A21_W91QVN-18-R-0010.pdf

PDF 1 MB Posted

Attached to
Base Maintenance
Solicitation number
W91QVN-18-R-0010
Issued by

About this file

This solicitation is for base maintenance services at five air bases in South Korea. The contractor will provide real property maintenance, facility operations, environmental control programs, engineering support, and property management. Key requirements include preventative maintenance, facility repairs, custodial services, grounds upkeep, waste management, and environmental compliance. The period of performance is one month for phase-in followed by a nine-month base period and four 12-month option years. The solicitation identifies minimum experience levels, certifications, and licenses for personnel in positions such as general manager, engineers, and environmental managers. The government will provide facilities, utilities, refuse collection, and communications services, with the contractor furnishing vehicles and equipment.

Solicitation

View the file

Other files

File Type Posted
A21_W91QVN-18-R-0010-0001.pdf PDF
Attachment_4_APPENDIX_I-2_PUBLICATIONS.doc DOC document
Attachment_9_APPENDIX-IV-CDRL.doc DOC document
Attachment_7_APPENDIX_II-2_FACILITY_LISTING_-_GIMHAE.xls XLS spreadsheet
Attachment_13_APPENDIX_VIII-POL-Breakdown.xls XLS spreadsheet
Attachment_1_-_ELINs_4th_Option.xls XLS spreadsheet
Attachment_7_APPENDIX_II-5_FACILITY_LISTING_-_GWANGJU.xls XLS spreadsheet
Attachment_6_APPENDIX_I-4_PACAF_SERVICE_CONTRACT_STANDARDS.PDF PDF
Attachment_12_APPENDIX_VII_Contractor_Funished_equipment,_tools_and_materials_list.xls XLS spreadsheet
Attachment_1__-_ELINs_1st_Option.xls XLS spreadsheet
Attachment_1__-_ELINs_2nd_Option.xls XLS spreadsheet
Attachment_11_APPENDIX-VI-HIGH-PRESSURE-VESSEL.xls XLS spreadsheet
Attachment_7_APPENDIX_II-1_FACILITY_LISTING_-_DAEGU.xls XLS spreadsheet
Attachment_3_APPENDIX_I-1_DEFINITIONS-ACRONYMS.doc DOC document
Attachment_7_APPENDIX_II-4_FACILITY_LISTING_-_CHONGJU.xls XLS spreadsheet
Attachment_15_Contingency_Services.docx DOCX document
Attachment_8_APPENDIX_III_GOVT-FURNISHED-PROPERTY.xlsx XLSX spreadsheet
Attachment_1_-_ELINs_Base_Period.xls XLS spreadsheet
Attachment_2_Annex-PRS.docx DOCX document
Attachment_1_-_ELINs_3rd_Option.xls XLS spreadsheet
Attachment_14_APPENDIX_IX-IMR.docx DOCX document
Attachment_10_APPENDIX-V-GIS-CONTRACT-DELIVERABLES.doc DOC document
Attachment_7_APPENDIX_II-3_FACILITY_LISTING_-_SUWON.xls XLS spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W91QVN-18-R-0010 20-Jul-2018

b. TELEPHONE NUMBER

02-7914-6280

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 06 Sep 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W91QVN9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MS. PAK, KWI-SON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCC YONGSAN, UNIT #15289

APO AP 96205-5289

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE F3J6SG 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

X SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

TEL: (DSN) 766-4259 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$38,500,000

NAICS:

561210

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W91QVN-18-R-0010

Section SF 1449 - CONTINUATION SHEET

AVAILABILITY OF FUNDS

“Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available"

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Real Property Maintenance (RPM)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, and supervision to perform real property maintenance service in accordance with Paragraphs 5.2 (5.2.1 thru 5.2.5 and 5.2.7 thru 5.2.13) and 5.3 of the PWS.

NET AMT

0001AA 9 Months Real Property Maintenance (RPM)

FFP

Daegu Air Base FOB: Destination

0001AB 9 Months Real Property Maintenance (RPM)

FFP

Gimhae Air Base

0001AC 9 Months Real Property Maintenance (RPM)

FFP

Gwangju Air Base

0001AD 9 Months Real Property Maintenance (RPM)

FFP

Suwon Air Base

0001AE 9 Months Real Property Maintenance (RPM)

FFP

Chongju Air Base

Facility Operations (FO)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, and supervision to perform facility operations service in accordance with Paragraphs 5.1, 5.4, 5.5, 5.7 and 5.8 of the PWS.

0002AA 9 Months Facility Operations (FO)

FFP

0002AB 9 Months Facility Operations (FO)

FFP

0002AC 9 Months Facility Operations (FO)

FFP

0002AD 9 Months Facility Operations (FO)

FFP

0002AE 9 Months Facility Operations (FO)

FFP

Environmental Control Program (ECP)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, and supervision to perform environmental control program service in accordance with Paragraphs 5.2.6 and 5.6 of the PWS.

0003AA 9 Months Environmental Control Program (ECP)

FFP

0003AB 9 Months Environmental Control Program (ECP)

FFP

0003AC 9 Months Environmental Control Program (ECP)

FFP

0003AD 9 Months Environmental Control Program (ECP)

FFP

0003AE 9 Months Environmental Control Program (ECP)

FFP

0004 1 Job Contract Data Requirement List (CDRL)

FFP

(Not Separately Priced CLIN.)

Contract Data Requirements List (CDRL) in accordance with Paragraph 21, Attachment 9.

0005 1 Job Contract Management Report (CMR)

FFP

(Firm Fixed Price CLIN).

Accounting for Services Contract requirement must be reported by 30 October of each calendar year during the life of the contract in accordance with Paragraph 19 of the PWS.

NOTE: Not to exceed 20 man hours for data collection and report. UIC:

FB52CX, Organization: 607MMS/CE, Unit #2166, APO AP 96213-2166

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0006 1 Job Direct Scheduled Work (DSW)

FFP

(Requirement CLIN) Direct Scheduled Work (DSW) for projects between W25,000,000 and W500,000,000 IAW paragraph 5.1.2.5 of the PWS with ELIN of Attachment 1.

ELIN items for DSW are specified in Attachment 1.

The contractor shall provide all personnel, equipment, tools, materials, vehicles, and supervision to perform ELINs services in accordance with Paragraph 5.9 of the

PWS.

This CLIN amount must match with Base Year Grand Total of the ELIN items in the Attachment 1.

ESTIMATED

UNIT UNIT PRICE ESTIMATED AMOUNT

Contractor Acquired Parts and Materials

FFP

(Requirement CLIN) Contractor Acquired Parts and Materials to perform Direct Scheduled Work (DSW) specified in PWS 5.1.2.5. and Contingency Exercise and Operation, Paragraph 18 of the PWS.

The contractor shall propose pricing only for parts and material required to perform work associated with CLINs X001, X002 and X003. In the event work on these CLINs require the replacement/ repairing of parts and material, this CLIN will be used. The condition for using this CLIN is that the man hours cannot exceed 50-manhours (labor) or any combination of labor, equipment, parts and material up to

KW 25,000,000.

The contractor shall submit actual cost (without profit) for parts and materials in accordance with the paragraph 5.9. of the PWS. Reasonable material handling charge is allowable.

The Contractor is not required to propose the unit price.

Not to Exceed for Base Year: W860,497,687

0008 1 Months Phase-In Period

FFP

(Firm Fixed Price CLIN) Phase-In Period from 1 - 31 March 2019 in accordance with Para 8.1. of the PWS.

The incumbent contractor should not propose any amount for this CLIN. No phase-in period will be allowed to the incumbent contractor.

OPTION Real Property Maintenance (RPM)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, 1001AA 12 Months OPTION Real Property Maintenance (RPM)

FFP

1001AB 12 Months OPTION Real Property Maintenance (RPM)

FFP

1001AC 12 Months OPTION Real Property Maintenance (RPM)

FFP

1001AD 12 Months OPTION Real Property Maintenance (RPM)

FFP

1001AE 12 Months OPTION Real Property Maintenance (RPM)

FFP

OPTION Facility Operations (FO)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, 1002AA 12 Months OPTION Facility Operations (FO)

FFP

1002AB 12 Months OPTION Facility Operations (FO)

FFP

1002AC 12 Months OPTION Facility Operations (FO)

FFP

1002AD 12 Months OPTION Facility Operations (FO)

FFP

1002AE 12 Months OPTION Facility Operations (FO)

FFP

OPTION Environmental Control Program (ECP)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, 1003AA 12 Months OPTION Environmental Control Program (ECP)

FFP

1003AB 12 Months OPTION Environmental Control Program (ECP)

FFP

1003AC 12 Months OPTION Environmental Control Program (ECP)

FFP

1003AD 12 Months OPTION Environmental Control Program (ECP)

FFP

1003AE 12 Months OPTION Environmental Control Program (ECP)

FFP

1004 1 Job OPTION Contract Data Requirement List (CDRL)

FFP

(Not Separately Priced CLIN.)

1005 1 Job OPTION Contract Management Report (CMR)

FFP

(Firm Fixed Price CLIN).

Accounting for Services Contract requirement must be reported by 30 October of each calendar year during the life of the contract in accordance with Paragraph 19 of the PWS.

NOTE: Not to exceed 20 man hours for data collection and report. UIC:

UNIT UNIT PRICE ESTIMATED AMOUNT

1006 1 Job OPTION Direct Scheduled Work (DSW)

FFP

(Requirement CLIN) Direct Scheduled Work (DSW) for projects between W25,000,000 and W500,000,000 IAW paragraph 5.1.2.5 of the PWS with ELIN of Attachment 1.

ELIN items for DSW are specified in Attachment 1.

The contractor shall provide all personnel, equipment, tools, materials, vehicles, and supervision to perform ELINs services in accordance with Paragraph 5.9 of the

PWS.

This CLIN amount must match with 1st Option Period Grand Total of the ELIN items in the Attachment 1.

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Contractor Acquired Parts and Materials

FFP

(Requirement CLIN) Contractor Acquired Parts and Materials to perform Direct Scheduled Work (DSW) specified in PWS 5.1.2.5. and Contingency Exercise and Operation, Paragraph 18 of the PWS.

The contractor shall propose pricing only for parts and material required to perform work associated with CLINs X001, X002 and X003. In the event work on these CLINs require the replacement/ repairing of parts and material, this CLIN will be used. The condition for using this CLIN is that the man hours cannot exceed 50-manhours (labor) or any combination of labor, equipment, parts and material up to

KW 25,000,000.

The contractor shall submit actual cost (without profit) for parts and materials in accordance with the paragraph 5.9. of the PWS. Reasonable material handling charge is allowable.

Not to Exceed for 1st Option Period: W880,633,333

OPTION Real Property Maintenance (RPM)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, 2001AA 12 Months OPTION Real Property Maintenance (RPM)

FFP

2001AB 12 Months OPTION Real Property Maintenance (RPM)

FFP

2001AC 12 Months OPTION Real Property Maintenance (RPM)

FFP

2001AD 12 Months OPTION Real Property Maintenance (RPM)

FFP

2001AE 12 Months OPTION Real Property Maintenance (RPM)

FFP

OPTION Facility Operations (FO)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, 2002AA 12 Months OPTION Facility Operations (FO)

FFP

2002AB 12 Months OPTION Facility Operations (FO)

FFP

2002AC 12 Months OPTION Facility Operations (FO)

FFP

2002AD 12 Months OPTION Facility Operations (FO)

FFP

2002AE 12 Months OPTION Facility Operations (FO)

FFP

OPTION Environmental Control Program (ECP)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, 2003AA 12 Months OPTION Environmental Control Program (ECP)

FFP

2003AB 12 Months OPTION Environmental Control Program (ECP)

FFP

2003AC 12 Months OPTION Environmental Control Program (ECP)

FFP

2003AD 12 Months OPTION Environmental Control Program (ECP)

FFP

2003AE 12 Months OPTION Environmental Control Program (ECP)

FFP

2004 1 Job OPTION Contract Data Requirement List (CDRL)

FFP

(Not Separately Priced CLIN.)

2005 1 Job OPTION Contract Management Report (CMR)

FFP

(Firm Fixed Price CLIN).

Accounting for Services Contract requirement must be reported by 30 October of each calendar year during the life of the contract in accordance with Paragraph 19 of the PWS.

NOTE: Not to exceed 20 man hours for data collection and report. UIC:

UNIT UNIT PRICE ESTIMATED AMOUNT

2006 1 Job OPTION Direct Scheduled Work (DSW)

FFP

(Requirement CLIN) Direct Scheduled Work (DSW) for projects between W25,000,000 and W500,000,000 IAW paragraph 5.1.2.5 of the PWS with ELIN of Attachment 1.

ELIN items for DSW are specified in Attachment 1.

The contractor shall provide all personnel, equipment, tools, materials, vehicles, and supervision to perform ELINs services in accordance with Paragraph 5.9 of the

PWS.

This CLIN amount must match with 2nd Option Period Grand Total of the ELIN

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Contractor Acquired Parts and Materials

FFP

(Requirement CLIN) Contractor Acquired Parts and Materials to perform Direct Scheduled Work (DSW) specified in PWS 5.1.2.5. and Contingency Exercise and Operation, Paragraph 18 of the PWS.

The contractor shall propose pricing only for parts and material required to perform work associated with CLINs X001, X002 and X003. In the event work on these CLINs require the replacement/ repairing of parts and material, this CLIN will be used. The condition for using this CLIN is that the man hours cannot exceed 50-manhours (labor) or any combination of labor, equipment, parts and material up to

KW 25,000,000.

The contractor shall submit actual cost (without profit) for parts and materials in accordance with the paragraph 5.9. of the PWS. Reasonable material handling charge is allowable.

Not to Exceed for 2nd Option Period: W901,240,153

OPTION Real Property Maintenance (RPM)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, 3001AA 12 Months OPTION Real Property Maintenance (RPM)

FFP

3001AB 12 Months OPTION Real Property Maintenance (RPM)

FFP

3001AC 12 Months OPTION Real Property Maintenance (RPM)

FFP

3001AD 12 Months OPTION Real Property Maintenance (RPM)

FFP

3001AE 12 Months OPTION Real Property Maintenance (RPM)

FFP

OPTION Facility Operations (FO)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, 3002AA 12 Months OPTION Facility Operations (FO)

FFP

3002AB 12 Months OPTION Facility Operations (FO)

FFP

3002AC 12 Months OPTION Facility Operations (FO)

FFP

3002AD 12 Months OPTION Facility Operations (FO)

FFP

3002AE 12 Months OPTION Facility Operations (FO)

FFP

OPTION Environmental Control Program (ECP)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, 3003AA 12 Months OPTION Environmental Control Program (ECP)

FFP

3003AB 12 Months OPTION Environmental Control Program (ECP)

FFP

3003AC 12 Months OPTION Environmental Control Program (ECP)

FFP

3003AD 12 Months OPTION Environmental Control Program (ECP)

FFP

3003AE 12 Months OPTION Environmental Control Program (ECP)

FFP

3004 1 Job OPTION Contract Data Requirement List (CDRL)

FFP

(Not Separately Priced CLIN.)

3005 1 Job OPTION Contract Management Report (CMR)

FFP

(Firm Fixed Price CLIN).

Accounting for Services Contract requirement must be reported by 30 October of each calendar year during the life of the contract in accordance with Paragraph 19 of the PWS.

NOTE: Not to exceed 20 man hours for data collection and report. UIC:

UNIT UNIT PRICE ESTIMATED AMOUNT

3006 1 Job OPTION Direct Scheduled Work (DSW)

FFP

(Requirement CLIN) Direct Scheduled Work (DSW) for projects between W25,000,000 and W500,000,000 IAW paragraph 5.1.2.5 of the PWS with ELIN of Attachment 1.

ELIN items for DSW are specified in Attachment 1.

The contractor shall provide all personnel, equipment, tools, materials, vehicles, and supervision to perform ELINs services in accordance with Paragraph 5.9 of the

PWS.

This CLIN amount must match with 3rd Option Period Grand Total of the ELIN

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Contractor Acquired Parts and Materials

FFP

(Requirement CLIN) Contractor Acquired Parts and Materials to perform Direct Scheduled Work (DSW) specified in PWS 5.1.2.5. and Contingency Exercise and Operation, Paragraph 18 of the PWS.

The contractor shall propose pricing only for parts and material required to perform work associated with CLINs X001, X002 and X003. In the event work on these CLINs require the replacement/ repairing of parts and material, this CLIN will be used. The condition for using this CLIN is that the man hours cannot exceed 50-manhours (labor) or any combination of labor, equipment, parts and material up to

KW 25,000,000.

The contractor shall submit actual cost (without profit) for parts and materials in accordance with the paragraph 5.9. of the PWS. Reasonable material handling charge is allowable.

Not to Exceed for 3rd Option Period: W922,329,173

OPTION Real Property Maintenance (RPM)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, 4001AA 12 Months OPTION Real Property Maintenance (RPM)

FFP

4001AB 12 Months OPTION Real Property Maintenance (RPM)

FFP

4001AC 12 Months OPTION Real Property Maintenance (RPM)

FFP

4001AD 12 Months OPTION Real Property Maintenance (RPM)

FFP

4001AE 12 Months OPTION Real Property Maintenance (RPM)

FFP

OPTION Facility Operations (FO)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, 4002AA 12 Months OPTION Facility Operations (FO)

FFP

4002AB 12 Months OPTION Facility Operations (FO)

FFP

4002AC 12 Months OPTION Facility Operations (FO)

FFP

4002AD 12 Months OPTION Facility Operations (FO)

FFP

4002AE 12 Months OPTION Facility Operations (FO)

FFP

OPTION Environmental Control Program (ECP)

FFP

(Firm Fixed Price CLIN).

The contractor shall provide all personnel, equipment, tools, materials, vehicles, 4003AA 12 Months OPTION Environmental Control Program (ECP)

FFP

4003AB 12 Months OPTION Environmental Control Program (ECP)

FFP

4003AC 12 Months OPTION Environmental Control Program (ECP)

FFP

4003AD 12 Months OPTION Environmental Control Program (ECP)

FFP

4003AE 12 Months OPTION Environmental Control Program (ECP)

FFP

4004 1 Job OPTION Contract Data Requirement List (CDRL)

FFP

(Not Separately Priced CLIN.)

4005 1 Job OPTION Contract Management Report (CMR)

FFP

(Firm Fixed Price CLIN).

Accounting for Services Contract requirement must be reported by 30 October of each calendar year during the life of the contract in accordance with Paragraph 19 of the PWS.

NOTE: Not to exceed 20 man hours for data collection and report. UIC:

UNIT UNIT PRICE ESTIMATED AMOUNT

4006 1 Job OPTION Direct Scheduled Work (DSW)

FFP

(Requirement CLIN) Direct Scheduled Work (DSW) for projects between W25,000,000 and W500,000,000 IAW paragraph 5.1.2.5 of the PWS with ELIN of Attachment 1.

ELIN items for DSW are specified in Attachment 1.

The contractor shall provide all personnel, equipment, tools, materials, vehicles, and supervision to perform ELINs services in accordance with Paragraph 5.9 of the

PWS.

This CLIN amount must match with 4th Option Period Grand Total of the ELIN

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Contractor Acquired Parts and Materials

FFP

(Requirement CLIN) Contractor Acquired Parts and Materials to perform Direct Scheduled Work (DSW) specified in PWS 5.1.2.5. and Contingency Exercise and Operation, Paragraph 18 of the PWS.

The contractor shall propose pricing only for parts and material required to perform work associated with CLINs X001, X002 and X003. In the event work on these CLINs require the replacement/ repairing of parts and material, this CLIN will be used. The condition for using this CLIN is that the man hours cannot exceed 50-manhours (labor) or any combination of labor, equipment, parts and material up to

KW 25,000,000.

The contractor shall submit actual cost (without profit) for parts and materials in accordance with the paragraph 5.9. of the PWS. Reasonable material handling charge is allowable.

Not to Exceed for 4th Option Period: W943,911,675

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0001AA POP 01-APR-2019 TO

31-DEC-2019

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

F3J6SG

0001AB POP 01-APR-2019 TO

31-DEC-2019

N/A (SAME AS PREVIOUS LOCATION)

0001AC POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0001AD POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0001AE POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0002 N/A N/A N/A N/A

0002AA POP 01-APR-2019 TO

31-DEC-2019

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

0002AB POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0002AC POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0002AD POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0002AE POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0003 N/A N/A N/A N/A

0003AA POP 01-APR-2019 TO

31-DEC-2019

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

0003AB POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0003AC POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0003AD POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0003AE POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 01-APR-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 N/A N/A N/A N/A

0008 POP 01-MAR-2019 TO

31-MAR-2019

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

1001 N/A N/A N/A N/A

1001AA POP 01-JAN-2020 TO

31-DEC-2020

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

1001AB POP 01-JAN-2020 TO

31-DEC-2020

N/A (SAME AS PREVIOUS LOCATION)

1001AC POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1001AD POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1001AE POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1002 N/A N/A N/A N/A

1002AA POP 01-JAN-2020 TO

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

1002AB POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1002AC POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1002AD POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1002AE POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 N/A N/A N/A N/A

1003AA POP 01-JAN-2020 TO

31-DEC-2020

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

1003AB POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1003AC POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1003AD POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1003AE POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1005 POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1006 POP 01-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1007 N/A N/A N/A N/A

2001 N/A N/A N/A N/A

2001AA POP 01-JAN-2021 TO

31-DEC-2021

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

2001AB POP 01-JAN-2021 TO

31-DEC-2021

N/A (SAME AS PREVIOUS LOCATION)

2001AC POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2001AD POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2001AE POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2002 N/A N/A N/A N/A

2002AA POP 01-JAN-2021 TO

31-DEC-2021

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

2002AB POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2002AC POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2002AD POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2002AE POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 N/A N/A N/A N/A

2003AA POP 01-JAN-2021 TO

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

2003AB POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2003AC POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2003AD POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2003AE POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2004 POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2005 POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2006 POP 01-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2007 N/A N/A N/A N/A

3001 N/A N/A N/A N/A

3001AA POP 01-JAN-2022 TO

31-DEC-2022

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

3001AB POP 01-JAN-2022 TO

31-DEC-2022

N/A (SAME AS PREVIOUS LOCATION)

3001AC POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3001AD POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3001AE POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3002 N/A N/A N/A N/A

3002AA POP 01-JAN-2022 TO

31-DEC-2022

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

3002AB POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3002AC POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3002AD POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3002AE POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3003 N/A N/A N/A N/A

3003AA POP 01-JAN-2022 TO

31-DEC-2022

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

3003AB POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3003AC POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3003AD POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3003AE POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3004 POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3005 POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3006 POP 01-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3007 N/A N/A N/A N/A

4001 N/A N/A N/A N/A

4001AA POP 01-JAN-2023 TO

31-DEC-2023

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

4001AB POP 01-JAN-2023 TO

31-DEC-2023

N/A (SAME AS PREVIOUS LOCATION)

4001AC POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4001AD POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4001AE POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4002 N/A N/A N/A N/A

4002AA POP 01-JAN-2023 TO

31-DEC-2023

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

4002AB POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4002AC POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4002AD POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4002AE POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4003 N/A N/A N/A N/A

4003AA POP 01-JAN-2023 TO

31-DEC-2023

N/A 607TH MMS (PACAF)

MR. YI TU CHAE

CIVIL ENGINEER OPERATIONS

DAEGU AIR BASE, ROK

UNIT #2166

APO AP 96213-2166

UNITED STATES

(DSN) 766-4259

4003AB POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4003AC POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4003AD POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4003AE POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4004 POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4005 POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4006 POP 01-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4007 N/A N/A N/A N/A

PWS

BASE MAINTENANCE CONTRACT (BMC)

TABLE OF CONTENTS

1. General Information

2. Definitions

3. Government Furnished Property and Services

4. Contractor-Furnished Items and Services

5. Specific Tasks

5.1. Production Control (Under Facility Operation (FO))

5.1.1. Maintenance Engineering

5.1.2. Work Requests

5.1.3. Disruption of Services

5.1.4. Customer Coordination

5.1.5. Work Clearance Permits

5.1.6. Work History

5.2. Infrastructure (Under Real Property Maintenance (RPM)

5.2.1. Storm Water Systems

5.2.2. Pavement Management Program

5.2.3. Airfield Lighting Systems

5.2.4. Petroleum, Oil, and Lubricant (POL) Systems

5.2.5. Cathodic Protection Management Program

5.2.6. Fuel Recovery Systems (Under Environmental Protection Services (ECP))

5.2.7. Utility Meters

5.2.8. Generators

5.2.9. Signage

5.2.10. Water Distribution Systems

5.2.11. Oil and Gas Systems

5.2.12. Exterior Electrical Distribution Systems

5.2.13. Fencing

5.3. Facility Maintenance (Under RPM)

5.3.1. Preventive Maintenance Inspections

5.3.2. Facility Finishes

5.3.3. Plumbing Systems

5.3.4. Heating, Ventilation, and Air Conditioning Systems

5.3.5. Collective Protections Systems (CPS)

5.3.6. Interior Electrical Systems

5.3.7. Roof Systems

5.3.8. Fire Protection and Detection Systems

5.3.9. Hardened Aircraft Shelters (HAS)

5.3.10. Revetments and Force Protection Devices

5.3.11. Locksmith Services

5.4. Physical Plant Operations (Under FO)

5.4.1. Boiler and Unfired Pressure Vessels

5.4.2. Water Treatment Plants

5.5. Civil Engineering Support (Under FO)

5.5.1. Custodial Services

5.5.2. Grounds Maintenance

5.5.3. Snow and Ice Control

5.5.4. Pest and Animal Control

5.5.5. Cranes and Hoists

5.5.6. Stockpiles

5.6. Environmental Protection Services (ECP)

5.6.1. Environmental Managers

5.6.2. Environmental Compliance Inspections

5.6.3. Management Action Plans

5.6.4. Wastewater Management

5.6.5. Storm water Management

5.6.6. Polychlorinated Biphenyl (PCB)

5.6.7. HAZMAT Program

5.6.8. HAMAT Spill Response

5.6.9. Hazardous Waste Program

5.6.10. Pollution Prevention

5.6.11. Storage Tanks

5.6.12. Conservation

5.6.13. Environmental Education and Training

5.7. Non-Design Engineering Support (Under FO)

5.7.1. Reviews

5.7.2. Drawing Reproduction

5.7.3. Base Maps & Facility Plans

5.8. Real Property Management (Under FO)

5.8.1. Facility Management

5.8.2. Real Property Accountability

5.8.3. Warrantee/Guarantee

5.8.4. Property Inventory

5.8.5. Facility Records

5.9. Contractor Acquired Parts and Materials

6. Hours of Operation.

7. Safety Requirements.

8. Phase-in/Phase-out.

9. Performance Requirements Summary.

10. US Government Organization for Contract Surveillance.

11. Annual Plans.

12. Physical Security.

13. Key and Lock Control.

14. US Government Observations.

15. Reporting Accidents.

16. Quality Control Plan.

17. Conservation of Utilities.

18. Contingency Exercises and Operations.

19. Accounting for Contract Services.

20. Antiterrorism (AT) and Operations Security (OPSEC)

21. List of Attachments

PERFORMANCE WORK STATEMENT

1. GENERAL INFORMATION.

1.1. Description of Services. The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, (except as specified in Paragraph 3 and Appendix III as government-furnished property and services.), and other items and services necessary to perform all civil engineering services, tasks and functions for Cheong-Ju, Daegu, Gimhae, Gwang-Ju, and Suwon Air Bases as defined in this Performance Work Statement (PWS). The contractor shall provide guidance and coordination for base civil engineer functions to ensure effective and economical operation of all activities. This includes customer support services, infrastructure maintenance, facility maintenance, physical plant operations, civil engineering support, environmental protection services, engineering support, and property management. Because work required under this PWS is typical in the commercial industry, all work shall be performed to industry standards and manufacturers’ recommendations. The contractor shall complete a government furnished equipment inventory with a Government representative within 90 calendar days after the contract start date. This inventory will become the government furnished materials list for the contract. The desired outcomes of the contractor’s efforts for these requirements are:

• All PWS requirements satisfied with properly trained and certified (as required) personnel.

• No environmental violations or regulatory actions against the installation.

• Effective and reliable Information Management for Civil Engineer services.

• Project programming, plans, and programs that meet the needs of government and mission partner organizations.

• Architectural and engineering services* that provide the installation with quality facilities and infrastructure and meet mission requirements.

• Managed projects that are on time, within budget, and comply with Air Force and installation standards.

• Geographic Information System and Computer Aided Design and Drafting drawings are current.

• Accurate and comprehensive real property records and documentation.

• Energy consumption and usage reduction measures are tracked and analyzed monthly.

• Accountable Furnishings Management.

• Comprehensive and responsive service calls operations management.

• Facilities are fully operational to meet mission requirements.

• Installation utility and infrastructure system are fully operational to meet mission requirements.

• Efficient and cost effective maintenance of facilities and property.

• Heating Ventilation Air Conditioning (HVAC), Electrical, Plumbing, and Structural systems in all facilities are properly maintained.

• Flight line is available for operational mission.

• Equipment and systems are maintained to sustain an operational capability.

• Installation grounds display a neat and professional appearance.

• Installation quality of life protected through effective pest management.

• Continuity of services during phase in / phase out periods of performance.

• 90% or higher customer satisfaction rating for all work performed under this PWS.

NOTE*: Any reference in this PWS to architectural and engineering services as defined in 40 U.S.C. 1102, FAR 2.101 and FAR 36.601-4(a) are out of the scope of this contract. The contractor shall not be required to perform such services.

In general, the Government will provide the Contractor with as-built drawings (both hard copy and AutoCAD file) including O&M manuals for projects done by the 607MMS/CE programming section. Also the Government will provide the contractor with base maps (GEOBASE) if needed. In addition, all drawings for work orders that are drafted by the contractor are shop drawings and are not considered as A&E services. If a detailed design is required, 607 MMS/CE provides all necessary drawings. In conclusion, the contractor’s scope of work is exclusively limited to NON-design engineering support.

1.2. Period of Performance. Period of Performance: The period of performance shall be for one (1) Month Phase-In Period with nine (9) Months Base Period and four (4) 12-month option years. The Period of Performance reads as follows:

Phase-In 1 Mar 2019 - 31 Mar 2019

Base Year 1 Apr 2019 - 31 Dec 2019

1st Option 1 Jan 2020 - 31 Dec 2020

2nd Option 1 Jan 2021 - 31 Dec 2021

3rd Option 1 Jan 2022 - 31 Dec 2022

4th Option 1 Jan 2023 - 31 Dec 2023

1.3. Special Expertise.

1.3.1. Prime Contractor’s Prior Experience and License. The contractor shall have at least three (3) years experience within the last ten (10) years in facility maintenance including electrical, mechanical, and real property management, and environmental protection services for the same or similar services. The contractor shall possess registered license in Facilities Maintenance and Management (시설물 유지관리 공사업) and Electrical Systems Repair (전기 공사업) issued by ROK government. Additional registered licenses that may be substituted by Subcontractors providing proof of registered licenses in Mechanical Systems Repair (기계설비 공사업) and Fire Protection Systems Management (소방시설 관리업) issued by ROK government. All registered licenses shall be current.

1.3.2. Personnel/Key Personnel:

1.3.2.1. Definition: “Key Personnel” means employees of the Prime Contractor that are considered to be essential to the work being performed under this contract. Key Personnel are as follows: General Contract Manager, Supervisory Engineer, Site Managers, Quality Control Managers, Site Engineers, and Environmental Manager.

1.3.2.2. Before removing, replacing, or diverting any of the listed or specified key personnel, the Contractor shall:

(1) Notify the Contracting Officer reasonably in advance (30 calendar days is considered reasonable);

(2) Submit justification (including proposed substitutions with resumes of equal qualifications) in sufficient detail to permit evaluation of the impact on this contract; and

(3) Obtain the Contracting Officer's written approval. Notwithstanding the foregoing, if the Contractor deems immediate removal or suspension of any member of its management team is necessary to fulfill its obligation to maintain satisfactory standards of employee competency, conduct, and integrity under the clause at 48 CFR 970.5203–3, Contractor's Organization, the Contractor may remove or suspend such person at once, although the Contractor shall notify the Contracting Officer prior to or concurrently with such action.

1.3.2.3. The list of key personnel may, with the consent of the contracting parties, be amended from time to time during the course of the contract to add or delete personnel so long as the aforementioned items are addressed.

1.3.2.4. General Contract Manager (GCM): The Contractor shall provide a GCM who shall be responsible for the performance of this work. The GCM shall have full responsibility to act for the Contractor on all contract matters relating to daily operations of this contract. The GCM shall be able to read, write, speak, and understand English and use English to conduct business.

1.3.2.4.1.The GCM shall have at least three (3) years experience as a GCM or equivalent position within the last ten (10) years in facility maintenance and repair field.

1.3.2.4.2. The GCM shall be available within 30 minutes during normal duty hours from Monday through Friday to meet with the Contracting Officer’s Representative (COR) to discuss work related issues. After normal duty hours, the GCM shall be available within 2 hours, 24 hours a day, and seven days a week for emergency purposes. The GCM shall be available by cell phone and shall provide their cell phone number to the Contracting Officer and COR.

1.3.2.5. Supervisory Engineer (SE): The contractor shall provide a supervisory engineer who shall be responsible for supervising the work of engineers and managing emergency, urgent, and routine job orders, Infrequent Maintenance &Repair (IM&R), safety program and facility operations which require engineering review IAW applicable regulations and standards. The SE shall be able to read, write, speak, and understand English and use English to conduct business.

1.3.2.5.1. The SE shall have a four (4) years engineering degree or higher in Architectural Engineering, Civil Engineering, Mechanical Engineering or Electrical Engineering from an accredited college or university and registered Professional Engineer (기술사) or Registered

Architect (건축사) issue by Human Resources Development Service of Korea

(한국산업인력공단) or the jurisdiction of the licensing board for the state, district, or country (https://www.nspe.org/ resources/licensure). Certificates shall be provided a copy of certificate(s) which indicate accredited University/College degrees held and a copy of the engineering license.

1.3.2.5.2. The SE shall act as alternate GCM in case the GCM is absent for any reason.

1.3.2.6. Site Manager (SM): The contractor shall provide a Site Manager for each site (Daegu, Gimhae, Kwangju and Suwon). Cheongju shall be covered by the Suwon SM. The SM shall be responsible for the performance of the work under this contract. The SM shall have full authority to act for the contractor on all matters relating to daily operation of this contract. The SM shall physically respond to any problem site location within one (1) hour of notification.

1.3.2.6.1. The SM shall have at least three (3) years experience as a site manager or equivalent position within the last ten (10) years in facility maintenance and repair field. The SM shall be able to read, write, speak, and understand English and use English to conduct business.

1.3.2.7. Quality Control/Safety Manager (QC): The contractor shall provide a quality control/safety managers for each site (Daegu, Gwangju, and Suwon). Cheongju shall be covered by Suwon QC and Gimhae shall be covered by Daegu QC. The QC shall be responsible for ensuring all works are performed IAW regulations and standards specified within this PWS. QC shall also act as site safety manager who is responsible maintaining safety programs IAW Occupational Safety and Health Administration (OSHA) laws and regulations.

1.3.2.7.1. QC shall have at least three (3) years experience as a quality control/QC manager of similar position within the last ten (10) years in facility maintenance and repair field. The QC shall be able to read, write, speak, and understand English and use English to conduct business.

1.3.2.7.2. QC shall have technician license in Industrial Quality Control (품질경영산업기사) issued by ROK government.

1.3.2.8. Site Engineer: The contractor shall provide a site engineer for each site (Daegu, Suwon, and Gwangju). The site engineer for Suwon shall cover Cheongju and the site engineer for Daegu shall cover Gimhae. The Site Engineers shall provide engineering support including site surveys and preparation of cost estimates, drawings, and scope of work for maintenance and repair (M&R) work requests. Also, Site Engineers shall conduct periodic facility/equipment condition surveys to prepare planned work order packages.

1.3.2.8.1. The Site Engineers shall have at least three (3) years experience as an engineer within the last ten (10) years in facility maintenance and repair field. The Site Engineers shall be able to read, write, speak, and understand English and use English to conduct business.

1.3.2.8.2. Site Engineers shall possess a four (4) year engineering degree or higher in Architectural Engineering, Civil Engineering, Mechanical Engineering, or Electrical Engineering from an accredited college or university and 1st class engineering license (기사 자격증) issued by ROK government.

1.3.2.9. Environmental Manager (EM). The contractor shall identify a person who shall be responsible for all environmental issues affecting the performance of this contract. The contractor shall provide an environmental manager for each site (Daegu, Suwon, and Gwangju).

The environmental manager for Suwon shall cover Chongju and the environmental manager for Daegu shall cover Gimhae.

1.3.2.9.1. This person shall have at least three (3) years experience within the last ten (10) years managing environmental issues. The EM shall be able to read, write, speak, and understand English and use English to conduct business.

1.3.2.9.1. EMs shall provide a certified copy of four (4) year engineering degree or higher in Environmental Engineering or relevant 1st class engineering license in Waste Treatment Engineering (폐기물 처리기사) issued by ROK government. Environmental managers shall comply with Korean and US environmental laws and applicable regulations and standards including USFK Pamphlet 201-1, Overseas Environmental Baseline Guidance Document (OEBGD), Executive Orders (Eos), and Air Force Instructions.

1.3.3. Additional Certified/Licensed Positions. The positions identified below require specialized certifications/licenses in order to perform the identified functions. Contractor employees shall have required current and valid professional certifications to accomplish the services of the PWS in compliance with all Federal, State, and local laws before starting work under this contract. The Contractor shall provide to the COR, in writing, requests for approval of non-licensed/non-certified contractor employees to work technical areas of this contract, to include proof of compliance with Federal, State, and local laws.

1.3.3.1. Electrical Technician(s). The Electrical technicians shall possess technician licenses issued by ROK Government in electrical repair (전기 기능사 자격증) with at least three (3) years of experience within the last ten (10) years in electrical repair.

1.3.3.2. Heating, Ventilating and Air Conditioning, and Refrigeration (HVAC/R) Mechanic(s).

The HVAC/R Mechanics shall possess technician licenses issued by ROK Government in mechanical repair (공조냉동 기능사 자격증) with at least three (3) years of experience within the last ten (10) years in mechanical repair and maintenance of HVAC systems.

1.3.3.3. Liquid Fuel Maintenance (LFM) and Petroleum Oil and Lubricants (POL) System Maintenance Technician(s). The LFM and POL Technician shall possess technician licenses issued by ROK Government in Class IV Hazardous Materials (위험물 기능사 제4류) and have at least three (3) years experience within the last ten (10) years in LFM and POL system maintenance.

1.3.3.4. Fire Protection System Technician(s). The contractor shall provide personnel that have the technical expertise, training, and knowledge to competently provide the required services for the specific systems and equipment. Fire Protection System technician shall be factory trained and have a thorough understanding of fire protection systems, operation, testing and inspection requirements outlined by NFPA Codes and Standard, as well as principles and technology of fire detection devices, signal appliances, control equipment and ancillary devices controlled by the system. Technicians shall possess a minimum of three (3) years experience within the last ten

(10) years working with commercial fire alarms and suppression systems and shall possess a technician license in Industrial Fire Systems Management (소방 설비 산업 기사) issued by ROK government.

1.3.3.5. Miscellaneous Certification/Licensing Requirements.

1.3.3.5.1. All contractor personnel operating motor vehicles/equipment must possess a valid ROK or USFK driver’s license. Personnel, who operate a motorized vehicle on the flight line shall be certified for flight line and runway-crossing IAW local policy. Personnel shall be certified prior to operating a motorized vehicle on the flight line.

1.3.3.5.2. All contractor personnel who supervise or perform pest control operations independent of direct supervision shall have current certification for all pesticides and herbicides used and shall be certified to the standards of ROK government certification requirement.

1.3.3.5.3. All contractor personnel handling hazardous material must be certified by appropriate U.S. Government agencies. The U.S. Government may recognize civilian certification as proper certification. ROK certification in Craftsman in Hazardous Materials (위험물 기능사) is acceptable. The strictest certification between U.S Government and ROK Government will be applicable for this contract.

1.3.3.5.4. All contractor personnel maintaining backflow protection devices must be certified to the standards identified in AFI 32-1066, Plumbing Systems and shall have valid plumbing technical licenses (배관기능사) issued by ROK government. The contractor shall coordinate with the COR for certification and recertification.

1.3.3.5.5. All contractor personnel who are welders shall have valid welding technical licenses (용접기능사) issued by ROK government.

1.3.3.5.6. All contractor personnel who operate boiler plant shall have valid boiler maintenance technical licenses (보일러 기능사) issued by ROK government.

1.3.3.5.7. All contractor personnel who operate water plant shall have valid water treatment plant operations technical licenses (정수시설운영관리사) issued by ROK government.

1.3.3.5.8. All contractor personnel who perform painting work shall have valid technician licenses in architectural painting (건축도장기능사) issued by ROK government.

1.3.3.5.9. All contractor personnel who perform carpentry work shall have valid technician licenses in architectural carpentry (건축목공기능사) issued by ROK government.

1.3.4. Appearance/Identification. Contractor personnel shall present a neat and clean appearance as the job they perform allows. The contractor shall ensure each employee wears an identification badge that shall include the employee’s name, title, employee’s photograph, and contractor’s name. Badges shall be worn upon first day of employment. Badges shall be displayed on a worn outer garment (except when safety is an overriding factor) while working.

The contractor’s badge does not replace base access badges issued by the USFK/ROK Air Force.

It is the contractor’s responsibility to acquire base access badges for its employees at each location.

1.3.5. Employee Training. The contractor shall provide all employees training. The contractor shall establish and implement a Training Plan to ensure employees are trained to perform the requirements of this PWS and the Contractor’s Quality Control Plan. The Training Plan shall be submitted to the COR at the Post-Award Conference.

1.3.6. Operations Safety. The contractor shall not employ persons, including any sub-contractors, for work on this contract who have been identified as potential threats to the health, safety, security, general well-being, or operational mission of the installation and its population.

The contractor shall ensure employees follow all safety and environmental warnings. Where understanding and discussing safety and environmental warnings are an integral part of a contract employee’s duties, contractor shall ensure that the employee is able to comprehend and follow such warnings.

1.3.7. First Aid Training. Ensure all electrical systems personnel receive cardiopulmonary resuscitation (CPR) training from qualified trainers. Employees shall be certified annually.

1.3.8. Labor Disruption/Strike Plan.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .