to and completed within required timeframes.

1. Logs are accurate and complete

1. All chemicals used shall be approved by 607 MMS CEAN (Environmental Element) prior to commencement of work

5.5.5.
Cranes and Hoists
The contractor shall operate, inspect, and maintain overhead cranes and hoists to include mechanical and electrical components
1. The contractor shall perform operational and load-performance tests to cranes and hoists with a load equal to its rated capacity.
1. Provide certification reports to the COR
5.5.6.
Stockpiles
The contractor shall maintain crushed stone, engineered fill and sane stockpiles
1. The contractor shall segregate stockpiles to prevent contamination and erosion. (As required)
1. 90% of stockpiles shall be free of debris and vegetation
Specific Requirements
Environmental Protection Services (ECP)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.6.1.
Environmental Managers
The contractor shall appoint an environmental manager on each COB to serve as the Environmental Management System (EMS) conduit between 607 MMS/CEAN and their organization
1. The contractor shall appoint an environmental manager on each COB and complete Unit Environmental Coordinate (UEC) training offered by 607 MMS/CEAN.

1. The environmental managers shall attend Cross Functional Team (CFT) Meetings. (As required)

1. All environmental manager appointment letters & UEC training completion certificate are submitted to the COR.

1. 90% attendance in CFT meetings.

5.6.2.
Environmental Compliance Inspections
The contractor shall conduct regular environmental compliance inspections on all contractor occupied facilities and all contractor responsible operations, including subcontractor activities

1. The contractor shall conduct environmental compliance inspections and submit written record of those inspections to the QAP, 607 MMS/CEAN, or authorized Government representative. (4 times / year)

1. The contractor shall maintain all environmental records, paper, and electronic copies, separately from other documents.

1. The contractor shall comply with all existing laws and regulations specified in the PWS

1. The contractor shall report spills or release into the environment to 607 MMS/CEAN and the COR

1. The contractor shall maintain Material Safety Data Sheets (MSDS) for all materials used by the contractor or sub-contractors

1. The contractor shall provide Environmental Plan within 30 days of the contract award

1. 100% of inspection records are submitted on time

1. 90% of all environmental documentations are accurately maintained

1. No violation of applicable laws and regulations

1. Incident is notified to 607 MMS/CEAN and/or the COR within one (1) hour of spill or release

1. 100% of MSDSs are maintained and updated for all chemicals being used

1. Environmental plan is submitted on time and accepted by the Government

5.6.3.
Management Action Plans (MAP)
The contractor shall identify, investigate, and monitor for non-compliant conditions at all USAF facilities on COBs
1. The contractor shall develop a MAP for each BMC-controlled corrective action condition

1. The contractor shall track, correct, and report Environmental Management System discrepancies and non-compliant conditions

1. 90% of corrective action plans are submitted to the Government within fifteen (15) calendar days of notification by the COR

1. 90% of non-compliant conditions are reported to 607 MMS/CEAN and/or the COR within seven (7) days of finding

5.6.4.
Wastewater Management
The contractor shall maintain wastewater collection and distribution system and associated components
1. The contractor shall monitor wastewater systems

1. The contractor shall perform sanitary sewage collection from buildings not connected to a wastewater collection system

1. The contractor shall document equipment status, inspections, maintenance and repairs on equipment logs for a monthly submittal. (1 time / month)

1. All wastewater systems are operational

1. 90% of facilities not connected to a wastewater collection system are maintained

1. Complete monthly logs are submitted to the COR on time

5.6.5.
Storm Water Management
The contractor shall provide storm water management services
1. The contractor shall monitor storm water discharge to ensure pollutants are not washed into the storm water drainage system
1. No environmental mishap
Specific Requirements
Civil Engineering Support (FO)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.6.6.
Polychlorinated Biphenyl (PCB)
The contractor shall perform PCB inspections
1. The contractor shall perform inventory of all PCB items on a quarterly basis. (4 times / year)
1. 100% of PCB containing item are identified on the inventory sheet
5.6.8.
Hazardous Material (HAZMAT) Spill Response
The contractor shall provide HAZMAT spill response services
1. The contractor shall maintain sufficient equipment

1. The contractor shall wear the proper PPE during spills

1. The contractor shall report hazardous substance spills to 607 MMS/CEAN and the COR and submit a spill report.

1. Spill prevention equipment shall be operational at all time

1. No personnel injury/mishap due to improper wear of PPE

1. 100% of spill reports are received within 24 hours

5.6.9.
Hazardous Waste (HAZWASTE) Program
The contractor shall provide HAZWASTE management services
1. The contractor shall track and report waste generation, storage, and disposal.
1. No more than 55 gallons of HAZWASTEs are stored at the HAZWASTE accumulation point
5.6.11.
Storage Tanks
The contractor shall manage all Underground Storage Tanks (UST) and Aboveground Storage Tanks (AST)
1. The contractor shall track compliance/non-compliance conditions.

1. The contractor shall maintain current inventories of all USTs and ASTs at all COBs, to include tanks that are temporary, in-service, and those that are “Out of Service”

1. 90% of compliance/non-compliance conditions are identified

1. Maintain current inventories at 100% accuracy

5.6.13.
Environmental Education and Training
The contractor shall comply with applicable environmental training
1. The contractor shall be trained on Environmental Management System (EMS) as directed by 607 MMS/CEAN

1. The contractor shall document all training and education of AF Form 55 or equivalent form

1. The contractor shall appoint environmental managers on each COB

1. 100% of contractors complete EMS training within 30 calendar days of arrival.

1. 90% of completed training records on AF Form 55

1. 100% of Environmental Manager appointment letters are established and approved

Specific Requirements
Non-Design Engineering Support (FO)
Spec Item
Title
Performance Objective
Related Information
Acceptable Performance Standard
5.7.1.
Reviews
The contractor shall provide engineering support IAW PWS 5.7.
1. The contractor shall provide non-design engineering support services by conducting maintainability and operations reviews on any design affecting facilities and/or infrastructures.

1. The contractor shall provide Computer Aided Drafting (CAD) support to include, but not limited to, preparing drawings for work orders. (As required)

1. 90% of scope of work and specifications are incorporated in the drawings

5.7.2.
Drawing Reproduction
The contractor shall provide drawings reproduction services
1. The contractor shall reproduce full-size drawings (up to and including E size)

1. 100% drawings reproduction requests are delivered within two calendar days upon request

5.7.3.
Base Maps & Facility Plans
The contractor shall maintain as-built files and update the record drawings
1. The contractor shall update the facility record drawings for all real property and real property installed equipment, including a master index of drawings, to include new or changed conditions within three months of completed work.

1. The contractor shall use CAD to maintain and update “As-Built” drawings, Base Comprehensive Plan (BCP) maps including utilities maps.

1. 90% of drawings shall be maintained with the latest, not older than two (2) years, version of CAD format software

1. 90% of “As-Built” drawings are updated as needed

16.7.
Quality Control Guide
The contractor shall provide written control guides should support the major functional area of performance. The control guides will be used by the contractor to collect data, evaluate and document performance against standards associated with each specific requirement. Performance is measured by assessing the required workload quantity in terms of quality and timeliness.
1. A complete listing of all specific PWS requirements by item number and task description.

1. The Quality standard/Performance Threshold(PRS) used to measure successful completion of each task.

1. The lot size that will be used to measure the performance of the task.

1. The timeliness standard based on PRS Table to each measurable requirement.

1. Surveillance method that will be used to evaluate the work.

1. Documentation of the results of the surveillance.

1. 100% inspection